Loading...
HomeMy Public PortalAboutPCP 2022-06-22Planning Commission Regular Meeting Agenda Fraser Town Hall, 153 Fraser Avenue and Virtually Wednesday June 22, 2022 6:30 PM - 9:00 PM NOTE: Times are approximate and agenda subject to change Watch the meeting live on Fraser's YouTube Channel Participate in the meeting through our virtual platform Zoom Meeting Information Meeting ID:259 040 8013 Phone 1 -346 -248 -7799 Roll Call Appointment Of Chair And Vice Chair Planning Commission Chair And Vice Chair Appointment Memo.pdf Approval Of Agenda Consent Agenda Minutes April 27, 2022 PCM 2022 -04 -27.Pdf Sign In Sheet April 27, 2022.Pdf Public Hearing And Possible Action Middle Park Health - Fraser Health Center Mayor Site Plan 1. Planner Briefing.pdf 2. Public Notice.pdf 3. Land Use Application Forms.pdf 4. Referral Comments.pdf 5. Fraser, CO Municipal Code 19.4.190.Pdf 6. Resolution 2022 -06 -02.Pdf 7. Cover Letter.pdf 8. Major Site Plan Sheets.pdf 9. Middle Park Health - Fraser Exterior Finish Board.pdf Koselig On Main Final Plat 01 Planner Briefing 6 -22 -2022.Pdf 02 PC Resolution 2022 -06 -01.Pdf 03 Agency Review Comments.pdf 04 Proof Of Publication.pdf 05 Final Plat And Site Plan.pdf 06 Conceptual Drawings And Site Plan.pdf 07 Civil Plans.pdf 08 Drainage Report.pdf 09 Cover Letter.pdf 10 Notice Sent To Neighbors.pdf 11 Residential Coverage.pdf 12 Traffic Impact Study.pdf Open Forum Other Business Future Agenda Items Adjourn UPCOMING MEETING WED. JULY 27, 2022 PLANNING COMMISSION Please contact the Town Clerk to request accommodations to assist people with disabilities to participate in public meetings. Listening devices for people with hearing impairment are available upon request. Town Clerk, Antoinette McVeigh 970 -531 -9943 or amcveigh@town.fraser.co.us https://www.youtube.com/channel/UCs5aHnl7d -kk0j1cxV28DSg https://us02web.zoom.us/j/2590408013 1. 2. Documents: 3. 4. a. Documents: 5. a. Documents: b. Documents: 6. 7. 8. 9. Planning Commission Regular Meeting Agenda Fraser Town Hall, 153 Fraser Avenue and Virtually Wednesday June 22, 2022 6:30 PM - 9:00 PM NOTE: Times are approximate and agenda subject to change Watch the meeting live on Fraser's YouTube Channel Participate in the meeting through our virtual platform Zoom Meeting Information Meeting ID:259 040 8013 Phone 1 -346 -248 -7799Roll CallAppointment Of Chair And Vice ChairPlanning Commission Chair And Vice Chair Appointment Memo.pdfApproval Of AgendaConsent AgendaMinutes April 27, 2022PCM 2022 -04 -27.PdfSign In Sheet April 27, 2022.PdfPublic Hearing And Possible ActionMiddle Park Health - Fraser Health Center Mayor Site Plan 1. Planner Briefing.pdf 2. Public Notice.pdf 3. Land Use Application Forms.pdf 4. Referral Comments.pdf 5. Fraser, CO Municipal Code 19.4.190.Pdf 6. Resolution 2022 -06 -02.Pdf 7. Cover Letter.pdf 8. Major Site Plan Sheets.pdf 9. Middle Park Health - Fraser Exterior Finish Board.pdf Koselig On Main Final Plat 01 Planner Briefing 6 -22 -2022.Pdf 02 PC Resolution 2022 -06 -01.Pdf 03 Agency Review Comments.pdf 04 Proof Of Publication.pdf 05 Final Plat And Site Plan.pdf 06 Conceptual Drawings And Site Plan.pdf 07 Civil Plans.pdf 08 Drainage Report.pdf 09 Cover Letter.pdf 10 Notice Sent To Neighbors.pdf 11 Residential Coverage.pdf 12 Traffic Impact Study.pdf Open Forum Other Business Future Agenda Items Adjourn UPCOMING MEETING WED. JULY 27, 2022 PLANNING COMMISSION Please contact the Town Clerk to request accommodations to assist people with disabilities to participate in public meetings. Listening devices for people with hearing impairment are available upon request. Town Clerk, Antoinette McVeigh 970 -531 -9943 or amcveigh@town.fraser.co.us https://www.youtube.com/channel/UCs5aHnl7d -kk0j1cxV28DSghttps://us02web.zoom.us/j/25904080131.2.Documents:3.4.a.Documents:5.a. Documents: b. Documents: 6. 7. 8. 9. MEMO TO:Planning Commission FROM:Antoinette McVeigh, Town Clerk DATE:June 16, 2022 SUBJECT:Appointment of the Chair and Vice Chair MATTER BEFORE COMMISSION: The Planning Commission shall elect a Chairperson and a Vice Chairperson annually. ACTION REQUESTED: Motion to appoint the Planning Commission Chair and Vice Chair. BACKGROUND: Fraser Municipal Code ARTICLE 6 - Planning Commission Sec. 2-6-20. - Members. T h e P l a n n i n g C o m m i s s i o n s h a l l c o n s i s t o f t h e f o l l o w i n g m e m b e r s : ( 1 ) T h e M a y o r s h a l l s e r v e a s a n e x o f f i c i o m e m b e r o f t h e P l a n n i n g C o m m i s s i o n . ( 2 ) O n e ( 1 ) m e m b e r o f t h e B o a r d o f T r u s t e e s s h a l l b e s e l e c t e d b y t h e M a y o r t o s e r v e a s a n e x o f f i c i o m e m b e r o f t h e P l a n n i n g C o m m i s s i o n . I n c a s e o f a v a c a n c y , i f n o m e m b e r o f t h e B o a r d o f T r u s t e e s i s w i l l i n g t o f i l l t h e v a c a n c y , t h e M a y o r m a y a p p o i n t a r e s i d e n t o f t h e T o w n t o s e r v e u n t i l t h e n e x t r e g u l a r e l e c t i o n . ( 3 ) O n e ( 1 ) m e m b e r o f t h e B o a r d o f T r u s t e e s s h a l l b e s e l e c t e d b y t h e B o a r d o f T r u s t e e s t o s e r v e a s a n e x o f f i c i o m e m b e r o f t h e P l a n n i n g C o m m i s s i o n . I n c a s e o f a v a c a n c y , i f n o m e m b e r o f t h e B o a r d o f T r u s t e e s i s w i l l i n g t o f i l l t h e v a c a n c y , t h e B o a r d o f T r u s t e e s m a y a p p o i n t a r e s i d e n t o f t h e T o w n t o s e r v e u n t i l t h e n e x t r e g u l a r e l e c t i o n . ( 4 ) T h e r e m a i n i n g f o u r ( 4 ) m e m b e r s o f t h e P l a n n i n g C o m m i s s i o n s h a l l b e r e s i d e n t s a p p o i n t e d b y t h e M a y o r t o s e r v e a s m e m b e r s o f t h e P l a n n i n g C o m m i s s i o n . Mayor: Philip Vandernail Board of Trustees Ex-Officio Mayor Appointment: Parnell Quinn Board of Trustees Ex-Officio Board Appointment: Katie Soles C o m m i s s i o n e r s A p p o i n t e d b y t h e M a y o r : R o b e r t G n u s e M a r g a r e t B o w l e s A n d r e w M i l l e r S a m B r e w e r ( R e s i g n e d J u n e 2 2 , 2 0 2 2 ) Sec. 2-6-60. - Chairperson. T h e P l a n n i n g C o m m i s s i o n s h a l l e l e c t a C h a i r p e r s o n f r o m a m o n g t h e m e m b e r s a p p o i n t e d b y t h e M a y o r a n d c r e a t e a n d f i l l s u c h o t h e r o f i t s o f f i c e s a s i t m a y d e t e r m i n e . T h e t e r m o f t h e C h a i r p e r s o n s h a l l b e o n e ( 1 ) y e a r w i t h e l i g i b i l i t y f o r r e e l e c t i o n . T h e P l a n n i n g C o m m i s s i o n s h a l l h o l d a t l e a s t o n e ( 1 ) r e g u l a r m e e t i n g e a c h m o n t h , a n d i t s h a l l a d o p t s u c h r u l e s a s i t d e e m s a p p r o p r i a t e f o r t r a n s a c t i o n o f b u s i n e s s a n d s h a l l k e e p a r e c o r d o f i t s r e s o l u t i o n s , t r a n s a c t i o n s , f i n d i n g s a n d d e t e r m i n a t i o n s , w h i c h r e c o r d s h a l l b e a p u b l i c r e c o r d . FRASER PLANNING COMMISSION MINUTES DATE:Wednesday, April 27, 2022 MEETING:Planning Commission Regular Meeting PLACE:Fraser Town Hall and Virtual On-Line Meeting PRESENT Commission:Commissioners:Chair Jean Wolter,Vice Chair Katie Soles,Philip Vandernail,Parnell Quinn,Margaret Bowles,Bob Gnuse and Sam Brewer Staff:Town Planner,Catherine Trotter;Town Clerk Antoinette McVeigh;Town Manager Ed Cannon Others:See list Chair Jean Wolter called the meeting to order at 6:30pm. 1.Roll Call:Chair Jean Wolter,Vice Chair Katie Soles,Philip Vandernail,Parnell Quinn, Margaret Bowles, Bob Gnuse and Sam Brewer 2.Approval of Agenda: Commissioner Soles moved,and Commissioner Quinn seconded the motion to approve the agenda. Motion carried: 7-0. 3.Consent Agenda: a.Minutes March 23, 2022 Commissioner Vandernail moved,and Commissioner Soles seconded the motion to approve the consent agenda. Motion carried: 7-0. Town Planner Trotter thanked Chair Wolter for her twelve years of service,including six years as the chair.This is Town Planner Trotter’s last meeting with the Planning Commission,her last day with the town is May 6.The Commissioners thanked Trotter for her eighteen years of employment and work with the Commission. Town Manager Cannon introduced Baseline Planning Services.They will be taking over the roll of the Planning for the town. 4.Public Hearing And Possible Action: a.Preliminary Plat/Major Site Plan Koselig on Main,406 Zerex St.&315 Fraser Ave Commissioner Gnuse motioned,and Commissioner Soles seconded the motion to open the public hearing. Motion carried 7-0. Page 2 of 2 Applicant is requesting Preliminary Plat/Site Plan approval. This subdivision application is being processed as a Major Subdivision in accordance with Section 19-3-210 of the Fraser Municipal Code. The purpose of a major subdivision plat is to divide one (1) or more lots or parcels of land into a total of five (5) or more lots or five (5) or more dwelling units. We are also processing a Major Site Plan in accordance with Section 19-2110 of the Land Development Code. The applicant’s project will consist of @ 4,000 SF of retail space and 20 apartment units. The project aims to deliver restricted low-income housing units and attainable market units to provide for rental housing to the residents of Fraser and Grand County. Town Planer Catherine Trotter presented to the Commission. Proof of publication was provided in the packet. The adjacent property owners were sent out certified mail and return receipt regarding notice of the hearing. The developer Byson Investments and managing partners Greg Bechler and Kevin Rifkin presented to the commission and answered questions. Architects Peter Nelson and Krista Klancke, general contractor Thomas Elliot, civil and structural engineer Kevin Vecchiarelli. also presented. Public comment was taken from Deb Anderberg, Barry Young and Nicole. A letter was sent to the commission from Bryan and Keary Hallack. Commissioner Soles motioned,and Commissioner Quinn seconded the motion to close the public hearing. Motion carried 7-0. Commissioner Vandernail motioned, and Commissioner Quinn seconded to approve Resolution 2022-04-01 A Preliminary Plat and Major Site Plan For Koselig On Main, 406 Zerex St. And 315 Fraser Ave, A Replat Of Lots 30-33 Lying N Of Us 40, Block 7, 1st Addition To The Town Of Eastom (Aka Fraser), Grand County, Colorado, Part Of Sec. 19, Township 1 South, Range 75 West Of The 6th PM Motion carried 7-0. 5. Other Business: 6.Open Forum: Commissioner Soles, downtown parking is limited TM Cannon, the town is looking into parking 7.Future Agenda Items: None 8. Adjourn: Commissioner Soles moved,and Commissioner Gnuse seconded the motion to adjourn. Motion carried: 7-0. Meeting adjourned at 8:09 p.m. __________________________ Antoinette McVeigh, Town Clerk Town of Fraser PO Box 370, Fraser, CO 80442 office 970-726-5491 fax 970-726-5518 www.frasercolorado.com MEMO TO: Planning Chairperson and Planning Commissioners FROM: Ryan Helle, Planning Technician, Baseline Corporation DATE: June 22, 2022 SUBJECT: Planning Brief on New Fraser Health Center – Major Site Plan MATTER BEFORE THE PLANNING COMMISSION Major Site Plan ACTION REQUESTED The owner, Kremmling Memorial Hospital District, a Colorado Special Tax District also known as Middle Park Health, is requesting Major Site Plan approval for the construction of a new outpatient medical clinic to be located at the south end of The Village at Grand Park, Filing 2, Lot 2C. The project is a 2-story, 31 thousand square foot building on a 2.7-acre site to include 57 parking spaces and an at-grade helistop. BACKGROUND This property is zoned Planned Development District and we are processing a Major Site Plan in accordance with Section 19-2-110 of the Land Development Code. The applicant purchased the 2.7-acre property from Grand Park, LLC. A Final Plan for The Village has been previously processed and recorded. A final plat for this property was previously approved by Planning Commission and Town Board and recently recorded by Town Staff. The recorded plat is included in the Planning Commission (PC) packet. The applicant received conditional approval for the same application in April 2020. Since it has been over two years, the approval has expired and the application has been resubmitted for a new approval. The applicant made revisions to the drawing set based on the comments from 2020. The applicant is proposing to construct a 27,345 +/- SF in-patient services hospital with two beds and a 3676 +/- SF outpatient services medical clinic with six beds. The town code requires the following parking spaces. • Section 19-4-230 TABLE 4.1, INSTITUTIONAL USES – HOSPITAL: o Requires 1 space per 2 beds plus 1 per employee at maximum staff occupancy o They have 2 beds in 27,345 SF, plus 20 employees. o This requires 1 + 20 spaces = 21 spaces • Section 19-4-230 TABLE 4.1, COMMERCIAL USES – MEDICAL AND DENTAL CLINICS: o Requires 4 spaces per room o They have 6 rooms in 3,676 SF o This requires 6 x 4 spaces = 24 spaces. o The total spaces required are 43. The total spaces provided are 53 spaces. Site plan parking appears to meet the code. Town of Fraser PO Box 370, Fraser, CO 80442 office 970-726-5491 fax 970-726-5518 www.frasercolorado.com Vicinity Map The maps below indicate the general vicinity of the proposed health center. Town of Fraser PO Box 370, Fraser, CO 80442 office 970-726-5491 fax 970-726-5518 www.frasercolorado.com Staff has provided the following materials in this packet: 1. Planner Briefing (this memo) 2. Public Notice 3. Land Use Application 4. Referral Comments 5. Building Design Development Standards (Code Section 19-4-190) 6. Resolution The applicant has provided the following materials in this packet: 7. Cover Letter 8. Major Site Plan 9. Exterior Materials Package The applicant has provided the following materials that have been reviewed by staff, but are not in the packet. 10. Title commitment 11. List of Adjacent Property Owners 12. Certified Mail Receipts Recommendation Pending any issues that may arise at the public hearing, staff recommends approval of the Major Site Plan for the new Fraser Health Center with the following conditions: 1. Applicant to address Agency Review Comments included in the packet, and revise and resubmit documents accordingly. 2. A Construction Guarantee Agreement (CGA) and appropriate security shall be submitted and approved prior to building permit issuance. See PC Resolution 2022-06-02 in packet. Please contact me with questions: ryan.helle@baselinecorp.com NOTICE OF PUBLIC HEARING FRASER, COLORADO NOTICE IS HEREBY GIVEN that a public hearing will be held by the Planning Commission of the Town of Fraser, Colorado, on Wednesday, June 22, 2022, at 6:30 PM in the Board Room of the Fraser Town Hall, located at 153 Fraser Avenue, Fraser, Colorado to consider the following agenda item: Major Site Plan - Middle Park Health – Fraser Health Center, 31 Telemark Drive, Fraser, CO LEGAL DESCRIPTION: The Village at Grand Park – Filing 2, Lot 12C CONTAINING AN AREA OF 2.69 ACRES, MORE OR LESS. Proposed plans for the subject property are on file with the Town Planning Department. Publish one time in the Middle Park Times on Thursday, June 9, 2022. LAND USE APPLICATION FORM PROJECT NAME DATE RECEIVED: APPLICATION FEE: TYPE OF APPLICATION HEARING DATE: Annexation, Zoning, Concept Plan Change of Zone Development Permit Conditional Use Final Plat Minor Subdivision Plat As Built Plat Planned Unit Development Preliminary Plat Site Plan Sketch Plan Subdivision Exemption Vacation of Street or Easement Variance Other Final Planned Development Plan PROJECT INFORMATION Applicant’s Name: Project Location: Address: Existing Zoning: Phone/Fax: Relation to Property Owner: Proposed Zoning: Legal Description of Property (lots, blocks, tracts, subdivision name, or metes & bounds - attach additional sheet, if necessary): Total Acreage of Property under Consideration: Number of Existing Residential Lots: Number of Proposed Residential Lots: Type of Housing Proposed: Number of Existing Commercial Lots: Number of Proposed Commercial Lots: ADDITIONAL CONTACTS Property Owner: Consultant: Address: Address: City/State/Zip: City/State/Zip: Phone/Fax: Phone/Fax: CERTIFICATION I hereby affirm that I have full legal capacity to authorize the filing of this application and that all information and exhibits herewith submitted are true and correct to the best of my knowledge. The Authorized Signer invites Town of Fraser representatives to make all reasonable inspections and investigations of the subject property during the period of processing this application. I further agree to pay all fees consistent with the Town of Fraser payment policies and comply with all Town Codes and regulations. I understand that all materials and fees required by the Town of Fraser must be submitted prior to having this application processed. Authorized Signature*: Date: *If other than owner, attach letter authorizing agent on behalf of owner. Town of Fraser, 153 Fraser Avenue, P.O. Box 370, Fraser, Colorado 80442 Phone: 970-726-5491, Fax: 970-726-5518, www.frasercolorado.com BRIEF DESCRIPTION OF DEVELOPMENT: PUBLIC NOTICE At least fourteen (14) days in advance of the public hearing, the applicant shall provide written notice to all owners of property within two hundred feet (200’) of the boundaries of the property that is the subject of the application. Such notice shall be sent via certified mail, return receipt requested and shall include the following information: A copy of the complete application with all accompanying materials, the name, address and phone number of the authorized contact for the applicant, and the time, date and place of the public hearing. The applicant shall provide the Town with a written affidavit prior to the time of the public hearing reflecting the date of mailings and the names, addresses and legal descriptions of all parties to whom the notifications were transmitted, together with a complete copy of the materials included in the mailing. Failure to properly mail the documents, notify the necessary parties, and/or provide the required affidavit shall be grounds for denial of the application or a continuance of the public hearing until such notice is provided. See sample letter below. The notification letter cannot be sent until a public hearing date has been scheduled by the Town. ADJACENT PROPERTY OWNER NOTIFICATION LETTER This notice to be sent by applicant to all owners of property within two hundred feet (200’) of the boundaries of the property that is subject to the application and to all surface owners, mineral owners, and lessees of mineral owners to whom notice is to be sent pursuant to C.R.S. 31-23-215. Such notice shall be sent via certified mail, return receipt requested. The applicant shall provide the Town with a written affidavit or other proof of notice prior to the time of public hearing reflecting the date of mailings, addresses and legal descriptions of all parties to whom the notifications were transmitted. Failure to properly mail the documents, notify the necessary parties and/or provide the required affidavit shall be grounds for denial of the application or a continuance of the public hearing until such notice is provided. Dear Sir/Madam: This letter is to advise you that _____________________ (applicant) has requested ______________ (land use request) for a property located at ____________ (property address or location) and that the Town of Fraser has scheduled a public hearing to consider this request. The public hearing is scheduled for _______________ (date assigned by Town) at __________ (time assigned by Town) at the Town of Fraser Town Hall located at 153 Fraser Avenue in the Board Room. Enclosed for your review is a copy of the proposal as presented to the Town of Fraser. Additional application materials are on file at the Town Hall offices. The Town of Fraser may be contacted at 970-726-5491 for further information. Please note that you may comment at the public hearing or by forwarding written comments to the Town of Fraser Planning Department (P.O. Box 370, Fraser, CO 80442). Written comments must be received by the Town prior to the public hearing. Sincerely, (applicant) AFFIDAVIT OF NOTICE To be completed after completion of notice distribution and forwarded to Town staff prior to the date of hearing I, applicant requesting, hereby affirm that notice was distributed in accordance with Town of Fraser codes. Date Owner/Applicant STATE OF COLORADO County of , Subscribed and sworn to before me this day of 20 , by . Witness my hand and official seal. (SEAL) Notary Public My commission expires: ************************************************************************************* *** NOTES: 1. In addition to minimum design criteria and standards, the Town of Fraser Subdivision and Zoning Regulations outline specific minimum submittal requirements. Please review these carefully in order to ensure prompt action on your land use application. 2. The Town of Fraser Subdivision and Zoning Regulations outline the review procedures applicable to each land use application. In cases with multiple requests for an individual property, it is preferable to synchronize the review procedures for a prompt and efficient review process. 3. The applicant is responsible for initiating formal reviews with the Colorado Department of Transportation, the U.S. Army Corps of Engineers, the Colorado Division of Wildlife, the Fraser Sanitation District, the Colorado Water Conservation Board, and other applicable agencies. The Town refers applications to these agencies for comment, however, the Town cannot initiate a permit request or consultation. 4. A Subdivision Improvement Agreement may be necessary. This document must be executed and recorded prior to or concurrent with plat recordation. 5. Contact the Planning Department at 970-726-5491 if you have any questions or need assistance. The applicant is responsible for payment of recording fees, improvement inspection fees, and other additional costs incurred by the Town for the services of professionals, consultants, or other review agencies applicable to the request. All invoices shall be paid in full prior to final Town Board approval of the application or issuance of the applicable permit, certificate or other approval document. NOTIFICATION OF SEVERED MINERAL ESTATES The Town of Fraser, pursuant to C.R.S., requires notification to mineral estate owners, mineral estate lessees and surface owners in connection with the following land use applications: Minor Subdivision Final Plat, Major Subdivision Preliminary Plat, Subdivision Exemption, Planned Development District Plan, or Development Permit Thirty (30) days in advance of the initial public hearing, the applicant shall provide notice to all surface owners, mineral owners and lessee of mineral owners in accordance with C.R.S. 31-23-215 and 24-65.5-1-3, as amended. The applicant must certify the same to the local government as a condition of approval of the application. Please use CERTIFICATE OF NOTICE TO MINERAL ESTATE OWNER form below. Town of Fraser PO Box 370, Fraser, CO 80442 office 970-726-5491 fax 970-726-5518 www.frasercolorado.com TOWN OF FRASER, STATE OF COLORADO CERTIFICATE OF NOTICE TO MINERAL ESTATE OWNER The undersigned is the Applicant and/or the Surface Owner, as defined in section 24-65.5-102(7), C.R.S. of the Surface Estate, as defined section 24-65.5-102(6), C.R.S., for which an application for development has been submitted to the Town of Fraser, State of Colorado, for one or more of the following land use actions: Minor Subdivision Final Plat, Major Subdivision Preliminary Plat, Subdivision Exemption, Planned Development District Plan, or development permit. The name of the application for development is as follows: C.R.S.