HomeMy Public PortalAboutChange Order No. 3 to Contract No. 10-2016 - Metro- Construction for Elstro Plaza-Muhlenkamp CorpR AIA Document c7orM—zoos
Change Order
PROJECT (Name and address)
Jack Elstro Plaza
TO CONTRACTOR (Name and address):
CHANGE ORDER NUMBER: 003
DATE: July 13, 2016
ARCHITECT'S PROJECT NUMBER: 141341
OWNER:
ARCHITECT:
CONTRACTOR:
Muhlenkamp Building Corporation CONTRACT DATE: February 11, 2016 FIELD: ❑
200 East Vine St. CONTRACT FOR: General Construction
Coldwater, OH 45828 OTHER: ❑
THE CONTRACT IS CHANGED AS FOLLOWS:
(Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives)
Provide bathroom fixtures as noted in PR 003 and PRO03 pricing attached.
The original Contract Sum was $ 2,095,670.00
The net change by previously authorized Change Orders $ 9,421.00
The Contract Sum prior to this Change Order was $ 2,105,091.00
The Contract Sum will be increased by this Change Order in the amount of $ 4,919.00
The new Contract Sum including this Change Order will be $ 2,110,010.00
The Contract Time will be increased by Zero (0) days.
The date of Substantial Completion as of the date of this Change Order therefore is unchanged.
NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have
been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and
Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
Rundell Ernstberger Associates Muhlenkamp Building Corporation City of Richmond
ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name)
618 E Market Street, Indianapolis, IN
46202
AD ESS
B (Signature
Cecil Penland
(Typed name)
?-1,4 - I !
DATE
200 East Vine St., Coldwater, OH 45828
ADDRES
(Si ature
Kerry Muhlenkamp
(Typed narpe) /, _
DATE
50 North 5th St., Richmond, IN 47374
AD
BY (Signature)
(Typed
Typ -/y /�
U
DATE
AIA Document G701 TM — 2001. Copyright 01979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA'
Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA° Document, or any
portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was
produced by AIA software at 12:06:28 on 07/13/2016 under Order No.7631050404_1 which expires on 08/21 /2016, and is not for resale.
User Notes: (1112102497)
,f.l.wAIA Document G709"" - 2001
Work Changes Proposal Request
PROJECT (Name and address):
Jack Elstro Plaza
OWNER (Name and address):
City of Richmond
50 North 5th St.
Richmond, IN 47374
FROM ARCHITECT (Name and
address):
Rundell Ernstberger Associates
618 E Market Street
Indianapolis, IN 46202
TO CONTRACTOR (Name and
address):
Muhlenkamp Building Corporation
200 East Vine St.
Coldwater, OH 45828
PROPOSAL REQUEST NUMBER: 003
DATE OF ISSUANCE: June 14, 2016
CONTRACT FOR: General Construction
CONTRACT DATE: February 11, 2016
ARCHITECT'S PROJECT NUMBER: 141341
OWNER:
ARCHITECT:
CONSULTANT: ❑
CONTRACTOR:
FIELD: ❑
OTHER: ❑
Please submit an itemized proposal for changes in the Contract Sum and Contract Time for proposed modifications to
the Contract Documents described herein. Within Seven (7) days, the Contractor must submit this proposal or notify
the Architect, in writing, of the date on which proposal submission is anticipated.
THIS IS NOT A CHANGE ORDER, A CONSTRUCTION CHANGE DIRECTIVE OR A DIRECTION TO PROCEED WITH THE
WORK DESCRIBED IN THE PROPOSED MODIFICATIONS. �/ J JwDESCRIPTION (Insert a written description (f the Work): l/���L�i� l J�
Provide the following fixtures in addition to or in lieu of the originally specified fixtures. //�--
"" Hand Dryers: Xeclerator, Model XL-SB, 20 volt
✓ Faucets: Sloan EFX375.002.000 t" &" Q
Soap Dispensers: As Originally Specified -No Change (Bobrick B-8221)
Toilet Paper Dispenser: B-4288 Pa Q "4_ �.n..._ dt' a.:•.�
Sanitary Napkin (Women's Restroom, Each Stall): Bobrick B-270
Litter Receptacle: Bobrick B-277 (Please note the former model was a combination letter receptacle and towel
dispenser.)
