HomeMy Public PortalAbout12-0028 Fannie's on the BeachDATE ISSUED: 01 -31 -2012
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
INSTALL SERVICE WINDOWS
1613 STRAND
FANNIE'S ON THE BEACH
PO BOX 39
TYBEE ISLAND GA 31328
FANNIE'S ON THE BEACH
PO BOX 39
TYBEE ISLAND GA 31328
U
$ 390.00
$1,500.00
PERMIT #: 120028
TOTAL BALANCE DUE: $ 390.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
C Oth
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
\ 2 -0028
on I -31 -1 c4�er��,i
loco-:nC1��kf aPP o
Cs
Location: 1 Co 4 3 5-r,L7 J-
NAME
ADDRESS
PIN #
TELEPHONE
Owner
A) T (i�1
t�'�`�►t
?` CI - 6
j 9
39
q � Z-
--5
Architect
or Engineer
I
Building
Contractor
(C ck all that apply)
Repair
❑ Renovation
❑ Minor Addition
❑ Substantial Addition
❑ Other
❑ Residential
❑ Single Family
❑ Duplex
❑ Multi - Family
❑ Commercial
❑ Footprint Changes
n Discovery
❑ Demolition
21
Details of Project: � J-� - .0(Q (;1
rlAUfl y--(A/1 GG)p i ce-i440( -Yv 1 1- L
Estimated Cost of Construction: $ //c0 6 0 l&ACrA4.) S
(Enter appropriate number)
(1) W... •• : (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units # Bedrooms # Bathrooms
Lot Area Living space (total sq. ft.)
# Off - street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.) With culvert? With swale?
Setbacks: Front Rear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through /f /k-
On -site waste and debris containers will be provided by Il.i
Construction debris will be disposed bye by means of . " t,5,tt ttL_- j c-I/(
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. 1 accept
responsibility for any corrective action that may be necessary t• - • - . rainage impai = • by this
permitted construction.
Date: `% ( Signature of Applicant
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning /variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
NFIP Flood Zone
Existing
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date
Zoning Administrator
Code Enforcement Officer
Water /Sewer
o� ar. Storm/Drainage
Q 6 S �' +' a\Inspections
C tqr. t.7 City Manager
c G a e_R e. K h d s o^ -erzs 6e # (�4-o
C/ cC C$6-5)(2 1-. + 415--2.:.* 3o at(
-10s # 25D g° Tern-A" - c 3R0
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL
LEAD -BASED PAINT
Adapted from http: / /www.epa.gov/lead /pubs /renovation.htm. Please use that site to access the following information.
Information for Property Owners of Rental Housing, Child- Occupied Facilities
Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space
rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard
information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers,
and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample
pre- renovation disclosure form may be used for this purpose.
After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented
by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation,
Repair and Remodeling rule. To become certified, property owners must submit an application for firm
certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for
certification to approve or disapprove the application.
Property owners who perform renovation, repairs, and painting jobs in rental property should also:
• Take training to learn how to perform lead -safe work practices.
• Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeepinq checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010.
Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
Information for Homeowners Working at Home
If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project.
However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home
and planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1 -800-
424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint.
Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools
As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is
performed in your home, or in the child care facility or school that your child attends.
• Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants
sign a pre- renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information
pamphlet.
•
Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of
children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child
care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet.
Information for Contractors
As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create
dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation,
repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and
child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families,
Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre- renovation disclosure form may
be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work
practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm
certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application.
Contractors who perform renovation, repairs, and painting jobs should also:
• Take training to learn how to perform lead -safe work practices.
• Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair,
and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may
take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to become a
certified renovator. Click here for a list of eligible courses.
• Provide a copy of your EPA or state lead training certificate to your client.
• Tell your client what lead -safe methods you will use to perform the job.
• Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010.
• Ask your client to share the results of any previously conducted lead tests.
• Provide your client with references from at least three recent jobs involving homes built before 1978.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements.