§24-65.5-101 et seq. and C.R.S. §31-23-215 impose certain requirements concerning notification to owners of severed mineral estates and other interested parties with respect to proposed surface development. The undersigned has read and fully understands those requirements. The undersigned hereby certifies that notice of such application has been provided to all mineral estate owners, lessees of mineral estate owners and any (other) surface owners in accordance with the requirements of C.R.S. §24-65.5-103 and/or 31-23-215, as applicable. Date Surface Owner OR Applicant (if different than Surface Owner) STATE OF COLORADO County of , Subscribed and sworn to before me this day of 20 , by . Witness my hand and official seal. (SEAL) Notary Public My commission expires: PROPERTY DESCRIPTION: PROPOSED LOT 12C, THE VILLAGE AT GRAND PARK LYING WITHIN THE SOUTHWEST QUARTER OF SECTION 28, TOWNSHIP 1 SOUTH, RANGE 75 WEST OF THE SIXTH PRINCIPAL MERIDIAN, TOWN OF FRASER, COUNTY OF GRAND, STATE OF COLORADO. EAST GRAND FIRE PROTECTION DISTRICT NO. 4 P.O. Box 2967 • Winter Park, Colorado 80482 (970) 726-5824 • www.eastgrandfire.com EAST GRAND FIRE PROTECTION DISTRICT DEVELOPMENT REVIEW CRITERIA Standards and Codes to be used: NFPA, IFC, IBC, IRC, AASHTO, Mountain Parks Electric, and Public Service (Xcel), East Grand Fire Protection District- SOG. International Fire Code (IFC): 2021 International Building Code (IBC): 2015 International Residential Code (IRC): 2015 NFPA Standards: 13, 24, 25, 101, 299, 1142 (and others-most current) ACCESS: In addition to: IFC Appendix D, NFPA Standard 299- Protection of Life and Property from Wildfire and the road standards of Fraser, Town of Winter Park, or Grand County. ROADWAYS: Roads and Driveways shall be constructed and in place before building construction begins. A minimum width 24 ft. road shall be required where either of the following conditions below are not met: • Access roads with hydrants shall be a minimum width of 26ft. (IFC D103.1). • Aerial fire apparatus access roads with minimum widths of 26ft. shall be required “where the vertical distance between the grade plane and the highest roof surface exceeds 30 feet” (IFC D105.2). Roads shall have a hard-all-weather surface sufficient to support 84,000 lbs. fire apparatus. Shoulders to be a minimum width of 4 ft. on each side. Vertical clearance to be a minimum of 18 ft. Maximum grade to be 7 %. Minimum curve radiuses to be 50 ft. measured at centerline or follow the AASHTO geometric designs for highways and streets manual, for Intercity Bus (BUS-45). At 750 ft. intervals Emergency turnarounds for fire apparatus are needed on all roads. (These can be oversized driveways, intersections, or specially constructed areas). No parking is to be allowed along 24/26-foot roadways. “No Parking” signage will be required along both sides of road with required signs provided by the developer. If parking is to be allowed, 9ft. needs to be added to width of road on ether or both sides of roadway in addition to signage. Cul-de-Sacs are to be avoided. If unavoidable the maximum length of cul-de-Sac shall be no more than 500 feet. A turnaround at end of Cul-de-Sac, with the continuation of 24/26 ft. road width, shall have 104 ft. minimum outside diameter. Cul-de-Sacs, turnarounds, and shoulders shall not be used for snow storage if it reduces access in any way. To avoid building construction delays special attention should be given to IFC Chapters 33 and 5. Sections 1410, 1412, 501, 503, 505, and 508. GATES: Gates are to be avoided, but, if necessary, shall be considered on a case-by-case basis. If allowed, the design would need to be approved prior to construction. Gate should consist of a counterweight type barrier that swings completely free of the access when released. A “Click2Enter” or “KNOX” key switch, or another approved device, shall operate the gate electronically. DRIVEWAYS and ACCESSES: Three homes (dwelling units) or more require a road, not a driveway. The minimum driveway width should be 14 ft. with two 1 ft shoulders, a maximum grade of 7%, an approach or departure angle not more than 8%, and vertical clearance of at least 14ft. If the access or drive extends more than 150 ft. from a roadway there shall be a turnaround adequate for our trucks. BRIDGES: Require a letter from an engineer with his or her stamp certifying that the bridge meets the requirements of the International Fire Code Section 503.2.6 which requires the bridge to be constructed and maintained in accordance with AASHTO HB 17 “Standard Specification for Highway Bridges.” Appendix D Section D102 (as amended by EGFD) suggests the bridge be capable of carrying the load of 84,000 lbs. Any crossings shall be constructed to the same standards as the traveled way on either side. 1 WATER SUPPLY: MUNICIPAL: Reference Appendix B of International Fire Code. Water supplies needed for firefighting would range between 3500 gallons per minute fire flow for three hours (minimum 630,000 gallons of fire protection storage), to a minimum 2500 gallons per minute for two hours (minimum 300,000 gallons of fire protection storage). A minimum water supply of 1500 gallons per minute fire flow for two hours (minimum 180,000 gallons of fire protection storage), will be considered in buildings protected by fire suppression sprinkler systems. Documentation would be needed that adequate flows will be available from the water system at a residual pressure no less than 20 psi. By installing fire sprinkler systems in all structures any large life or property losses would be avoided and would make the best use of the available water supplies. Fire hydrants are to be located at least every 500 ft. or as agreed to by the Fire District. Fire hydrant locations and distribution shall be in accordance with Appendix C of the International Fire Code. For planning purposes, the following may be used. Fire hydrants must meet the requirements of the local water purveyor / water authority or be Mueller Super Centurion 250A-423 or equivalent hydrant having at least one 4 ½ inch NST opening facing the Road. Hydrants are to be installed to the local water authority’s requirement. Fire Hydrant installation outside of a Water Authority’s jurisdiction shall be required to be acceptable to East Grand Fire District. The approach to the hydrant is to be a level-walking surface free of obstructions or depressions, at least five feet wide from the center of the hydrant in all directions including the backside. Existing Fire Hydrants can be credited for a new development if the hydrant has at least one 4.5-inch opening, a 6-inch barrel, is in good repair, is appropriately located, has adequate access, has adequate flows, and is not an antiquated Hydrant. If any one of these conditions is not met it will need to be replaced. International Fire Code tables B105.1 and C105.1 provide further guidance on flows and fire hydrant distribution. RURAL: The acceptable calculated amount of water storage necessary for structural fire extinguishment or at least 30,000 gallons of fire protection water storage which is the minimal creditable amount acceptable to Insurance Services Office. UTILITIES: Careful consideration should be given to the location of all utilities to avoid interference with fire department operations. Meters, transformers, and gas piping all need to be carefully located to avoid damage from ice, snow, and vehicles. All utility meters shut offs or other equipment that would be attached to the exterior of a building shall be protected from falling ice and snow. Shutoffs need to be readily available. WILDFIRE: There is Wildfire potential for this project. Normal precautions of maintaining defensible space around buildings, irrigated grass, mowing, minimizing any flammable vegetation, and storing combustibles / flammables away from the buildings would help. Making the exterior walls and roofs non-combustible would certainly minimize the risk. Consulting with I.C.C. Wildland Urban Interface Code is encouraged. Dennis K. Soles Fire Marshal East Grand Fire Protection District 2 Turning Performance Analysis 4/3/2007 Representative: Organization: Number:EP1955494-101 East Grand Velocity 100' Platform Kerber, Wayne Front Range Fire Apparatus, Ltd 169 Configuration: V:Department:East Grand Fire Inside Cramp Angle: Axle Track: Wheel Offset: Loaded Tire Width: Chassis Overhang: Wheelbase: Inside Turn: Curb to Curb: Wall to Wall: Parameters: Calculated Turning Radii: Comments: Additional Bumper Depth: Front Overhang 45° 85.34" 4.68" 17.70" 79.62" 16.00" 124.60" 279.00" 265.47" 472.43" 552.88" Aerial Application Components Item #Description Front Axle 0018453 Axle, Suspension, Front, Oshkosh TAK-4, Non-Drive, 22,800 lb Front Wheels 0111380 Aluminum, Alcoa, 22.50 x 12.25 Front Tires 0111371 Michelin, 425/65R22.50, 20 Ply, XZY-3 Chassis 0121631 Velocity Chassis Front Bumper 0123647 Tray, Bumper, Center, Standard, 35" W x 11.5" L x 13" D Aerial Device 0022160 Aerial, 100' Pierce Platform Notes: Actual Inside Cramp Angle may be less due to highly specialized options. Curb to Curb turning radius calculated for a 9.00 inch curb. Page 1 of 24/3/2007As of 12:38:19PM Configuration Version:169 Turning Performance Analysis 4/3/2007 Representative: Organization: Number:EP1955494-101 East Grand Velocity 100' Platform Kerber, Wayne Front Range Fire Apparatus, Ltd 169 Configuration: V:Department:East Grand Fire Definitions: Inside Cramp Angle Maximum turning angle of the front inside tire. Axle Track King-pin to king-pin distance of the front axle. Wheel Offset Offset from the center-line of the wheel to the king-pin. Tread Width Width of the tire tread. Chassis Overhang Distance from the center-line of the front axle to the front edge of the cab. This does not include the bumper depth. Additional Bumper Depth Depth that the bumper assembly adds to the front overhang. Wheelbase Distance between the center lines of the vehicle's front and rear axles. Inside Turning Radius Radius of the smallest circle around which the vehicle can turn. Curb to Curb Turning Radius Radius of the smallest circle inside of which the vehicle's tires can turn. This measurement assumes a curb height of 9 inches. Wall to Wall Turning Radius Radius of the smallest circle inside of which the entire vehicle can turn. This measurement takes into account any front overhang due to the chassis, bumper extensions and/or aerial devices. Page 2 of 24/3/2007As of 12:38:19PM Configuration Version:169 PO Box 528, Granby CO 80446 June 15, 2022 Ryan Helle/Planning Technician Baseline Engineering Corporation | Engineering, Planning, & Surveying RE: Plat review for Middle Park Health, Fraser CO To whom it may concern: Public Service Company of Colorado has no concerns to the new development at Middle Park Health, located at King Crossing RD & HWY 40. Gas main is located on the south, north and west side of the development if the grade changes in the roadway area an application will need to be submitted to relocate at the proper depth. I have listed below the general guidelines that are required for gas construction. If you have any questions or concerns please call or email. Preliminary Plat Review General Guidelines Application • If main is not available- apply for Gas distribution for the project to extend the main. • Gas main will be installed at 36” depth, and must be 10’ away from water main if water main runs parallel and 5’ from electric. • Gas main preferable to be installed in a 5’ easement. No sleeves allowed for service crossings. • Gas will be installed in a sole trench- no other utilities are to be located with main or services. • Reinforcement may be needed for existing system depending on the current capacity (additional cost of reinforcement will be the responsibility of the applicant.) Meter Locations • While customer preference regarding meter location deserves reasonable consideration, it remains the right of the Company to determine the placement of meters. All meter locations including multiple points of service shall have the approval of the local Xcel Design Department. • Meters and service regulators are to be set outside the serviced structure where they will be readily accessible and be protected from corrosion and other damage, including vehicular. Please see the attached diagram showing clearances for meter placement. • Meter sets in areas of deep snow need to be placed on a gable end (no shed roof allowed) Note: Due to excessive snowfall, ice and snow shields will not be permitted in the following Colorado counties: Eagle, Lake, Park, Grand, and Summit. Meters shall be installed on the gable or non-drip side of a building or in an approved remote location from the building or structure in these counties. Please note – this is not a final assessment of what the new gas distribution will entail. There may be additional things in the field I cannot see. Once an application has been submitted to XCEL we can start the full design process and identify the scope of work that will need to be done for this request. Please see attached information regarding new service. Sincerely, Kathleen Jacoby Kathleen Jacoby Xcel Energy | Responsible By Nature Design Planner, Mountain Division 583 East Jasper Court, Granby CO 80446-0528 P: 970-262-4055 F: 970-887-2453 E: kathleen.jacoby@xcelenergy.com xcelenergy.com/InstallAndConnect Visit our website for more information about installing and connecting service with Xcel Energy! Need to put in an application? https://xcelenergy.force.com/FastApp/BP_Login 1 Ryan Helle From:Julie Koehler <julie.koehler@merrick.com> Sent:Thursday, June 16, 2022 9:49 AM To:Ryan Helle Subject:FW: [External] Middle Park Health MSP [EXTERNAL EMAIL] DO NOT CLICK links or attachments unless you recognize the sender and know the content is safe.  Merrick has no comments on this one.    Thank you.    Julie    Julie Koehler, PE, ENV SP | Senior Project Manager | Merrick & Company T: +1 303-353-3359 | C: +1 720-402-6620 | www.merrick.com    From: Jessica George Robles <jessica.robles@merrick.com>   Sent: Thursday, June 16, 2022 9:01 AM  To: Julie Koehler <julie.koehler@merrick.com>  Subject: RE: [External] Middle Park Health MSP    Hi Julie,    There were no review comments on this one.    Thank you,  Jessica    Jessica George Robles, P.E. | Project Engineer | Merrick & Company T: +1 210-446-4354 | C: +1 210-857-6235 | www.merrick.com   From: Julie Koehler <julie.koehler@merrick.com>   Sent: Wednesday, June 15, 2022 5:13 PM  To: Jessica George Robles <jessica.robles@merrick.com>  Subject: FW: [External] Middle Park Health MSP    Hi Jessica,    Do we have comments on this one?    Thank you,    Julie    Julie Koehler, PE, ENV SP | Senior Project Manager | Merrick & Company 2 T: +1 303-353-3359 | C: +1 720-402-6620 | www.merrick.com    From: Ryan Helle <ryan.helle@baselinecorp.com>   Sent: Wednesday, June 15, 2022 1:26 PM  To: Julie Koehler <julie.koehler@merrick.com>  Subject: [External] Middle Park Health MSP      Hi Julie,  I’m just checking in to see if you received the emails regarding Middle Park Health and if you had any comments.  Thanks,    RYAN HELLE | PLANNING TECHNICIAN  Baseline Engineering Corporation | Engineering, Planning, & Surveying Phone: 719.531.6200 | Cell: 573.450.8755 | www.baselinecorp.com | Social Media Office: 1046 Elkton Drive, Colorado Springs, CO 80907    Please consider the environment before printing this email. This transmission, which may contain confidential information, is for the intended recipient only. Any review, retransmission, dissemination or other use of, or taking of any action in reliance upon this information by persons or entities other than the intended recipient, is prohibited. If you received this in error, please contact the sender and delete the material from your computer and networks.    Caution: This email originated from outside of the Merrick organization. Do not click links or open attachments  unless you recognize the sender and know the content is safe.   1 Ryan Helle From:Jean Johnston <JeanJ@mpei.com> Sent:Tuesday, June 7, 2022 4:57 PM To:Ryan Helle Cc:Ed Cannon Subject:RE: [External] Middle Park Health MSP Follow Up Flag:Follow up Flag Status:Flagged [EXTERNAL EMAIL] DO NOT CLICK links or attachments unless you recognize the sender and know the content is safe. Hi Ryan, Below are some of Mountain Parks Electric, Inc. (MPEI) requirements. 1. MPEI has existing underground lines along the east and south property lines. I cannot find where the electric meter is to be located from the drawings, so I don’t know how we will design the electric to feed the building. If the meter location is determined, please send a drawing to me. 2. Required separations from other utilities must be given to assure safety for the general public and our employees for normal activity around our power lines and equipment. MPEI requires a blanket easement or 20 foot wide easements/separation (10’ on each side of centerline) for primary power lines, as installed. (Part of the easement can be in the road if provided for in the plat). No structure (including decks and building overhangs) is allowed closer than 10’ from any primary voltage power lines or within ten feet (10’) around any equipment. Water and sanitation districts require a minimum of ten feet (10’) separation to parallel power lines. MPEI requires five foot (5’) separation to parallel gas lines and one foot (1’) separation to communications. 3. All equipment must be set a minimum of 5’ behind a road edge with no curb, or minimum of 3’ behind a minimum 6” curb. All equipment must have a minimum clearance of 10’ to any obstruction to the front of the equipment. Plastic communication boxes must be a minimum of 2 feet from electric vaults. 4. Meters MUST be under a permanent gable end of the building or on a meter pedestal located a safe distance from snow shed and snow storage. 5. The Plat must have appropriate easement language. Please see our suggested language at the bottom of the review. 6. MPEI is experiencing supply chain issues with transformers. Currently, lead times are over a year for most sizes. Blanket Easement: PER THIS PLAT, A BLANKET EASEMENT UPON, ACROSS, ABOVE, OVER, UNDER AND THROUGH THE SUBJECT PROPERTY IS GRANTED TO MOUNTAIN PARKS ELECTRIC, INC. FOR THE PURPOSE OF INGRESS TO AND EGRESS FROM, AND THE INSTALLATION, REPAIR, REPLACEMENT, OPERATION AND MAINTENANCE OF AN ELECTRIC DISTRIBUTION SYSTEM, INCLUDING ELECTRIC LINES AND ALL ASSOCIATED FACILITIES. WITH RESPECT TO THE ELECTRIC UTILITY EASEMENT GRANTED HEREBY, NO STRUCTURE SHALL BE ALLOWED CLOSER THAN TEN FEET (10’) FROM ANY PRIMARY VOLTAGE POWER LINES OR WITHIN TEN FEET (10’) AROUND ANY ABOVE GROUND EQUIPMENT. NO OTHER UTILITY LINE (WHETHER GAS, WATER, SEWER OR OTHER UTILITY) SHALL BE ALLOWED CLOSER THAN FIVE FEET (5’) FROM ANY PRIMARY VOLTAGE POWER LINES OR WITHIN FIVE FEET (5’) AROUND ANY ABOVE GROUND EQUIPMENT. NOT WITHSTANDING THE FOREGOING, UNDERGROUND 2 COMMUNICATION FACILITIES SHALL NOT BE ALLOWED CLOSER THAN ONE FOOT (1’) TO ANY POWER LINES AND ABOVE GROUND COMMUNICATION FACITLITIES SHALL NOT BE CLOSER THAN TWO FEET (2’) TO ANY ABOVE GROUND ELECTRIC FACILITIES. NO GRADE CHANGES (FILL OR CUT) IN EXCESS OF SIX INCHES (6”) ARE PERMITTED WITHIN TEN FEET (10’) OF ANY PRIMARY ELECTRIC LINE OR WITHIN FIVE FEET (5’) OF ANY OTHER FACILITY, INCLUDING SECONDARY ELECTRIC LINES, WITHOUT PRIOR WRITTEN AUTHORIZATION FROM MOUNTAIN PARKS ELECTRIC, INC. Dedicated Plat Language: ONSITE ELECTRIC UTILITY EASEMENTS ARE HEREBY DEDICATED BY THIS PLAT IN THE LOCATIONS SHOWN HEREON AND ARE ESTABLISHED FOR INGRESS TO AND EGRESS FROM, THE INSTALLATION, REPAIR, REPLACEMENT, OPERATION AND MAINTENANCE OF PUBLIC UTILITES, INCLUDING ELECTRIC LINES AND EQUIPMENT. ONCE ELECTRICAL UTILITIES ARE INSTALLED IN SUCH UTILITY EASEMENT(S), NO STRUCTURE SHALL BE ALLOWED CLOSER THAN TEN FEET (10’) FROM ANY PRIMARY VOLTAGE POWER LINES OR WITHIN TEN FEET (10’) AROUND ANY ABOVE GROUND EQUIPMENT. NO GAS LINE WILL BE PERMITTED CLOSER THAN FIVE FEET (5’) TO ANY PRIMARY VOLTAGE LINES OR EQUIPMENT. NOT WITHSTANDING THE FOREGOING, UNDERGROUND COMMUNICATION FACILITIES SHALL NOT BE ALLOWED CLOSER THAN ONE FOOT (1’) TO ANY POWER LINES AND ABOVE GROUND COMMUNICATION FACILITIES SHALL NOT BE CLOSER THAN TWO FEET (2’) TO ANY ABOVE GROUND ELECTRIC FACILITIES. NO GRADE CHANGES (FILL OR CUT) IN EXCESS OF SIX INCHES (6”) ARE PERMITTED IN THE UTILITY EASEMENT WITHOUT PRIOR WRITTEN AUTHORIZATION FROM MOUNTAIN PARKS ELECTRIC, INC. Thank you for your consideration, Jean Jean Johnston Right of Way Specialist, Sr Staker JeanJ@mpei.com ex 265 Mountain Parks Electric, Inc. 321 West Agate Ave • P.O. Box 170, Granby, CO 80446-0170 • 970.887.3378 We are owned by those we serve. This institution is an equal opportunity provider and employer. Click here to take our quick online survey for chance to win a $100 bill credit! From: Ryan Helle <ryan.helle@baselinecorp.com> Sent: Tuesday, June 7, 2022 11:48 AM To: 'Ed Cannon' <ecannon@town.fraser.co.us>; 'julie.koehler@merrick.com' <julie.koehler@merrick.com>; 'jshockey@wpgov.com' <jshockey@wpgov.com>; 'ckarsh@jvajva.com' <ckarsh@jvajva.com>; 'cbrown@town.fraser.co.us' <cbrown@town.fraser.co.us>; Jean Johnston <JeanJ@mpei.com>; 'kathleen.jacoby@xcelenergy.com' <kathleen.jacoby@xcelenergy.com>; 'dsoles@eastgrandfire.com' <dsoles@eastgrandfire.com>; 'rmowrey@eastgrandfire.com' <rmowrey@eastgrandfire.com>; 'agosey@eastgrandfire.com' <agosey@eastgrandfire.com> Cc: Julie Esterl <julie.esterl@baselinecorp.com>; Alyssa Rivas <alyssa.rivas@baselinecorp.com> Subject: RE: [External] Middle Park Health MSP Caution: This email originated from outside of MPEI. Do not click links or open attachments unless you recognize the sender and know the content is safe. 3 Referral Agencies, I am following up as a reminder to review and provide comment for the Middle Park Health Major Site Plan. A similar plan was submitted in 2020 and approved with conditions. Since two years have passed since approval, a new approval is required. The applicant has since made revisions based on comments from 2020. Please review the submittal documents which can be found by clicking the link below. Referral comments will be made part of the public record of the Town of Fraser. The Planning Commission public hearing will be June 22, 2022. Please provide any comments by June 15, 2022. Drop box link: https://www.dropbox.com/sh/oap725qrdh8wdav/AAAY9YoCXer6k0h31L8SvpfQa?dl=0 Thank you, RYAN HELLE | PLANNING TECHNICIAN Baseline Engineering Corporation | Engineering, Planning, & Surveying Phone: 719.531.6200 | Cell: 573.450.8755 | www.baselinecorp.com | Social Media Office: 1046 Elkton Drive, Colorado Springs, CO 80907 From: Ryan Helle Sent: Wednesday, June 1, 2022 12:08 PM To: 'Ed Cannon' <ecannon@town.fraser.co.us>; 'julie.koehler@merrick.com' <julie.koehler@merrick.com>; 'jshockey@wpgov.com' <jshockey@wpgov.com>; 'ckarsh@jvajva.com' <ckarsh@jvajva.com>; 'cbrown@town.fraser.co.us' <cbrown@town.fraser.co.us>; 'jeanj@mpei.com' <jeanj@mpei.com>; 'kathleen.jacoby@xcelenergy.com' <kathleen.jacoby@xcelenergy.com>; 'dsoles@eastgrandfire.com' <dsoles@eastgrandfire.com>; 'rmowrey@eastgrandfire.com' <rmowrey@eastgrandfire.com>; 'agosey@eastgrandfire.com' <agosey@eastgrandfire.com> Cc: Julie Esterl <julie.esterl@baselinecorp.com>; Alyssa Rivas <alyssa.rivas@baselinecorp.com> Subject: Middle Park Health MSP Referral Agencies, Middle Park Health has submitted a Major Site Plan for approval. A similar plan was submitted in 2020 and approved with conditions. Since two years have passed since approval, a new approval is required. The applicant has since made revisions based on comments from 2020. Please review the submittal documents which can be found by clicking the link below. Referral comments will be made part of the public record of the Town of Fraser. The Planning Commission public hearing will be June 22, 2022. Please provide any comments by June 15, 2022. Drop box link: https://www.dropbox.com/sh/oap725qrdh8wdav/AAAY9YoCXer6k0h31L8SvpfQa?dl=0 Thank you, RYAN HELLE | PLANNING TECHNICIAN Baseline Engineering Corporation | Engineering, Planning, & Surveying Phone: 719.531.6200 | Cell: 573.450.8755 | www.baselinecorp.com | Social Media Office: 1046 Elkton Drive, Colorado Springs, CO 80907 1 Ryan Helle From:Will Berry <will@whitmerlawfirm.com> Sent:Wednesday, June 15, 2022 2:59 PM To:Julie Esterl Cc:Ryan Helle; Kent Whitmer Subject:RE: [EXTERNAL] RE: Middle Park Health, Fraser MSP - Submittal Documents Attachments:2005-012709 Grand Park PDD.pdf [EXTERNAL EMAIL] DO NOT CLICK links or attachments unless you recognize the sender and know the content is safe. Julie, Two quick comments for this one: 1. The title commitment does not include the attached 2005 PDD Plan, which looks to include the subject property and has various limitations for the applicable planning area, 1Wa (none of which look to be violated by the plans). Just want to clarify if applicant believes the project is subject to this PDD. 2. The parking easement recorded at Reception No. 2011005627 (Exception 17) is not depicted on the site plan. It might have been terminated by Paragraph 11 of the 2019 plat; if so, Exception 17 should be removed from the title work so that the Town knows the site plan does not violate TC 19-2-110(d)(4). William G. Berry, Attorney The Whitmer Law Firm, LLC Telephone: 970.725.3460 ex. 2 Website: www.whitmerlawfirm.com From: Julie Esterl <julie.esterl@baselinecorp.com> Sent: Tuesday, June 14, 2022 9:30 AM To: Will Berry <will@whitmerlawfirm.com>; Kent Whitmer <kent@whitmerlawfirm.com> Cc: Ryan Helle <ryan.helle@baselinecorp.com> Subject: FW: [EXTERNAL] RE: Middle Park Health, Fraser MSP - Submittal Documents Will, Attached is the updated Title Commitment for the Fraser Health Center Site Plan project. JULIE ESTERL | PRINCIPAL PLANNER Baseline Engineering Corporation | Engineering, Planning, & Surveying Phone: 303.202.5010x222 | Mobile: 608.215.9300 | www.baselinecorp.com | Social Media Office: 112 N. Rubey Drive, #210, Golden, CO 80403 From: Thomas C. Coburn <TCoburn@middleparkhealth.org> Sent: Tuesday, June 14, 2022 9:17 AM To: Julie Esterl <julie.esterl@baselinecorp.com>; 'Paul Garland' <Paul.Garland@davispartnership.com>; Jason Cleckler <JCleckler@middleparkhealth.org> Cc: Todd Wainwright <Todd.Wainwright@davispartnership.com>; Mark Hageman <Mark.Hageman@davispartnership.com>; Ryan Spaustat <ryans@landmark-co.com> <ryans@landmark-co.com>; Katharine Schmachtenberger <Katharine.Schmachtenberger@davispartnership.com>; Katherine Clark <kclark@ssr- 2 inc.com>; Ryan Helle <ryan.helle@baselinecorp.com> Subject: RE: [EXTERNAL] RE: Middle Park Health, Fraser MSP - Submittal Documents [EXTERNAL EMAIL] DO NOT CLICK links or attachments unless you recognize the sender and know the content is safe. Good morning all, Attached is the updated title commitment. Thanks, Tom From: Julie Esterl <julie.esterl@baselinecorp.com> Sent: Monday, June 13, 2022 10:23 AM To: 'Paul Garland' <Paul.Garland@davispartnership.com> Cc: Thomas C. Coburn <TCoburn@middleparkhealth.org>; Todd Wainwright <Todd.Wainwright@davispartnership.com>; Mark Hageman <Mark.Hageman@davispartnership.com>; Ryan Spaustat <ryans@landmark-co.com> <ryans@landmark- co.com>; Katharine Schmachtenberger <Katharine.Schmachtenberger@davispartnership.com >; Katherine Clark <kclark@ssr-inc.com>; Ryan Helle <ryan.helle@baselinecorp.com> Subject: [EXTERNAL] RE: Middle Park Health, Fraser MSP - Submittal Documents Paul, Good morning. Ryan and I are preparing the PC Packet this week. We have a request from the Town Attorney to review the Title Commitment. I know I mentioned it might not be needed, but you indicated you would have it prepared anyway. Also, the Attorney noted that your cover letter mentions that it is being prepared, and has asked to review it. Can you please forward it to me or let me know if/when it will be ready? Thank you, JULIE ESTERL | PRINCIPAL PLANNER Baseline Engineering Corporation | Engineering, Planning, & Surveying Phone: 303.202.5010x222 | Mobile: 608.215.9300 | www.baselinecorp.com | Social Media Office: 112 N. Rubey Drive, #210, Golden, CO 80403 From: Paul Garland <Paul.Garland@davispartnership.com> Sent: Wednesday, June 1, 2022 8:00 AM To: Julie Esterl <julie.esterl@baselinecorp.com> Cc: Thomas C. Coburn <TCoburn@middleparkhealth.org>; Todd Wainwright <Todd.Wainwright@davispartnership.com>; Mark Hageman <Mark.Hageman@davispartnership.com>; Ryan Spaustat <ryans@landmark-co.com> <ryans@landmark- co.com>; Katharine Schmachtenberger <Katharine.Schmachtenberger@davispartnership.com >; Katherine Clark <kclark@ssr-inc.com> Subject: Re: Middle Park Health, Fraser MSP - Submittal Documents [EXTERNAL EMAIL] DO NOT CLICK links or attachments unless you recognize the sender and know the content is safe. Thank you, Julie. 