ATTACHMENTS (List attached documents that support
REQUESTED BYTHEARCHITECT:
Cam""'' 1 tre
(Signature)
Cecil Penland, Principal
(Printed name and title)
AIA Document G709TM — 2001. Copyright ® 1993 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA's Document is
protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this Al a Document, or any portion of it, may
result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA
software at 17:21:28 on 06/1412016 under Order No.7631050404_1 which expires on 08/21/2016, and is not for resale.
User Notes: (1446607201)
m
�
F
m
c c
Sw
S Z
W
22
T
CO CD CD CO
V
Z 00
O O O O O O
OOOOOOOOOOn
00 N000�000000 O O O 00
a0
CDm
a
a
o�
F
O O O O 0�0000000000000000000� 000000 O O O O OI
II rn
0 0 0 0 0 0
0 000000oao0o00000000000000 0 0 0 0 0
F
a
w
sy
a
O O O O O O
000000000000000 N0000000000 O O O O O
a
co
F
y o
.....
000000
0 0000000oo9)1o0Q0000000a000000000
OG
' O
•-
a
a
3 w
at3
►•
a `'
a
a�
crLsa`-'EEL
ymmmaf)i
m
u
�U
O o O O
Z Z O O
N CO N CM
b C?
Q r
N
N
O
YY
N
L "N
01
L
M
D O
O
M
G c_
N
c N 7
C
O
2 a 2
LL
p,
p V v
U
p my m
W
o
Z
F
oX
K
E
E
a
Wa0
ma'o
O
�m
a
G
O
m�U
IL N 10.0)
G
2
L m
m;UO-
.Q
MItQ)
at � 0.
v,
Q
��+i
cc, C
O
7
u—
7�
y O c
'pG
C n
rn
cra
G. Z
LL S
LL y U Y
o M
1a�;�a
m�
���
R m
c ZL U
n�
F a cco @
� tq�X
mrn
o a n
2 MOO 1 A28i8N 9
co N O M N O
M � <
o � o
_ E
o O 6
CL
m w
c� m
0 o v
F o 0
E
a �
m
to H'� H'�
(n fn
J W N
a
J �
0aaa
0
0
m
0
0
g�
f
4274 Hudson Drive
Stow, Ohio 44224
PHONE: (330) 929-2369 FAX: (330) 929-7854
CORP
Pg. 1 of 1
REVISED CHANGE
ORDER #1
Phone: (41
200 E VINE ST Job Name/Location:
COLDWATER, OH 45828
E-MAIL: kerry-mbC ccD-bright. net
CONTACT: KERRY MUHLENKAMP Fax:
We hereby submit this proposal per the information given and as described herein:
DELETE:
FURNISH & INSTALL THE FOLLOWING AS MANUFACTURED BY: BRADLEY
QTY. MODEL DESCRIPTION
2 2A05 PAPER TOW EL/WASTE RECEPTACLE UNITS - RECESSED
ADD:
FURNISH 8f INSTALL THE FOLLOWING AS MANUFACTURED BY: BRADLEY
QTY. MODEL DESCRIPTION
1678-2000 Date: 6/23/2
JACK ELSTRO PLAZA
47 N 6TH ST., RICHMOND. IN 47374
3 4A10-11 SANITARY NAPKIN DISPOSALS -SURFACE MOUNTED
2 357-35 WASTE RECEPTACLES W/HINGED COVER - SURFACE MOUNTED
FURNISH ONLY THE FOLLOWING AS MANUFACTURED BY: EXCEL DRYER, INC.
