Loading...
HomeMy Public PortalAboutChange Order No. 4 to Contract No. 10-2016 - Metro- Construction for Elstro Plaza-Muhlenkamp Corp#.,AIA Document G701TM - 2001 Change Order PROJECT (Name and address) Jack Elstro Plaza TO CONTRACTOR (Name and address). Muhlenkamp Building Corporation 200 East Vine St. Coldwater, OH 45828 CHANGE ORDER NUMBER: 004 DATE: July 15, 2016 ARCHITECT'S PROJECT NUMBER: 141341 CONTRACT DATE: February 11, 2016 CONTRACT FOR: General Construction OWNER: ARCHITECT: CONTRACTOR: FIELD: ❑ OTHER: ❑ THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) Provide one additional luminaire and associated bracketing on each of the two southernmost light poles per PR 01. The original Contract Sum was $ 2,095,670.00 The net change by previously authorized Change Orders $ 14,340.00 The Contract Sum prior to this Change Order was $ 2,110,010.00 The Contract Sum will be increased by this Change Order in the amount of $ 3,911.00 The new Contract Sum including this Change Order will be $ 2,113,921.00 The Contract Time will be increased by Zero (0) days. The date of Substantial Completion as of the date of this Change Order therefore is unchanged. NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Rundell Ernstberger Associates Muhlenkamp Building Corporation City of Richmond ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name) 618 E Market Street, Indianapolis, IN 46202 ADDRESS B (Signa ure Cecil Penland (Typed name) -7- 15 - 7W1[0 DATE 200 East Vine St., Cold wate 45828 ADDR SS (Signature) Kerry Muhlenkamp (Typed n me) DATEf 50 North 5th St., Richmond, IN 47374 AD //Iil�Ai� /K✓t/x/.2%t/�ti� BY (Signature) (Typed name) DATE AIA Document G701 TM —2001. Copyright© 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This Ale Document Is protected by U.S. Copyright Law and Intemational Treaties. Unauthorized reproduction or distribution of this AIAe Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 09:56:22 on 07/15t2016 under Order No.7631050404_1 which expires on 08/21/2016, and is not for resale. (2003126890) User Notes: #-AIA Document G709"m - 2001 Work Changes Proposal Request PROJECT (Name and address): Jack Elstro Plaza OWNER (Name and address): City of Richmond 50 North 5th St. Richmond, IN 47374 FROM ARCHITECT (Name and address): Rundell Ernstberger Associates 618 E Market Street Indianapolis, IN 46202 TO CONTRACTOR (Name and address): Muhlenkamp Building Corporation 200 East Vine St. Coldwater, OH 45828 PROPOSAL REQUEST NUMBER: 001 DATE OF ISSUANCE: June 6, 2016 CONTRACT FOR: General Construction CONTRACT DATE: February 11, 2016 ARCHITECT'S PROJECT NUMBER: 141341 OWNER: ARCHITECT: CONSULTANT: ❑ CONTRACTOR: FIELD: ❑ OTHER: ❑ Please submit an itemized proposal for changes in the Contract Sum and Contract Time for proposed modifications to the Contract Documents described herein. Within Seven (7) days, the Contractor must submit this proposal or notify the Architect, in writing, of the date on which proposal submission is anticipated. THIS IS NOT A CHANGE ORDER, A CONSTRUCTION CHANGE DIRECTIVE OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED IN THE PROPOSED MODIFICATIONS. DESCRIPTION (Insert a written description (?/'the Work): Provide one (1) additional ltuninaire and associated bracketing on each of the two (2) southernmost light poles in order to raise light levels within the park and on Sailor Street/Service Drive to the south. ATTACHMENTS (List attached documents that support descrption): REQUESTED BY THE ARCHITECT: Cecil Penland, Principal (Signature) (Printed name and title) AIA Document G709T" —2001. Copyright© 1993 and 2001 by The American Institute of Architects. AN rights reserved. WARNING: This AIA® Document Is protected by U.S. Copyright Law and Intemational Treaties. Unauthorized reproduction or distribution of this AIAe Document, or any portion of R. may � resut In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:03:07 on 06106/2016 under Order No.7631050404_1 which expires on 0812112016, and is not for resale. User Notes: (1767397238) t s m° N Y 'b r fZ W m $ V 0 00000o Ooa000Oot0000000000000000000000 [7 a F O OOOOO OOOOOOOONOOo0000000000oO0O0000 O J 'A 3 Y ::: :......::...... .. .:::::. � . ..... ..:..... 0 O o 0 0 0 0 000000000000000oo00o00a00 O C. 0 0 0 z 'L a a .. 0 0 0 0 0 0 0000000000000000000000000 0 0 0 0 0 a gF i — e� . 0 0 0 0 0 0 m 0000000000000000000000000 0 0 0 0 0 O � LL J 3 w ttpp ebXl 3 ... -. ......:.. .: a c t L .........:.. ...:... oE L ......... .......... , , ....:.. ....... .. ..... E �U o000 .ZZ00 u c4 0 F z 0 m �? = .J � cc w L - r-E ao'T i!L-: a o L Wa m Unoco0 min on � � a co n co r- N m GO 7 m Cl) 0 0 0 stune� eLOCTRIC Electrical Contractors ■ . . Muhlenkamp Building Corporation TO: Alan Hartke 200 E. Vine Street Coldwater, Ohio 45828 2250 Central Point Parkway • Lima, Ohio 45804 419.222.1109 Phone 419.22T1999 Fax www.sidneyelectric.com DATE: QUOTE NUMBER: June 16, 2016 # 15-5933.2-MPE We take pleasure in submitting the following proposal in accordance with specifications included herein and subject to the conditions on the reverse side hereof for acceptance within 30 days from above date. Estimated Delivery RE: Jack Elstro Plaza — Richmond, 1N PR #001 We are pleased to provide the following proposal for the electrical work on the above referenced project. Added Luminaires • Provide and install one additional luminaire and associated bracketing on each of two southernmost light poles. Material $ 2,875.00 Labor $ 270.00 Total $ 3,145.00 Notes: 1) No cost is included for sales tax, permits, bonding or engineered drawings. 2) This price is based on work performed during normal working hours. Customer Acceptance NECX Acceptance Date Title