• a out how to c. .ly with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
• Read ab'lut how V . lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
SignatV
�� Date
IF YOU'RE NOT
L1.0 SA;1 CFR,FIF0
.DISTURBING
JUST SIX
SQUARE FEET
"COULD COST YOU
BIG TIME
Printed Name
Permit Acknowledgement of
Asbestos /Environmental Notification to Georgia EPD for
Projects involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
a/. _J
lino .
ted Name
Date
Office Use Only:
Project Address:
Permit Number:
FANNIE'S ON THE BEACH
1613 STRAND
TYBEE ISLAND, GA 31328
PAY
TO THE
ORDER OF
2139
DATE /" ✓ ( /
$0,
DOLLARS
Ro
FOR
THE SAVANNAH BANK N.A.
/ TYBEE ISLAND, GEORGIA 31328
/
"002L391
1:06 L 2046 54o:
FANNIE'S ON THE BEACH
1613 STRAND
TYBEE ISLAND, GA 31328
PAY
TO THE
ORDER OF
DATE
..luo xr.�uii... _ .rzre.re .uu ..
/0 -13 Y/
2146
64- 465 -612
DOLLARS Ll ""�",.•
FOR
THE SAVANNAH BANK N.A.
ISLA 31328
��
s z 2
000 2 L4611' 1:06 L 2046540:
COMMUNITY DEVELOPMENT DEPARTMENT
P.O. Box 2749 • 403 Butler Ave. • Tybee Island, GA 31328
Phone (912) 786 -4573 • Fax (912) 786 -9539
FEES
Accessory Structure r $100
• with electrical: additional $40 + $5 per $1000*
• with plumbing: additional $40 + $5 per $1000*
Administrative Approval of Minor Subdivision
Clearing & Grading
Cell Tower
Demolition
Discovery / Tearout (fee applied to construction permit)
Dock/Crossover - Commercial
Dock/Crossover - Residential
$125
$75
$2,000
$250
$50
$250 + $8 per $1000*
$100 +$5 per$1000*
Driveway, Patio $50 + $5 per $1000*
Electrical $50 + $5 per $1000*
Fence $50 + $5 per $1000*
Infrastructure $250 + $8 per $1000*
Land Disturbance $150
Map Amendment, Text Amendment, Site Plan - Major Commercial,
Special Review, Subdivision, Zoning Variance - Commercial $500
$50 + $5 per $1000*
$50 + $5 per $1000*
$50
$250
$32
Mechanical
Plumbing
Reinspection (each additional after two failures)
Relocation of Structure
Returned Check
it. Water Tap / Meter #
Capital Cost Recovery
per water meter
3/4" $670.00
1" $938.40
1 -1/2" $1,693.00
2" $2,007.60
Above 2" determined by City Mgr. '
Sewer Stub #
4" $550.00
6" $818.40
8" $1,573.00
# Installation of line and meter shall be
the responsibility of the applicant
$2,000.00
J
2l3e1- 2' 3
if t
Sign - Banner $1
• with electrical: additional $40 + $10 per $1000*
Sign - Permanent $75 + $10 per $100
with electrical: additional $40 + $10 per $1000*
Sign - Temporary
• with electrical: additional $40 + $l0 per $1000*
Site Plan — Residential; Minor Commercial (to amend a Site
approved within the prior 3 years)
Sprinkler, Fire Suppression
Street Cut
5
$50
Plan that was
$250
$100 + $1 per sprinkler head
$75 + $500 (2 -year refundable LOC or bond)
or 110% of the value of the work, whichever is greater
Swimming Pool - Commercial $250 + $8 per $1000*
Swimming Pool - Residential $100 + $5 per $1000*
Temporary Structure $100
• when plan review required: additional $250 (not applied to permit fee)
Tree Removal - Dead Tree
Tree Removal $50 + $50 /inch if required to mitigate
Well - Deep $100
Well - Shallow $50
49 Work Without a Permit $250 + double all fees
Zoning Variance - Residential $200
All of the above include two inspections per phase * Starting after first $1000
$15
'Construction
Plan Deposit (applies to all plan reviews) $250
• fee applied to permit; forfeited if abandoned
Building Permit - Commercial
$499 or less $50
Construction $500 - $1000 $75
Construction $1001 or higher
$100 for first $1000 +$8 per $1000 + inspection fee
Building Permit - Residential
$499 or less — work by owner $0
$499 or less — work by contractor $50
Construction $500 - $1000 $50
Construction $1001 or higher
$50 for first $1000 + $5 per $1000 + inspection fee
New construction value = $100 per heated sq. ft.
