Loading...
HomeMy Public PortalAboutAB 19-105 DC-PH-2A contract awardMcCALL CITY COUNCIL 216 East Park Street AGENDA BILL McCall, Idaho 83638 Number AB 19-105 Meeting Date May 23, 2019 AGENDA ITEM INFORMATION  SUBJECT: Request to Award the McCall Downtown Core Reconstruction - Park Street and Veteran’s Alley – Phase 2A Surface Improvements contract to Knife River Corporation Department Approvals Initials Originator or Supporter   Mayor / Council     City Manager     Clerk     Treasurer     Community Development     Police Department     Public Works  Originator   Golf Course    COST IMPACT: Approximately $1,072,000 Parks and Recreation    FUNDING SOURCE: Streets LOT: ~$431,000 Water Department: ~$204,000 PLRWSD: ~$437,000 Airport      Library    TIMELINE: Summer-Fall 2019 Information Systems      Grant Coordinator    SUMMARY STATEMENT: The McCall Downtown Core Reconstruction – Phase 2A - Park Street and Veteran’s Alley project consists of sub-surface water, sewer, stormwater utility replacement/reconstruction that will occur on Park Street and Veteran’s Alley (behind Umpqua Bank and Hometown Sports). Attached is the plans cover sheet and overall site plan of the project that identifies the proposed utility improvements. The project is being completed in collaboration with the Payette Lakes Recreational Water and Sewer District to maximize efficiency and minimize cost. PLRWSD will be considering awarding their portion of this project at their meeting on 5/21/19. The project (2A) is the first half of Phase 2 of the Downtown Core Reconstruction project. Phase 2A (subsurface utilities) will be constructed during summer and fall 2019. Phase 2A will require at least 63 days to construct and will begin in late July and be completed in mid-October. A second half (Phase 2B) is planned for Summer 2020. Phase 2B will reconstruct the surface infrastructure (roadway, on-street parking, sidewalks, landscaping, illumination) on Park Street and Veteran’s Alley. During April 2019, the City, with the assistance of Horrocks Engineers, conducted formal bidding for the Park Street and Veteran’s Alley – Phase 1B Surface Improvements construction contract. The bid opening was held on May 1, 2019. One responsive bid, by Knife River Corporation was received. Attached is a letter from Horrocks Engineers providing their recommendation for contract award, and a discussion regarding the bid results. Also attached is a draft version of the Contract. A final version of the Contract will be provided at the meeting.  RECOMMENDED ACTION: Award the Park Street and Veteran’s Alley – Phase 2A Surface Improvements contract to Knife River Corporation in the amount of $1,072,141 and authorize the Mayor to sign all necessary documents.  RECORD OF COUNCIL ACTION  MEETING DATE ACTION  2018-7-24 AB-18-136: Downtown Core Phase 1A Contract Award  2018-7-24 AB-19-045: Downtown Core Phase 1B Contract Award