HomeMy Public PortalAbout100_061_Thomas and Hutton - Engineering Agreement for Force Main #7 THOMAS & HUTTON
50 PARK OF COMMERCE WAY I SAVANNAH, GA314055
912.234.534¢ l WWW.THOMASANDHUTTON.COM
June 12, 2014
Ms. Diane Schleicher
City of Tybee Island
403 Butler Avenue
Tybee Island, GA 31328
Re: City of Tybee Island, GA
Letter Agreement for Services
Additional Services for Lift Station #7
Force Main Replacement
Dear Ms. Schleicher:
Pursuant to our discussion at the May 8, 2014 Infrastructure Committee meeting, you
requested Thomas & Hutton perform the following scope changes, which were not included in
our original contract: Design, permitting, and construction phase services for Lift Station # 7
force main replacement.
The project will consist of approximately 2,700 linear feet of 6-inch C-900 PVC force main
and appurtenances, connecting to the existing force main in front of Lift Station #7 along US
Hwy 80 from Campbell Avenue to Jones Avenue. A directional drill is proposed for the marsh
crossing and potentially for the entire installation of pipe within the Georgia DOT right-of-way to
reduce surface impacts. The force main plans and specifications will be incorporated into the
existing Jones Avenue Water and Lift Station #6 Sewer improvement projects currently under
construction and the proposed Lift Station #7 force main project will be completed as a
Change Order to the existing project. By completing as part of the existing project, the
engineering services typically required for a stand-alone project will be greatly reduced, thus
saving costs within the budget for construction within the GEFA-funded contract.
A. Survey Phase
Based upon concept plan approved by the Owner. Consultant will perform the
following Survey Phase tasks:
1. Topographic Survey
Surveyor shall prepare a topographic survey of the site for use in planning
and engineering design. Surveyor shall obtain vertical and horizontal
data in a roughly 30-foot wide grid along the force main route, from
parking lane to edge of right of way on the side selected by Owner for
installation of the force main. Surveyor shall field locate known visible
utilities and drainage within the project limits. If underground utility locates
are needed, a separate proposal can be prepared based on the needs
of the Client. No other survey tasks (easements, etc.) are included at this
time.
Ms. Diane Schleicher
City of Tybee Island
Letter Agreement for Services
June 12, 2014
Page 2
B. Design Phase
1. Engineering Design
After completion of Survey Phase and Owner approval, the Consultant
shall prepare site development plans. These plans shall be submitted to
the Owner for review. The site development plans will include:
• Force Main Plan and Profile (2 sheets) -pipe route and size, air release
valve location, including preparation of design calculations.
• Erosion Control Measures - for sewer systems - include on the plan
sheets
• Quantity Takeoff and Opinion of Probable Construction Cost for sewer
systems.
Construction and erosion control details within the existing drawings will be
utilized.
C. Permit Phase
1. Permits
Agency submittals anticipated for this project include:
• Georgia EPD - sewer line construction & NPDES construction permit
(see below)
• City of Tybee Island
• US Soil Conservation S ervice - erosion control report of technical
review
• Georgia Department of Transportation- parallel encroachment along
Hwy 80
Submittal fees are not included in our fee schedule and shall be provided
by the Owner at the time of submittal. Consultant will assist Owner in
obtaining construction permits for the project. This phase includes revising
plans and specifications according to agency comments and if
requested, meeting with the agencies on behalf of the Owner.
2. Erosion Control Permit
Consultant will assist the Owner in compliance with the requirements of
the permit to Discharge Storm Water Associated with Construction
Activity. This will require an update to the existing erosion control permit to
include an additional 0.6 acres of disturbance.
Ms. Diane Schleicher
City of Tybee Island
Letter Agreement for Services
June 12, 2014
Page 3
D. Construction Phase
Consultant will provide the following services for the Construction Phase:
1. Bid Process
No bid phase services will be required. Project shall be handled as a
change order to the existing project.
2. Construction Services
Construction observation shall be expanded for the additional area.
Construction observation and monitoring does not include exhaustive or
continuous on-site inspections to check the quality or quantity of the
Contractor's work. However, it does include visits to the project site at
intervals appropriate to the various stages of construction to review
general compliance with approved plans and specifications. Such visits
and observations shall not require Consultant to assume responsibilities for
the means and methods of construction, nor for safety measures or
conditions on the job site. Both parties understand that the Contractor
has notification requirements at specific intervals of the construction
process.
The Consultant provides construction services for the work designed by
the Consultant. Other construction work that may occur on site is the
responsibility of other design professionals or the Owner and expressly not
the responsibility of the Consultant.
3. Record Drawing Preparation
Consultant shall prepare record drawings for the additional area and
include in the overall set of record drawings for the combined project.