3 Tom, Jason, FYI, Ryan indicated that we should still get the title commitment so we can be certain all easements end up on our plan and nothing new shows up during construction. Best, Paul Sent from my "smart"phone. Apologies for any autocorrect misspellings. From: Julie Esterl <julie.esterl@baselinecorp.com> Sent: Tuesday, May 31, 2022 9:24:13 PM To: Paul Garland <Paul.Garland@davispartnership.com> Cc: Thomas C. Coburn <tcoburn@middleparkhealth.org>; Todd Wainwright <Todd.Wainwright@davispartnership.com>; Mark Hageman <Mark.Hageman@davispartnership.com>; Ryan Spaustat <ryans@landmark-co.com> <ryans@landmark- co.com>; Katharine Schmachtenberger <Katharine.Schmachtenberger@davispartnership.com >; Katherine Clark <kclark@ssr-inc.com> Subject: RE: Middle Park Health, Fraser MSP - Submittal Documents Hi Paul, Thanks for your voicemails and for following up by email. There is still time to get the newspaper and mailed notices out for the June 22nd PC meeting, I will plan to submit the newspaper notice on Monday, June 6 th to the Middle Park Times. You will need to send out the mailed notices on or before June 9 th. Please forward the affidavit of mailing to me on or before June 13th. Let me know if you need the template for the affidavit. Regarding the clouded drawing set, since the previous set was already conditionally approved, I will accept the un- clouded plan set. I’ll send it out on referral, and do an internal review. Since the referral period is 16 days, comments will not be required back to me before I need to post the packet to the website, so there will need to be a general condition of addressing agency comments – if any. Just a heads up on that. I’ll look for the submittal of the other items tomorrow. Thanks again, JULIE ESTERL | PRINCIPAL PLANNER Baseline Engineering Corporation | Engineering, Planning, & Surveying Phone: 303.202.5010x222 | Mobile: 608.215.9300 | www.baselinecorp.com | Social Media Office: 112 N. Rubey Drive, #210, Golden, CO 80403 From: Paul Garland <Paul.Garland@davispartnership.com> Sent: Tuesday, May 31, 2022 5:04 PM To: Julie Esterl <julie.esterl@baselinecorp.com> Cc: Thomas C. Coburn <tcoburn@middleparkhealth.org>; Todd Wainwright <Todd.Wainwright@davispartnership.com>; Mark Hageman <Mark.Hageman@davispartnership.com>; Ryan Spaustat <ryans@landmark-co.com> <ryans@landmark- co.com>; Katharine Schmachtenberger <Katharine.Schmachtenberger@davispartnership.com >; Katherine Clark <kclark@ssr-inc.com> Subject: RE: Middle Park Health, Fraser MSP - Submittal Documents [EXTERNAL EMAIL] DO NOT CLICK links or attachments unless you recognize the sender and know the content is safe. 4 Thanks, Julie. See responses/questions below in red text. We assume we’ll still be on the June PC Hearing Agenda. Could you please confirm this? Thank you, Paul. PAUL GARLAND, ASLA, PLA, LEED GA Associate, Landscape Architect Davis Partnership Architects D 303 308 2569 M 303 908 4842 paul.garland@davispartnership.com www.davispartnership.com From: Julie Esterl <julie.esterl@baselinecorp.com> Sent: Tuesday, May 31, 2022 9:56 AM To: Paul Garland <Paul.Garland@davispartnership.com> Cc: Thomas C. Coburn <tcoburn@middleparkhealth.org>; Todd Wainwright <Todd.Wainwright@davispartnership.com>; Mark Hageman <Mark.Hageman@davispartnership.com>; Ryan Spaustat <ryans@landmark-co.com> <ryans@landmark- co.com>; Katharine Schmachtenberger <Katharine.Schmachtenberger@davispartnership.com >; Katherine Clark <kclark@ssr-inc.com> Subject: RE: Middle Park Health, Fraser MSP - Submittal Documents Paul, Thank you for the submittal. There are a few items that need attention. 1. The application needs to be signed and dated. We will get this signed. I noticed we didn’t last time, and failed to this time as well. 2. Since you are not the property owner, you will need to submit a letter from the property owner authorizing you to submit this application on their behalf. We will get you a document stating such. 3. Please submit the revised & clouded Major Site Plan drawing set We were looking at this submittal as a First Submittal since our “continuance” option has expired. If we do indeed need to provide clouds for our revisions, what level of detail are you looking for? For example, do we need to go into each item in a table and cloud each number that changed? Or would clouding the parking lot on the plan suffice – since that caused the table to change? 1. Proof of ownership (usually a deed) is required, but a Title Commitment is not. Understood. We were working on Title Commitment per our last email exchange last week. I know it’s in the works now and will be ready early next week. If the deed is more readily available, we’ll send that instead. 2. Fees are paid to the Town Clerk, Antoinette McVeigh. Please contact Antoinette regarding how to pay the fee. amcveigh@town.fraser.co.us Thank you. We are working with Antoinette to have these fees paid. Thank you, JULIE ESTERL | PRINCIPAL PLANNER Baseline Engineering Corporation | Engineering, Planning, & Surveying Phone: 303.202.5010x222 | Mobile: 608.215.9300 | www.baselinecorp.com | Social Media Office: 112 N. Rubey Drive, #210, Golden, CO 80403 From: Paul Garland <Paul.Garland@davispartnership.com> Sent: Friday, May 27, 2022 3:50 PM 5 To: Julie Esterl <julie.esterl@baselinecorp.com> Cc: Thomas C. Coburn <tcoburn@middleparkhealth.org>; Todd Wainwright <Todd.Wainwright@davispartnership.com>; Mark Hageman <Mark.Hageman@davispartnership.com>; Ryan Spaustat <ryans@landmark-co.com> <ryans@landmark- co.com>; Katharine Schmachtenberger <Katharine.Schmachtenberger@davispartnership.com >; Katherine Clark <kclark@ssr-inc.com> Subject: Middle Park Health, Fraser MSP - Submittal Documents [EXTERNAL EMAIL] DO NOT CLICK links or attachments unless you recognize the sender and know the content is safe. Julie, This is email 1 of 2 and contains our submittal documents for the Site Plan Submittal – except for the drawing sheets. Those will be sent in a 2nd email shortly. You will notice that the Title Commitment and the Review Fee are not included here. Those will both be delivered next week. Tom will coordinate payment of the review fee early next week. Can that be complete over the phone? Or does a physical check need to be run? Please reach out if there are any additional items you need from us to log this into your system and begin the review process. Thank you, Paul. Paul Garland, PLA, ASLA, LEED GA Associate, Landscape Architect Davis Partnership Architects T 303 861 8555 D 303 308 2569 M 303 908 4842 2901 Blake Street, Suite 100 Denver, Colorado 80205-2849 www.davispartnership.com CONFIDENTIALITY NOTICE: This electronic email and any attachments may contain confidential, privileged and/or proprietary information that is intended solely for the intended recipient; it is to be considered confidential and protected by applicable legal privileges. If received in error, please notify the sender immediately. CONFIDENTIALITY NOTICE: This electronic email and any attachments may contain confidential, privileged and/or proprietary information that is intended solely for the intended recipient; it is to be considered confidential and protected by applicable legal privileges. If received in error, please notify the sender immediately. CONFIDENTIALITY NOTICE: This electronic email and any attachments may contain confidential, privileged and/or proprietary information that is intended solely for the intended recipient; it is to be considered confidential and protected by applicable legal privileges. If received in error, please notify the sender immediately. Links contained in this email have been replaced by ZixProtect Link Protection. If you click on a link in the email above, the link will be analyzed for known threats. If a known threat is found, you will not be able to proceed to the destination. If suspicious content is detected, you will see a warning. June 15, 2022 Mr. James Shockey, AICP Community Development Director Town of Winter Park 50 Vasquez Road Winter Park, Colorado 80482 Via email: jshockey@wpgov.com RE: Middle Park Health – Fraser Health Center Review JVA Job# 1566.107c Dear James: JVA Inc. has reviewed the Major Site Plan resubmittal for the above referenced project, dated May 27, 2022 as it relates to connections and improvements within Town of Winter Park boundaries. We have reviewed the site plan for conformance with the Town of Winter Park Standards and Specifications (Standards) and offer the following comments. 1. Please revise the plans with the recent name change from King’s Crossing Road to Telemark Drive. 2. The flowline of the proposed curb and gutter on the north side of Telemark Drive shall be placed approximately 1’ beyond the existing white stripe and maintain one tangent between the Lions Gate intersection and the curve beginning in the approximate location of the access drive. 3. The curb and gutter shall end 8’ to the east of the proposed walk on the east side of the access drive. The curb shall taper from 6” at the edge of walk to 0” over a distance of 8 feet. An 8’ concrete ‘panel’ shall also taper along the back of this curb to be flush with grade where both curb and panel terminate. 4. The proposed curb ramps shall be constructed to Town standards and include detectable warnings. 5. Several existing curb inlets on Telemark Drive discharge to the site property. The storm pipes shown on the plans along Telemark Drive towards the Lions Gate intersection do not exist. Please correct survey and adjust design as required to accommodate these existing drainages. Where storm pipes cross Telemark Drive, curb inlets shall be installed along the proposed curb and gutter and tie into these storm drains. 6. The existing stop sign at the northeast corner of the Lions Gate intersection is not shown. This sign shall remain or be relocated as necessary to be clear of pedestrian travel paths from the proposed curb ramp. 7. The plans shall include a note to provide the return or relocation of any other existing signage in the Winter Park Right-of-Way to the Town or Winter Park and coordinate this effort with the Town. 8. All monument signs or wayfinding signage shall conform to Winter Park standards and maintain clearance of sight triangles. 9. Please provide the sight triangles at the Lions Gate intersection and adjust landscaping plans if needed to maintain clearances. 10. It appears that the existing trees at the southeast corner of the property are within sight triangles of the proposed drive access and will need to be removed. Middle Park Health – Fraser Health Center MSP Review 06/15/22 2 of 2 It is our understanding that other review agencies may have comments regarding improvements within the Town of Winter Park Right-of-Way and these shall be addressed by the Applicant accordingly. Feel free to reach out with any questions. We look forward to reviewing revised plans and responses to the above comments. Sincerely, JVA, INCORPORATED By: ____________________________________ Cooper Karsh, P.E., CFM Project Manager 6/16/22, 11:01 AM Fraser, CO Municipal Code 1/1 (a) (1) (2) (3) (b) (1) (2) (3) (c) Sec. 19-4-180. - Utilities. Water supply. Connection required. Each new development within the Town shall be required to connect to the municipal water system. Design. The internal water distribution system of each subdivision shall be designed and sized hydraulically to meet the initial and future demands of the proposed subdivision and shall be approved by the Town prior to construction. Specifications. Refer to Chapter 14 of this Code, Design Criteria and Construction Standards. Sanitary sewer disposal. Connection required. Each new development within the Town shall be required to connect to the municipal sanitary sewer system. Design. Collection systems shall be designed to meet the initial and future demands of the proposed subdivision and shall be approved by the Town prior to construction. Specifications. Refer to Chapter 14 of this Code, Design Criteria and Construction Standards. Other utilities. Proper coordination shall be established between the applicant and the applicable utility companies for the establishment of utility easements, all of which shall be indicated and dedicated on the final plat or via separate instrument. ( Ord. 452 §1(Exh. A), 2018) FRASER PLANNING COMMISSION RESOLUTION NO. 2022-06-02 A RESOLUTION APPROVING A MAJOR SITE PLAN FOR A NEW FRASER HEALTH CENTER TO BE LOCATED AT THE VILLAGE AT GRAND PARK, FILING 2, LOT 2C, TOWN OF FRASER, GRAND COUNTY, COLORADO, PART OF SEC. 28, TOWNSHIP 1 SOUTH, RANGE 75 WEST OF THE 6TH PM. WHEREAS, at the regular meeting of the Fraser Planning Commission held on June 22, 2022, Paul Garland of Davis Partnership Architect, on behalf of Kremmling Memorial Hospital District, a Colorado Special Tax District AKA Middle Park Health, requested approval for a Major Site Plan for a new Fraser Health Center; and WHEREAS, Kremmling Memorial Hospital District is the current owner of the property; and WHEREAS, the applicant is requesting major site plan approval which would allow for the construction of a 27,345 square foot medical clinic with 59 parking spaces and 46,495 square feet of landscaped area on Lot 2C, Village at Grand Park, Filing 2 in Fraser; and WHEREAS, Staff has determined that this application is in compliance with the Land Development Code of the Town of Fraser when the conditions listed below have been addressed. NOW THEREFORE BE IT RESOLVED that the Fraser Planning Commission has voted to approve this development application with the following conditions: 1. Applicant to address Agency Review Comments included in the packet, and revise and resubmit documents accordingly. 2. A Construction Guarantee Agreement (CGA) and appropriate security shall be submitted and approved prior to building permit issuance. APPROVED AND ADOPTED THIS 22nd DAY OF JUNE, 2022. FRASER PLANNING COMMMISSION Chairman ATTEST: _________________________________________ Town Clerk May 27, 2022 Julie Esterl Principal Planner Baseline Corp. 153 Fraser Avenue Fraser, CO 804442 Re: Middle Park Health – Fraser Health Center Arch. Project No. 17322.03 Dear Julie: As the Applicant on behalf of MPH (Middle Park Health), please accept this Major Site Plan application regarding a new Health Center at the south end of The Village at Grand Park development. This project was previously Approved with Conditions at the April 22, 2020 Fraser Planning Commission hearing. Due to the length of time this project has sat idle we are submitting again per the Town’s requirements. The site plan has been updated to more reflect as-built conditions of Main Street and Lions Gate Crossing, as well as to improve snow removal efforts within the parking lot. The site is approximately 2.7 acres on the north side of Kings Crossing Road between Lions Gate Drive and Pine Tree Plaza. This new development will fill a need for medical services within the Town of Fraser and this area of Grand County. The 2-story, 31,000sf building sits on a site with 53 proposed parking spaces including 5 accessible parking spaces. There is an at-grade helistop with a flight path planned for ingress and egress to the northwest corner of the site. This flight path allows for free helicopter access now and plans for future growth within The Village at Grand Park development. The health center anticipates approximately one use of the helistop each month for situations where a patient requires emergency evacuation to a more appropriately equipped facility. Architecture The first floor of the proposed health center will provide an Emergency Department, Inpatient Care (2 patient rooms) and Imaging, Lab and Pharmacy Services. Access to an exterior patio on the second floor will be provided while a majority of the second floor will be shelled space for future growth. The building skin will include brick veneer, stone and metal and wood panels. Rooftop equipment is hidden from ground views with additional metal panel screening. Landscape Landscape improvements will meet Town of Fraser requirements and Village at Grand Park design guidelines. Exterior gathering spaces will be provided for areas of respite for visitors and employees to enjoy the outdoor environment and have been positioned to take advantage of views to the south of nearby mountain peaks. Landscape within the helistop flight path has been restricted to 36” height to eliminate conflicts with a helicopter in flight. Roadway/Access Middle Park Health – Fraser Health Center May 27, 2022 Page 2 The site provides access to the Main Building Entry from Kings Crossing and Hwy 40 on the south side of the building. Lions Gate will connect to Main Street around the west side of the site and provide access to the Ambulance Drop Off, Main Street, and The Village at Grand Park. Service and delivery access is provided at the northeast side of the building where a covered and enclosed utility yard provides screening of a generator, transformer, trash dumpsters, and a built-in storage building. A fire lane is provided for access around the east side of the building. Site Grading and Drainage The site grade falls more than 12 feet from the southwest corner to the northeast corner of the site. Proximity of the building to Main Street has set the first-floor finished elevation which then sets grades for the remainder of the site. The helistop is 10’ above the first-floor elevation to provide needed clearances around the site. An accessible path is provided from the southwest building entry to the helistop. The new medical center development works within the regional drainage plan as designed for the Village at Grand Park. All surface drainage is directed to an underground storm water pipe system. This system then ties to facilities already in place at the northeast corner of the site. UTILITIES Water: There are 2 new fire hydrants proposed for this building. One is located on the north side near the Ambulance Entrance using an existing stubbed line within Main Street. The second is on the south side of the building in a parking island near the south building entrance requiring a new tee within Main Street. A 4” domestic water service and 6” fire service lines are proposed to enter the building on the east side near the service yard. We plan to use an existing stub from the water line in Main Street but will need to verify the size and location of this stub. Sanitary Sewer: A sanitary service line is planned to tie to the stubbed line from Main Street. A couple of additional notes: we are in the process of obtaining an as-built survey of the Grand Park Development improvements and will include those minor detail changes in our Permit Set to obtain our Construction Permit. Also, the title company needs a few more days to complete the title commitment. We will submit that next week when it’s ready. We look forward to discussing this project with you at your convenience. The accompanying documents are those required per the Fraser, Colorado Site Plan Checklist. Sincerely, DAVIS PARTNERSHIP ARCHITECTS, PC Paul F. Garland, PLA, ASLA, LEED GA Associate Attachments Cc: File, MPH LANDSCAPE SYMBOLS LEGEND ? ? SECTION REFERENCE EXTERIOR ELEVATION REFERENCE DIMENSION LINE CENTERLINE 8'-2" NORTH ARROW 0'10'20'40'80' GRAPHIC SCALE ? ? NOTE AND LEADER CALLOUT DETAIL CALLOUT ? ?? ?? ?? ℄ NORTH KINGS CROSSING RD OL D V I C T O R Y R D M A I N S T L I O N S G A T E D R TRE S T L E D R M A I N S T SECOND S T KINGS C R O S S I N G R D L I O N S G A T E D R SCALE: 1" = 200' - 0" VICINITY MAP TOWN OF FRASER NOTES 1. THE OWNER AND HIS OR HER HEIRS, SUCCESSORS, AND ASSIGNS SHALL PROVIDE ADEQUATE MAINTENANCE FOR ALL SITE ELEMENTS. MAP DATA: GOOGLE. PROPOSED LOT 12C, THE VILLAGE AT GRAND PARK LYING WITHIN THE SOUTHWEST QUARTER OF SECTION 28, TOWNSHIP 1 SOUTH, RANGE 75 WEST OF THE SIXTH PRINCIPAL MERIDIAN, TOWN OF FRASER, COUNTY OF GRAND, STATE OF COLORADO. PROPERTY DESCRIPTION: THE PURPOSE OF THIS SITE PLAN REVIEW IS TO BUILD A NEW OUTPATIENT MEDICAL CLINIC. THE PROJECT INCLUDES 59 NEW PARKING SPACES, A LOADING DOCK, AND A TOTAL OF 46,495.75 SQ.FT. LANDSCAPED AREA. THIS SITE CONTAINS A CALCULATED AREA OF 2.77 ACRES, LOT 12C. PROJECT DESCRIPTION: SHEETS INDEX Sheet Number Sheet Name Sheet Issue Date 05/27/2022L-000 COVER SHEET C-100 CIVIL SITE PLAN C-200 UTILITY PLAN C-300 GRADING PLAN L-001 SITE PLAN L-002 L-003 LANDSCAPE PLAN PLANTING DETAILS A-001 FLOOR PLAN - LEVEL ONE A-002 FLOOR PLAN - LEVEL TWO A-003 A-004 HIGH ROOF PLAN A-005 EXTERIOR ELEVATIONS A-006 EXTERIOR ELEVATIONS EL000 LIGHTING LEGENDS AND ABBREVIATIONS EL001 LIGHTING FIXTURE SCHEDULE EL002 PHOTOMETRICS NORTH 05/27/2022 SHEET NUMBER: PROJECT NO. DATE: DA T E RE V RE M A R K S DR W N CH K D AP R V D 17322.03 MA J O R S I T E P L A N MI D D L E P A R K HE A L T H - N E W FR A S E R H E A L T H CE N T E R MAJOR SITE PLAN MIDDLE PARK HEALTH - NEW FRASER HEALTH CENTER APPLICANT CIVIL ENGINEER MIDDLE PARK HEALTH 214 S. 4TH STREET KREMMLING, CO 80459 970-219-5444 CONTACT: TOM COBURN Tcoburn@middleparkhealth.org LANDMARK CONSULTANTS, INC. 141 9TH ST STEAMBOAT SPRINGS, CO 80487 PHONE: 970-819-6380 CONTACT: RYAN SPAUSTAT ryan@landmark-co.com LANDSCAPE ARCHITECT DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: PAUL GARLAND Paul.Garland@davispartnership.com ARCHITECT DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: JD DREYER JD.Dreyer@davispartnership.com Grand County Parcel ID No. 158729100154 ELECTRICAL ENGINEER SMITH SECKMAN REID INC. 7935 E PRENTICE AVE, SUITE 300W GREENWOOD VILLAGE, CO 80111 PHONE: 303-779-1222 CONTACT: KATHERINE CLARK Kclark@ssr-inc.com 5/ 2 7 / 2 0 2 2 SU B M I T T A L # 1 EXTERIOR ELEVATIONS EXTERIOR ELEVATIONSA-007 COVER SHEET OFF-STREET PARKING REQUIREMENTS LANDSCAPE REQUIREMENTS L-000 *REFER TO FRASER MUNICIPAL CODE SEC. 19-4-230 TABLE 4.1, COMMERCIAL USES - MEDICAL AND DENTAL CLINICS **REFER TO FRASER MUNICIPAL CODE SEC. 19-4-230 TABLE 4.1, INSTITUTIONAL USES - HOSPITAL ***REFER TO 2010 ADA STANDARDS - 208.2 PARKING SPACES ****REFER TO 2010 ADA STANDARDS - 208.2.1 HOSPITAL OUT-PATIENT FACILITIES VEHICLE PARKING CALCULATIONS ACCESSIBLE VEHICLE PARKING CALCULATIONS 05/27/2022 05/27/2022 05/27/2022 05/27/2022 05/27/2022 05/27/2022 05/27/2022 05/27/2022 05/27/2022 05/27/2022 05/27/2022 05/27/2022 05/27/2022 05/27/2022 05/27/2022 05/27/2022 XG XG XG XG X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X X T T T X E X E T XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE X E X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T XT XT XT XT XT XT XT XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS X S X S X S X S X S X S X S X S XS XS X S X S X S X S X S X S X S X S X S X S X S X S XS XS XS X S X S X S X S XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS X S X S X S X S X S XS XS XS XS XSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXS XS XS XS X S X S X S X S X S X S X S X S XS XS XS X W XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW X W X W X W X W X W X W X W XW XWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXW XW XW XW XW XW XW XW X W X W X W X W XW XW XW XW XW XW XW XW XW XW XW XW XW TR TR TR TR TR ST ST ST ST ST ST ST ST ST ST V A N VAN W W S S SC W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W G G G GM EX FH HYDRANT EX MARKET STREET ALIGNMENT AND ROUNDABOUT (BY OTHERS) PROPERTY LINE MATCH EXISTING PR RETAINING WALL W/ GUARDRAIL EX. SEWER TO BE ABANDONED PR AREA INLET (TYP.) PR CURB INLET PR AREA INLET PR CURB INLET MATCH EXISTING CORE INTO EXISTING M.H PR CURB INLET (TYP.) CORE INTO EXISTING M.H. PED. RAMP PR FH PR SEWER SERVICE PR. WATER SERVICE/ FIRE SUPRESSION COVERED ENTRANCE CANOPY KING'S CROSSING ROAD LI O N ' S G A T E D R OLD VICT O R Y R D MAI N S T COVERED ENTRANCE CANOPY HELI PAD PR CURB INLET PR CURB INLET PR FH PED. RAMP PR CURB INLET CONNECT TO MAIN CONNECT TO MAIN PR AREA INLET CONNECT TO EX SANITARY PED. RAMP PR AREA INLET (TYP.) PED. RAMP PED. RAMP PR AREA INLET (TYP.) PR RETAINING WALL W/ GUARDRAIL PR AREA INLET (TYP.) STAIRS PR AREA INLET (TYP.) PR AREA INLET (TYP.) PR AREA INLET (TYP.) ADA PARKING (TYP.) PED. RAMP PED. RAMP DRO P - O F F C I R C L E STORM INLET STRIPED ISLAND (TYP.) STRIPED ISLAND (TYP.) PARKING LIGHT (TYP.) MOUNTABLE CURB FOR PLOWING MOUNTABLE CURB FOR PLOWING SPILL CURB CATCH CURB AND GUTTER 8-FT SIDEWALK MOUNTABLE CURB TAPERED CURB FLUSH FLUSH CONNECTION TO SIDEWALK RELOCATE STREET LIGHT REPLACE EXISTING ASPHALT AS REQUIRED PED. RAMP PED. RAMP PED. RAMP EX PED. RAMP PED. RAMP CONNECT TO EXISTING SIDEWALK CONNECT TO EXISTING SIDEWALK SHEET NUMBER: PROJECT NO. DATE: DA T E RE V RE M A R K S DR W N CH K D AP R V D 17322.03 MA J O R S I T E P L A N MI D D L E P A R K HE A L T H - N E W FR A S E R H E A L T H CE N T E R MAJOR SITE PLAN MIDDLE PARK HEALTH - NEW FRASER HEALTH CENTER Grand County Parcel ID No. 158729100154 05/27/2022 5/ 2 7 / 2 0 2 2 SU B M I T T A L # 1 APPLICANT CIVIL ENGINEER MIDDLE PARK HEALTH 214 S. 4TH STREET KREMMLING, CO 80459 970-219-5444 CONTACT: TOM COBURN Tcoburn@middleparkhealth.org LANDMARK CONSULTANTS, INC. 141 9TH ST STEAMBOAT SPRINGS, CO 80487 PHONE: 970-819-6380 CONTACT: RYAN SPAUSTAT ryan@landmark-co.com LANDSCAPE ARCHITECT DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: PAUL GARLAND Paul.Garland@davispartnership.com ARCHITECT DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: JD DREYER JD.Dreyer@davispartnership.com ELECTRICAL ENGINEER SMITH SECKMAN REID INC. 7935 E PRENTICE AVE, SUITE 300W GREENWOOD VILLAGE, CO 80111 PHONE: 303-779-1222 CONTACT: KATHERINE CLARK Kclark@ssr-inc.comLEGEND: PROPERTY BOUNDARY ADJACENT PROPERTY BOUNDARY EASEMENT SECTION LINE CENTERLINE FOUND MONUMENT FOUND SECTION CORNER BUILDING ROOF LINE/OVERHANG DECK WALL FENCE ASPHALT CONCRETE GRAVEL SIGN GAS CABLE FIBER OPTIC TELEPHONE ELECTRIC OVERHEAD ELECTRIC DITCH/SWALE CABLE PEDESTAL GAS METER AND MANHOLE/VAULT TELEPHONE PEDESTAL AND MANHOLE/VAULT ELECTRIC PED, JUNCTION BOX AND METER LIGHT POLE AND LIGHT POLE W/ MAST UTILITY POLE AND GUY WIRE INLET AND STORM MANHOLE OVERLAND AND CHANNEL FLOW ARROWS CONIFEROUS AND DECIDUOUS TREE EX EX EXISTING STORM SEWER W/ FES PROPOSED STORM SEWER W/ FES PROPOSED MAJOR CONTOUR 6805 EXISTING MAJOR CONTOUR PROPOSED MINOR CONTOUR EXISTING MINOR CONTOUR 6805 EXISTING SANITARY SEWER W/ MH PROPOSED SANITARY SEWER W/ MH PROPOSED WATER PROPOSED GV, FH & CS SS XS EXISTING WATER ST NOTES:NOTES: 1.ALL REFERENCES HEREON TO BOOKS, PAGES, FILES, RECEPTION NUMBERS AND FILE NUMBERS ARE TO PUBLIC DOCUMENTS FILED IN THE RECORDS OF ROUTT COUNTY, COLORADO. 2.EXISTING CONDITIONS ARE BASED ON SURVEYING INFORMATION PREPARED BY CORE CONSULTANTS AND CONSTRUCTION DRAWING INFORMATION PREPARED BY TKE CIVIL & STRUCTURAL ENGINEERS. FINAL DESIGN INFORMATION SHALL BE BASED ON A NEW SURVEY OF CURRENT EXISTING CONDITIONS. 3.UTILITIES ARE SHOWN PER APPARENT SURFACE EVIDENCE TOGETHER WITH RECORD INFORMATION. IF MORE ACCURATE LOCATIONS OF UNDERGROUND UTILITIES ARE REQUIRED, THE UTILITY WILL HAVE TO BE VERIFIED BY FIELD POTHOLING. LANDMARK CONSULTANTS, INC. AND THE SURVEYOR OF RECORD SHALL NOT BE LIABLE FOR THE LOCATION OF OR THE FAILURE TO NOTE THE LOCATION OF NON-VISIBLE UTILITIES. 4.ANY PERSON WHO KNOWINGLY REMOVES, ALTERS OR DEFACES ANY PUBLIC LAND SURVEY MONUMENT OR LAND MONUMENT OR ACCESSORY, COMMITS A CLASS TWO (2) MISDEMEANOR PURSUANT TO STATE STATUTE 18-4-508, C.R.S. 5.THIS SITE CONTAINS A CALCULATED AREA OF 2.692 ACRES. 6.NO PORTIONS OF THE SUBJECT PROPERTY ARE LOCATED WITHIN SPECIAL FLOOD HAZARD AREAS, AS DETERMINED BY GRAPHIC INTERPRETATION OF THE F.E.MA. FLOOD INSURANCE RATE MAP NUMBER 08049CO991C, WITH AN EFFECTIVE DATE OF JANUARY 1, 2008. 7.THE MEASURED DISTANCES SHOWN HEREON ARE IN U.S. SURVEY FEET. 8.EXISTING CONDITIONS BASED ON CONSTRUCTION DRAWINGS FOR THE VILLAGE AT GRAND PARK-FILING NO. 2. 9.REFER TO LANDSCAPE ARCHITECTURAL SITE PLAN FOR ADDITIONAL INFORMATION. 