Inspection ($15 minimum) $3 per $1000
Reinspection $50
Aid to Construction - Commercial - -- -see Sec. 70 -33
Aid to Construction - Residential
New $1 per sq. ft.
Building Addition 50¢ per sq. ft.
Engineering Services
varies by project
MOV
fees effective 07/14/2011
560- 2 -3 -.17 Outside Delivery of Drinks.
(1) A Retail Consumption Dealer shall not sell or permit the sale of Alcoholic Beverages
except within the licensed Place of Business under its exclusive custody and control.
(2) For purposes of this Regulation the term "Licensed Premises" shall also include an
area that is directly adjacent and contiguous to the licensed Premises provided the area:
(a) Is approved by the Local governing authority;
(b) Has the same address of as the licensed Premises;
(c) Is owned or leased and is exclusively controlled by the Retail Consumption Dealer;
(d) Is not public domain;
(e) Is served from the same bar or serving location that permanently services the leased
Premises.
(3) Any area not under the exclusive custody and control of the Retail Consumption
Dealer shall not be considered a part of any licensed Premise.
(a) Alcoholic Beverages may not be sold, served, or delivered in, into, or within such an
area.
(4) Any area under the exclusive custody and control of the Retail Consumption Dealer
that is not directly adjacent and contiguous to the licensed Place of Business shall not be
deemed part of the licensed Place of Business and is subject to Regulation 560- 2- 3 -.12.
(5) A Retail Consumption Dealer shall be responsible for:
(a) All sale, delivery, or service of Alcoholic Beverages through any window, door, or
other opening in the licensed Place of Business;
(b) Consumption and possession of all Alcoholic Beverages by any Person located on the
licensed Place of Business.
Authority O.C.G.A. Secs. 3 -2 -2, 5A -302, 91A -215. History. Original Rule entitled "Shipment Through
Georgia" adopted. F. and eff. June 30, 1965. Repealed: New Rule entitled "Separation of Georgia
Products" adopted. F. May 5, 1982; eff. May 25, 1982. Repealed: New Rule entitled "Outside Delivery of
Drinks" adopted. F. Oct. 1, 2010; eff. Oct. 21, 2010.
//191 2
441 14, ce
S-�-Q212
ac15."' S
h0A-es
--c;(e_ tdes
-1=4 NjV!E-S
c_,21,( Thit
lAutti
C) °
/we /W2kt
11 `/ ,1J /n D tN
WO CV) J n-4 ko v
a ant,- e
'f
C r C - v $ 0 / 1 0 4 w i LQD 511-t Q,, ( 64
0/).04/(- flutrziAr.7
Fannies Tybee no permits
17 images, October 2011
r n
Ikuall
111 Ows
Tippr
a� �
1613 Strand, Tybee Island, GA - Goo Maps
Go
\De To re,
Silver Avenue / Strand Avenue, Tybee Island Georgia Uni
Address E approx,rnate
Page 1 of
To see all the details that are visible on the
screen, use the "Print" link next to the map.
http: / /maps.google.com /maps ?hl =en &client = dell - usuk -rel &channel =us &tab =wl &q= 10/7/20
LEGAL NOTICE
CITY OF TYBEE ISLAND
VIOLATIONS) j$Crogg& _lor!
PERMIT NO.
WHEREAS, VIOLATIONS OF THE CODE OF THE CITY OF
TYBEE ISLAND HAVE BEEN FOUND, NOTICE IS HEREBY
GIVEN THAT ALL PERSONS CEASE, DESIST FROM, AND
STOP WORK
AT ONCE ON ANY CONSTRUCTION, ALTERATION, REPAIR, OR
FURTHER USE OF THESE PREMISES KNOWN AS
313 sraThab •got� %
UNTIL THE VIOLATION HAS BEEN CORRECTED AND APPROVED
BY THE CITY OF TYBEE ISLAND. ALL PERSONS ACTING
CONTRARY TO THIS NOTICE OR REMOVING OR MUTILATING IT
ARE LIABLE TO SUMMARY ARREST UNLESS SUCH ACTION IS
AUTHORIZED BY THE CITY OF TYBEE ISLAND.
DATE WHO PHONE
INSPECTOR