HomeMy Public PortalAbout12-0019 MaierCity of l,.iee Island • Community Develop.__znt Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
Permit No. -c -/-/ Date Requested 14
Owner's Name /174//-_,L_. Date Needed
Gen. Contractor __ } Subcontractor
Contact Information S rte) Ta_ 0� - "3 lI `/ 2.■
Project Address J ') 1Z-
Scope of Work
Inspector
Inspection i - 4 - !._.
► \ \\
M
512_
INTERNATIONAL
CODE COUNCIL'
MEMBER
IAA (i) r..t-- JAI } 4414_,,
Date of Inspection
Pass 'Fa44't1 Fee
Inspection ` - r ; -. Pass
Inspection 131- - <<.
/,.
Pass
FAH n Fee
Fee
Inspection Pass ❑ Fail ❑ Fee
Permit No.
City of 1
403 Butler
Phone
cal Gtcess
e, ---
„uee Island • Community Develoi. .ent Dept.
Inspection Report R-ea 5
Ave. • P.O. Box 2749 • Tybee Island, GA 31328 I }. r )
912.786.4573 ext. 114 • Fax 912.786.9539 f
X11
INTERNATIONAL
CODE COUNCIL
MEMBER
— 0'019 Date Requested 3 ' i - � Z
Owner's Name / r 1Q . r Date Needed 3 -2- 12-
Subcontractor
Gen. Contractor U e 1-C3 r
Contact Information \ c�
Project Address
Scope of Work
Inspector
Inspection
11 �zla.s-
e plo Q �..,
I% P Date of Inspection ;//A/
OD ALc_ES
Inspection -4 . -, cz\
Inspection
Ct
Pass El Fail ® Fee K.\ 0
Pass ❑ Fail Fee ■ )
Pass El Fail Fee
Inspection Pass ❑ Fail ❑ Fee
City of 1, gee Island - Community Develop.._.4nt Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
Permit No. /2
Owner's Name /4741
Date Requested
1 ► \�\
INTERNATIONAL
CODE COUNCIL
MEMBER
Date Needed ! U> '
Gen. Contractor / ' / 5 it Subcontractor
Contact Information i ,)i
Project Address / 7 / Zz4z-
Scope of Work r�, ' A/ 4'4Z ! 41/9-1....
Inspector ,� /I Date of Inspection
Inspection 1` - Pass Fee
Inspection Tr/ - Pass
Inspection ! Pass
Inspection ' Pass Ei ' F��I -' j Fee
Fee
Fee
I , , i / J / , )/ /, , J >D'
PP
DATE ISSUED: 01 -12 -2012
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CITY OF TYBEE ISLAND
BUILDING PERMIT
R &R FOUR FLR JSTS WATER DAM
17 IZLAR LANE
GREGORY T. MAIER
2237 EAST VICTORY DRIVE
SAVANNAH GA 31404
CONTRACTOR NAME GRE
ADDRESS 2237 EA
CITY STATE ZIP SAV
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE U
TOTAL FEES CHARGED $ 175.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $7,500.00
AIER
ICTORY DRIVE
GA 31404
PERMIT #: 120019
?3.11-cOr CSA GrDue
TOTAL BALANCE DUE: $ 175.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
/Z -o /9
Location:
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
NAME ADDRESS
PIN #
TELEPHONE
Owner
6, 7e,?/-b-X,
/ 7 53 lh 4- /At
6 sq-- 105�
Architect
or Engineer
Building
Contractor
647COa- USA
e...X2 v c... e
Zr Zlo F. t/ t c 'o/Ly ot ,t-a12
1A441- 4.)4/,4. w 44 . f) tip
46,7 - 0117 /
(Check all that apply)
aRepair
Renovation
❑ Minor Addition
❑ Substantial Addition
❑ Other
'K,Residential
Single Family
❑ Duplex
Multi - Family - 3
❑ Commercial
❑ Footprint Changes
❑ Discovery
❑ Demolition
esi,d o 4*.7.I.44
Details of Project: [,J Jaiet4fra joy 1.l' ta4 14.- VIA
Estimated Cost of Construction: $ 7� )O' � ft.t.
efion-Type (Enter appropriate number)
(1 Wood Frame (4) Masonry (6) Other (please specify)
(2) ood & Maso (5) Steel & Masonry
(3) B 'ck Veneer
Propos use:
Remarks:
ATTACH A
following inf
PY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
ation based on the construction drawings and site plan:
# Units # Bedrooms # Bathrooms
Lot Area Living space (total sq. ft.)