10.REFER TO LANDSCAPE ARCHITECTURAL SITE PLAN FOR SNOWMELT LOCATIONS. PROPERTY DESCRIPTION: 11.LOT 12C, THE VILLAGE AT GRAND PARK-FILING NO. 2, GRAND COUNTY, COLORADO. ( IN FEET ) 1 inch = ft. Feet03030 30 60 90 NORTH C-100CIVIL SITE PLAN XG XG XG XG X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X X T T T X E X E T XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE X E X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS X S X S X S X S X S X S X S X S XS XS X S X S X S X S X S X S X S X S X S X S X S X S XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS X S X S X S X S X S XS XS XS XS XS XS XS XS XS XS XS XS XSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXS X S X S X S X S X S X S X S X S XS XS XS X W XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW X W X W X W X W X W X W X W XW XWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXW XW XW XW XW XW XW XW XW XW XW XW XW TR TR TR TR TR ST ST ST ST ST ST ST ST ST V A N VAN W W S S SC W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W G G G GM EX FH HYDRANT PROPOSED MARKET STREET ALIGNMENT AND ROUNDABOUT (BY OTHERS) PROPERTY LINE EX SEWER STUB TO BE ABANDONED PR AREA INLET (TYP.) PR CURB INLET PR CURB INLET CORE INTO EXISTING M.H PR CURB INLET (TYP.) CORE INTO EXISTING M.H. PR FH #1 PR SEWER SERVICE POINT OF ENTRY COVERED ENTRANCE CANOPY KING'S CROSSING ROAD LI O N ' S G A T E D R MAI N S T COVERED ENTRANCE CANOPY HELI PAD PR CURB INLET PR CURB INLET PR FH #2 PR CURB INLET PR AREA INLET CONNECT TO EX SANITARY PR AREA INLET (TYP.) PR AREA INLET (TYP.) PR AREA INLET (TYP.) PR AREA INLET (TYP.) PR AREA INLET (TYP.) DRO P - O F F C I R C L E STORM INLET 4" DOMESTIC WATER SERVICE PR. 6" FIRE LINE CONTRACTOR TO COORDINATE GRADING AND CONSTRUCTION OVER GAS LINE WITH UTILITY COMPANIES 6 " D I P 6 " D I P 6 " D I P 6" DIP 6" D I P PR AREA INLET (TYP.) PR AREA INLET (TYP.) PR AREA INLET (TYP.) PR AREA INLET (TYP.) PR AREA INLET (TYP.) 6 " D I P 6" DIP PR AREA INLET (TYP.) PR AREA INLET (TYP.) POTHOLE EX SANITARY SERVICE TO DETERMINE SIZE AND MATERIAL 6 " D I P PR CURB INLET (TYP.) CONNECT TO EX MAIN PR SWIVEL TEE W/ TB & GV POTHOLE EX WATER MAIN TO DETERMINE SIZE AND MATERIAL CONNECT TO EX MAIN PR SWIVEL TEE W/ TB & GV CONNECT TO EX MAIN PR SWIVEL TEE W/ TB & GV 45° BEND 90° BEND 90° BEND 90° BEND GATE VALVE 90° BEND GATE VALVE WATER/SEWER CROSSING 11.25° BEND 45° BEND 90° BEND GATE VALVE SHEET NUMBER: PROJECT NO. DATE: DA T E RE V RE M A R K S DR W N CH K D AP R V D 17322.03 MA J O R S I T E P L A N MI D D L E P A R K HE A L T H - N E W FR A S E R H E A L T H CE N T E R MAJOR SITE PLAN MIDDLE PARK HEALTH - NEW FRASER HEALTH CENTER Grand County Parcel ID No. 158729100154 05/27/2022 5/ 2 7 / 2 0 2 2 SU B M I T T A L # 1 APPLICANT CIVIL ENGINEER MIDDLE PARK HEALTH 214 S. 4TH STREET KREMMLING, CO 80459 970-219-5444 CONTACT: TOM COBURN Tcoburn@middleparkhealth.org LANDMARK CONSULTANTS, INC. 141 9TH ST STEAMBOAT SPRINGS, CO 80487 PHONE: 970-819-6380 CONTACT: RYAN SPAUSTAT ryan@landmark-co.com LANDSCAPE ARCHITECT DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: PAUL GARLAND Paul.Garland@davispartnership.com ARCHITECT DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: JD DREYER JD.Dreyer@davispartnership.com ELECTRICAL ENGINEER SMITH SECKMAN REID INC. 7935 E PRENTICE AVE, SUITE 300W GREENWOOD VILLAGE, CO 80111 PHONE: 303-779-1222 CONTACT: KATHERINE CLARK Kclark@ssr-inc.com ( IN FEET ) 1 inch = ft. Feet03030 30 60 90 NORTH C-200UTILITY PLAN LEGEND: PROPOSED WATER PROPOSED GV, FH & CS EXISTING WATER SS XS C EXISTING SANITARY SEWER W/ MH & C.O. PROPOSED SANITARY SEWER W/ MH & C.O. NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION MADE AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE NOR IS RESPONSIBLE FOR THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. CONTRACTOR TO VERIFY EXISTING HORIZONTAL AND VERTICAL LOCATIONS PRIOR TO CONSTRUCTION. 3.ALL SEWER CONSTRUCTION SHALL BE PER TOWN OF FRASER DESIGN CRITERIA AND CONSTRUCTION STANDARDS, LATEST EDITION. 4.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 5.MANHOLES LOCATED OUTSIDE OF THE ROADWAY SHALL PROTRUDE 1' ABOVE EXISTING GRADE TO REDUCE INFILTRATION. GRADE SURFACE TO DRAIN AROUND/AWAY FROM MANHOLE RIMS. 6.ALL MANHOLES LOCATED IN THE ROADWAY SHALL HAVE RIM ELEVATIONS ADJUSTED TO 14" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 7.SEWER SERVICE SHALL HAVE A MINIMUM OF 7-FT OF COVER. 8.WATER SERVICE SHALL HAVE A MINIMUM OF 9-FT OF COVER. 9.ALL WATER PIPE SHALL BE INSTALLED WITH A #10 SOLID COPPER WIRE COATED WITH 45 MIL POLYETHYLENE FOR LOCATING PURPOSES. "GLENN TEST STATIONS" BY VALVCO, INC TRACER WIRE TEST STATIONS SHALL BE INSTALLED ADJACENT TO ALL FIRE HYDRANTS. ADDITIONAL LOCATIONS MAY BE REQUIRED. 10.ALL MATERIALS USED FOR BACKFILL SHALL BE FREE FROM REFUSE ORGANIC MATERIAL, COBBLES, BOULDERS, LARGE ROCKS OR STONES OR FROZEN SOILS GREATER THAN 6-INCHES IN DIAMETER. 11.ALL TRENCHES SHALL BE COMPACTED TO 95% AS DETERMINED BY ASTM D698 (STANDARD PROCTOR) OR AS SPECIFIED BY GEOTECHNICAL ENGINEER. XG XG XG XG X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X X T T T X E X E T XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE X E X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T XT XT XT XT XT XT XT XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS X S X S X S X S X S X S X S X S XS XS X S X S X S X S X S X S X S X S X S X S X S X S XS XS XS X S X S X S X S XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS X S X S X S X S X S XS XS XS XS XSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXS XS XS XS X S X S X S X S X S X S X S X S XS XS XS X W XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW X W X W X W X W X W X W X W XW XWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXW XW XW XW XW XW XW XW X W X W X W X W XW XW XW XW XW XW XW XW XW XW XW XW XW TR TR TR TR TR ST ST ST ST ST ST ST ST ST ST V A N VAN W W S S SC W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W G G G GM 8723.50 FG 8723.50 FG 8723.50 FG 1 . 9 % 4 . 0 % 5 . 7 % 8720 872 5 8 7 2 5 8 7 2 0 87 1 5 8710 871 0 871 0 8715 8715 871 5 872 0 8 7 2 5 8715 8719 8720 8715 87 1 4 87 1 5 87 2 0 8 7 1 5 8 7 1 8 8 7 2 0 87 2 5 8715 87 2 5 87 1 5 872 0 8725 8720 8715 8711 2 . 0 % 2 . 0 % 2 . 0 % 8715 8715 8718 8717 8716 8714 8713 8712 8712 8713 8714 8716 8717 8718 87 1 9 8725 871 8 8715 87 1 2 87 2 3 87 2 3 8720 8715 8710 8710 8710 8712 8711 8712 8722.75 FG@ TW 8722.75 FG@ TW 8711.75 FG@BW 8712.25 FG@BW 5 . 0 % 5 . 0 % 8720 8 7 2 5 8 7 2 8 8713.00 FG@BW 8721.75 FG@ TW PROPOSED MARKET STREET ALIGNMENT AND ROUNDABOUT (BY OTHERS) PROPERTY LINE MATCH EXISTING PR RETAINING WALL W/ GUARDRAIL PR AREA INLET (TYP.) PR CURB INLET PR AREA INLET PR CURB INLET MATCH EXISTING CORE INTO EXISTING M.H CORE INTO EXISTING M.H. PED. RAMP COVERED ENTRANCE CANOPY KING'S CROSSING ROAD LI O N ' S G A T E D R OLD VICT O R Y R D COVERED ENTRANCE CANOPY HELI PAD PR CURB INLET PR CURB INLET PED. RAMP PR CURB INLET PR AREA INLET PR AREA INLET (TYP.) PED. RAMP PED. RAMP PR AREA INLET (TYP.) PR RETAINING WALL W/ GUARDRAIL PR AREA INLET (TYP.) LANDING PR AREA INLET (TYP.) PR AREA INLET (TYP.) PR AREA INLET (TYP.) PED. RAMP PED. RAMP STORM INLET STAIRS BOT=8715.3 TOP=8725.3 11-FT WALL 10-FT WALL 8.75-FT WALL TAPER WALL FFE=8713 . 0 FFE = 8 7 1 3 . 0 F F E = 8 7 1 3 . 0 F F E = 8 7 1 3 . 0 SHEET NUMBER: PROJECT NO. DATE: DA T E RE V RE M A R K S DR W N CH K D AP R V D 17322.03 MA J O R S I T E P L A N MI D D L E P A R K HE A L T H - N E W FR A S E R H E A L T H CE N T E R MAJOR SITE PLAN MIDDLE PARK HEALTH - NEW FRASER HEALTH CENTER Grand County Parcel ID No. 158729100154 05/27/2022 5/ 2 7 / 2 0 2 2 SU B M I T T A L # 1 APPLICANT CIVIL ENGINEER MIDDLE PARK HEALTH 214 S. 4TH STREET KREMMLING, CO 80459 970-219-5444 CONTACT: TOM COBURN Tcoburn@middleparkhealth.org LANDMARK CONSULTANTS, INC. 141 9TH ST STEAMBOAT SPRINGS, CO 80487 PHONE: 970-819-6380 CONTACT: RYAN SPAUSTAT ryan@landmark-co.com LANDSCAPE ARCHITECT DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: PAUL GARLAND Paul.Garland@davispartnership.com ARCHITECT DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: JD DREYER JD.Dreyer@davispartnership.com ELECTRICAL ENGINEER SMITH SECKMAN REID INC. 7935 E PRENTICE AVE, SUITE 300W GREENWOOD VILLAGE, CO 80111 PHONE: 303-779-1222 CONTACT: KATHERINE CLARK Kclark@ssr-inc.com ( IN FEET ) 1 inch = ft. Feet03030 30 60 90 NORTH C-300GRADING PLAN LEGEND: PROPOSED MAJOR CONTOUR 6805 EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING MAJOR CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.DETAILED SPOT GRADES TO BE PROVIDED WITH CONSTRUCTION DRAWINGS. 3.ELEVATIONS FOR IMPROVEMENTS THAT ARE CONTROLLED BY ADJACENT EXISTING FACILITIES (SUCH AS PROPOSED GUTTERS ALONG EXISTING ASPHALT) MAY REQUIRE ADJUSTMENT BASED ON ACTUAL CONDITIONS. COORDINATE WITH ENGINEER TO ENSURE A CONSISTENT SECTION WITH SMOOTH TRANSITIONS WHERE NECESSARY. 4.SEE SOILS REPORT FOR PAVEMENT, SUBGRADE AND MATERIAL PREPARATION, DESIGN AND RECOMMENDATIONS. 5.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS, UNLESS NOTED OTHERWISE. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. NOTES: PROPOSED STORM INLET (CURB & AREA) PROPOSED LOT LINE EXISTING RIGHT OF WAY FLOOD HAZARD LIMITS PROPOSED MINOR CONTOUR EXISTING MINOR CONTOUR 6805 00.10 EXISTING SPOT ELEVATION 00.10 X 2.0%PROPOSED OVERLAND FLOW DIRECTION W/SLOPE 2.0%PROPOSED CHANNELIZED FLOW DIRECTION W/ SLOPE EXISTING CHANNELIZED FLOW DIRECTION XG XG XG XG X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G LOT 12B 20,072 SQFT TR TR TR TR TR XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE X E X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT SD SD SDSDSDSD XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS X S X S X S X S X S X S X S X S XS XS X S X S X S X S X S X S X S X S X S X S X S X S XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS X S X S X S X S X S XS XS XS XS XS XS XS XS XS XS XS XS XS XS XSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXS X S X S X S X S X S X S X S X S XS XS XS X W XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW X W X W X W X W X W X W X W XW XWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXW XW XW XW XW XW XW ST ST ST ST ST ST ST ST > > > > > > > > //////////////////////////////////////////////////////////////////////////////////////////////////////// /////////////////////////////////////////////////////////////////////////////////////////////////////////////// ///////////////////////////////////// W W S S SC W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W G G G GM KINGS CROSSING RD LI O N S G A T E D R MAI N S T V A N VAN EXI S T I N G 5 8 ' T O W N O F F R A S E R UTI L I T Y E A S E M E N T A G R E E M E N T REC . 2 0 0 8 - 0 0 7 8 3 8 (EX C E P T I O N # 2 2 ) EXISTIN G 5 8 ' T O W N O F F R A S E R UTILITY E A S E M E N T AGREE M E N T REC. 20 0 8 - 0 0 7 8 3 8 (EXCE P T I O N # 2 2 ) E X I S T I N G 2 0 ' E X I S T I N G G A S E A S E M E N T R E C . 2 0 0 9 - 0 0 2 5 3 3 ( E X C E P T I O N # 2 5 ) IN G R O U N D F A T O SA F E T Y A R E A GENERATOR, RE: ELECTRICAL TRANSFORMER, RE: ELECTRICAL TRASH AND RECYCLING BINS ENCLOSURE, RE: ARCHITECTURE MOUNTABLE CURB SNOW MELT FOR THE ENTIRE SERVICE AREA: APPROX. 780 SQFTAMBULANCE DROPOFF WITH SNOWMELT: APPROX. 1400 SQFT LITTER AND RECYCLING RECEPTACLES FLAGSTONE PAVERS FLAGSTONE PAVERS INTEGRALLY COLORED CONCRETE BANDING, TYP. (2) TABLE AND CHAIRS (2) BENCH LITTER AND RECYCLING RECEPTACLES 18"H SEATWALL, TYP. BENCH FUTURE MONUMENT SIGN, FINAL LOCATION AND DESIGN TO BE DETERMINED (3) BIKE RACKS BENCH BENCH INTEGRALLY COLORED CONCRETE BANDING, TYP. PAN CURB ONLY STANDARD GREY CONCRETE, RE: CIVIL (2) PLANTER (2) SEATING BENCH TABLE AND CHAIRS PAN CURB ONLY 24.00' TYP. 20.00' TYP. 1 0 . 0 0 ' T Y P . 24.00' (7) BOLLARDSSNOW MELT FOR THE ENTRANCE: APPROX. 1200 SQFT 20.00' 8 . 5 0 ' 8. 0 0 ' 5.00' 8.00' 5. 0 0 ' EXISTING 1' SIGN AND MAINTENANCE EASEMENT EXISTING 1' SIGN AND MAINTENANCE EASEMENT EXISTING 20' MOUNTAIN PARKS ELECTRIC EASEMENT REC.97006497 (EXCEPTION #14) FIRE LANE FIRE LANE 41.63' 39 . 4 4 ' SNOW STORAGE: APPROX. 9570 SQFT SNOW STORAGE: APPROX. 2525 SQFT LOADING AREA 10.00' 3 5 . 0 0 ' 5 . 0 0 ' T Y P . 1 1 . 0 0 ' 20.00' TYP. ACCESSIBLE SIGNS, TYP. CANOPY, RE: ARCHITECTURE CANOPY, RE: ARCHITECTURE PROPOSED RETAINING WALL WITH GUARDRAIL GRAVEL BENCH 2 4 . 0 0 ' T Y P . 8.00' 8.00' 6 . 5 0 ' 6. 0 0 ' 8. 0 0 ' 5. 0 0 ' 6. 0 0 ' TY P . (2) PIPE BOLLARDS EXISTING ELECTRICAL BOX TO REMAIN EXISTING SHED TO REMAIN NEIGHBOR'S EXISTING CARPORT TO REMAIN BOULDERS, TYP. VAN ACCESSIBLE SPACE 1 0 . 0 0 ' T Y P . 5 . 0 0 ' T Y P . TLOF PERIMETER 40. 0 0 ' 20.00' TYP. 20.00' TYP. 2 0 . 0 0 ' SNOW STORAGE: APPROX. 690 SQFT 2 8 . 9 7 ' SNOW STORAGE: APPROX. 930 SQFT SNOW STORAGE: APPROX. 900 SQFT SNOW STORAGE: APPROX. 1490 SQFT SNOW STORAGE: APPROX. 550 SQFT SNOW STORAGE: APPROX. 200 SQFT SNOW STORAGE: APPROX. 480 SQFT SNOW STORAGE: APPROX. 400 SQFT SNOW STORAGE: APPROX. 200 SQFT AASHTO SIGHT TRIANGLE AASHTO SIGHT TRIANGLE SNOW STORAGE: APPROX. 1430 SQFT 15. 0 0 ' 15. 0 0 ' 10.00' EXISTING LIGHT TO BE VERIFIED WITH NEW SURVEY EXISTING 8' ATTACHED WALK TO BE VERIFIED WITH NEW SURVEY PROPOSED 8' ATTACHED WALK PROPOSED STAIRWAY SNOW STORAGE: APPROX. 460 SQFT HELIPAD ACCESS PATH WITH SNOWMELT: APPROX. 1980 SQFT 6 . 0 0 ' 6.0 0 ' 8. 0 0 ' STRIPPED ISLANDS TYP. 0'15'30'60'SITE PLAN NORTHSCALE: 1" = 30' - 0' LEGEND 05/27/2022 SHEET NUMBER: PROJECT NO. DATE: DA T E RE V RE M A R K S DR W N CH K D AP R V D 17322.03 MA J O R S I T E P L A N MI D D L E P A R K HE A L T H - N E W FR A S E R H E A L T H CE N T E R MAJOR SITE PLAN MIDDLE PARK HEALTH - NEW FRASER HEALTH CENTER APPLICANT CIVIL ENGINEER MIDDLE PARK HEALTH 214 S. 4TH STREET KREMMLING, CO 80459 970-219-5444 CONTACT: TOM COBURN Tcoburn@middleparkhealth.org LANDMARK CONSULTANTS, INC. 141 9TH ST STEAMBOAT SPRINGS, CO 80487 PHONE: 970-819-6380 CONTACT: RYAN SPAUSTAT ryan@landmark-co.com LANDSCAPE ARCHITECT DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: PAUL GARLAND Paul.Garland@davispartnership.com ARCHITECT DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: JD DREYER JD.Dreyer@davispartnership.com Grand County Parcel ID No. 158729100154 ELECTRICAL ENGINEER SMITH SECKMAN REID INC. 7935 E PRENTICE AVE, SUITE 300W GREENWOOD VILLAGE, CO 80111 PHONE: 303-779-1222 CONTACT: KATHERINE CLARK Kclark@ssr-inc.com 5/ 2 7 / 2 0 2 2 SU B M I T T A L # 1 SITE PLAN L-001 SNOW REMOVAL *REFER TO FRASER MUNICIPAL CODE SEC. 19-4-185. - SNOW STORAGE. XG XG XG XG X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G X G LOT 12B 20,072 SQFT TR TR TR TR TR XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E X E XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE X E X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T X T XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT XT SD SD SDSDSDSD XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS X S X S X S X S X S X S X S X S XS XS X S X S X S X S X S X S X S X S X S X S X S X S XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS XS X S X S X S X S X S XS XS XS XS XS XS XS XS XS XS XS XS XS XS XSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXS X S X S X S X S X S X S X S X S XS XS XS X W XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW X W X W X W X W X W X W X W XW XWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXW XW XW XW XW XW XW ST ST ST ST ST ST ST ST > > > > > > > > //////////////////////////////////////////////////////////////////////////////////////////////////////// /////////////////////////////////////////////////////////////////////////////////////////////////////////////// ///////////////////////////////////// W W S S SC W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W G G G GM KINGS CROSSING RD LI O N S G A T E D R MAI N S T V A N VAN 2 0 ' N O N - E X C L U S I V E E A S E M E N T R E C . 9 7 0 0 6 4 9 6 ( E X C E P T I O N # 1 4 ) R E C . 2 0 0 9 - 0 0 6 7 5 1 ( E X C E P T I O N # 2 7 ) R E C . 2 0 0 9 - 0 0 3 9 3 5 ( E X C E P T I O N # 1 4 ) 1 4 ' T E M P O R A R Y S N O W S T O R A G E E A S E M E N T R E C . 2 0 1 1 - 0 0 5 6 2 9 ( E X C E P T I O N # 2 9 ) (3) SPM (3) JS (9) BGB (11) CAO (9) CNV (3) CPP (3) AHR (3) JS (3) HSO (6) FGE (6) AHR (3) JS (6) CPP (3) SPM (3) CNV (3) SDM (6) CNV (12) CAO (5) HSO (5) JHW (5) CPP (3) SDM (5) HSO (1) PV (7) PFF (5) PBP (3) PBP (1) PV (2) PB (5) CAH (3) PMM (5) PSR (6) FGE (5) MDB (9) BGB (1) PB (7) PPG (3) RAG (3) ARB (3) PPG (3) ARB (5) CAH (3) SPM (3) RAG (3) PPG (5) PB (5) PFT (5) GAB (3) HSO (3) JSB (3) PFT (3) PB (5) RAG (3) PFT (3) LTA (3) LTA (3) JC (3) RAG (3) JC (1) BO (2) CAT (3) PFT (2) CAT (13) PBP (1) PA (12) JSB (9) CAO (2) CAT (5) RAG (3) PFF (10) BGB (6) JS (3) ALW (3) PBP (1) PV (5) JSB (6) CAH (6) AHR (3) PFT (1) BO (3) HSO (2) RTA (1) AG (7) CAO (1) AG (3) RTA (1) AG (3) RTA (1) AG (3) PFF (5) ALW (5) PMM (3) AFS (5) CAH (5) AFS (5) PBP (6) CAT (5) CAH (6) CAT (7) PBP (22) BGB (6) CNV (7) CAT (3) CA (5) PB (3) PFF (6) JHW (3) PFF (3) PP (3) PA 20' EXISTING GAS EASEMENT REC.2009-002533 (EXCEPTION #25) EXISTING 20' MOUNTAIN PARKS ELECTRIC EASEMENT REC.97006497 (EXCEPTION #14) (5) JSB (12) HSO (3) PBP (3) HSO (3) JSB (2) JS (5) CAH (5) ALW (5) PMM (3) LTA EXISTING TREE TO BE REMOVED EXISTING TREES TO BE REMOVED, TYP. EXISTING TREES TO BE REMOVED, TYP. EXISTING TREES TO REMAIN, TYP. EXISTING TREES TO REMAIN, TYP. EXISTING TREES TO BE REMOVED, TYP. EXISTING TREE TO REMAIN (3) PSR (3) PSR (7) GAB (3) PSR (9) ARB (3) RAG (1) PA IRRIGATED NATIVE SEED, TYP. IRRIGATED NATIVE SEED, TYP. AASHTO SIGHT TRIANGLE AASHTO SIGHT TRIANGLE (8) CAH (3) CAH (1) RTA (3) PFT IRRIGATED NATIVE SEED, TYP. EXISTING TREE TO BE REMOVED FUTURE MONUMENT SIGN, FINAL LOCATION AND DESIGN TO BE DETERMINED (5) PBP (8) PFT 0'15'30'60'LANDSCAPE PLAN NORTHSCALE: 1" = 30' - 0' LEGEND 05/27/2022 SHEET NUMBER: PROJECT NO. DATE: DA T E RE V RE M A R K S DR W N CH K D AP R V D 17322.03 MA J O R S I T E P L A N MI D D L E P A R K HE A L T H - N E W FR A S E R H E A L T H CE N T E R MAJOR SITE PLAN MIDDLE PARK HEALTH - NEW FRASER HEALTH CENTER APPLICANT CIVIL ENGINEER MIDDLE PARK HEALTH 214 S. 4TH STREET KREMMLING, CO 80459 970-219-5444 CONTACT: TOM COBURN Tcoburn@middleparkhealth.org LANDMARK CONSULTANTS, INC. 141 9TH ST STEAMBOAT SPRINGS, CO 80487 PHONE: 970-819-6380 CONTACT: RYAN SPAUSTAT ryan@landmark-co.com LANDSCAPE ARCHITECT DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: PAUL GARLAND Paul.Garland@davispartnership.com ARCHITECT DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: JD DREYER JD.Dreyer@davispartnership.com Grand County Parcel ID No. 158729100154 ELECTRICAL ENGINEER SMITH SECKMAN REID INC. 7935 E PRENTICE AVE, SUITE 300W GREENWOOD VILLAGE, CO 80111 PHONE: 303-779-1222 CONTACT: KATHERINE CLARK Kclark@ssr-inc.com 5/ 2 7 / 2 0 2 2 SU B M I T T A L # 1 PLANTING SCHEDULE L-002LANDSCAPE PLAN 05/27/2022 SHEET NUMBER: PROJECT NO. DATE: DA T E RE V RE M A R K S DR W N CH K D AP R V D 17322.03 MA J O R S I T E P L A N MI D D L E P A R K HE A L T H - N E W FR A S E R H E A L T H CE N T E R MAJOR SITE PLAN MIDDLE PARK HEALTH - NEW FRASER HEALTH CENTER APPLICANT CIVIL ENGINEER MIDDLE PARK HEALTH 214 S. 4TH STREET KREMMLING, CO 80459 970-219-5444 CONTACT: TOM COBURN Tcoburn@middleparkhealth.org LANDMARK CONSULTANTS, INC. 141 9TH ST STEAMBOAT SPRINGS, CO 80487 PHONE: 970-819-6380 CONTACT: RYAN SPAUSTAT ryan@landmark-co.com LANDSCAPE ARCHITECT DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: PAUL GARLAND Paul.Garland@davispartnership.com ARCHITECT DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: JD DREYER JD.Dreyer@davispartnership.com Grand County Parcel ID No. 158729100154 ELECTRICAL ENGINEER SMITH SECKMAN REID INC. 7935 E PRENTICE AVE, SUITE 300W GREENWOOD VILLAGE, CO 80111 PHONE: 303-779-1222 CONTACT: KATHERINE CLARK Kclark@ssr-inc.com 5/ 2 7 / 2 0 2 2 SU B M I T T A L # 1 PLANTING DETAILS DO NOT CUT LEADER. PRUNE DAMAGED OR DEAD WOOD IMMEDIATELY AFTER PLANTING. USE NYLON TREE STRAPS AT END OF WIRE ROOTBALL 12 GAUGE GALVANIZED WIRE, DOUBLE STRAND TWISTED 24" x 3/4" P.V.C. MARKERS (TYP) OVER WIRES POST WITH GROMMETED NYLON STRAPS. DRIVE (30" MIN.) INTO SUBGRADE. ADJUST STAKE SO THAT TOP IS LEVEL WITH OR JUST BELOW FIRST BRANCHES. ALLOW FOR 1" MIN. OF TRUNK SWAY BETWEEN STAKES APPLY MULCH TO 3" DEPTH OVER PLANTING AREA PLANT TOP MOST ROOT IN ROOTBALL AT OR SLIGHTLY HIGHER THAN LEVEL AT WHICH IT GREW FINISH GRADE REMOVE UPPER 2 3 OF WIRE, ROPE AND BURLAP FROM ROOTBALL SET ROOTBALL DIRECTLY ON UNDISTURBED SUBSOIL. BROKEN OR CRUMBLING ROOTBALLS WILL BE REJECTED SLOPE SIDES OF HOLE TO BE 3 TO 5 TIMES AS WIDE AS THE DIAMETER OF THE ROOTBALL FORM SOIL INTO 3" WATER RING AROUND TREE BASE AT TIME OF PLANTING, REMOVE PRIOR TO MULCHING COMPOSTED BACKFILL MIXTURE WITH FERTILIZER TREE GUY ASSEMBLY NORTH EVERGREEN AND TREES OVER 3" CAL.TREE STAKING DECIDUOUS TREE STAKING POST TREE GUY ASSEMBLY POST TREE PLANTING N.T.S. NORTH PLANTING AREA SHALL BE LOOSENED AND AERATED AT LEAST 3 TO 5 TIMES THE DIAMETER OF ROOTBALL NO TREE WRAP SHALL BE USED NOTES: 1.EVERGREEN SHRUBS SHALL BE PLANTED NO CLOSER THAN 3' TO THE CLOSEST PAVEMENT 2.ALL PLANT CONTAINERS TO BE REMOVED PRIOR TO PLANTING. 3.PLACE WEED CONTROL FABRIC IN ALL SHRUB BEDS 4.BACKFILL AND WATER IN THOROUGHLY 5.BROKEN ROOTBALLS WILL BE REJECTED SECTION PLANT SHRUB 2" HIGHER THAN ORIGINAL GROWN GRADE APPLY 3" DEEP MULCH ABOVE FINISHED GRADE AS SHOWN DIG PIT TWICE AS WIDE AS THE CONTAINER LOOSEN SIDES OF ROOTBALL PRUNE DAMAGED OR DEAD WOOD PRIOR TO PLANTING 3'-0" MIN. DISTANCE FROM CENTER OF SPREADING EVERGREEN SHRUBS TO NEAREST PAVEMENT OR CURB ROOTBALL SCALE:N.T.S SHRUB PLANTING SCARIFY POT BOUND PLANTS PRIOR TO PLANTING TO ENABLE FAST ROOT GROWTH 3" MULCH CAREFULLY CUT AND REMOVE PANTING CONTAINER LANDSCAPE CONTROL FABRIC. APPLY PRE-EMERGENT HERBICIDE PLANTING SOIL MIX PLAN VIEW SECTION NOTES: 1. ON-CENTER SPACING VARIES (SEE PLANT LIST) RA I S E P L A N T I N G B E D 1 " AB O V E F I N I S H G R A D E 2" M I N EQ. E Q . EQ . 18" O.C. TYP. 18" O.C. TYP. SCALE:N.T.S PERENNIAL PLANTING L-003 TREE PROTECTION DETAIL N.T.S. TREE PROTECTION AREA ZONE 2 LOWER CANOPY PROTECTION CONTACT LANDSCAPE ARCHITECT IF ANY PRUNING IS NEEDED PRIOR TO WORK IF POTENTIAL FOR DAMAGE EXISTS. ZONE 1EXTENDS THROUGH ENTIRE TREE PROTECTION AREA. ANY DIGGING, EXCAVATING, TRENCHING, CHANGING OF GRADE, OR OTHER ACTIONS THAT MAY POTENTIALLY IMPACT THE ROOTING ENVIRONMENT MUST BE AUTHORIZED BY THE LANDSCAPE ARCHITECT PRIOR TO WORK COMMENCEMENT. WORK WITHIN THE CRZ MUST TAKE PLACE IN ACCORDANCE WITH THE CONDITIONS ESTABLISHED BY THE LANDSCAPE ARCHITECT. NOTES ·FENCING HEIGHT MUST BE A MINIMUM OF 48" ·ATTACH "TREE PROTECTION AREA" SIGNS TO FENCING EVERY 50' ·THE TREE PROTECTION AREA SHALL NOT BE MODIFIED OR REMOVED PRIOR TO CONSENT OF THE LANDSCAPE ARCHITECT ·MATERIALS, DEBRIS, EQUIPMENT, AND SITE AMENITIES SHALL NOT BE STORED WITHIN THE TREE PROTECTION AREA ·ENTRANCE TO THE TREE PROTECTION AREA IS NOT PERMITTED WITHOUT THE CONSENT OF THE LANDSCAPE ARCHITECT THE AREA INSIDE A PERIMETER ESTABLISHED AT THE CRITICAL ROOT ZONE (CRZ). THE CRZ IS EQUAL TO THE DRIPLINE, FURTHEST EXTENT OF TREE CANOPY; OR IS EQUAL TO ONE FOOT RADIALLY FROM THE TREE FOR EVERY ONE INCH OF TRUNK DIAMETER AT BREAST HEIGHT (DHB = 4.5' ABOVE SOIL LINE); OR WHICHEVER IS GREATER. ZONE 3 TRUNK PROTECTION REQUIRED IF CONSTRUCTION OCCURS WITHIN TEN FEET OR LESS (CONSTRUCTION PERMITTED INSIDE THE CRZ ONLY IF THE EQUIPMENT IS OPERATED EXCLUSIVELY ON EXISTING HARDSCAPE AND NO SOIL COMPACTION TAKES PLACE). DW UP F D F D F D F D F D F D F D F D F D FD FD F D BB DD EE FF C E F J 1916141210 2 5 7 8 G 18 3 15 6 1 GG HH A CC 13 17 4 H B D 9 11 AA 4' - 0 " 12 ' - 0 " 27 ' - 0 " 17 ' - 0 " 27 ' - 2 " 2' - 0 " 2' - 0 "A M B UL A N CE EN T RY N OU R I S H 1 3 ' - 0 " 4 ' - 0 " 1 5 ' - 1 0 " 1 9 ' - 4 " 1 8 ' - 1 0 1 / 2 " 2 ' - 0 " 2 ' - 0 " 5 ' - 7 1 / 2 " ELEV 2 1107 ELEV 1 1106 VEST 1100 PUB TLT 1108 PUB TLT 1109 MAIN ENTRY STAIR A 1110 STAIR B 1303 OPEN LAB 1500BLOOD DRAW 1501 PAT TLT 1502 TDR 1402 REG 1102 GREETER 1103 MECH/BOILER 1609 CLEAN LINEN 1606SOILED LINEN 1605 BIO HAZ 1607 MAIN STORE 1611 STAFF TLT/SWR 1602 LOBBY 1101 PAT ROOM 2 - AII 1304 PAT ROOM 1 1305PAT TLT 1304A PAT TLT 1305A AMBULANCE VESTIBULE 1216 DECON / BODY HOLD 1213 TRAUMA 1 / BARIATRIC EXAM 1215 TRAUMA 2 1214 CT 1403 CONTROL 1404 X-RAY 1405 BREAK ROOM 1601 MEDS 1212 CARE TEAM - INPATIENT 1301 EQUIP 1210 PHARMACY 1208 SOILED HOLD 1302 ON-CALL 1207 STAFF TLT / SHWR 1206 PAT TLT ISO 1205A EVS 1 1209 EXAM 3 - ISO 1205 EXAM 2 1204 EXAM 1 1203 PAT TLT 1201 PAT CHG 1401 CLEAN SUPPLY 1217 TRIAGE 1218 BEREAV / CONSULT 1105 CORR 1200 3 ' - 4 "8 ' - 9 1 /2 " 1 5 ' - 0 " 5 ' - 9 " 2 1 ' - 1 " 7 ' - 6 " 1 8 ' - 6 1 /2 " 2 ' - 1 1 /2 " CORR 1300 BENCH CANOPY ABOVE CANOPY ABOVE 8 0 ' - 8 " 91 ' - 2 " EVS 1604 MGR OFFICE 1202 CONFERENCE ROOM 1104 ? ? NORM. ELECTRICAL 1609B EMERG. ELECTRICAL 1609A MED GAS 1608 CORR 1400 W-2 W-1 CARE TEAM - ED 1211 8 2 ' - 1 1 /2 " 106' - 9" 6' - 8"17' - 2"20' - 1"5' - 1"10' - 3"9' - 4"23' - 7"7' - 3"7' - 4" UTILITY YARD STORAGE SHED SHEET NUMBER: MA J O R S I T E P L A N DATE: PROJECT NO. DA T E RE V RE M A R K S DR W N CH K D AP R V D MAJOR SITE PLAN APPLICANT ARCHITECT LANDSCAPE ARCHITECT CIVIL ENGINEER ELECTRICAL ENGINEER 5/ 2 7 / 2 0 2 2 SU B M I T T A L # 1 Grand County Parcel ID No. 158729100154 A-001FLOOR PLAN - LEVEL ONE 5/27/2022 MIDDLE PARK HEALTH - NEW FRASER HEALTH CENTER 17322.03 MI D D L E P A R K HE A L T H - N E W FR A S E R H E A L T H CE N T E R Ch e c k e r Au t h o r Ap p r o v e r 214 S. 4TH STREET KREMMLING, CO 80459 970-219-5444 CONTACT: TOM COBURN MIDDLE PARK HEALTH 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: JD DREYER DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 CONTACT: PAUL GARLAND paul.garland@davispartnership.com DAVIS PARTNERSHIP ARCHITECTS 141 9TH ST STEAMBOAT SPRINGS, CO 80487 PHONE: 970-819-6380 CONTACT: RYAN SPAUSTAT LANDMARK CONSULTANTS, INC. 7935 E PRENTICE AVE, SUITE 300W GREENWOOD VILLAGE, CO 80111 PHONE: 303-779-1222 CONTACT: KATHERINE CLARK SMITH SECKMAN REID INC. kclark@ssr-inc.com Tcoburn@middleparkhealth.org jd.dreyer@davispartnership.com ryan@landmark-co.com 3/32" = 1'-0"1 LEVEL ONE 0'4'12'24'42'-8" SCALE: 3/32" = 1'-0" UP BB DD EE FF C E F J 1916141210 2 5 7 8 G 18 3 15 6 1 GG HH A CC 13 17 4 H B D 9 11 AA OPEN TO BELOW PATIO STAIR A 2110 STAIR B 2300 ELEV 1 552 ELEV 2 553 CORR 2100 CANOPY CANOPY RS-EPDM3 4' - 0 " 12 ' - 0 " 27 ' - 0 " 17 ' - 0 " 27 ' - 2 " 2' - 0 " 2' - 0 " 1 3 ' - 0 " 4 ' - 0 " 1 5 ' - 1 0 " 1 9 ' - 4 " 1 8 ' - 1 0 1 / 2 " 2 ' - 0 " 2 ' - 0 " 5 ' - 7 1 / 2 " 3 ' - 4 "8 ' - 9 1 /2 " 1 5 ' - 0 " 5 ' - 9 " 2 1 ' - 1 " 7 ' - 6 " 1 8 ' - 6 1 /2 " 2 ' - 1 1 /2 " 8 0 ' - 8 " 91 ' - 2 " 8 2 ' - 1 1 /2 " 106' - 9" 6' - 8"17' - 2"20' - 1"5' - 1"10' - 3"9' - 4"23' - 7"7' - 3"7' - 4" SHELL SHAFT SHAFT SHEET NUMBER: MA J O R S I T E P L A N DATE: PROJECT NO. DA T E RE V RE M A R K S DR W N CH K D AP R V D MAJOR SITE PLAN APPLICANT ARCHITECT LANDSCAPE ARCHITECT CIVIL ENGINEER ELECTRICAL ENGINEER 5/ 2 7 / 2 0 2 2 SU B M I T T A L # 1 Grand County Parcel ID No. 158729100154 A-002FLOOR PLAN - LEVEL TWO 5/27/2022 MIDDLE PARK HEALTH - NEW FRASER HEALTH CENTER 17322.03 MI D D L E P A R K HE A L T H - N E W FR A S E R H E A L T H CE N T E R Ch e c k e r Au t h o r Ap p r o v e r 214 S. 4TH STREET KREMMLING, CO 80459 970-219-5444 CONTACT: TOM COBURN MIDDLE PARK HEALTH 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: JD DREYER DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 