CITY. MODEL DESCRIPTION
2 XL-SB AUTOMATIC, BRUSHED STAINLESS STEEL, 120V, XLEF
ADD ALTERNATE:
FURNISH 8 LL THE FOLLOWING AS MANUFACTURED BY: BRADLEY
QTY. MOD DESCRIPTION
6 6324 LIDU4QSOAP DISPENSERS -
ADD:
FURNISH $ INSTALL THE FOLLOWING AS MAN D BY: BRADLEY
QTY. MODEL DESCRIPTION
2 6A01-11 SENSORED FOAM4N5AP DISPENSERS _*S 3 ACE MOUNTED
All malen*`guaranteed to be as specified. All work to be completed in a professional
manner according to standard practices. Any alteration or deviation from above
specifications involving extra costs will be executed only upon written orders, and will
become an extra charge over and above the estimate. All agreements contingent upon
strikes, accidents, or delays beyond our control. Owner to carry fire, tomado, and other
necessary insurance. Our workers are fully covered by Workers' Compensation Insurance.
ADD TOTAL: $800.00
L_ ADD TOTAL: $150.00
Authorized Signature: ` .W66 & L
NOTE: This proposal may be withdrawn by us if
not accepted within 60 days.
PLEASE SIGN AND RETURN ONE COPY OF PROPOSAL UPON ACCEPTANCE:
ACCEPTANCE OF PROPOSAL - The above prices, specifications and SIGNATURE:
to do the work as specified. A written purchase order or subcontract will DATE:
be issued promptly.
I
r►I
NORTH MECHANICAL
CONTRACTING, INC.
C
June 20, 2016
Attn: Kerry Muhlenkamp
Muhlenkamp Building Corporation
200 Vine Street
Coldwater, OH 45828
Re: Jack Elstro Plaza
PR4003 — Replace Lavatory Faucets With Sloan EFX300.502.0010 3324295 plug in type sensor faucets
Mr. Muhlenkamp
North Mechanical Contracting is pleased to offer our proposal of $1,912.00
(One thousand nine hundred twelve dollars and no cents) for the mechanical and plumbing piping work associated with the above
mentioned project. The scope orwork included with this proposal is as listed below.
Scopc of Work:
• Change (6) original Delta Lavatory Faucets model 22C 131 to Sloan model EFX300.502.0010 332495 plug in type
faucets as requested for hard wired instead of the battery style listed on the PR#003
• Labor to install is already included in original scope of work
• I land dryers by others
• Soap despisers by others
• Toilet paper dispensers by others
• Sanitary napkin dispensers by others
• Litter receptacles by others
F,xcludcd:
• Electrical work
• Sales tax
• Any work not specifically listed as included above
Thank you for the opportunity to provide you with this quotation. If 1 can be of further assistance, please do not hesitate to
contact me at (765) 966-0541.
Thank you,
Butch Bowen
Project Manager
2627 N. Emerson Ave. Indianapolis, IN 46218 Phone 317-610-2627 Fax 317-610-2638
Slone�r
e�ecrRic
Electrical Contractors
Muhlenkamp Building Corporation
TO: Alan Hartke
200 E. Vine Street
Coldwater, Ohio 45828
2250 Central Point Parkway • Lima, Ohio 45804
419.222.1109 Phone
419.227.1999 Fax
www.sidneyelectric.com
PROPOSAL
DATE:
QUOTE NUMBER:
June 16, 2016
# 15-5933.1-MPE
We take pleasure in submitting the following proposal in accordance with specifications included herein and subject to the conditions on the reverse side
hereof for acceptance within 30 _ days from above date. Estimated Delivery
RE: Jack Elstro Plaza — Richmond, IN
PR #003
We are pleased to provide the following proposal for the electrical work on the
above referenced project.
Power for Automatic Faucets
• Install one double GFCI receptacle in the wall beneath the counter top in each of two restrooms to plug
in the power supply provided by the faucet supplier.
• Install branch circuits to each double outlet utilizing two of the spare 20A circuit breakers in Panel P1.
Material $ 183.00
Labor $ 808.00
Total $ 991.00
Notes:
1) No cost is included for sales tax, permits, bonding or engineered drawings.
2) This price is based on work performed during normal working hours.
3) Power supplies for the faucet are supplied by others.
Customer Acceptance
Acceptance Date
NECK
•Mi01W IUt14Y Cp1H4(tgK •SSOW�
By-
Title