Loading...
HomeMy Public PortalAbout100_081_GMP 7.2.14 - Tybee Public Safety Building TOTAL PROJECT BUDGET Project: Tybee Island Public Safety Building Institution: City of Tybee Island Project No.: 13.013 Location: Tybee Island, Georgia Start Date: 12/23/13 Architect: Greenline Architecture Revised: 7.2.14 A. CONSTRUCTION 1. Total Construction- Hard Costs (based on 14,920 s.f.) $2,370,192 2. GC/CM Proposed Costs Preconstruction Services (Fee, Costs&Expenses)0.5-0.85% 1.5734% $44,054 GC Fee (3.5%-4.5%) 5.00% $140,000 General Conditions (8%-9.5%) 8.00% $260,479 3. Total for Construction (referred to as Stated Cost Limitation) 14.57% $2,814,725 4. Relocation & Upgrades to Existing Fuel Pumps $130,502 5. Security System-Allowance for Equipment and Wiring $136,019 Total Guaranteed Maximum Price for Construction $3,081,247 Increase in GMP for CO#1 $ 14,566 B. PROJECT OVERSIGHT(RCI, PM, ETC.)-NOT USED C.ARCHITECTURAL&ENGINEERING SERVICES Design Services 1 Design Documents&Contract Administration (Basic Building Design) $156,180 Lead Architect/Architect of Record Civil Engineering Landscape Design MEP Engineering Structural Engineering 2 Assist with CM at Risk $7,000 3 Special Consultants (by Owner) Audio/Visual/Security 0.00% $0 Technology/Data 0.00% $0 4 Reimbursable Expenses (Fixed Fee) $2,000 Total for A&E Services 0.00% $165,180 D. LOOSE EQUIPMENT (estimate) 1. Fixtures, Furnishings& Equipment+ Design 0.00% $20,000 2. Total for Loose Equipment 0.00% $20,000 E.TESTING, SURVEYS, ETC-Subject to Contingency Allowance 1. Engineering Data, Surveys, Geotech.Testing,etc. (1%of"A4"w/a min. of$6,500 and a max. of$400,000) 2. Extra Drawings&Specifications (0.05%of A4 w/a min of$1,000 and a max of$40,000) 3. Special Inspections Testing $13,533 Total for Testing 0.00% $13,533 F. OWNER CONTINGENCY(on Items"A"through "E") 1. New Construction 2.00% $61,625 2. Design Contingency (Rounding) 0.00% $0 Total Contingency 2.00% $61,625 Estimated Cost for Garbage Removal and Testing $48,587 Extra Structural Improvement Costs $23,829 Amount Over Contingency $10,791 G. SPECIAL COSTS- Not Subject to Contingency 1 Dispatch radio and communications $ 30,000.00 2 Asbestos Abatement&Demolition of Existing Buildings $ 32,630.00 3 Relocating power poles and Transformer by GA Power $ 24,594.00 4 Relocate AT&T Service $ 25,476.00 5 Boring and Conduit pathways for AT&T service $ 2,134.00 6 Relocate Comcast Service $ 2,000.00 7 Relocate Comcast Broadcasting Facilities $ 9,981.00 8 Parking Lot Lights-will lease from Ga Power $ - 9 Relocate CEMA Siren $ 2,000.00 10 Upgrade to Existing Site Survey $ 2,400.00 11 AV equipment&cabling FY 15 GF Budget* 12 Data&Communicatin cabling $ 12,908.00 13 Relocation of Existing 911 Center(AT&T Proposal) FY 15 GF Budget* 14 Coastal SWCD $50 15 Commissioning (0.5%- 1.5%) 0.00% $0 Total Special Cost 0.00% $144,173 H. CURRENT TOTAL PROJECT COST (SPLOST Portion) $3,511,115 FY 13&FY 14 Project Costs $1,536,014 Balance of Project Cost: $1,975,100 *911 System Cost: $134,552 FY 15 General Fund $134,552 *AV equipment and cabling estimate: $100,000 FY 15 General Fund $100,000 TOTAL PROJECT COST INCLUDING GENERAL FUND $3,745,667 Note: Original project costs(SPLOST Portion): 3,500,324 Current project costs(SPLOST Portion): 3,511,115 Difference: 10,791