CONTACT: PAUL GARLAND paul.garland@davispartnership.com DAVIS PARTNERSHIP ARCHITECTS 141 9TH ST STEAMBOAT SPRINGS, CO 80487 PHONE: 970-819-6380 CONTACT: RYAN SPAUSTAT LANDMARK CONSULTANTS, INC. 7935 E PRENTICE AVE, SUITE 300W GREENWOOD VILLAGE, CO 80111 PHONE: 303-779-1222 CONTACT: KATHERINE CLARK SMITH SECKMAN REID INC. kclark@ssr-inc.com Tcoburn@middleparkhealth.org jd.dreyer@davispartnership.com ryan@landmark-co.com 3/32" = 1'-0"1 LEVEL TWO 0'4'12'24'42'-8" SCALE: 3/32" = 1'-0" BB DD EE FF C E F J 1916141210 2 5 7 8 G 18 3 15 6 1 GG HH A CC 13 17 4 H B D 9 11 AA 4' - 0 " 12 ' - 0 " 27 ' - 0 " 17 ' - 0 " 27 ' - 2 " 2' - 0 " 2' - 0 " 1 3 ' - 0 " 4 ' - 0 " 1 5 ' - 1 0 " 1 9 ' - 4 " 1 8 ' - 1 0 1 / 2 " 2 ' - 0 " 2 ' - 0 " 5 ' - 7 1 / 2 " 3 ' - 4 "8 ' - 9 1 /2 " 1 5 ' - 0 " 5 ' - 9 " 2 1 ' - 1 " 7 ' - 6 " 1 8 ' - 6 1 /2 " 2 ' - 1 1 /2 " 8 0 ' - 8 " 91 ' - 2 " 8 2 ' - 1 1 /2 " 106' - 9" 6' - 8"17' - 2"20' - 1"5' - 1"10' - 3"9' - 4"23' - 7"7' - 3"7' - 4" RTU RTU RTU SCREEN WALL RS-MET1 SHEET NUMBER: MA J O R S I T E P L A N DATE: PROJECT NO. DA T E RE V RE M A R K S DR W N CH K D AP R V D MAJOR SITE PLAN APPLICANT ARCHITECT LANDSCAPE ARCHITECT CIVIL ENGINEER ELECTRICAL ENGINEER 5/ 2 7 / 2 0 2 2 SU B M I T T A L # 1 Grand County Parcel ID No. 158729100154 A-003HIGH ROOF PLAN 5/27/2022 MIDDLE PARK HEALTH - NEW FRASER HEALTH CENTER 17322.03 MI D D L E P A R K HE A L T H - N E W FR A S E R H E A L T H CE N T E R Ch e c k e r Au t h o r Ap p r o v e r 214 S. 4TH STREET KREMMLING, CO 80459 970-219-5444 CONTACT: TOM COBURN MIDDLE PARK HEALTH 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: JD DREYER DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 CONTACT: PAUL GARLAND paul.garland@davispartnership.com DAVIS PARTNERSHIP ARCHITECTS 141 9TH ST STEAMBOAT SPRINGS, CO 80487 PHONE: 970-819-6380 CONTACT: RYAN SPAUSTAT LANDMARK CONSULTANTS, INC. 7935 E PRENTICE AVE, SUITE 300W GREENWOOD VILLAGE, CO 80111 PHONE: 303-779-1222 CONTACT: KATHERINE CLARK SMITH SECKMAN REID INC. kclark@ssr-inc.com Tcoburn@middleparkhealth.org jd.dreyer@davispartnership.com ryan@landmark-co.com 3/32" = 1'-0"1 HIGH ROOF - PLAN 0'4'12'24'42'-8" SCALE: 3/32" = 1'-0" LEVEL 1 100' -0" LEVEL 2 115' -4" T.O.S. ROOF B 130' -8" 2578 T.O. HIGH CANOPY 127' -10" T.O. PARAPET B 133' -4" T.O. PARAPET A 117' -4" T.O.S. ROOF A 113' -6" 36 149 T.O. LOW CANOPY 112' -7" BU I L D I N G A N G L E S WS-WD1 WS-MAS4a WS-MET2 WS-WD1 WS-MAS4a SF27 SF27 SF27 SF30 SF29SF30 SF09 SF03 SF06 CW02 SF02 WS-MAS4c WS-MAS4c WS-MAS4c WS-MET1 WS-MAS1 WS-MAS1 PWS-MAS1 LEVEL 1 100' -0" FLOOR PLANS - LEVEL TWO 115' -4" LEVEL 3 130' -8" LEVEL 4 145' -6" LEVEL 1 100' -0" LEVEL 2 115' -4" T.O.S. ROOF B 130' -8" 19 16 14 12 10 T.O. HIGH CANOPY 127' -10" T.O. PARAPET B 133' -4" T.O. PARAPET A 117' -4" T.O.S. ROOF A 113' -6" 18 15 1317 11 T.O. LOW CANOPY 112' -7" BU I L D I N G A N G L E S WS-MAS4a WS-WD1 WS-MET2 SF26 SF20 SF30 WS-MAS4cWS-MAS4c WS-MAS1 LEVEL 1 100' -0" FLOOR PLANS - LEVEL TWO 115' -4" LEVEL 3 130' -8" LEVEL 4 145' -6" WS-MAS1, WS-MAS2 WS-MAS3, WS-MAS4 WS-WD1 WS-MET1 EXTERIOR ELEVATION FINISH LEGEND WOOD-LOOK PANEL METAL PANEL STONE BRICK SHEET NUMBER: MA J O R S I T E P L A N DATE: PROJECT NO. DA T E RE V RE M A R K S DR W N CH K D AP R V D MAJOR SITE PLAN APPLICANT ARCHITECT LANDSCAPE ARCHITECT CIVIL ENGINEER ELECTRICAL ENGINEER 5/ 2 7 / 2 0 2 2 SU B M I T T A L # 1 Grand County Parcel ID No. 158729100154 A-004EXTERIOR ELEVATIONS 5/27/2022 MIDDLE PARK HEALTH - NEW FRASER HEALTH CENTER 17322.03 MI D D L E P A R K HE A L T H - N E W FR A S E R H E A L T H CE N T E R Ch e c k e r Au t h o r Ap p r o v e r 214 S. 4TH STREET KREMMLING, CO 80459 970-219-5444 CONTACT: TOM COBURN MIDDLE PARK HEALTH 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: JD DREYER DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 CONTACT: PAUL GARLAND paul.garland@davispartnership.com DAVIS PARTNERSHIP ARCHITECTS 141 9TH ST STEAMBOAT SPRINGS, CO 80487 PHONE: 970-819-6380 CONTACT: RYAN SPAUSTAT LANDMARK CONSULTANTS, INC. 7935 E PRENTICE AVE, SUITE 300W GREENWOOD VILLAGE, CO 80111 PHONE: 303-779-1222 CONTACT: KATHERINE CLARK SMITH SECKMAN REID INC. kclark@ssr-inc.com Tcoburn@middleparkhealth.org jd.dreyer@davispartnership.com ryan@landmark-co.com 1/8" = 1'-0"2 EXTERIOR ELEVATION - NORTH 2 1/8" = 1'-0"1 EXTERIOR ELEVATION - NORTH 1 LEVEL 1 100' -0" LEVEL 2 115' -4" 1916141210 T.O. HIGH CANOPY 127' -10" T.O. PARAPET B 133' -4" 1815131711 T.O. LOW CANOPY 112' -7" BU I L D I N G A N G L E S WS-WD1 WS-MAS4a SF26 SF15 SF35 CW03 SF17 SF19 SF18 SF04 CW02 SF21 SF08 WS-MAS1 WS-MAS3 E01E01 WS-MET2 LEVEL 1 100' -0" FLOOR PLANS - LEVEL TWO 115' -4" LEVEL 3 130' -8" LEVEL 4 145' -6" LEVEL 1 100' -0" LEVEL 2 115' -4" T.O.S. ROOF B 130' -8" 2 5 7 8 T.O. HIGH CANOPY 127' -10" T.O. PARAPET B 133' -4" T.O. PARAPET A 117' -4" T.O.S. ROOF A 113' -6" 3 614 9 T.O. LOW CANOPY 112' -7" BU I L D I N G A N G L E S WS-MAS4a WS-WD1 SF26 SF28 SF08 WS-MAS1 WS-MET2 LEVEL 1 100' -0" FLOOR PLANS - LEVEL TWO 115' -4" LEVEL 3 130' -8" LEVEL 4 145' -6" WS-MAS1, WS-MAS2 WS-MAS3, WS-MAS4 WS-WD1 WS-MET1 EXTERIOR ELEVATION FINISH LEGEND WOOD-LOOK PANEL METAL PANEL STONE BRICK SHEET NUMBER: MA J O R S I T E P L A N DATE: PROJECT NO. DA T E RE V RE M A R K S DR W N CH K D AP R V D MAJOR SITE PLAN APPLICANT ARCHITECT LANDSCAPE ARCHITECT CIVIL ENGINEER ELECTRICAL ENGINEER 5/ 2 7 / 2 0 2 2 SU B M I T T A L # 1 Grand County Parcel ID No. 158729100154 A-005EXTERIOR ELEVATIONS 5/27/2022 MIDDLE PARK HEALTH - NEW FRASER HEALTH CENTER 17322.03 MI D D L E P A R K HE A L T H - N E W FR A S E R H E A L T H CE N T E R Ch e c k e r Au t h o r Ap p r o v e r 214 S. 4TH STREET KREMMLING, CO 80459 970-219-5444 CONTACT: TOM COBURN MIDDLE PARK HEALTH 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: JD DREYER DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 CONTACT: PAUL GARLAND paul.garland@davispartnership.com DAVIS PARTNERSHIP ARCHITECTS 141 9TH ST STEAMBOAT SPRINGS, CO 80487 PHONE: 970-819-6380 CONTACT: RYAN SPAUSTAT LANDMARK CONSULTANTS, INC. 7935 E PRENTICE AVE, SUITE 300W GREENWOOD VILLAGE, CO 80111 PHONE: 303-779-1222 CONTACT: KATHERINE CLARK SMITH SECKMAN REID INC. kclark@ssr-inc.com Tcoburn@middleparkhealth.org jd.dreyer@davispartnership.com ryan@landmark-co.com 1/8" = 1'-0"1 ELEVATION - SOUTH 1 Copy 1 1/8" = 1'-0"2 EXTERIOR ELEVATION - SOUTH 2 LEVEL 1 100' -0" LEVEL 2 115' -4" T.O.S. ROOF B 130' -8" BBDDEEFF T.O. HIGH CANOPY 127' -10" T.O. PARAPET B 133' -4" T.O. PARAPET A 117' -4" T.O.S. ROOF A 113' -6" GGHH CC AA T.O. LOW CANOPY 112' -7" WS-MAS5a WS-MET1 WS-MET1 WS-MET1 WS-MET1 WS-MET1 WS-MAS4a WS-MET2 CW03 SF05SF10 SF12 5.00° WS-MET1 WS-MET1 WS-MET1 WS-MET1 WS-MAS5c WS-MAS4d LEVEL 1 100' -0" FLOOR PLANS - LEVEL TWO 115' -4" LEVEL 3 130' -8" LEVEL 4 145' -6" WS-MAS1, WS-MAS2 WS-MAS3, WS-MAS4 WS-WD1 WS-MET1 EXTERIOR ELEVATION FINISH LEGEND WOOD-LOOK PANEL METAL PANEL STONE BRICK SHEET NUMBER: MA J O R S I T E P L A N DATE: PROJECT NO. DA T E RE V RE M A R K S DR W N CH K D AP R V D MAJOR SITE PLAN APPLICANT ARCHITECT LANDSCAPE ARCHITECT CIVIL ENGINEER ELECTRICAL ENGINEER 5/ 2 7 / 2 0 2 2 SU B M I T T A L # 1 Grand County Parcel ID No. 158729100154 A-006EXTERIOR ELEVATIONS 5/27/2022 MIDDLE PARK HEALTH - NEW FRASER HEALTH CENTER 17322.03 MI D D L E P A R K HE A L T H - N E W FR A S E R H E A L T H CE N T E R Ch e c k e r Au t h o r Ap p r o v e r 214 S. 4TH STREET KREMMLING, CO 80459 970-219-5444 CONTACT: TOM COBURN MIDDLE PARK HEALTH 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: JD DREYER DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 CONTACT: PAUL GARLAND paul.garland@davispartnership.com DAVIS PARTNERSHIP ARCHITECTS 141 9TH ST STEAMBOAT SPRINGS, CO 80487 PHONE: 970-819-6380 CONTACT: RYAN SPAUSTAT LANDMARK CONSULTANTS, INC. 7935 E PRENTICE AVE, SUITE 300W GREENWOOD VILLAGE, CO 80111 PHONE: 303-779-1222 CONTACT: KATHERINE CLARK SMITH SECKMAN REID INC. kclark@ssr-inc.com Tcoburn@middleparkhealth.org jd.dreyer@davispartnership.com ryan@landmark-co.com 1/8" = 1'-0"1 EXTERIOR ELEVATION - EAST LEVEL 1 100' -0" LEVEL 2 115' -4" T.O.S. ROOF B 130' -8" C E F JG T.O. HIGH CANOPY 127' -10" T.O. PARAPET B 133' -4" T.O. PARAPET A 117' -4" T.O.S. ROOF A 113' -6" A HBD T.O. LOW CANOPY 112' -7" WS-MAS4a WS-MAS5a WS-MAS4e WS-WD1 WS-MET1 WS-MET1WS-MET1 WS-MET1 SF23 SF22 SF24 SF25 CW01 SF01 WS-MET2 LEVEL 1 100' -0" FLOOR PLANS - LEVEL TWO 115' -4" LEVEL 3 130' -8" LEVEL 4 145' -6" MEAN SEA LEVEL 0.00' LEVEL 1 100.00' LEVEL 1 100' -0" LEVEL 2 115' -4" T.O.S. ROOF B 130' -8" FF T.O. HIGH CANOPY 127' -10" T.O. PARAPET B 133' -4" T.O. PARAPET A 117' -4" T.O.S. ROOF A 113' -6" GG HH T.O. LOW CANOPY 112' -7" A-554 - HOLD A3 WS-MAS5c WS-MAS5a SF33 SF33 SIGNAGE SHOWN FOR REFERENCE ONLY LEVEL 1 100' -0" FLOOR PLANS - LEVEL TWO 115' -4" LEVEL 3 130' -8" LEVEL 4 145' -6" A-570 D5 WS-MAS1, WS-MAS2 WS-MAS3, WS-MAS4 WS-WD1 WS-MET1 EXTERIOR ELEVATION FINISH LEGEND WOOD-LOOK PANEL METAL PANEL STONE BRICK SHEET NUMBER: MA J O R S I T E P L A N DATE: PROJECT NO. DA T E RE V RE M A R K S DR W N CH K D AP R V D MAJOR SITE PLAN APPLICANT ARCHITECT LANDSCAPE ARCHITECT CIVIL ENGINEER ELECTRICAL ENGINEER 5/ 2 7 / 2 0 2 2 SU B M I T T A L # 1 Grand County Parcel ID No. 158729100154 A-007EXTERIOR ELEVATIONS 5/27/2022 MIDDLE PARK HEALTH - NEW FRASER HEALTH CENTER 17322.03 MI D D L E P A R K HE A L T H - N E W FR A S E R H E A L T H CE N T E R Ch e c k e r Au t h o r Ap p r o v e r 214 S. 4TH STREET KREMMLING, CO 80459 970-219-5444 CONTACT: TOM COBURN MIDDLE PARK HEALTH 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: JD DREYER DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 CONTACT: PAUL GARLAND paul.garland@davispartnership.com DAVIS PARTNERSHIP ARCHITECTS 141 9TH ST STEAMBOAT SPRINGS, CO 80487 PHONE: 970-819-6380 CONTACT: RYAN SPAUSTAT LANDMARK CONSULTANTS, INC. 7935 E PRENTICE AVE, SUITE 300W GREENWOOD VILLAGE, CO 80111 PHONE: 303-779-1222 CONTACT: KATHERINE CLARK SMITH SECKMAN REID INC. kclark@ssr-inc.com Tcoburn@middleparkhealth.org jd.dreyer@davispartnership.com ryan@landmark-co.com 1/8" = 1'-0"1 EXTERIOR ELEVATION - WEST 1 1/8" = 1'-0"2 EXTERIOR ELEVATION - WEST 2 EL000LIGHTING LEGENDS AND ABBREVIATIONS APPLICANT CIVIL ENGINEER LANDSCAPE ARCHITECT ARCHITECT ELECTRICAL ENGINEER MIDDLE PARK HEALTH 214 S. 4TH STREET KREMMLING, CO 80459 970-219-5444 CONTACT: TOM COBURN Tcoburn@middleparkhealth.org LANDMARK CONSULTANTS, INC. 141 9TH ST STEAMBOAT SPRINGS, CO 80487 PHONE: 970-819-6380 CONTACT: RYAN SPAUSTAT ryan@landmark-co.com DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: PAUL GARLAND Paul.Garland@davispartnership.com DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: JD DREYER JD.Dreyer@davispartnership.com SMITH SECKMAN REID INC. 7935 E PRENTICE AVE, SUITE 300W GREENWOOD VILLAGE, CO 80111 PHONE: 303-779-1222 CONTACT: KATHERINE CLARK Kclark@ssr-inc.com SHEET NUMBER: PROJECT NO. DATE: DA T E R E V R E M A R K S D R W N C H K D A P R V D 05/27/2022 17322.03 MA J O R S I T E P L A N MI D D L E P A R K HE A L T H - N E W FR A S E R H E A L T H CE N T E R MAJOR SITE PLAN MIDDLE PARK HEALTH - NEW FRASER HEALTH CENTER Grand County Parcel ID No. 158729100154 3/ 0 5 / 2 0 2 0 IN I T I A L S U B M I T T A L 5/ 2 7 / 2 0 2 2 2N D I N I T I A L S U B M I T T A L LIGHTING (TYPE DETERMINES MOUNTING) RECESSED OR SURFACE DOWNLIGHT LUMINAIRE PENDANT MOUNTED LUMINAIRE WALLWASH LUMINAIRE WALL MOUNTED LUMINAIRES NO SHADING INDICATES CONNECTION TO NORMAL BRANCH CIRCUIT ILLUMINATED EXIT SIGNS, PROVIDE DIRECTIONAL ARROWS AND MOUNTING AS INDICATED ON PLANS BATTERY POWERED EMERGENCY LIGHT TRACK LIGHTING POLE MOUNTED SITE LIGHTING LUMINAIRES FAA SPECIALTY LIGHTING (TYPE DETERMINES MOUNTING) SURFACE, SUSPENDED, OR RECESSED LUMINAIRES HALF-SHADING INDICATES CONNECTION TO CRITICAL BRANCH CIRCUIT FULL-SHADING INDICATES CONNECTION TO LIFE SAFETY BRANCH CIRCUIT GROUND OR POLE MOUNTED FLOODLIGHT FIXTURE TYPE:XX CIRCUIT NUMBER: 1 CONTROL DESIGNATION: x XX 1 x LIGHTING FIXTURE ANNOTATIONS (LOCATION OF DESIGNATORS MAY VARY) 20 ' - 0 " GENERAL NOTES A. UPON APPROVAL OF THIS SITE DEVELOPMENT PACKAGE, NO SUBSTITUTIONS, ADDITIONS, OR CHANGES MAY BE MADE TO THE FIXTURE TYPES AND LOCATIONS WITHOUT APPROVAL FROM THE CITY OF FRASER. B. CONTROLS - ALL SITE LIGHTING FIXTURES WILL BE CONTROLLED TO AUTOMATICALLY TURN ON AT SUNSET AND OFF AT SUNRISE VIA AN ASTROLOGICAL TIMECLOCK. C. SITE AREA - THE TOTAL SITE IMPROVEMENT SCOPE INCLUDES AN AREA OF APPROXIMATELY 98,000SF REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION. D. ALL FIXTURES WILL BE FULL CUT OFF. LIGHT POLES ADJACENT TO THE PROPERTY BOUNDARY ARE TO BE PROVIDED WITH ALL SHIELDING AND GLARE PREVENTION ACCESSORIES. E. ALL POLE MOUNTED FIXTURES TO BE PROVIDED WITH FAA LIGHTING ON POST TOP ADJACENT TO THE HELIPAD. HELIPAD TO HAVE FAA LIGHTING FOR SAFETY REQUIREMENTS. No Scale TYPICAL POLE DETAIL REFER TO FIXTURE CUTSHEETS FOR FINISH, COLOR, AND VISUAL APPEARANCE. ALL FIXTURES ARE TO BE FULL CUT OFF, REFER TO DISTRIBUTION DIAGRAMS ON CUTSHEETS FOR ADDITIONAL INFORMATION. GENERAL NOTES: LUMINAIRE SCHEDULE TYPE DESCRIPTION MANUFACTURER Model Count LAMPS VOLTAGE BALLAST/DRIVER MOUNTING REMARKSLAMPSMIN. LUMENS COLOR INPUT WATTS EG1 LED BOLLARD, SYMMETRIC DOWNLIGHT WITH IMPACT-RESISTANT FROSTED ACRYLIC LENS, CHARCOAL POWDER COAT FINISH TECH LIGHTING 700OBSYN-830-42-C-H-UNV-S 13 LED 578 SEE REMARKS 28.9 UNIV LED DRIVER IN-GRADE 3000K ER1 4" LED RECESSED DOWNLIGHT, MATTE CHROME, COLD ROLLED STEEL HOUSING,WET LOCATION ALPHABET LIGHTING NU4-RD-XTM19-10LM-30K-83-HE80-277-DIM10-NC-MC-MC-XX 18 LED 870 SEE REMARKS 12.0 277 0-10V DIMMABLE DRIVER RECESSED 3000K ER1A 4" LED RECESSED DOWNLIGHT, MATTE CHROME, COLD ROLLED STEEL HOUSING,WET LOCATION ALPHABET LIGHTING NU4-RD-XTM19-20LM-30K-83-S20-277-DIM10-NC-MC-MC-XX 13 LED 1730 SEE REMARKS 22.0 277 0-10V DIMMABLE DRIVER RECESSED 3000K ES1 SINGLE HEAD LED, DARK PLATINUM POLYESTER POWDER COAT FINISH, FULL CUT OFF, DIE CAST ALUMINUM HOUSING, WITH EXTRUDED ARM MOUNT TO STRAIGHT SUQARE STEEL POLE EATON INVUE VSX-E03-LED-E1-SL3-DP-8030-HSS (WITH) SSS VERIFY 5G 7 LED 9000 SEE REMARKS 75.0 UNIV LED DRIVER POLE MOUNTED 3000K, PROVIDE MOUNTING ACCESSORIES AS REQUIRED ES2 DOUBLE HEAD LED, DARK PLATINUM POLYESTER POWDER COAT FINISH, FULL CUT OFF, DIE CAST ALUMINUM HOUSING, WITH EXTRUDED ARM MOUNT TO STRAIGHT SUQARE STEEL POLE EATON INVUE VXS-E03-LED-E1-T4-DP-8030 (WITH) SSS VERIFY 5G 3 LED 9000 SEE REMARKS 150.0 UNIV LED DRIVER POLE MOUNTED 3000K, PROVIDE MOUNTING ACCESSORIES AS REQUIRED ES3 DOUBLE HEAD LED, DARK PLATINUM POLYESTER POWDER COAT FINISH, FULL CUT OFF, DIE CAST ALUMINUM HOUSING, WITH EXTRUDED ARM MOUNT TO STRAIGHT SQUARE STEEL POLE EATON INVUE VXS-E03-LED-E1-T3-DP-8030 (WITH) SSS VERIFY 5G 1 LED 9000 SEE REMARKS 150.0 UNIV LED DRIVER POLE MOUNTED 3000K, PROVIDE MOUNTING ACCESSORIES AS REQUIRED ES4 SINGLE HEAD LED, DARK PLATINUM POLYESTER POWDER COAT FINISH, FULL CUT OFF, DIE CAST ALUMINUM HOUSING, WITH EXTRUDED ARM MOUNT TO STRAIGHT SQUARE STEEL POLE EATON INVUE VSX-E01-LED-E1-SL4-DP-8030-HSS (WITH) SSS VERIFY 5G 1 LED 3000 SEE REMARKS 25.0 UNIV LED DRIVER POLE MOUNTED 3000K, PROVIDE MOUNTING ACCESSORIES AS REQUIRED EL001LIGHTING FIXTURE SCHEDULE APPLICANT CIVIL ENGINEER LANDSCAPE ARCHITECT ARCHITECT ELECTRICAL ENGINEER MIDDLE PARK HEALTH 214 S. 4TH STREET KREMMLING, CO 80459 970-219-5444 CONTACT: TOM COBURN Tcoburn@middleparkhealth.org LANDMARK CONSULTANTS, INC. 141 9TH ST STEAMBOAT SPRINGS, CO 80487 PHONE: 970-819-6380 CONTACT: RYAN SPAUSTAT ryan@landmark-co.com DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: PAUL GARLAND Paul.Garland@davispartnership.com DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: JD DREYER JD.Dreyer@davispartnership.com SMITH SECKMAN REID INC. 7935 E PRENTICE AVE, SUITE 300W GREENWOOD VILLAGE, CO 80111 PHONE: 303-779-1222 CONTACT: KATHERINE CLARK Kclark@ssr-inc.com SHEET NUMBER: PROJECT NO. DATE: DA T E R E V R E M A R K S D R W N C H K D A P R V D 05/27/2022 17322.03 MA J O R S I T E P L A N MI D D L E P A R K HE A L T H - N E W FR A S E R H E A L T H CE N T E R MAJOR SITE PLAN MIDDLE PARK HEALTH - NEW FRASER HEALTH CENTER Grand County Parcel ID No. 158729100154 3/ 0 5 / 2 0 2 0 IN I T I A L S U B M I T T A L 5/ 2 7 / 2 0 2 2 2N D I N I T I A L S U B M I T T A L TYPE ES1-4 EL002PHOTOMETRICS APPLICANT CIVIL ENGINEER LANDSCAPE ARCHITECT ARCHITECT ELECTRICAL ENGINEER MIDDLE PARK HEALTH 214 S. 4TH STREET KREMMLING, CO 80459 970-219-5444 CONTACT: TOM COBURN Tcoburn@middleparkhealth.org LANDMARK CONSULTANTS, INC. 141 9TH ST STEAMBOAT SPRINGS, CO 80487 PHONE: 970-819-6380 CONTACT: RYAN SPAUSTAT ryan@landmark-co.com DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: PAUL GARLAND Paul.Garland@davispartnership.com DAVIS PARTNERSHIP ARCHITECTS 2901 BLAKE STREET, SUITE 100 DENVER, COLORADO 80205 PHONE: 303-861-8555 CONTACT: JD DREYER JD.Dreyer@davispartnership.com SMITH SECKMAN REID INC. 7935 E PRENTICE AVE, SUITE 300W GREENWOOD VILLAGE, CO 80111 PHONE: 303-779-1222 CONTACT: KATHERINE CLARK Kclark@ssr-inc.com SHEET NUMBER: PROJECT NO. DATE: DA T E R E V R E M A R K S D R W N C H K D A P R V D 05/27/2022 17322.03 MA J O R S I T E P L A N MI D D L E P A R K HE A L T H - N E W FR A S E R H E A L T H CE N T E R MAJOR SITE PLAN MIDDLE PARK HEALTH - NEW FRASER HEALTH CENTER Grand County Parcel ID No. 158729100154 3/ 0 5 / 2 0 2 0 IN I T I A L S U B M I T T A L 5/ 2 7 / 2 0 2 2 2N D I N I T I A L S U B M I T T A L Calculation Summary Label Units Avg Max Min Avg/Min Max/Min 5' BEYOND PROP LINE Fc 0.25 1.8 0.0 N.A. N.A. OVERALL SITE Fc 1.29 7.9 0.0 N.A. N.A. 0.0 0.1 0.1 0.2 0.4 1.0 1.5 1.4 1.1 1.1 1.0 0.8 0.8 0.9 0.8 0.5 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.60.70.50.30.20.20.20.20.20.20.20.30.30.20.10.20.20.20.20.20.10.10.00.00.00.00.00.00.00.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.7 1.0 0.8 0.3 0.1 0.0 0.0 0.1 0.1 0.2 0.2 0.3 0.5 0.6 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.6 0.8 1.2 1.6 1.8 1.0 0.3 0.1 0.1 0.1 0.3 0.3 0.3 0.4 0.6 0.9 1.2 1.2 0.7 0.2 0.2 0.3 0.5 0.7 0.7 0.8 0.8 0.8 0.7 0.8 1.0 1.2 1.5 1.8 1.1 0.2 0.1 0.0 0.2 0.3 0.4 0.4 0.5 0.5 0.5 0.6 0.8 1.2 1.2 1.3 1.4 1.4 1.2 1.2 1.3 1.4 1.8 2.2 1.6 0.2 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.3 0.6 0.8 0.8 1.0 1.0 1.0 1.0 1.2 1.5 1.3 1.2 1.5 1.4 1.2 1.4 1.4 1.5 2.0 2.3 2.3 0.4 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.3 0.4 0.7 1.1 1.2 1.5 1.6 1.6 1.4 1.6 1.6 1.2 1.6 3.0 2.6 1.3 1.3 1.5 1.7 2.0 3.0 2.1 0.5 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.2 0.3 0.7 1.1 0.8 0.9 1.2 1.0 1.5 2.0 1.6 1.1 1.7 2.0 1.6 2.7 5.1 4.1 2.0 1.6 1.8 2.0 2.4 2.7 2.6 0.5 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.4 0.7 0.9 1.9 2.6 1.9 1.5 1.9 1.6 2.7 4.2 2.8 1.5 2.0 2.4 1.9 3.2 7.1 5.3 2.4 1.9 2.1 2.3 2.9 3.4 2.5 0.4 0.1 0.1 0.0 0.0 0.0 0.1 0.2 0.4 0.9 1.3 2.1 2.3 1.8 1.8 2.5 2.2 4.1 7.7 4.3 2.2 2.4 2.3 1.6 2.4 4.6 3.7 1.9 1.6 2.0 2.4 3.0 3.6 2.3 0.4 0.1 0.1 0.0 0.0 0.0 0.1 0.2 0.5 1.1 2.1 2.5 2.4 2.1 2.2 2.6 2.4 3.8 6.5 4.0 2.3 2.4 2.2 1.5 1.7 2.6 2.3 1.4 1.5 1.8 2.3 3.1 3.5 2.3 0.4 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.2 0.4 1.1 2.5 2.5 2.2 1.9 2.0 2.3 2.1 2.9 4.1 3.0 1.9 2.3 2.3 2.1 2.1 2.3 2.2 1.9 2.0 2.0 2.2 2.7 2.9 2.5 0.4 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.2 0.3 1.1 2.6 2.7 2.0 1.6 1.8 2.4 2.6 2.9 3.1 2.5 2.2 2.5 2.4 2.1 2.3 2.4 2.4 2.2 2.2 2.1 2.0 2.1 3.1 2.2 0.5 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.3 1.3 2.4 2.3 1.6 1.5 1.8 2.5 2.9 3.9 3.8 3.0 2.5 2.4 2.2 1.8 1.8 2.0 1.9 1.7 1.8 1.7 1.8 2.0 2.3 2.3 0.4 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 1.2 2.4 2.1 1.7 1.4 1.6 2.2 3.0 4.4 3.7 2.8 2.1 1.9 1.8 1.3 1.9 3.0 2.4 1.3 1.4 1.5 1.6 2.1 2.3 1.7 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.8 2.4 2.4 1.8 1.3 1.4 2.0 2.6 4.6 3.6 2.4 1.8 1.7 1.8 1.6 2.8 5.0 3.5 1.8 1.6 1.6 1.5 1.6 1.9 1.2 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.6 1.8 1.8 1.5 1.2 1.3 1.6 2.8 4.4 4.2 2.0 1.6 1.6 2.0 1.8 3.5 7.6 4.6 2.2 1.9 1.7 1.4 1.4 1.5 0.8 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.5 1.4 1.7 1.4 1.1 1.2 1.7 2.3 4.4 3.4 2.0 1.6 1.4 1.6 1.4 2.7 4.8 3.5 1.8 1.7 1.6 1.4 1.1 0.8 0.5 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.4 1.1 1.4 1.0 0.9 1.1 1.6 2.4 3.8 3.0 2.1 1.4 1.2 1.3 1.0 1.7 2.8 2.2 1.4 1.7 1.8 1.9 1.4 0.7 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.2 0.4 0.5 0.5 0.9 1.0 0.7 0.7 1.4 1.4 1.8 2.7 2.4 1.7 1.4 1.3 1.4 1.4 1.5 1.7 1.7 1.6 1.9 2.1 2.2 2.3 2.1 1.1 0.3 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.4 0.8 1.6 1.2 0.8 0.5 2.0 0.8 1.2 1.5 1.8 1.9 2.0 2.0 1.9 1.9 1.9 1.9 2.0 1.7 1.5 1.7 1.9 2.0 2.5 2.4 2.2 1.5 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.4 0.7 1.4 2.0 1.0 0.5 0.6 0.7 2.9 1.0 1.4 4.3 4.7 5.6 3.8 5.4 3.1 5.2 2.1 1.0 1.0 1.3 1.5 1.9 2.3 2.9 2.6 1.2 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.3 0.6 1.2 2.1 2.4 0.8 0.7 0.5 1.1 2.7 2.7 3.1 2.4 3.4 2.2 3.6 1.5 0.6 0.6 0.7 1.0 1.4 1.8 2.6 2.9 2.2 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.4 0.8 1.6 5.2 0.2 0.7 0.7 0.7 0.8 2.0 1.3 0.4 0.5 0.6 0.7 1.0 1.7 2.5 2.9 2.7 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.6 1.0 2.0 7.9 0.7 0.5 0.8 1.3 2.1 2.8 2.8 0.0 0.0 0.0 0.0 0.1 0.1 0.3 2.6 2.6 2.2 0.3 0.4 0.6 1.1 1.9 2.8 3.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.4 1.2 6.5 0.3 0.3 0.5 1.0 1.8 2.4 2.7 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.3 0.6 0.8 0.9 0.3 0.3 0.5 1.0 1.5 2.7 2.5 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.3 0.4 0.4 0.4 0.7 0.4 0.6 1.0 1.8 2.4 2.8 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.3 0.9 1.7 4.1 0.5 0.4 0.6 1.1 2.0 2.9 3.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.3 0.4 0.5 0.5 0.4 0.5 0.7 1.3 2.2 2.9 2.8 0.0 0.0 0.0 0.1 0.1 0.2 0.4 1.5 5.6 4.1 1.8 2.7 0.5 0.6 0.9 1.6 2.5 3.0 2.8 0.0 0.0 0.1 0.2 0.8 3.9 7.1 6.4 4.3 0.6 1.4 0.2 0.1 0.1 0.2 0.5 2.1 1.0 0.4 0.2 0.2 0.4 0.5 0.5 0.8 1.2 1.7 2.5 3.0 2.3 0.1 0.3 1.9 5.6 6.3 6.6 1.8 0.7 0.8 1.2 0.4 0.4 0.4 1.2 0.5 0.5 0.7 0.3 0.5 0.5 0.5 0.8 1.1 1.7 2.0 3.1 2.6 1.3 1.8 5.3 6.8 2.9 0.7 0.2 0.2 2.2 2.7 0.1 0.6 0.4 0.4 0.8 1.1 1.2 1.1 0.9 0.8 1.1 1.4 2.2 2.3 2.4 1.7 0.4 2.8 1.1 0.3 0.1 0.1 0.1 0.3 0.2 0.3 1.0 2.0 2.3 2.3 1.9 1.6 1.2 1.1 1.3 1.6 2.0 2.2 1.4 0.4 0.2 0.2 0.1 0.1 0.0 0.1 0.2 0.5 1.3 2.3 2.5 2.4 2.3 1.7 1.4 1.1 0.9 0.7 0.2 0.1 0.1 0.0 0.1 0.2 0.5 1.3 1.9 2.3 1.8 1.6 1.6 1.2 0.9 0.1 0.3 0.7 1.3 1.5 1.6 1.5 1.1 0.3 0.6 0.9 1.1 1.0 0.4 0.5 VAN VAN ES3 ES2 ES2 ES2 ES4 ES1 EG1 EG1 EG1 EG1 EG1 EG1 EG1 EG1 EG1 EG1 EG1 ES1 ES1 ES1 ES1 ER1A EW1 EW1 EW1 EW1 ER1 ER1 ER1 ER1A ER1A ER1A ER1A ER1A ER1A ER1A ER1A ER1A ER1A ER1 EW1 EW1 EW1 EW1 ER1A ER1A ER1A EG1 EG1 ES1 ES1 1" = 30'-0"1 SITE PHOTOMETRIC PLAN MPH - FRASER HEALTH CENTER exterior materials MULLIONS SPLIT FACE STONE (WS_MAS4A,B - WS_MAS5A,B - PWS_MAS4A) HONED AND SAWN STONE (WS_MAS4C) METAL ROOF (RS_MET1) BRICK - SMOOTH (USED AT ALL STACKED BOND AND SOLDIER COURSING LOCATIONS | WS_MAS1,2,3 - PWS_MAS1) BRICK - ROUGH (USED AT ALL RUNNING BOND LOCATIONS | WS_MAS1,2,3 - PWS_MAS1) WOOD COMPOSITE PANEL (WS_WD1 - SS_WD1) METAL WALL PANEL (WS_MET1 - PWS_MET1) Town of Fraser PO Box 370, Fraser, CO 80442 office 970-726-5491 fax 970-726-5518 www.frasercolorado.com MEMO TO: Planning Commission Chairperson and Planning Commissioners FROM: Alyssa Rivas, Baseline Engineering Corporation DATE: June 22, 2022 SUBJECT: Planner Briefing on Final Plat, Koselig on Main, 406 Zerex St. & 315 Fraser Ave MATTER BEFORE THE PLANNING COMMISSION: Final Plat, Koselig on Main, 406 Zerex St. & 315 Fraser Ave ACTION REQUESTED: The applicant, 406 Zerex LLC, is requesting Final Plat approval of Koselig on Main, 406 Zerex St. & 315 Fraser Ave. BACKGROUND: This subdivision application is being processed as a Major Subdivision in accordance with Section 19-3-210 of the Fraser Municipal Code. The purpose of a major subdivision plat is to divide one (1) or more lots or parcels of land into a total of five (5) or more lots or five (5) or more dwelling units. The Preliminary Plat and Major Site Plan were conditionally approved at the Fraser Planning Commission meeting on April 27, 2022 by Resolution 2022-04-01. Maps below indicate the general vicinity of this proposed development: Town of Fraser PO Box 370, Fraser, CO 80442 office 970-726-5491 fax 970-726-5518 www.frasercolorado.com As outlined in the April 27, 2022 Planner Briefing for the Preliminary Plat and Major Site Plan approval, the applicant’s project will consist of 4,000 SF of retail space and 20 apartment units. The project aims to deliver restricted low-income housing units and attainable market units to provide for rental housing to the residents of Fraser and Grand County. Residential density and parking requirements were considered consistent with the Fraser Municipal Code and conditionally approved per Resolution 2022-04-01 Conditions of Preliminary Plat and Major Site Plan approval are listed below with a staff comment on the status of each item: 1. Applicant to resubmit civil drawings in conjunction with Final Plat submittal. Staff Comment: Civil drawing were revised, resubmitted and sent out to referral agencies. A number of comments were returned and the applicant should address these outstanding comments as a condition of Final Plat approval. 2. Address review comments in Whitmer Law Firm memo dated 4-16-2022 and revise documents accordingly. Staff Comment: The applicant addressed the Whitmer Law Firm comments aside from providing the final Construction Guarantee Agreement (CGA), which should be a condition of Final Plat approval. Town of Fraser PO Box 370, Fraser, CO 80442 office 970-726-5491 fax 970-726-5518 www.frasercolorado.com 3. Applicant must secure CDOT Access Permit prior to recordation of Final Plat. Staff Comment: The applicant is working with CDOT to secure the necessary permits. All required permits should be required prior to recordation of the Final Plat 4. Address Agency Review Comments included in packet. Staff Comment: The applicant addressed most of the agency comments from the Preliminary Plat submittal. Some minor edits are still outstanding. Addressing these comments should be a condition of Final Plat approval. 5. A Construction Guarantee Agreement (CGA) and appropriate security shall be submitted and approved prior to building permit issuance. Staff Comment: This is still outstanding and should be a condition of Final Plat approval. 6. Confirm the exterior lighting is dark sky compliant. Details to be added to site plan. Staff Comment: This is still outstanding and should be a condition of Final Plat approval. 7. The applicant shall pay school and park impact fees prior to recordation of Final Plat. Staff Comment: This is still outstanding and should be a condition of Final Plat approval. 