In order to provide the additional scope of work specified, we request a modification of
our contract. Our fee to perform the described scope is as follows:
Fee or Time &
Phase Fee Structure Expense Budget
Survey: Lump Sum $ 5,500.00
Design: Lump Sum $ 7,200.00
Permit: Lump Sum $ 6,500.00
Construction: Lump Sum $ 5,000.00
Post-Construction: Lump Sum $ 900.00
Additional Services: Time & Expense
Ms. Diane Schleicher
City of Tybee Island
Letter Agreement for Services
June 12, 2014
Page 4
If acceptable, please indicate your authorization to proceed with this additional work by
signing and initialing where designated below and returning a copy to us for our files. This
proposal will be open for acceptance until July 31, 2014, unless changed by us in writing. Please
note that no work will be performed without prior written authorization to proceed. This extra
work is subject to the terms and conditions of the contract executed for this project dated June
10, 2013
This proposal between the City of Tybee Island (Owner), and Thomas & Hutton
Engineering Co. ("Consultant" or "Engineer"), consisting of the Consulting Services on a Time &
Expense Basis Rate Sheet and Exhibit "A," represent the entire understanding between you and
us with respect to the scope change. This agreement may only be modified in writing if signed
by both of us.
We appreciate this opportunity to be of service to you on this project. Should you have
any questions or need further information, please do not hesitate to call on us.
Very truly yours,
THOMAS & HUTTON ENGINEERING CO.
By JCL
A. Christopher Stovall, P.E.
Project Manager
ACS/kbw
Enclosures: Exhibit "A" Additional Services of Consultant
Consulting Services on a Time & Expense Basis Rate Sheet
ACCEPTED: , 2014
By -
TITLE
EXHIBIT"A"TO LETTER AGREEMENT FOR SERVICES
BETWEEN THOMAS&HUTTON ENGINEERING CO.(CONSULTANT)AND CITY OF TYBEE ISLAND(OWNER)
ADDITIONAL SERVICES FOR LIFT STATION#7 FORCE MAIN REPLACEMENT .TUNE 12,2014
EXHIBIT "A"
ADDITIONAL SERVICES OF CONSULTANT
If authorized by Owner in writing, Consultant shall furnish or obtain from others, Additional
Services of the following types that are not considered normal or customary Basic Services.
1. Revising previously fully approved and accepted studies (by regulatory agencies),
reports, design documents or Contract Documents when such revisions are due to
causes beyond Consultant's control.
2. Furnish the services of special consultant for other than the civil or structural engineering
defined in the scope of services. Special services such as mechanical or electrical
engineering, geotechnical exploration, underwater investigation, laboratory testing
and inspections of samples, materials, and equipment.
3. Preparing to serve or serving as a consultant or witness for Owner in any litigation, public
hearing or other legal or administrative proceeding involving the project.
4. Services after completion of the Construction Phase, such as inspections during any
equipment, material, or construction guarantee period and reporting observed
discrepancies under guarantees called for in any contract for the project.
5. If requested by Owner and agreed to in writing, a Resident Project Representative will
be furnished and will act as directed by Consultant in order to assist in observing
performance of the work of Contractor(s). Through more extensive on-site observations
of the work in progress by the Resident Project Representative, Consultant shall
endeavor to provide further protection for the Owner against defects and deficiencies
in the work of Contractor(s). However, the furnishing of such representation will not
make Consultant responsible for construction means, methods, techniques, sequences,
procedures or for safety precautions or programs, or for Contractor(s), failure to perform
their work in accordance with the Contract Documents.
Owner's Initials
��j� Consultant's Initials
ler
> Q g
a t 7, 5 5 P. 2. Q c0
CO CD N dl 00 y Ti;
co� � '9 - i4
4 0
v
C g C N
C2
0.,
as m ZS id `> ��— = _ — tu
_ [® - m
Q Y ` a 7= x cc CC x V a Isi
(D i3 C m LL LL LL it m ti co 0
V :a C C.] .0 C C m
•■ N, 7 Q y 111; 2
U) W A CD
Cl) Gf m C _
N 7 7 = _ - - — — — C cG
C U 8 O E 2 & & & $ $ a -1,' a 2 .g C co
N i 0 W 0 c Cl) Cl) c0 0) CO Cl) CO V) G 2 I- h I-' _ m r
rii CS C7 CJ C7 CS C7 C7 CS C7 r.0 0 0 ca
�w cs c� c` .0 c U
_ m
m .. C
8 - _ al al c
z
rn. o - 4
0 0 7, 2
o _I-CD a 7 d Co_ m III o O a`1 94 m 7 a q, Q7 Q
I- a J '
3 C L UJ ry U V,
>. O 67 C E_9
r> 2 as p p'w
0 -
c 0 Qe
ZllfliflJ4JJllfl hUh cal
s r o Cr,a r m —
x c t ua tin a =.2 =.Q '�'.'E. . e i c `�` c ` a n. �7 r, cc m
n °7 5 a�a encna �nau)acn�sna� 'n ('nom ran Cq m _, iff_c r'
05 ., E o c -
I Q N 7) s P B co)
<I( =I ca TS 9 U C Q a m -
Z7 7 — 0 c e y C Cr)
3 — — 0 ? H
0 g g e .1.1 2
v o ® 55 I m we5w u aErn ' E �:
• R 1 1. R ° [ Q N C G O
I
] E 2'> o > 6
Lu=, C ry Q c (3 U qw cG [)t m
v°r ° z t w w w u5 (2 m as 2 �, m cT,
IE a uU1 't o¢ cr C =
s i 8 a ti ff Ill §,
as or es. 4/9, va .60- 04. rs vs to ar r vs at w iil !
Q p
Owner's Initials
Consultant's Initials