# Off -str t parking spa. es
Trees loc ted & listed on ite plan
Access:
Drivew (ft.) With culvert? With swale?
Setbac s: Front Rear Sides (L) (R)
StoriLs Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
E abed xed dH WyEV :01 ZIOZ 60 Uef
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be pr vided by
--Construction debris will be disposed by Caniagc by means of C ii- chrz 14. kc,'
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drain' ii paired by this
permitted construction.
'2/9
Date:
2. ° r 7/ Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning/variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and /or number been reported to MPC?
NFIP Flood Zone
Existing
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals:
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm/Drainage
Inspections
City Manager
Signature
abed
Date
FEES
Permit /6 -2 -
Inspections 3 -
Water Tap
Sewer Stub
Aid to Const.
TOTAL
xed dH WvEV:OL ZLOZ 60 Uel
LEAD -BASED PAINT
Adapted from htftJ/ www. eea .00vfead/oubs/renovation.htm. Please use that site to access the following information.
Information for Property Owners of Rental Housing, Child- Occupied Fadlities
Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space
rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard
information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers,
and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample
pre - renovation disclosure form may be used for this purpose.
After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented
by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation,
Repair and Remodeling rule. To become certified, property owners must submit an application for firm
certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for
certification to approve or disapprove the application.
Property owners who perform renovation, repairs, and painting jobs in rental property should also:
• Take training to learn how to perform lead -safe work practices.
• Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeoino checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010.
• Read about how to comply with EPA's rule in the PA Small Entity Compliance Guide 1p Renovate Right.
• Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation. Repair and Paintino.
Information for Homeowners Working at Home
If you are a homeowner performing renovation, repair, or painting work In your own home, EPA's RRP rule does not cover your project.
However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living In a pre -1978 home
and planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Eamiiies Child
care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1 -800-
424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint.
Information for Tenants and Families of Children under Age 6 In Child Care Facilities and Schools
As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is
performed in your home, or in the child care facility or school that your child attends.
• Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants
sign a pre - renovation disclosure forrrt, which indicates that the tenant received the Renovate Right lead hazard information
pamphlet.
• Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of
children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child
care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard information for Families, Child
Care Providers, and Sf ools lead hazard information pamphlet.
Information for Contractors
As a contractor, you play an important role In helping to prevent lead exposure. Ordinary renovation and maintenance activities can create
dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation,
repairs, and painting jobs in pre -1978 housing and child - occupied facilities must, before beginning work, provide owners, tenants, and
child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families,
Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre - renovation disclosure form may
be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work
practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm
certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application.
Contractors who perform renovation, repairs, and painting jobs should also:
• Take training to learn how to perform lead -safe work practices.
. Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair,
and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may
take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to become a
certified renovator. Click here for a list of eligible courses.
• Provide a copy of your EPA or state lead training certificate to your client.
• Tell your client what lead -safe methods you will use to perform the job.
• Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2D10.
• Ask your client to share the results of any previously conducted lead tests.
• Provide your client with references from at least three recent jobs Involving homes built before 1978.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices o. the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has
developed to help ' tr ors comply with the renovation recordkeeping requirements.
• R?d about how .• comljly with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
• d about ho to use lead -safe work practices in EPA's Steps to Lead Safe Renovation. Repair and Painting.
Gam(- -'j -2O Z•
Date
JUST SIX'
1: ET
BIG TIME
Signatui
Prince Name
(5g c✓L-";
g abed
xed dH kitEV:01 ZIOZ 60 ue
Permit Acknowledgement of
Asbestos/Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos Sr Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or ii usual site conditions may have EPD regulations that could affect the
project.
Undersigned
Printed Name
Date
Office Use Only:
Project Address:
Permit Number:
g abed
xed dH WVPf :01 Z 60? 60 uE