8. Applicant shall resubmit for review and approval all Final Plat and site plan documents. This development application shall be scheduled for Planning Commission once a complete application has been submitted. Staff Comment: The applicant resubmitted the Final Plat and Site Plan documents on March 20, 2022. The application was considered complete and scheduled for Planning Commission on June 22, 2022. Staff has provided the following materials in the packet: • Planner Briefing (THIS MEMO) • Draft PC Resolution 2022-06-01 • Agency Review Comments • Proof of Publication The applicant has provided the following materials in the packet: • Final Plat & Site Plan • Conceptual Drawings & Site Plan • Civil Plans • Drainage Report • Cover Letter • Notice Sent to Neighbors • Residential Coverage • Traffic Impact Study Town of Fraser PO Box 370, Fraser, CO 80442 office 970-726-5491 fax 970-726-5518 www.frasercolorado.com The applicant has also provided the following materials that are NOT in the packet: • Land Use Application • Title Commitment • Neighbor list • Affidavit of Notice • Phase I Environmental Site Assessment • Geotechnical Engineering Study Recommendation: Staff is recommending that the Planning Commission forward this application to the Fraser Board of Trustees with a recommendation of approval including the following conditions: 1. Applicant must address all Referral Agency Comments included in the packet. 2. Applicant must resubmit civil drawings in accordance with Referral Agency Comments prior to building permit issuance. 3. Applicant must secure CDOT Access Permit, if required, prior to recordation of Final Plat. 4. A Construction Guarantee Agreement (CGA) and appropriate security shall be submitted and approved prior to building permit issuance. 5. Lighting details and notes must be added to the Exterior Lighting plan showing compliance with the dark sky regulations of the Municipal Code. 6. The applicant shall pay school and park impact fees prior to recordation of Final Plat. 7. Applicant shall resubmit for review and approval all Final Plat documents. This development application shall be scheduled before the Town of Fraser Board of Trustees once a complete application has been submitted. See PC Resolution 2022-06-01. Please contact me with questions or concerns at alyssa.rivas@baselinecorp.com FRASER PLANNING COMMISSION RESOLUTION NO. 2022-06-01 A RESOLUTION APPROVING A FINAL PLAT FOR KOSELIG ON MAIN, 406 ZEREX ST. AND 315 FRASER AVE, A REPLAT OF LOTS 30-33 LYING N OF US 40, BLOCK 7, 1ST ADDITION TO THE TOWN OF EASTOM (AKA FRASER), GRAND COUNTY, COLORADO, PART OF SEC. 19, TOWNSHIP 1 SOUTH, RANGE 75 WEST OF THE 6TH PM. At the regular meeting of the Fraser Planning Commission held on June22, 2022, 406 Zerex, LLC requested approval for a Final Plat for Koselig on Main, 406 Zerex St. & 315 Fraser Ave; and WHEREAS, 406 Zerex, LLC is the current owner of the property; and WHEREAS, the applicant is requesting Final Plat approval for Koselig on Main which would allow for the construction of 4000 +/- SF of retail and 20 apartments at 406 Zerex Street in Fraser; and WHEREAS, Staff has determined that this application is in compliance with the Land Development Code of the Town of Fraser when the conditions listed below have been addressed. NOW THEREFORE BE IT RESOLVED that the Fraser Planning Commission has voted to approve this development application with the following conditions: 1. Applicant must address all Referral Agency Comments included in the packet. 2. Applicant must resubmit civil drawings in accordance with Referral Agency Comments prior to building permit issuance. 3. Applicant must secure CDOT Access Permit, if required, prior to recordation of Final Plat. 4. A Construction Guarantee Agreement (CGA) and appropriate security shall be submitted and approved prior to building permit issuance. 5. Lighting details and notes must be added to the Exterior Lighting plan showing compliance with the dark sky regulations of the Municipal Code. 6. The applicant shall pay school and park impact fees prior to recordation of Final Plat. 7. Applicant shall resubmit for review and approval all Final Plat documents. This development application shall be scheduled before the Town of Fraser Board of Trustees once a complete application has been submitted. APPROVED AND ADOPTED THIS 22nd DAY OF JUNE, 2022. FRASER PLANNING COMMMISSION Chairman ATTEST: _________________________________________ Town Clerk 1 Alyssa Rivas From:Aggen - CDOT, Kandis <kandis.aggen@state.co.us> Sent:Wednesday, June 8, 2022 8:33 AM To:Alyssa Rivas Cc:Brian Killian - CDOT Subject:Re: 406 Zerex St - Koselig on Main Final Plat Referral Request [EXTERNAL EMAIL] DO NOT CLICK links or attachments unless you recognize the sender and know the content is safe.  Hi Alyssa,   Thanks for sending this review.  CDOT is working with the permittee on CDOT access permitting.  We have provided comments on the traffic study and  requested a revised study.  The application process is on hold until we receive a revised study.    Thanks,    Kandis Aggen   Assistant Access Manager  Region 3 Traffic & Safety      To help prprivacy, Mprevented download from the In       P 970.683.6270 | F 970.683.6290  kandis.aggen@state.co.us | www.codot.gov  222 S. Sixth St., Rm 100, Grand Junction, CO 81501      On Tue, May 24, 2022 at 7:28 PM Alyssa Rivas <alyssa.rivas@baselinecorp.com> wrote:  Referral Agencies,     406 Zerex, LLC., has submitted a Final Plat application to the Town of Fraser for Koselig on Main. Please review the  submittal documents which can be found by clicking the link below. Referral comments will be made part of the public  record of the Town of Fraser. The Planning Commission public hearing will be June 22, 2022. Please provide any  comments to be by June 10, 2022.      https://www.dropbox.com/scl/fo/9ohsimrudpstfeatobkpo/h?dl=0&rlkey=jltmrxsv8ouoy2aw8vavqq8lv     2 Thank you,     ALYSSA RIVAS | ASSOCIATE PLANNER  Baseline Engineering Corporation | Engineering, Planning, & Surveying Phone: 303.940.9966 | Cell: 719.332.3928 | www.baselinecorp.com | Social Media  Office: 112 N. Rubey Drive, #210, Golden, CO 80403 Thank you for your ongoing support! We are now in the office, as well as home, continuing to provide the best services for our clients.    Employee Owned 5970 Greenwood Plaza Blvd Greenwood Village, CO 80111 Tel: +1 303-751-0741 hello@merrick.com www.merrick.com June 10, 2022 Ms. Julie Esterl Principal Planner Baseline Engineering Corporation 112 N. Ruby Drive #210 Golden, CO 80403 RE: Review of 406 Zerex St. - Koselig on Main Final Plat Dear Ms. Esterl: Merrick & Company has reviewed the proposed Final Plat for 406 Zerex St.- Koselig on Main and the associated Title Commitment dated 4-29-2022 with the following comments and concerns. 1. The property described and shown on the plat does not match the property described in the Title Commitment dated 4-29-2022. 2. The property depicted on the plat does not match the Title Commitment property or the property description written on the plat. 3. The Basis of Bearings needs to fully describe the monuments used. 4. The Basis of Bearings depicted on the plat does not match the written Basis of Bearings Statement. 5. Vicinity map is at too large of a scale and needs to be at a Quarter Section scale view, not a multiple section scale view. 6. Font size and type is very inconsistent. a. Typically 0.08 to 0.1 of the drawing scale for regular text. b. Title text and label text such as Sections, Roads, etc. can be slightly larger. 7. There is no Statement of Land Surveyors Statue of Limitations [CRS 38-80-105] 8. Sheet 2 does not seem to pertain to a final plat and should be removed. 9. Contours, utilities, and other improvements not related to boundary determination should not be shown. 10. Monuments need to be existent at all corners of the parcel. 11. The Town of Eastom Plat is requested to be submitted for cross check. a. Historical Lots and Blocks should be labeled in a screened (shaded) color for reference. 12. A closure report is requested to cross check the bearing and distance calls and the area. 13. Bold lines should be reserved for the boundary of the parcel. Please lighten the lines that do not pertain to the boundary. 14. Bearings and Distances and label tags associated with the boundary should be bold and a consistent font. 15. Recording information needs to be shown for adjoining rights-of-way. 16. A statement of scale or representative fraction of the drawing is missing. (Note that only the bar scale is shown). 17. A statement of lineal units needs to be added. Please feel free to contact me at 970-744-4614. I can also be e-mailed at jacob.frisch@merrick.com. Sincerely, Jacob S. Frisch, PLS, CFedS Northern Colorado Survey Manager Employee Owned 2480 W. 26th Street, Unit B225 Denver, Colorado 80211 Tel: +1 303-964-3333 hello@merrick.com www.merrick.com June 9, 2022 Ed Cannon, Town Manager Town of Fraser 153 Fraser Avenue, P.O. Box 370 Fraser, Colorado 80442 RE: KOSELIG ON MAIN DRAINAGE REVIEW Dear Mr. Cannon: We have reviewed the Koselig on Main submittal received May 27, 2022. The submittal included the Koselig on Main Drainage Memorandum and Construction Plans, dated May 20, 2022 by JVA Consulting Engineers. We have the following comments to offer related to the drainage improvements. Drainage Report 1. For the Infiltration Basin, we have the following comments: a. The geotechnical report does not provide recommendations related to an underground infiltration basin. Provide groundwater elevation and soil conditions, such as infiltration rates, needed to inform the design. b. Since underground storage has a high risk of plugging, is difficult to maintain, may have unknown geotechnical conditions, and does not provide freeboard as a typical pond would have, we recommend that the storage volume be increased by at least 15% to provide a safety factor. c. It is preferred to have an outlet pipe for underground storage facilities, instead of only relying on infiltration. If possible, provide an outlet pipe that connects to the existing storm sewer system in Frazer Avenue or that directly outfalls to the river. d. The volume sizing calculation is based on the assumption that infiltration will occur at the historic flow rate. Provide the estimated infiltration rate based on the existing soil conditions and verify that this rate is equal to or greater than the historic flow rate. If it is less than the historic flow rate, increase the required volume. e. Maintenance will be the responsibility of the property owner. Provide a maintenance plan that describes how the pond will be maintained, equipment needed, and a maintenance schedule. 2. Provide sizing calculations for the proposed storm sewer pipes, including the pipe connections from the inlets to the infiltration basin and inlet control calculation for the 6” PVC with a small pipe headwall. 3. Provide sizing calculations for the proposed concrete pan. 4. Provide sizing calculations for the proposed valley inlets. Similar to Comment 12 below, the existing alley grades just north of the inlets is lower than the grate elevations so ponded water will not be contained. Adjust the proposed grading to provide the minimum required ponding depth at the inlets, plus freeboard. 5. Provide a copy of the Drainage Map in the Drainage Memorandum. q:\denver_north\projects\0492-07 fraser development reviews\reviews\koselig on main(406 zerex st)\2022-0527 submittal\koselig on main drainage review_2022-0610.docx Construction Plans 6. Provide a cover sheet that includes the project name, type of document (i.e., Final Development Plans, Site Plans, Preliminary Plans, etc.), and location map. 7. On Sheets C0.2 and C1.0. existing inlets are shown at the intersections of Hwy. 40 and Fraser Ave. and Doc Susie Ave. and Fraser Ave. Show the existing storm sewer system that connects these inlets, the pipe size, and where it outfalls to. 8. On Sheet C1.0, we recommend that the finished floor elevations (FFE) for both buildings be raised to protect them from potential street flooding. Without analyzing offsite runoff to the existing gutters and concrete pans along Hwy. 40 and Fraser Avenue, we recommend assuming that the flow depth will be at least 1-foot deep, which is typically the maximum allowed street flow depth. Allowing for 0.5 feet of freeboard, the FFE’s should be set at lease 1.5 feet above the highest adjacent flowline elevation. Currently the FFE’s for both buildings are set at about the flowline elevations which appears to have a high risk for flooding. 9. On Sheet C1.0, just northwest of the Hwy. 40 and Fraser Ave. intersection, it appears that a section of concrete pan is proposed where there is an existing driveway ramp. The driveway ramp will no longer be needed, so instead of a concrete pan, provide curb and gutter for this section of sidewalk and match to the existing curb and gutter at each end. Adjust the sidewalk grading as needed. 10. On Sheet C1.0, it appears that a pond is proposed between the two buildings just north of Fraser Ave. Clarify the purpose of this low graded area. 11. On Sheet C1.0, relocate the trash enclosure so it is not shown blocking the south half of the concrete pan. 12. On Sheet C1.0, it shows that runoff from the parking lot area is intended to be routed by about a 4’ wide concrete pan that would only be 2 inches deep. The existing alley grades just north of the concrete pan are lower and do not provide additional depth to contain flow in the concrete pan. Verify that the concrete pan has capacity to contain the 100-year tributary flow. Freeboard must also be provided to ensure this runoff is contained and routed to the inlets and infiltration basin. 13. On Sheet C1.0, several small-sized PVC storm pipes are proposed. We recommend increasing the pipe sizes to be 10 inches minimum to reduce the potential for clogging and for easier maintenance. 14. For the proposed PVC storm pipes, provide cleanouts as needed. 15. On Sheet C1.0, a trash removal structure that is easily accessible must be provided at all the inflows to the underground detention system. This can be an inlet or manhole type structure that is designed to remove trash and sediment. We recommend routing the two 6” PVC and 8” PVC storm pipes to a single trash removal structure. The proposed valley inlets must be modified to provide trash removal. 16. Provide a detailed layout of the infiltration basin, including the size of pipes, cells, infiltration layers/materials, inspection ports and/or access manholes for maintenance, elevations, and dimensions. Please let us know if you have any questions. q:\denver_north\projects\0492-07 fraser development reviews\reviews\koselig on main(406 zerex st)\2022-0527 submittal\koselig on main drainage review_2022-0610.docx Sincerely, Merrick & Company Jeanne M. Boyle, PE, CFM Cc: Alyssa Rivas, Baseline Engineering Corporation Julie Esterl, Baseline Engineering Corporation Ryan Helle, Baseline Engineering Corporation 1 Alyssa Rivas From:Jean Johnston <JeanJ@mpei.com> Sent:Wednesday, June 1, 2022 1:16 PM To:Alyssa Rivas Cc:Julie Esterl; Ryan Helle Subject:FW: 406 Zerex St - Koselig on Main Final Plat Referral Request Follow Up Flag:Follow up Flag Status:Flagged [EXTERNAL EMAIL] DO NOT CLICK links or attachments unless you recognize the sender and know the content is safe.  Hi Alyssa,  MPEI would like easement language included on the front page of the plat. If this does not happen, then we will need to  ask the developer for an easement before we install our equipment on the site.    A blanket easement works best for this type of plat. See below.    Blanket Easement:   PER THIS PLAT, A BLANKET EASEMENT UPON, ACROSS, ABOVE, OVER, UNDER AND THROUGH THE SUBJECT  PROPERTY IS GRANTED TO MOUNTAIN PARKS ELECTRIC, INC. FOR THE PURPOSE OF INGRESS TO AND EGRESS  FROM, AND THE INSTALLATION, REPAIR, REPLACEMENT, OPERATION AND MAINTENANCE OF AN ELECTRIC  DISTRIBUTION SYSTEM, INCLUDING ELECTRIC LINES AND ALL ASSOCIATED FACILITIES.   WITH RESPECT TO THE ELECTRIC UTILITY EASEMENT GRANTED HEREBY, NO STRUCTURE SHALL BE ALLOWED  CLOSER THAN TEN FEET (10’) FROM ANY PRIMARY VOLTAGE POWER LINES OR WITHIN TEN FEET (10’) AROUND  ANY ABOVE GROUND EQUIPMENT. NO OTHER UTILITY LINE (WHETHER GAS, WATER, SEWER OR OTHER UTILITY)  SHALL BE ALLOWED CLOSER THAN FIVE FEET (5’) FROM ANY PRIMARY VOLTAGE POWER LINES OR WITHIN FIVE  FEET (5’) AROUND ANY ABOVE GROUND EQUIPMENT. NOT WITHSTANDING THE FOREGOING, UNDERGROUND  COMMUNICATION FACILITIES SHALL NOT BE ALLOWED CLOSER THAN ONE FOOT (1’) TO ANY POWER LINES AND  ABOVE GROUND COMMUNICATION FACITLITIES SHALL NOT BE CLOSER THAN TWO FEET (2’) TO ANY ABOVE  GROUND ELECTRIC FACILITIES. NO GRADE CHANGES (FILL OR CUT) IN EXCESS OF SIX INCHES (6”) ARE PERMITTED  WITHIN TEN FEET (10’) OF ANY PRIMARY ELECTRIC LINE OR WITHIN FIVE FEET (5’) OF ANY OTHER FACILITY,  INCLUDING SECONDARY ELECTRIC LINES, WITHOUT PRIOR WRITTEN AUTHORIZATION FROM MOUNTAIN PARKS  ELECTRIC, INC.    Please let me know if you have any questions. Jean      Jean Johnston Right of Way Specialist, Sr Staker JeanJ@mpei.com ex 265 Mountain Parks Electric, Inc. 321 West Agate Ave • P.O. Box 170, Granby, CO 80446-0170 • 970.887.3378 We are owned by those we serve. This institution is an equal opportunity provider and employer. 2 Click here to take our quick online survey for chance to win a $100 bill credit! From: Alyssa Rivas <alyssa.rivas@baselinecorp.com>   Sent: Tuesday, May 24, 2022 7:28 PM  To: 'Kent@whitmerlawfirm.com' <Kent@whitmerlawfirm.com>; Jean Johnston <JeanJ@mpei.com>;  'kandis.aggen@state.co.us' <kandis.aggen@state.co.us>; 'dsoles@eastgrandfire.com' <dsoles@eastgrandfire.com>;  'rmowrey@eastgrandfire.com' <rmowrey@eastgrandfire.com>; 'julie.koehler@merrick.com'  <julie.koehler@merrick.com>; 'brian.killian@state.co.us' <brian.killian@state.co.us>  Cc: Julie Esterl <julie.esterl@baselinecorp.com>; Ryan Helle <ryan.helle@baselinecorp.com>  Subject: [External] 406 Zerex St ‐ Koselig on Main Final Plat Referral Request       Referral Agencies,    406 Zerex, LLC., has submitted a Final Plat application to the Town of Fraser for Koselig on Main. Please review the  submittal documents which can be found by clicking the link below. Referral comments will be made part of the public  record of the Town of Fraser. The Planning Commission public hearing will be June 22, 2022. Please provide any  comments to be by June 10, 2022.     https://www.dropbox.com/scl/fo/9ohsimrudpstfeatobkpo/h?dl=0&rlkey=jltmrxsv8ouoy2aw8vavqq8lv   Thank you,    ALYSSA RIVAS | ASSOCIATE PLANNER  Baseline Engineering Corporation | Engineering, Planning, & Surveying Phone: 303.940.9966 | Cell: 719.332.3928 | www.baselinecorp.com | Social Media Office: 112 N. Rubey Drive, #210, Golden, CO 80403 Thank you for your ongoing support! We are now in the office, as well as home, continuing to provide the best services for our clients.    Caution: This email originated from outside of MPEI. Do not click links or open attachments unless you recognize  the sender and know the content is safe.   1 Alyssa Rivas From:Will Berry <will@whitmerlawfirm.com> Sent:Wednesday, June 8, 2022 2:15 PM To:Alyssa Rivas Cc:Kent Whitmer Subject:FW: 406 Zerex St - Koselig on Main Final Plat Referral Request [EXTERNAL EMAIL] DO NOT CLICK links or attachments unless you recognize the sender and know the content is safe.  Hello Alyssa,    We’ve reviewed the final plat submittal and only have a few comments.     TC § 19‐3‐230(e) requires a plat note advising that CO’s cannot be issued until SIA improvements are  complete and accepted by the Town. Here’s some suggested language.   o All purchasers, owners, and tenants of any lot, parcel, or tract shown on this plat are hereby  notified that although building permits may be issued prior to final completion of subdivision  improvements, no certificate of occupancy may be issued for a structure on any lot, parcel, or  tract until all such improvements, as required by the Subdivision Improvements Agreement  entered into with the Town of Fraser, have been completed and preliminarily accepted by the  Town in accordance with Fraser Town Code § 19‐3‐445.   Section 10.1 of the SIA needs to be completed and we need copies of the assembled SIA exhibits.    Thanks,    William G. Berry, Attorney The Whitmer Law Firm, LLC Telephone: 970.725.3460 ex. 2 Website: www.whitmerlawfirm.com    From: Alyssa Rivas <alyssa.rivas@baselinecorp.com>   Sent: Tuesday, June 7, 2022 12:31 PM  To: Kent Whitmer <kent@whitmerlawfirm.com>; 'kandis.aggen@state.co.us' <kandis.aggen@state.co.us>;  'dsoles@eastgrandfire.com' <dsoles@eastgrandfire.com>; 'rmowrey@eastgrandfire.com'  <rmowrey@eastgrandfire.com>; 'brian.killian@state.co.us' <brian.killian@state.co.us>  Cc: Julie Esterl <julie.esterl@baselinecorp.com>  Subject: RE: 406 Zerex St ‐ Koselig on Main Final Plat Referral Request     Hi all,    I just want to confirm that you received the below referral request on 5/24/2022 – this is a new process for us as we  begin our work with the Town of Fraser and I wanted to make sure it wasn’t sitting in anyone’s junk folder. Again, please  return any comments to me by June 10th.     Thank you,    ALYSSA RIVAS | ASSOCIATE PLANNER  2 Baseline Engineering Corporation | Engineering, Planning, & Surveying Phone: 303.940.9966 | Cell: 719.332.3928 | www.baselinecorp.com | Social Media Office: 112 N. Rubey Drive, #210, Golden, CO 80403 Thank you for your ongoing support! We are now in the office, as well as home, continuing to provide the best services for our clients.   From: Alyssa Rivas   Sent: Tuesday, May 24, 2022 7:28 PM  To: 'Kent@whitmerlawfirm.com' <Kent@whitmerlawfirm.com>; 'jeanj@mpei.com' <jeanj@mpei.com>;  'kandis.aggen@state.co.us' <kandis.aggen@state.co.us>; 'dsoles@eastgrandfire.com' <dsoles@eastgrandfire.com>;  'rmowrey@eastgrandfire.com' <rmowrey@eastgrandfire.com>; 'julie.koehler@merrick.com'  <julie.koehler@merrick.com>; 'brian.killian@state.co.us' <brian.killian@state.co.us>  Cc: Julie Esterl <julie.esterl@baselinecorp.com>; Ryan Helle <ryan.helle@baselinecorp.com>  Subject: 406 Zerex St ‐ Koselig on Main Final Plat Referral Request     Referral Agencies,    406 Zerex, LLC., has submitted a Final Plat application to the Town of Fraser for Koselig on Main. Please review the  submittal documents which can be found by clicking the link below. Referral comments will be made part of the public  record of the Town of Fraser. The Planning Commission public hearing will be June 22, 2022. Please provide any  comments to be by June 10, 2022.     https://www.dropbox.com/scl/fo/9ohsimrudpstfeatobkpo/h?dl=0&rlkey=jltmrxsv8ouoy2aw8vavqq8lv   Thank you,    ALYSSA RIVAS | ASSOCIATE PLANNER  Baseline Engineering Corporation | Engineering, Planning, & Surveying Phone: 303.940.9966 | Cell: 719.332.3928 | www.baselinecorp.com | Social Media Office: 112 N. Rubey Drive, #210, Golden, CO 80403 Thank you for your ongoing support! We are now in the office, as well as home, continuing to provide the best services for our clients.   Koselig on Main Final Plat PC Hearing - Page 1 of 1 FILER Julie Esterl julie.esterl@baselinecorp.com (970) 726-5491 FILING FOR Middle Park Times Columns Wide:1 Ad Class:Legals INTERIM AD DRAFT T his i s t h e pro o f of y ou r a d s ch ed u l e d t o r un i n Mi d d l e Pa r k Ti m es on th e d at e s i nd i ca t ed b e l o w. I f c h a n ge s a r e ne ed ed , p l ea se co nt a ct us pr i o r to d ea dlin e a t (9 70 ) 8 87 -3 33 4. Notice ID: JBk4cJEbk2Adxu6YH1XX | Proof Updated: Jun. 03, 2022 at 03:35pm MDT Notice Name: Koselig on Main Final Plat PC Hearing This is not an invoice. Below is an estimated price, and it is subject to change. You will receive an invoice with the final price upon invoice creation by the publisher. 06/09/2022: Other 14.62 Affidavit Fee 4.00 Subtotal $18.62 Tax %0.00 Total $18.62 2) 6 YARD DUMPSTERS24’ 0" Sidewalk7’ 0" 1234567811121819202122232425262720’ 0"131415161710 ’ 0 " 20’ 0" 10’ AB C D E F 2 45361 22’ 0" 22’ 0" 22’ 0" 22’ 0"22’ 0"12 3 4 5 6 7 8 2’ 0" AB C D E F 2 45361 HOOKSHOOKSW/ D W/ D 7 9 1110 12 13 G H I J K 22’ 0"22’ 0" 22’ 0" 20’ 0" 64’ 0" 8’ 0" 8 ADA 1 2 345 6 7 8 9 24’ 8"20’ 0" 10’ 0"L 24’ 0" 9’ 0"18’ 0" 4’ 0"9’ 0"5’ 7 9 1110 1213G H I J K 8 22’ 0"22’ 0"22’ 0"22’ 0"L 6’ 0"11’ 0"47’ 0" 8’ 0"6’ 0" 58’ 0"4’ 0" Know what's below. before you dig.Call R C: \ P e t e r N e l s o n \ F r a s e r T o w n C e n t e r \ A s s o c F i l e s \ 2 0 1 8 T B M A R K 2 4 X 3 6 - B _ W - B i z C a r d - 4 5 4 6 1 9 6 . j p g SHEET SH E E T C O N T E N T S PR O J E C T 20 2 2 P e t e r N e l s o n A r c h i t e c t u r e c LO C A T I O N 1S T I S S U E 4/ 2 1 / 2 0 2 2 IS S U E D SC A L E As N o t e d 1/ 8 " = 1 ' - 0 " 1/ 4 " = 1 ' - 0 " 1/ 2 " = 1 ' - 0 " 1" = 1 ' - 0 " PO B o x 3 2 7 6 OW N E R AR C H I T E C T Wi n t e r P a r k , C o l o r a d o 8 0 4 8 2 97 0 . 5 3 1 . 1 1 8 7 I ne l s o n p e t e r f @ g m a i l . c o m Pe t e r N e l s o n A r c h i t e c t u r e GE N E R A L C O N T R A C T O R OW N E R CI V I L E N G I N E E R 47 C O O P E R C R E E K W A Y Wi n t e r P a r k , C o l o r a d o 8 0 4 8 2 97 0 . 7 2 2 . 7 6 7 7 kv e c c h i a r e l l i @ j v a j v a . c o m JV A , I n c . 2N D I S S U E 5/ 2 0 / 2 0 2 2 As N o t e d GE N E R A L L E G E N D , N O T E S & AB B R E V I A T I O N S C0.1 5/20/22 CS NE1/4 S.19 T.1S, R.75W REC. #2012002871 OWNER: 404 DOC SUSIE LLC E1/2 NE1/4 S.19, T.1S, R.75 BOOK 426, PAGE 0428 OWNER: TOWN OF FRASER BOOK 242 PAGE 606 OWNER: YOUNGS REAL ESTATE CO., LLC NE1/4 S.19 T.1S, R.75W REC. #2015006301 OWNER: CAMERON, CHRISTOPHER PALMER 20' WIDE ALLEY G G FRASER AVE. (60' ROW) (ASPHALT ROAD) DO C S T R E E T (3 4 . 5 ' R O W ) (A S P H A L T R O A D ) U . S . H I G H W A Y 4 0 ( A S P H A L T R O A D ) N 2 7 ° 4 5 ' 0 5 " W 6 0 . 0 7 ' 34.5' 34.5' N89°50'56"W 109.64' N72°59'11"W 15.97' N0°09'04"E 8.27' S0°09'04"W 12.90' 124.93' 1,576 SF (ORD #274) VACATED ROW REC #2001-012433 14 . 5 ' R E C 2 0 0 1 - 0 1 2 4 3 4 UTILITY EASEMENT E E E E E E E E E G G G G G G G G G G G C: \ P e t e r N e l s o n \ F r a s e r T o w n C e n t e r \ A s s o c F i l e s \ 2 0 1 8 T B M A R K 2 4 X 3 6 - B _ W - B i z C a r d - 4 5 4 6 1 9 6 . j p g SHEET SH E E T C O N T E N T S PR O J E C T 20 2 2 P e t e r N e l s o n A r c h i t e c t u r e c LO C A T I O N 1S T I S S U E 4/ 2 1 / 2 0 2 2 IS S U E D SC A L E As N o t e d 1/ 8 " = 1 ' - 0 " 1/ 4 " = 1 ' - 0 " 1/ 2 " = 1 ' - 0 " 1" = 1 ' - 0 " PO B o x 3 2 7 6 OW N E R AR C H I T E C T Wi n t e r P a r k , C o l o r a d o 8 0 4 8 2 97 0 . 5 3 1 . 1 1 8 7 I ne l s o n p e t e r f @ g m a i l . c o m Pe t e r N e l s o n A r c h i t e c t u r e GE N E R A L C O N T R A C T O R OW N E R CI V I L E N G I N E E R 47 C O O P E R C R E E K W A Y Wi n t e r P a r k , C o l o r a d o 8 0 4 8 2 97 0 . 7 2 2 . 7 6 7 7 kv e c c h i a r e l l i @ j v a j v a . c o m JV A , I n c . 2N D I S S U E 5/ 2 0 / 2 0 2 2 As N o t e d DE M O L I T I O N P L A N C0.2 5/20/22 CS NE1/4 S.19 T.1S, R.75W REC. #2012002871 OWNER: 404 DOC SUSIE LLC E1/2 NE1/4 S.19, T.1S, R.75 BOOK 426, PAGE 0428 OWNER: TOWN OF FRASER BOOK 242 PAGE 606 OWNER: YOUNGS REAL ESTATE CO., LLC NE1/4 S.19 T.1S, R.75W REC. #2015006301 OWNER: CAMERON, CHRISTOPHER PALMER 20' WIDE ALLEY G G FRASER AVE. (60' ROW) (ASPHALT ROAD) DO C S T R E E T (3 4 . 5 ' R O W ) (A S P H A L T R O A D ) U . S . H I G H W A Y 4 0 ( A S P H A L T R O A D ) N 2 7 ° 4 5 ' 0 5 " W 6 0 . 0 7 ' 34.5' 34.5' N89°50'56"W 109.64' N72°59'11"W 15.97' N0°09'04"E 8.27' S0°09'04"W 12.90' 124.93' 1,576 SF (ORD #274) VACATED ROW REC #2001-012433 14 . 5 ' R E C 2 0 0 1 - 0 1 2 4 3 4 UTILITY EASEMENT E E E E E E E E E G G G G G G G G G G G C: \ P e t e r N e l s o n \ F r a s e r T o w n C e n t e r \ A s s o c F i l e s \ 2 0 1 8 T B M A R K 2 4 X 3 6 - B _ W - B i z C a r d - 4 5 4 6 1 9 6 . j p g SHEET SH E E T C O N T E N T S PR O J E C T 20 2 2 P e t e r N e l s o n A r c h i t e c t u r e c LO C A T I O N 1S T I S S U E 4/ 2 1 / 2 0 2 2 IS S U E D SC A L E As N o t e d 1/ 8 " = 1 ' - 0 " 1/ 4 " = 1 ' - 0 " 1/ 2 " = 1 ' - 0 " 1" = 1 ' - 0 " PO B o x 3 2 7 6 OW N E R AR C H I T E C T Wi n t e r P a r k , C o l o r a d o 8 0 4 8 2 97 0 . 5 3 1 . 1 1 8 7 I ne l s o n p e t e r f @ g m a i l . c o m Pe t e r N e l s o n A r c h i t e c t u r e GE N E R A L C O N T R A C T O R OW N E R CI V I L E N G I N E E R 47 C O O P E R C R E E K W A Y Wi n t e r P a r k , C o l o r a d o 8 0 4 8 2 97 0 . 7 2 2 . 7 6 7 7 kv e c c h i a r e l l i @ j v a j v a . c o m JV A , I n c . 2N D I S S U E 5/ 2 0 / 2 0 2 2 As N o t e d GR A D I N G & D R A I N A G E P L A N C1.0 5/20/22 C: \ P e t e r N e l s o n \ F r a s e r T o w n C e n t e r \ A s s o c F i l e s \ 2 0 1 8 T B M A R K 2 4 X 3 6 - B _ W - B i z C a r d - 4 5 4 6 1 9 6 . j p g SHEET SH E E T C O N T E N T S PR O J E C T 20 2 2 P e t e r N e l s o n A r c h i t e c t u r e c LO C A T I O N 1S T I S S U E 4/ 2 1 / 2 0 2 2 IS S U E D SC A L E As N o t e d 1/ 8 " = 1 ' - 0 " 1/ 4 " = 1 ' - 0 " 1/ 2 " = 1 ' - 0 " 1" = 1 ' - 0 " PO B o x 3 2 7 6 OW N E R AR C H I T E C T Wi n t e r P a r k , C o l o r a d o 8 0 4 8 2 97 0 . 5 3 1 . 1 1 8 7 I ne l s o n p e t e r f @ g m a i l . c o m Pe t e r N e l s o n A r c h i t e c t u r e GE N E R A L C O N T R A C T O R OW N E R CI V I L E N G I N E E R 47 C O O P E R C R E E K W A Y Wi n t e r P a r k , C o l o r a d o 8 0 4 8 2 97 0 . 7 2 2 . 7 6 7 7 kv e c c h i a r e l l i @ j v a j v a . c o m JV A , I n c . 2N D I S S U E 5/ 2 0 / 2 0 2 2 As N o t e d DR A I N A G E D E T A I L S CD1.0 5/20/22 C: \ P e t e r N e l s o n \ F r a s e r T o w n C e n t e r \ A s s o c F i l e s \ 2 0 1 8 T B M A R K 2 4 X 3 6 - B _ W - B i z C a r d - 4 5 4 6 1 9 6 . j p g SHEET SH E E T C O N T E N T S PR O J E C T 20 2 2 P e t e r N e l s o n A r c h i t e c t u r e c LO C A T I O N 1S T I S S U E 4/ 2 1 / 2 0 2 2 IS S U E D SC A L E As N o t e d 1/ 8 " = 1 ' - 0 " 1/ 4 " = 1 ' - 0 " 1/ 2 " = 1 ' - 0 " 1" = 1 ' - 0 " PO B o x 3 2 7 6 OW N E R AR C H I T E C T Wi n t e r P a r k , C o l o r a d o 8 0 4 8 2 97 0 . 5 3 1 . 1 1 8 7 I ne l s o n p e t e r f @ g m a i l . c o m Pe t e r N e l s o n A r c h i t e c t u r e GE N E R A L C O N T R A C T O R OW N E R CI V I L E N G I N E E R 47 C O O P E R C R E E K W A Y Wi n t e r P a r k , C o l o r a d o 8 0 4 8 2 97 0 . 7 2 2 . 7 6 7 7 kv e c c h i a r e l l i @ j v a j v a . c o m JV A , I n c . 2N D I S S U E 5/ 2 0 / 2 0 2 2 As N o t e d DR A I N A G E D E T A I L S CD1.1 5/20/22 CS NE1/4 S.19 T.1S, R.75W REC. #2012002871 OWNER: 404 DOC SUSIE LLC E1/2 NE1/4 S.19, T.1S, R.75 BOOK 426, PAGE 0428 OWNER: TOWN OF FRASER BOOK 242 PAGE 606 OWNER: YOUNGS REAL ESTATE CO., LLC NE1/4 S.19 T.1S, R.75W REC. #2015006301 OWNER: CAMERON, CHRISTOPHER PALMER 20' WIDE ALLEY G G FRASER AVE. (60' ROW) (ASPHALT ROAD) DO C S T R E E T (3 4 . 5 ' R O W ) (A S P H A L T R O A D ) U . S . H I G H W A Y 4 0 ( A S P H A L T R O A D ) 34.5' 34.5' 10.5' 10.5' N89°50'56"W 109.64' N72°59'11"W 15.97' N0°09'04"E 8.27' S0°09'04"W 12.90' 124.93' 1,576 SF (ORD #274) VACATED ROW REC #2001-012433 14 . 5 ' R E C 2 0 0 1 - 0 1 2 4 3 4 UTILITY EASEMENT E E E E E E E E E G G G G G G G G G G G G G G E E C: \ P e t e r N e l s o n \ F r a s e r T o w n C e n t e r \ A s s o c F i l e s \ 2 0 1 8 T B M A R K 2 4 X 3 6 - B _ W - B i z C a r d - 4 5 4 6 1 9 6 . j p g SHEET SH E E T C O N T E N T S PR O J E C T 20 2 2 P e t e r N e l s o n A r c h i t e c t u r e c LO C A T I O N 1S T I S S U E 4/ 2 1 / 2 0 2 2 IS S U E D SC A L E As N o t e d 1/ 8 " = 1 ' - 0 " 1/ 4 " = 1 ' - 0 " 1/ 2 " = 1 ' - 0 " 1" = 1 ' - 0 " PO B o x 3 2 7 6 OW N E R AR C H I T E C T Wi n t e r P a r k , C o l o r a d o 8 0 4 8 2 97 0 . 5 3 1 . 1 1 8 7 I ne l s o n p e t e r f @ g m a i l . c o m Pe t e r N e l s o n A r c h i t e c t u r e GE N E R A L C O N T R A C T O R OW N E R CI V I L E N G I N E E R 47 C O O P E R C R E E K W A Y Wi n t e r P a r k , C o l o r a d o 8 0 4 8 2 97 0 . 7 2 2 . 7 6 7 7 kv e c c h i a r e l l i @ j v a j v a . c o m JV A , I n c . 2N D I S S U E 5/ 2 0 / 2 0 2 2 As N o t e d UT I L I T Y P L A N C2.0 5/20/22 C: \ P e t e r N e l s o n \ F r a s e r T o w n C e n t e r \ A s s o c F i l e s \ 2 0 1 8 T B M A R K 2 4 X 3 6 - B _ W - B i z C a r d - 4 5 4 6 1 9 6 . j p g SHEET SH E E T C O N T E N T S PR O J E C T 20 2 2 P e t e r N e l s o n A r c h i t e c t u r e c LO C A T I O N 1S T I S S U E 4/ 2 1 / 2 0 2 2 IS S U E D SC A L E As N o t e d 1/ 8 " = 1 ' - 0 " 1/ 4 " = 1 ' - 0 " 1/ 2 " = 1 ' - 0 " 1" = 1 ' - 0 " PO B o x 3 2 7 6 OW N E R AR C H I T E C T Wi n t e r P a r k , C o l o r a d o 8 0 4 8 2 97 0 . 5 3 1 . 1 1 8 7 I ne l s o n p e t e r f @ g m a i l . c o m Pe t e r N e l s o n A r c h i t e c t u r e GE N E R A L C O N T R A C T O R OW N E R CI V I L E N G I N E E R 47 C O O P E R C R E E K W A Y Wi n t e r P a r k , C o l o r a d o 8 0 4 8 2 97 0 . 7 2 2 . 7 6 7 7 kv e c c h i a r e l l i @ j v a j v a . c o m JV A , I n c . 2N D I S S U E 5/ 2 0 / 2 0 2 2 As N o t e d UT I L I T Y D E T A I L S CD2.0 5/20/22 CS NE1/4 S.19 T.1S, R.75W REC. #2012002871 OWNER: 404 DOC SUSIE LLC E1/2 NE1/4 S.19, T.1S, R.75 BOOK 426, PAGE 0428 OWNER: TOWN OF FRASER BOOK 242 PAGE 606 OWNER: YOUNGS REAL ESTATE CO., LLC NE1/4 S.19 T.1S, R.75W REC. #2015006301 OWNER: CAMERON, CHRISTOPHER PALMER 20' WIDE ALLEY G G FRASER AVE. (60' ROW) (ASPHALT ROAD) DO C S T R E E T (3 4 . 5 ' R O W ) (A S P H A L T R O A D ) U . S . H I G H W A Y 4 0 ( A S P H A L T R O A D ) N 2 7 ° 4 5 ' 0 5 " W 6 0 . 0 7 ' 34.5' 34.5' N89°50'56"W 109.64' N72°59'11"W 15.97' N0°09'04"E 8.27' S0°09'04"W 12.90' 124.93' 1,576 SF (ORD #274) VACATED ROW REC #2001-012433 14 . 5 ' R E C 2 0 0 1 - 0 1 2 4 3 4 UTILITY EASEMENT E E E E E E E E E G G G G G G G G G G G C: \ P e t e r N e l s o n \ F r a s e r T o w n C e n t e r \ A s s o c F i l e s \ 2 0 1 8 T B M A R K 2 4 X 3 6 - B _ W - B i z C a r d - 4 5 4 6 1 9 6 . j p g SHEET SH E E T C O N T E N T S PR O J E C T 20 2 2 P e t e r N e l s o n A r c h i t e c t u r e c LO C A T I O N 1S T I S S U E 4/ 2 1 / 2 0 2 2 IS S U E D SC A L E As N o t e d 1/ 8 " = 1 ' - 0 " 1/ 4 " = 1 ' - 0 " 1/ 2 " = 1 ' - 0 " 1" = 1 ' - 0 " PO B o x 3 2 7 6 OW N E R AR C H I T E C T Wi n t e r P a r k , C o l o r a d o 8 0 4 8 2 97 0 . 5 3 1 . 1 1 8 7 I ne l s o n p e t e r f @ g m a i l . c o m Pe t e r N e l s o n A r c h i t e c t u r e GE N E R A L C O N T R A C T O R OW N E R CI V I L E N G I N E E R 47 C O O P E R C R E E K W A Y Wi n t e r P a r k , C o l o r a d o 8 0 4 8 2 97 0 . 7 2 2 . 7 6 7 7 kv e c c h i a r e l l i @ j v a j v a . c o m JV A , I n c . 2N D I S S U E 5/ 2 0 / 2 0 2 2 As N o t e d HO R I Z O N T A L C O N T R O L P L A N C3.0 5/20/22 C: \ P e t e r N e l s o n \ F r a s e r T o w n C e n t e r \ A s s o c F i l e s \ 2 0 1 8 T B M A R K 2 4 X 3 6 - B _ W - B i z C a r d - 4 5 4 6 1 9 6 . j p g SHEET SH E E T C O N T E N T S PR O J E C T 20 2 2 P e t e r N e l s o n A r c h i t e c t u r e c LO C A T I O N 1S T I S S U E 4/ 2 1 / 2 0 2 2 IS S U E D SC A L E As N o t e d 1/ 8 " = 1 ' - 0 " 1/ 4 " = 1 ' - 0 " 1/ 2 " = 1 ' - 0 " 1" = 1 ' - 0 " PO B o x 3 2 7 6 OW N E R AR C H I T E C T Wi n t e r P a r k , C o l o r a d o 8 0 4 8 2 97 0 . 5 3 1 . 1 1 8 7 I ne l s o n p e t e r f @ g m a i l . c o m Pe t e r N e l s o n A r c h i t e c t u r e GE N E R A L C O N T R A C T O R OW N E R CI V I L E N G I N E E R 47 C O O P E R C R E E K W A Y Wi n t e r P a r k , C o l o r a d o 8 0 4 8 2 97 0 . 7 2 2 . 7 6 7 7 kv e c c h i a r e l l i @ j v a j v a . c o m JV A , I n c . 2N D I S S U E 5/ 2 0 / 2 0 2 2 As N o t e d SI T E D E T A I L S CD3.0 5/20/22 C: \ P e t e r N e l s o n \ F r a s e r T o w n C e n t e r \ A s s o c F i l e s \ 2 0 1 8 T B M A R K 2 4 X 3 6 - B _ W - B i z C a r d - 4 5 4 6 1 9 6 . j p g SHEET SH E E T C O N T E N T S PR O J E C T 20 2 2 P e t e r N e l s o n A r c h i t e c t u r e c LO C A T I O N 1S T I S S U E 4/ 2 1 / 2 0 2 2 IS S U E D SC A L E As N o t e d 1/ 8 " = 1 ' - 0 " 1/ 4 " = 1 ' - 0 " 1/ 2 " = 1 ' - 0 " 1" = 1 ' - 0 " PO B o x 3 2 7 6 OW N E R AR C H I T E C T Wi n t e r P a r k , C o l o r a d o 8 0 4 8 2 97 0 . 5 3 1 . 1 1 8 7 I ne l s o n p e t e r f @ g m a i l . c o m Pe t e r N e l s o n A r c h i t e c t u r e GE N E R A L C O N T R A C T O R OW N E R CI V I L E N G I N E E R 47 C O O P E R C R E E K W A Y Wi n t e r P a r k , C o l o r a d o 8 0 4 8 2 97 0 . 7 2 2 . 7 6 7 7 kv e c c h i a r e l l i @ j v a j v a . c o m JV A , I n c . 2N D I S S U E 5/ 2 0 / 2 0 2 2 As N o t e d SI T E D E T A I L S CD3.1 5/20/22 May 20, 2022 Catherine Trotter, AICP Town Planner 153 Fraser Ave PO Box 370 Fraser, CO 80442 RE: Koselig on Main – Drainage Memorandum JVA Job Number 3544c Dear Catherine: JVA, Inc. has performed an analysis for the proposed stormwater utilities on the project site including historic and developed conditions. The proposed development was analyzed as one site. Drainage Design Criteria Runoff analyses for the proposed site, as well as the historic site, were determined using the Rational Method (Q=CIA). The runoff coefficients (C) for various land usages were obtained from the Urban Storm Drainage Criteria Manual by the Mile High Flood District (MHFD), where applicable. Intensities (I) were determined using the point rainfall values published within the latest NOAA Atlas 14 and calculated Time of Concentration (tc). Pre- and Post-development imperviousness calculations for each sub-basin, corresponding rainfall intensities, composite runoff coefficients, and storm flows for the 10-year and 100-year storms for each basin are provided in the appendix. Detention and stormwater quality requirements are proposed to be met with directing site flows to an on-site infiltration basin. The basin will be sized accordingly to capture 100% of the 100 yr, 24-hr storm event. It is recommended that an easement be proposed to allow access and maintain the infiltration basin. Drainage Basin Descriptions Existing Basins: Basin H1 consists of the entire undeveloped site. Currently the entirety of the site flows from the southwest to the northeast. Flows are then captured and conveyed within concrete pans located in the alley north of the site, within the Town Right-of-Way (ROW). Offsite flows do not enter the site in existing conditions. Existing US Highway 40 improvements include curb and gutter and cross pans that divert stormwater from entering the property from the west. An existing pan along the south Fraser Avenue property boundary conveys offsite stormwater around the property. Developed Basins: Basin ‘Full Site’ consists of the entire developed site. All flows from the site will be conveyed to the on site infiltration basin along the north portion of the site. In the event of a storm runoff event greater than the volume of the infiltration basin, the basin will overflow into the alley north of the site and be conveyed along existing drainage patterns within the Town ROW. Koselig on Main Drainage Report 5/20/2022 2 of 2 Conclusions Calculations for the historic and developed basins described above are attached to this letter. Detention and Water Quality: It is shown in the attached calculations that the proposed infiltration basin will retain 100% of the 100 yr, 24-hr storm. Water quality is achieved through the infiltration process. As sediment builds up, routine maintenance of the proposed infiltration basin will be required. Easily accessible maintenance points will be included in the final design for this purpose. Conveyance: The proposed drainage design will convey the 100 yr storm runoff to the infiltration basin without overtopping. In case of an emergency overflow excess runoff will be directed into the Town ROW north of the site. Offsite flows are directed around the site via existing curb and gutter and valley pans within the Town ROW. Sincerely, JVA, INCORPORATED By: ____________________________________ [Samuel Redfield, P.E.] [Senior Project Engineer] Enclosures: Rational Method Calculations Contech Infiltration Basin Sizing Report JVA Incorporated Job Name: Koselig On Main PO Box 1860 Job Number: 3544c 47 Cooper Creek Way, S 328 Date: 3/14/22 Winter Park, CO 80482 By: SAR Ph: (970) 722 7677 Koselig On Main Historic Runoff Coefficient & Time of Concentration Calculations Location: Fraser Minor Design Storm: 10 Major Design Storm: 100 Soil Type: C/D Basin Design Data I (%) = 100% 90% 90% 40% 25% 25% 2% 2% I (%)tc Comp tc Final Basin Name Design Point Apaved streets (sf) Adrives/co nc (sf) Aroof (sf) Agravel (sf) Aplygnd (sf) Aart. turf (sf) Alscape (B soil) (sf) Alscape (C/D soil) (sf) ATotal (sf) ATotal (ac) Imp (%)C2 C5 C10 C100 Upper most Length (ft) Slope (%) ti (min) Length (ft) Slope (%)Type of Land Surface K Velocity (fps) tt (min) Time of Conc ti + tt = tc Total Length (ft) tc=(L/180)+ 10 (min.) Min tc H1 1 1,461 23,792 25,253 0.58 7.1% 0.06 0.11 0.25 0.54 60 2.8% 9.9 0 1.0% Paved areas & shallow paved swales 20 2.0 0.0 9.9 60 10.3 9.9 0 0.00 Paved areas & shallow paved swales 20 0 10.0 0 0.00 Paved areas & shallow paved swales 20 0 10.0 0 0.00 Paved areas & shallow paved swales 20 0 10.0 0 0.00 Paved areas & shallow paved swales 20 0 10.0 TOTAL SITE 0 1,461 0 0 0 0 23,792 0 25,253 0.58 7.1% 0.06 0.11 0.25 0.54 I = (28.5 P1) / ((10 + TC) 0.786) Basin Name Design Point Time of Conc (tc) C2 C5 C10 C100 2 5 10 100 ATotal (sf)ATotal (ac) Q2 Q5 Q10 Q100 H1 1 9.9 0.06 0.11 0.25 0.54 1.48 1.88 2.26 3.97 25,253 0.58 0.05 0.12 0.33 1.24 0 0 0 0.00 0 0 0 0.00 0 0 0 0.00 0 0 0 0.00 TOTAL SITE 25,253 0.58 0.05 0.12 0.33 1.24 Initial Overland Time (ti)Travel Time (tt) tt=Length/(Velocity x 60) tc Urbanized Check ON Runoff Coeff's Rainfall Intensities (in/hr)Area Flow Rates (cfs) Runoff Coeff's 3544c - Rational Calculations Historic Page 1 of 8 JVA Incorporated Job Name: Koselig On Main PO Box 1860 Job Number: 3544c 47 Cooper Creek Way, S 328 Date: 3/14/22 Winter Park, CO 80482 By: SAR Ph: (970) 722 7677 Koselig On Main Composite Runoff Coefficient Calculations Location: Fraser Minor Design Storm: 10 Major Design Storm: 100 CA = KA + (1.31i^3 - 1.44i^2 + 1.135i + 0.12) Soil Type: C/D CCD = KCD + (0.858i^3 - 0.786i^2 + 0.774i + 0.04) CB = (CA + CCD)/2 Basin Design Data I (%) = 100% 90% 90% 40% 25% 25% 2% 2% I (%) Basin Name Design Point Apaved streets (sf) Adrives/c onc (sf) Aroof (sf) Agravel (sf) Aplygnd (sf) Aart. turf (sf) Alscape (B soil) (sf) Alscape (C/D soil) (sf) ATotal (sf) ATotal (ac) Imp (%)C2 C5 C10 C100 Full Site 1 7,611 4,072 10,384 3,185 25,252 0.58 81.9% 0.73 0.76 0.81 0.88 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 Runoff Coeff's 3544c - Rational Calculations Developed C Page 2 of 8 JVA Incorporated Job Name: Koselig On Main PO Box 1860 Job Number: 3544c 47 Cooper Creek Way, S 328 Date: 3/14/22 Winter Park, CO 80482 By: SAR Ph: (970) 722 7677 Koselig On Main Time of Concentration Calculations Location: Fraser Minor Design Storm: 10 Major Design Storm: 100 Soil Type: C/D Sub-Basin Data tc Comp tc Final Basin Name Design Point ATotal (ac)C5 Upper most Length (ft) Slope (%) ti (min) Length (ft)Slope (%) Type of Land Surface Cv Velocity (fps) tt (min) Time of Conc ti + tt = tc Total Length (ft) tc=(L/180)+ 10 (min) Min tc Full Site 1 0.58 0.76 66 2.0% 4.0 0 0.0% Paved areas & shallow paved swales 20 0.0 0.0 4.0 66 10.4 5.0 0 0 0.00 Paved areas & shallow paved swales 20 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 0 0 0.00 #N/A 0 10.0 Initial Overland Time (ti)Travel Time (tt) tt=Length/(Velocity x 60) tc Urbanized Check ON 3544c - Rational Calculations Developed Tc Page 4 of 8 JVA Incorporated Job Name: Koselig On Main PO Box 1860 Job Number: 3544c 47 Cooper Creek Way, S 328 Date: 3/14/22 Winter Park, CO 80482 By: SAR Ph: (970) 722 7677 Koselig On Main Developed Storm Runoff Calculations Design Storm : 100 Year Point Hour Rainfall (P1) : 1.46 I = (28.5 P1) / ((10 + TC)^0.786) B a s i n N a m e D e s i g n P o i n t A r e a ( a c ) R u n o f f C o e f f t c ( m i n ) C * A ( a c ) I ( i n / h r ) Q ( c f s ) T o t a l t c ( m i n ) S C* A ( a c ) I ( i n / h r ) Q ( c f s ) I n l e t T y p e Q i n t e r c e p t e d Q c a r r y o v e r Q b y p a s s P i p e S i z e ( i n ) or e q u i v a l e n t P i p e M a t e r i a l S l o p e ( % ) P i p e F l o w (c f s ) M a x P i p e Ca p a c i t y ( c f s ) L e n g t h ( f t ) V e l o c i t y ( f p s ) t t ( m i n ) To t a l T i m e (m i n ) N o t e s Full Site 1 0.58 0.88 5.00 0.51 4.95 2.52 5.00 0.51 4.95 2.52 Infiltration Basin Direct Runoff Total Runoff Inlets Pipe Pipe/Swale Travel Time 3544c - Rational Calculations Q100 Page 6 of 8 JVA Incorporated Job Name: Koselig On Main PO Box 1860 Job Number: 3544c 47 Cooper Creek Way, S 328 Date: 3/14/22 Winter Park, CO 80482 By: SAR Ph: (970) 722 7677 Koselig On Main Developed Storm Runoff Calculations Design Storm : 10 Year Point Hour Rainfall (P1) : 0.83 I = (28.5 P1) / ((10 + TC)^0.786) B a s i n N a m e D e s i g n P o i n t A r e a ( a c ) R u n o f f C o e f f t c ( m i n ) C * A ( a c ) I ( i n / h r ) Q ( c f s ) T o t a l t c ( m i n ) S C* A ( a c ) I ( i n / h r ) Q ( c f s ) I n l e t T y p e Q i n t e r c e p t e d Q c a r r y o v e r Q b y p a s s P i p e S i z e ( i n ) or e q u i v a l e n t P i p e M a t e r i a l S l o p e ( % ) P i p e F l o w (c f s ) M a x P i p e Ca p a c i t y ( c f s ) L e n g t h ( f t ) V e l o c i t y ( f p s ) t t ( m i n ) To t a l T i m e (m i n ) N o t e s Full Site 1 0.58 0.81 5.00 0.47 2.82 1.32 5.00 0.47 2.83 1.32 Infiltration Basin Direct Runoff Total Runoff Inlets Pipe Pipe/Swale Travel Time 3544c - Rational Calculations Q Minor Page 7 of 8 JVA Incorporated Job Name: Koselig On Main PO Box 1860 Job Number: 3544c 47 Cooper Creek Way, S 328 Date: 3/14/22 Winter Park, CO 80482 By: SAR Ph: (970) 722 7677 Koselig On Main Detention Volume Calculations: Rational Method Based on FAA Procedure, per Federal Aviation Agency "Airport Drainage" Manual Developed Drainage Basin Full Site Design Storm 100 year Composite "C" Factor 0.88 Basin Size 0.58 Historic Drainage Basin H1 Design Storm 100 year Composite "C" Factor 0.54 Basin Size 0.58 Detention = (Cd-Ch)*P*A P = 24-hr, 100-yr = 3.50 in Detention = (Cd-Ch)*P*A0.05752 ac-ft 2505 cf 3544c - Rational Calculations Rational Method Detention Page 8 of 8 Date:3/14/2022 Project Name:Koselig On Main City / County:Fraser/Grand State:Colorado Designed By:SAR Company:JVA, Inc. =Adjustable Input Cells Telephone: Out-to-out length (ft): 63.0 Backfill Porosity (%): 40% System Diameter (in): 24 Out-to-out width (ft):26.0 Depth Above Pipe (in):0.0 Pipe Spacing (in):12 Number of Manifolds (ea):1.0 Depth Below Pipe (in):0.0 Incremental Analysis (in):2 Number of Barrels (ea):9.0 Width At Ends (ft):1.0 System Invert (Elevation):0 Width At Sides (ft):1.0 Depth (ft) Elevation (ft) Incremental Storage (cf) Cumulative Storage (cf) Incremental Storage (cf) Cumulative Storage (cf) Incremental Storage (cf) Cumulative Storage (cf) Percent Open Storage (%) Ave. Surface Area (sf) 0.00 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0% 728.0 0.17 0.16 71.9 71.9 92.6 92.6 164.5 164.5 43.7% 1,109.4 0.33 0.33 126.0 197.9 70.9 163.5 196.9 361.4 54.8% 1,242.3 0.50 0.50 155.3 353.2 59.2 222.7 214.5 575.9 61.3% 1,325.6 0.67 0.66 173.9 527.1 51.8 274.5 225.7 801.6 65.8% 1,378.5 0.83 0.83 185.3 712.4 47.2 321.7 232.5 1,034.1 68.9% 1,408.3 1.00 1.00 190.8 903.2 45.0 366.7 235.8 1,269.9 71.1% 1,418.0 1.17 1.16 190.8 1,094.0 45.0 411.7 235.8 1,505.7 72.7% 1,408.3 1.33 1.33 185.3 1,279.3 47.2 458.9 232.5 1,738.3 73.6% 1,378.5 1.50 1.50 173.9 1,453.3 51.8 510.7 225.7 1,964.0 74.0% 1,325.6 1.67 1.66 155.3 1,608.5 59.2 569.9 214.5 2,178.4 73.8% 1,242.3 1.83 1.83 126.0 1,734.5 70.9 640.9 196.9 2,375.4 73.0% 1,109.4 2.00 2.00 71.9 1,806.4 92.6 733.4 164.5 2,539.8 71.1% 728.0 Pipe Stone Total SystemSystem Storage Volume Estimation Miscellaneous Contech Engineered Solutions, LLC is pleased to offer the following estimate of storage volume for the above named project. The results are submitted as an estimate only, without liability on the part of Contech Engineered Solutions, LLC for accuracy or suitability to any particular applicaton and are subject to verification of the Engineer of Record. This tool is only applicable for rectangular shaped systems. CMP: Underground Detention System Storage Volume Estimation Summary of Inputs Pipe & Analysis InformationSystem Information Backfill Information These results are submitted to you as a guideline only, without liability on the part of CONTECH Engineered Solutions, LLC for accuracy or suitability to any particular application, and are subject to your verification. Dear Fraser Planning Commission, We are excited to present you with our plans for a mixed-use development at 406 Zerex St and 315 Fraser Avenue. This submittal will aim to answer your questions about who we are, how we got here and what we are proposing. Who We Are: Byson Investments (Byson) is the developer on this project. Managing partners Greg Bechler and Kevin Rifkin both grew up in Colorado, attended CU Boulder and have enjoyed their winters and summers in the Fraser Valley for the majority of their lives. Having spent the last 10 years working on real estate development projects across Colorado and the US, Greg and Kevin have developed an acumen for delivering quality real estate developments that contribute positively to the community that encompasses the project. Byson has partnered with what we feel is one of the best all-around development teams in Fraser and the county. Peter Nelson Architecture will serve as the project’s architect of record with Peter Nelson and Krista Klancke leading the way to ensure our project meets the expectations of longtime residents and seasonal workers alike. PGArnold will serve as the project’s general contractor with Thomas Elliot leading their team. We are so excited to have such a solid local GC on board that will ensure we deliver as planned and on time! JVA Inc. will serve as Civil and Structural Engineer for the project with Kevin Vecchiarelli and Craig Kobe leading Civil and Structural efforts respectively. We are so happy to have such a strong contingent of Fraser and Grand County residents on our development team as we feel this will help us deliver something that truly meets the needs of those living in Downtown Fraser. How we got here: After reading the 2017 Downtown Fraser Strategic Plan, Kevin and Greg realized that there was a need that matched their skillset, in their own backyard. We quickly began the acquisition process and were able to find a parcel of land that we feel is the center of downtown Fraser. Once home to longtime favorite eateries Dairy King and One Love restaurant the site sits across highway 40 from the Fraser train station and is adjacent to some of Fraser’s best bars, restaurants and trail systems. After falling in love with the site’s potential Greg and Kevin quickly started to connect with their architect and the town to discuss the most important question, “What would work best at this site?” In line with the 2017 plan the answer was retail facing highway 40 and denser, attainable long-term housing. Having delivered similar projects in the past Kevin and Greg got started on planning with their team and the town. After 8 months of collaboration and planning the team has developed a project plan that we think will make an awesome contribution to the local area and more importantly the locals themselves. What we are proposing: The proposed development will consist of two buildings, one that fronts highway 40 and one that fronts Doc Susie Avenue. The building on highway 40 will consist of ~4,000 sqft of retail space on the first floor and two additional floors of apartment units. There will be ten two- bedroom units in this building. The building fronting Doc Susie Avenue will consist of ten apartment units as well. The first floor will consist of a parking garage and two ground floor units. One unit is an ADA accessible one-bedroom unit and the other is also a one-bedroom unit. Both of these units will be deed restricted at 80% AMI. The second and third floors will consist of a total of four three-bedroom units and four two-bedroom units. All units will come with in unit washer and dryers and 18 of the 20 units will come with private outdoor space and covered storage closets large enough to fit bikes, skis and even kayaks. Both buildings will have exteriors that blend into the surrounding area with a mix of wood and steel siding, exposed concrete and a large space on the Doc Susie building that we hope to have a mural commissioned by the Fraser Art committee. Color tones will include different shades of charcoal and brown as shown in our architectural drawings. The retail space along highway 40 will be glass frontage with garage doors on the north and south ends creating a welcoming indoor/outdoor experience for our future restaurant tenants. The project will utilize off site fabrication for certain building components (walls, floors, roof trusses) to limit the amount of waste produced when compared to traditional framing, and more importantly limit the amount of time the site has unfinished materials spread across it. By creating an interior facing parking lot and covered parking garage we aim to create an attractive street scape that allows those walking along the street to enjoy our project's buildings and landscape as opposed to parking lots. In addition to the building on highway 40 having two outdoor patios on the north and south ends, the project will have ~2,000 sqft of green space where residents and locals can come to enjoy a quiet and secluded park as they walk through town. The planned development conforms to all zoning codes laid out in the River Walk Mixed Use Overlay District (RMU). LAND USE APPLICATION FORM PROJECT NAME DATE RECEIVED: APPLICATION FEE: TYPE OF APPLICATION HEARING DATE: Annexation, Zoning, Concept Plan Change of Zone Development Permit Conditional Use Final Plat Minor Subdivision Plat As Built Plat Planned Unit Development Preliminary Plat Site Plan Sketch Plan Subdivision Exemption Vacation of Street or Easement Variance Other Final Planned Development Plan PROJECT INFORMATION Applicant’s Name: Project Location: Address: Existing Zoning: Phone/Fax: Relation to Property Owner: Proposed Zoning: Legal Description of Property (lots, blocks, tracts, subdivision name, or metes & bounds - attach additional sheet, if necessary): Total Acreage of Property under Consideration: Number of Existing Residential Lots: Number of Proposed Residential Lots: Type of Housing Proposed: Number of Existing Commercial Lots: Number of Proposed Commercial Lots: ADDITIONAL CONTACTS Property Owner: Consultant: Address: Address: City/State/Zip: City/State/Zip: Phone/Fax: Phone/Fax: CERTIFICATION I hereby affirm that I have full legal capacity to authorize the filing of this application and that all information and exhibits herewith submitted are true and correct to the best of my knowledge. The Authorized Signer invites Town of Fraser representatives to make all reasonable inspections and investigations of the subject property during the period of processing this application. I further agree to pay all fees consistent with the Town of Fraser payment policies and comply with all Town Codes and regulations. I understand that all materials and fees required by the Town of Fraser must be submitted prior to having this application processed. Authorized Signature*: Date: *If other than owner, attach letter authorizing agent on behalf of owner. Town of Fraser, 153 Fraser Avenue, P.O. Box 370, Fraser, Colorado 80442 Phone: 970-726-5491, Fax: 970-726-5518, www.frasercolorado.com Koselig on Main 05/09/2022 X 6/22/2022 406 Zerex LLC 406 Zerex St & 315 Fraser Ave, Fraser, CO 80442 5303 E Evans Ave, Suite 306, Denver, CO 80222 Business (B) & River Walk Mixed Use Overlay (RMU) (B) & (RMU) 303-324-9998 self FRASER 1ST - EASTOM 1ST Lot: 31 - 33 Block: 7 PART OF LOTS 31-33 & FRASER - EASTOM Lot: 24 - 29 Block: 7 PTS OF LOTS 24 & 30, ALL LOT 25-29 .66 0 2 1 1 Apartments 406 Zerex LLC 5303 E Evans Ave, Suite 306 Denver, C) 80222 303-324-9998 Peter Nelson Architecture PO Box 3276 Winter Park, CO 80428 970-531-1187 $2,070 BRIEF DESCRIPTION OF DEVELOPMENT: PUBLIC NOTICE At least fourteen (14) days in advance of the public hearing, the applicant shall provide written notice to all owners of property within two hundred feet (200’) of the boundaries of the property that is the subject of the application. Such notice shall be sent via certified mail, return receipt requested and shall include the following information: A copy of the complete application with all accompanying materials, the name, address and phone number of the authorized contact for the applicant, and the time, date and place of the public hearing. The applicant shall provide the Town with a written affidavit prior to the time of the public hearing reflecting the date of mailings and the names, addresses and legal descriptions of all parties to whom the notifications were transmitted, together with a complete copy of the materials included in the mailing. Failure to properly mail the documents, notify the necessary parties, and/or provide the required affidavit shall be grounds for denial of the application or a continuance of the public hearing until such notice is provided. See sample letter below. The notification letter cannot be sent until a public hearing date has been scheduled by the Town. ADJACENT PROPERTY OWNER NOTIFICATION LETTER This notice to be sent by applicant to all owners of property within two hundred feet (200’) of the boundaries of the property that is subject to the application and to all surface owners, mineral owners, and lessees of mineral owners to whom notice is to be sent pursuant to C.R.S. 31-23-215. Such notice shall be sent via certified mail, return receipt requested. The applicant shall provide the Town with a written affidavit or other proof of notice prior to the time of public hearing reflecting the date of mailings, addresses and legal descriptions of all parties to whom the notifications were transmitted. Failure to properly mail the documents, notify the necessary parties and/or provide the required affidavit shall be grounds for denial of the application or a continuance of the public hearing until such notice is provided. Dear Sir/Madam: This letter is to advise you that 406 Zerex LLC (applicant) has requested Final Plat (land use request) for a property located at 406 Zerex St & 315 Fraser Ave, Fraser, CO 80442 and that the Town of Fraser has scheduled a public hearing to consider this request. The public hearing is scheduled for 6/22/2022 (date assigned by Town) at 6:00 pm (time assigned by Town) at the Town of Fraser Town Hall located at 153 Fraser Avenue in the Board Room. Enclosed for your review is a copy of the proposal as presented to the Town of Fraser. Additional application materials are on file at the Town Hall offices. The Town of Fraser may be contacted at 970-726-5491 for further information. Please note that you may comment at the public hearing or by forwarding written comments to the Town of Fraser Planning Department (P.O. Box 370, Fraser, CO 80442). Written comments must be received by the Town prior to the public hearing. Sincerely, (applicant) Koselig on Main will be a mixed use development consisting of two separate structures. One structure will face Hwy 40 and include ground floor retail space with two floors of apartments above. The other structure will face Doc Susie Ave and include a 9 car parking garage with two apartments on the ground floor and two floors of apartments above. The total development will include ~4,000 sqft of retail space and 20 apartment units. The development will also provide a pocket park, additional on street and off street parking spaces, and outdoor patio seating for two retail tenants. 406 Zerex LLC 406 ZEREX ST & 315 FRASER AVENUE October 2021 December 2021 April 2022 June 2022 July 2022 October 2023 Close on land •Preliminary Plat •Permits Final Plat Construction Start •Delivery Koselig on Main Sketch Plan Review Retail Interior Exterior Total Retail A 1,580 590 2,170 Retail B 727 727 Retail C 1,573 421 1,994 Total 3,880 1,011 4,891 Residential Interior Exterior Combined Units Total Interior Total Exterior Total Combined 2 bed 812 113 924 10 8,116 1,126 9,242 2 bed long 922 129 1,051 4 3,687 517 4,204 3 bed 1,148 127 1,275 4 4,594 507 5,101 1 bed ADA 597 597 1 597 - 597 1 bed small 490 490 1 490 - 490 Total 3,969 369 4,337 20 17,484 2,150 19,634 Site Size 28,704 Interior Exterior Combined Retail %13.5%3.5%17.0% Residential %60.9%7.5%68.4%<- Must be less than 75% Total %74.4%11.0%85.4% Koselig on Main Traffic Impact Study Byson Real Estate Co. Fraser, Colorado March 4, 2022 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson, PE, PTOE 303.589.6875 joe@sustainabletrafficsolutions.com Sustainable Traffic Solutions, Inc. Koselig on Main Traffic Impact Study Byson Real Estate Co. Fraser, Colorado March 4, 2022 Table of Contents Page 1.0 Introduction ................................................................................................... 1 2.0 Project Description ........................................................................................ 1 2.1 Study Area ............................................................................................... 1 2.2 Study Assumptions .................................................................................. 1 3.0 Existing Traffic Volumes ............................................................................... 2 3.1 Level of Service Analysis ......................................................................... 2 4.0 Site Generated Traffic Volumes ................................................................... 3 4.1 Trip Generation ........................................................................................ 3 4.2 Trip Distribution and Assignment ............................................................. 3 5.0 Year 2023 Traffic Conditions ........................................................................ 3 6.0 Year 2042 Traffic Conditions ........................................................................ 4 7.0 Auxiliary Lane Analysis ................................................................................ 4 8.0 Conclusions ................................................................................................... 5 List of Appendices Appendix A Traffic Count Data Appendix B CDOT Straight Line Diagram Appendix C VISTRO Analysis Results List of Tables Table 1 – Estimated Daily Volumes for Key Links in the Study Area Table 2 – Intersection Operational Summary Table 3 – Trip Generation Estimate Table of Contents (Continued) Sustainable Traffic Solutions, Inc. Koselig on Main Traffic Impact Study Byson Real Estate Co. Fraser, Colorado March 4, 2022 ii List of Figures Figure 1 – Vicinity Map Figure 2 – Site Plan Figure 3 – Laneage and Traffic Control – Existing Figure 4 – Existing Traffic Volumes – Morning Peak Hour Figure 5 – Existing Traffic Volumes – Evening Peak Hour Figure 6 – Term Trip Distribution Figure 7 – Trip Assignment – Morning Peak Hour Figure 8 – Trip Assignment – Evening Peak Hour Figure 9 – Year 2023 Background Traffic Volumes – Morning Peak Hour Figure 10 – Year 2023 Background Traffic Volumes – Evening Peak Hour Figure 11 – Year 2023 Total Traffic Volumes – Morning Peak Hour Figure 12 – Year 2023 Total Traffic Volumes – Evening Peak Hour Figure 13 – Year 2042 Background Traffic Volumes – Morning Peak Hour Figure 14 – Year 2042 Background Traffic Volumes – Evening Peak Hour Figure 15 – Year 2042 Total Traffic Volumes – Morning Peak Hour Figure 16 – Year 2042 Total Traffic Volumes – Evening Peak Hour Sustainable Traffic Solutions, Inc. Koselig on Main Traffic Impact Study Byson Real Estate Co. Fraser, Colorado March 4, 2022 1 Koselig on Main Traffic Impact Study 1.0 Introduction A residential development is planned on the northeast corner of Zerex Street (US 40) / Fraser Avenue. Two buildings are planned with a total of 20 units. The building that fronts on Zerex Street will have a small space for a business. Figure 1 contains a vicinity map showing the location of the site, and Figure 2 contains the site plan. Two accesses are planned from the site including one access to Doc Susie Avenue and a second access to the alley where traffic will enter/exit Doc Susie Avenue. This traffic study was based on the Colorado Department of Transportation traffic impact study requirements 1. 2.0 Project Description 2.1 Study Area The study area includes the following intersections. • Zerex Street / Eastom Avenue • Zerex Street / Fraser Avenue • Doc Susie Avenue / alley • Doc Susie Avenue / site access The existing laneage and traffic control at the study area intersections are contained in Figure 3. Zerex Street has a five lane section with curb and gutter. Eastom Avenue, Fraser Avenue, and Doc Susie Avenue are all two lane streets. Parking is allowed on all of the streets in the study area. 2.2 Study Assumptions The following assumptions were utilized for this study. • Adjustment of Traffic Count Data for COVID 19. Historic traffic count data were used to determine if it would be necessary to compensate for the effect of COVID 19. The historic data was obtained from Count Station 000216, a continuous count station on SH 125 north of US 40 in Grand County. The data from the count station showed that volumes in January 2022 decreased by 8% compared to the average of January 2018 and 2019. Therefore, the data collected for the project was inflated by 8% to compensate for the impact of COVID 19. The table with the data from Count Station 000216 is contained in Appendix A. 1 State Highway Access Code. The Transportation Commission of Colorado. Amended March 2002. Sustainable Traffic Solutions, Inc. Koselig on Main Traffic Impact Study Byson Real Estate Co. Fraser, Colorado March 4, 2022 2 • Short-Term Planning Horizon. The development is expected to be completed and occupied in Year 2023, therefore, Year 2023 is the short-term planning horizon. • Long-Term Planning Horizon. The long-term planning horizon is Year 2042 because it is 20 years in the future. • Growth in Background Traffic. An annual growth rate was developed for Zerex Street (US 40) using the 20-year factor that is found in the straight-line diagram for US 40. Based on the 20-year factor of 1.18, an annual growth rate of 0.85% was calculated. The straight line diagram is contained in Appendix B. • Saturation Flow Rate. The saturation flow rate was assumed to be 1,600 passenger cars / hour / lane which is typical in rural areas. • Peak Hour Factor (PHF). The PHF was based on the data collected for the traffic study. At new approaches with low traffic volumes, the PHF was assumed to be 0.85 for all movements. • Truck Percentage. A truck percentage of 2% was assumed for all movements. 3.0 Existing Traffic Volumes Traffic count data were collected for the project on Wednesday February 9, 2022 by All Traffic Data. The peak hour volumes are summarized in Figures 4 and 5. Existing and future daily volumes are summarized in Table 1. The traffic count data are contained in Appendix A. 3.1 Level of Service Analysis To evaluate the performance of the intersections within the study area, the level of service (LOS) was calculated using PTV VISTRO software. This software package utilizes criteria described in the Highway Capacity Manual 2. LOS is a measure used to describe operational conditions at an intersection. LOS categories ranging from A to F are assigned based on the predicted delay in seconds per vehicle for the intersection as a whole, as well as for individual turning movements. LOS A indicates very good operations, and LOS F indicates poor, congested operations. In rural areas, the typical threshold for acceptable operation is LOS C. The results of the analysis are summarized in the following table. It shows that Zerex Street / Eastom Avenue is operating at acceptable levels of service during both peak hours. Zerex Street / Fraser Avenue is operating at LOS C during the morning peak hour and LOS D during the evening peak hour. The level of service for intersections with side-street stop-control is determined by the movement with the highest delay value. In the case of these two intersections, the side-street left turn 2 Highway Capacity Manual, 7th Edition. National Academy of Sciences, Engineering, and Medicine. 2022. Sustainable Traffic Solutions, Inc. Koselig on Main Traffic Impact Study Byson Real Estate Co. Fraser, Colorado March 4, 2022 3 has the highest delay. The detailed analysis results are summarized in Table 2 and the VISTRO analysis results are contained in Appendix C. 4.0 Site Generated Traffic Volumes 4.1 Trip Generation In order to estimate the traffic impacts associated with this development, the amount of traffic generated by the project was calculated using trip generation rates contained in the Institute of Transportation Engineers (ITE) Trip Generation manual3 (see Table 3). 4.2 Trip Distribution and Assignment The trip distribution for the development is contained in Figure 6. It is based on the existing peak hour volumes collected for the traffic study. The peak hour assignments are contained in Figures 7 and 8. The traffic that is expected to be generated by the retail space was not assigned because there is no designated parking for the patrons of that business, so those motorists will park on the street. Therefore, the volumes in Figures 7 and 8 only include the new traffic associated with the residential development. 5.0 Year 2023 Traffic Conditions Construction of the development is expected to be completed in Year 2023. Background traffic volumes for the Year 2023 were developed by inflating the through volumes on Zerex Street using the growth rates that were discussed in Section 2.2. The background traffic volume scenarios are contained in Figures 9 and 10. The Year 2023 total traffic volume scenarios were developed by adding the trip assignment to the background traffic volumes (see Figures 11 and 12). The results of the analysis of the background and total traffic volume scenarios are summarized in the following table. All of the intersections are expected to operate at acceptable levels of service except for Zerex Street / Fraser Avenue during the evening peak hour. 3 Trip Generation, 11th Edition. Institute of Transportation Engineers. September 2021. AM PM 1 - Zerex Street / Eastom Avenue Side-Street Stop B C 2 - Zerex Street / Fraser Avenue Side-Street Stop C D Intersection Control Peak Hour Sustainable Traffic Solutions, Inc. Koselig on Main Traffic Impact Study Byson Real Estate Co. Fraser, Colorado March 4, 2022 4 The detailed analysis results are summarized in Table 2 and the VISTRO analysis results are contained in Appendix C. 6.0 Year 2042 Traffic Conditions The Year 2042 background and total traffic volume scenarios were developed as discussed in Section 5.0. Figures 13 and 14 contain the background volumes, and the total traffic volumes are contained in Figures 15 and 16. The results of the analysis of the background and total traffic volume scenarios are summarized in the following table. All of the intersections are expected to operate at acceptable levels of service except for Zerex Street / Eastom Avenue and Zerex Street / Fraser Avenue during the evening peak hour. The detailed analysis results are summarized in Table 2 and the VISTRO analysis results are contained in Appendix C. 7.0 Auxiliary Lane Analysis The need for northbound right turn deceleration lanes was reviewed based on criteria that are contained in the State Highway Access Code. Zerex Street is classified as an NR-B roadway and the speed limit is 35 MPH in the vicinity of the site. A review of the need for auxiliary lanes is contained in the following table. It shows that northbound right turn deceleration lanes will not be required at either intersection as a result of the traffic that will be generated by this development. Control AM PM Control AM PM 1 - Zerex Street / Eastom Avenue Side-Street Stop B C Side-Street Stop B C 2 - Zerex Street / Fraser Avenue Side-Street Stop C D Side-Street Stop C D 3 - Doc Susie Avenue / Site Access ---------Side-Street Stop A A 4 - Doc Susie Avenue / Alley ---------Side-Street Stop A A Background Intersection Total Control AM PM Control AM PM 1 - Zerex Street / Eastom Avenue Side-Street Stop C D Side-Street Stop C D 2 - Zerex Street / Fraser Avenue Side-Street Stop C E Side-Street Stop C E 3 - Doc Susie Avenue / Site Access ---------Side-Street Stop A A 4 - Doc Susie Avenue / Alley ---------Side-Street Stop A A Intersection Background Total Sustainable Traffic Solutions, Inc. Koselig on Main Traffic Impact Study Byson Real Estate Co. Fraser, Colorado March 4, 2022 5 8.0 Conclusions STS has drawn the following conclusions based on the analysis performed for this project. Intersection Operation. The operation of the intersections was analyzed using PTV VISTRO software. The following bullets discuss the two key intersections on Zerex Street. • Zerex Street / Eastom Avenue. This intersection is operating at acceptable levels of service (LOS C, or better) through the Year 2023 total traffic volume scenarios. By the Year 2042, the operation of the intersection is expected to decline to LOS D during the evening peak hour of the background and total traffic volume scenarios. • Zerex Street / Fraser Avenue. This intersection is operating at LOS C during the morning peak hour and LOS D during the evening peak hour. It is expected to continue to operate at LOS C during the morning peak hour, however, the operation during the evening peak hour is expected to degrade to LOS E by the Year 2042 background and total traffic volume scenarios. Auxiliary Lanes. No new auxiliary lanes will be warranted on Zerex Street by the traffic from this development. Morning Evening NBRT >50 VPH 4 1 NBRT >50 VPH 5 8 2 - Zerex Street / Fraser Avenue Intersection / Movement Peak Hour Volume Threshold 1 - Zerex Street / Eastom Avenue Sustainable Traffic Solutions, Inc. Koselig on Main Traffic Impact Study Byson Real Estate Co. Fraser, Colorado March 4, 2022 Tables Table 1 – Estimated Daily Volumes for Key Links in the Study Area Table 2 – Intersection Operational Summary Table 3 – Trip Generation Estimate Li n k Ze r e x S t r e e t n o r t h o f E a s t o m A v e n u e Ze r e x S t r e e t b e t w e e n E a s t o m A v e n u e a n d F r a s e r A v e n u e Ze r e x S t r e e t s o u t h o f F r a s e r A v e n u e Ea s t o m A v e n u e e a s t o f Z e r e x S t r e e t Fr a s e r A v e n u e e a s t o f Z e r e x S t r e e t 1. T h e Y e a r 2 0 2 1 v o l u m e s h i g h l i g h t e d i n y e l l o w w e r e c o l l e c t e d i n t h e f i e l d . T h e o t h e r e x i s t i n g v o l u m e s w e r e e s t i m a t e d u s i n g t h e p e a k h o u r t o d a i l y r a t i o f o r t h e e v e n i n g p e a k h o u r . 11 , 0 1 7 21 0 12 , 0 0 0 11 , 2 3 0 15 0 10 0 50 50 12 , 2 1 0 12 , 2 3 0 12 , 3 8 0 21 0 11 0 16 0 Ye a r 2 0 4 2 Ba c k g r o u n d Ye a r 2 0 4 2 T o t a l 13 , 5 4 0 13 , 6 9 0 11 , 8 1 0 Ta b l e 1 . E s t i m a t e d D a i l y V o l u m e s f o r K e y L i n k s i n t h e S t u d y A r e a 10 , 7 0 0 15 0 11 , 6 6 0 Ye a r 2 0 2 2 Ex i s t i n g T r a f f i c 1 De v e l o p m e n t Tr a f f i c Ye a r 2 0 2 3 Ba c k g r o u n d Ye a r 2 0 2 3 T o t a l 15 0 Ye a r 2 0 2 2 Fa c t o r e d T r a f f i c 11 , 5 6 0 11 , 9 0 0 12 , 1 3 0 11 0 16 0 11 0 16 0 14 , 3 7 0 16 0 13 , 8 8 0 14 , 0 9 0 14 , 2 2 0 16 0 21 0 Ko s e l i g o n M a i n 1 - D a i l y V o l u m e s 3/ 3 / 2 0 2 2 3: 5 8 P M De l a y LO S De l a y LO S De l a y LO S De l a y LO S De l a y LO S De l a y LO S De l a y LO S De l a y LO S De l a y LO S De l a y LO S 14 . 4 B 20 . 5 C 14 . 5 B 20 . 7 C 14 . 6 B 20 . 9 C 16 . 3 C 25 . 3 D 16 . 4 C 25 . 6 D 18 . 5 C 27 . 1 D 18 . 7 C 27 . 4 D 18 . 7 C 27 . 6 D 22 . 2 C 35 . 4 E 22 . 2 C 35 . 8 E 8. 6 A ` #N / A 8. 6 A 8. 6 A 8. 6 A 8. 6 A 8. 6 A 8. 6 A No t e s EB L T WB L T -- - -- - -- - -- - -- - -- - -- - -- - -- - WB L T EB L T WB L T EB L T EB L T WB L T WB L T EB L T EB L T WB L T EB L T WB L T 4 - D o c S u s i e A v e n u e / A l l e y Mo r n i n g 3 - D o c S u s i e A v e n u e / S i t e A c c e s s 2 - Z e r e x S t r e e t / F r a s e r A v e n u e EB L T WB L T EB L T WB L T 1 - Z e r e x S t r e e t / E a s t o m A v e n u e WV L T WB L T EB L T WB L T WB L T -- - -- - -- - WB L T WB L T Ta b l e 2 . I n t e r s e c t i o n O p e r a t i o n a l S u m m a r y St o p - C o n t r o l l e d I n t e r s e c t i o n s 1 Ye a r 2 0 2 2 F a c t o r e d Ye a r 2 0 2 3 B a c k g r o u n d Mo r n i n g Ev e n i n g Mo r n i n g Ev e n i n g Mo r n i n g Ev e n i n g Ye a r 2 0 2 3 T o t a l 1. T h e l e v e l o f s e r v i c e f o r i n t e r s e c t i o n s w i t h s i d e - s t r e e t s t o p - c o n t r o l i s d e t e r m i n e d b y t h e m o v e m e n t w i t h t h e h i g h e s t d e l a y v a l u e . Ev e n i n g Ye a r 2 0 4 1 B a c k g r o u n d Ye a r 2 0 4 1 T o t a l Ev e n i n g Mo r n i n g EB L T EB L T EB L T Ko s e l i g o n M a i n 2 - L O S 3/ 2 / 2 0 2 2 1: 2 0 P M Ta b l e 3 . T r i p G e n e r a t i o n E s t i m a t e Ra t e To t a l In Ou t Ra t e To t a l In Ou t Ra t e To t a l In Ou t Mu l t i f a m i l y H o u s i n g ( M i d - R i s e ) ( N o t C l o s e t o Ra i l T r a n s i t ) 22 1 20 DU 4. 5 4 91 45 45 0. 3 7 8 2 6 0. 3 9 8 5 3 St r i p R e t a i l P l a z a ( < 4 0 K ) 82 2 3. 9 1, 0 0 0 f t 2 54 . 4 5 21 3 10 6 10 6 2. 3 6 10 6 4 6. 5 9 26 13 13 To t a l -- - -- - -- - -- - 30 4 15 2 15 2 -- - 18 8 10 -- - 34 18 16 La n d U s e IT E C o d e 1 Si z e Un i t Av e r a g e D a i l y T r i p s Mo r n i n g P e a k H o u r T r i p s Ev e n i n g P e a k H o u r T r i p s No t e s : 1. T h e t r i p g e n e r a t i o n e s t i m a t e i s b a s e d o n r a t e s c o n t a i n e d i n Tr i p G e n e r a t i o n , 1 1 t h E d i t i o n ( I n s t i t u t e o f T r a n s p o r t a t i o n E n g i n e e r s , S e p t e m b e r 2 0 2 1 ) . Ko s e l i g o n M a i n 3 - T r i p G e n 3/ 3 / 2 0 2 2 3: 4 4 P M Sustainable Traffic Solutions, Inc. Koselig on Main Traffic Impact Study Byson Real Estate Co. Fraser, Colorado March 4, 2022 Figures Figure 1 – Vicinity Map Figure 2 – Site Plan Figure 3 – Laneage and Traffic Control – Existing Figure 4 – Existing Traffic Volumes – Morning Peak Hour Figure 5 – Existing Traffic Volumes – Evening Peak Hour Figure 6 – Term Trip Distribution Figure 7 – Trip Assignment – Morning Peak Hour Figure 8 – Trip Assignment – Evening Peak Hour Figure 9 – Year 2023 Background Traffic Volumes – Morning Peak Hour Figure 10 – Year 2023 Background Traffic Volumes – Evening Peak Hour Figure 11 – Year 2023 Total Traffic Volumes – Morning Peak Hour Figure 12 – Year 2023 Total Traffic Volumes – Evening Peak Hour Figure 13 – Year 2042 Background Traffic Volumes – Morning Peak Hour Figure 14 – Year 2042 Background Traffic Volumes – Evening Peak Hour Figure 15 – Year 2042 Total Traffic Volumes – Morning Peak Hour Figure 16 – Year 2042 Total Traffic Volumes – Evening Peak Hour Pr o j e c t Si t e Sc a l e Da t e Dr a w n b y Jo b # Fi g u r e 1" = 5 0 0 ' Ma r c h 4 , 2 0 2 2 JL H By s o n R e a l E s t a t e C o . 1 Ko s e l i g o n M a i n T r a f f i c I m p a c t S t u d y VI C I N I T Y M A P Fr a s e r Av e n u e LE G E N D - S t a t e H i g h w a y - O t h e r R o a d w a y s - R i v e r s a n d S t r e a m s Ea s t o m Av e n u e Zer e x S t r e e t (U S 4 0 ) Sc a l e Da t e Dr a w n b y Jo b # Fi g u r e NT S Ma r c h 4 , 2 0 2 2 JL H By s o n R e a l E s t a t e C o . 2 Ko s e l i g o n M a i n T r a f f i c I m p a c t S t u d y SI T E P L A N Al l e y Fr a s e r A v e n u e Zere x S t r e e t (US 4 0 ) Hi g h w a y 4 0 Bu i l d i n g Do c S u s i e Bu i l d i n g Doc Susie Avenue Si t e A c c e s s Si t e A c c e s s Figure 3 – Laneage and Traffic Control – Existing Zerex/FraserZerex/Eastom Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/4/2022 Fraser, CO Koselig on Main TIS Version 2022 (SP 0-2) Generated with Figure 4 – Existing Traffic Volumes – Morning Peak Hour Zerex/FraserZerex/Eastom Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/4/2022 Fraser, CO Koselig on Main TIS Version 2022 (SP 0-2) Generated with Figure 5 – Existing Traffic Volumes – Evening Peak Hour Zerex/FraserZerex/Eastom Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/4/2022 Fraser, CO Koselig on Main TIS Version 2022 (SP 0-2) Generated with Fr a s e r Av e n u e Sc a l e Da t e Dr a w n b y Jo b # Fi g u r e 1" = 5 0 0 ' Ma r c h 4 , 2 0 2 2 JL H By s o n R e a l E s t a t e C o . 6 Ko s e l i g o n M a i n T r a f f i c I m p a c t S t u d y TR I P D I S T R I B U T I O N LE G E N D - S t a t e H i g h w a y - O t h e r R o a d w a y s - R i v e r s a n d S t r e a m s Ea s t o m Av e n u e Zer e x S t r e e t (U S 4 0 ) 50 % 50 % Figure 7 – Trip Assignment – Morning Peak Hour Doc Susie/AlleyDoc Susie/Site AccessZerex/FraserZerex/Eastom Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/4/2022 Fraser, CO Koselig on Main TIS Version 2022 (SP 0-2) Generated with Figure 8 – Trip Assignment – Evening Peak Hour Doc Susie/AlleyDoc Susie/Site AccessZerex/FraserZerex/Eastom Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/4/2022 Fraser, CO Koselig on Main TIS Version 2022 (SP 0-2) Generated with Figure 9 – Year 2023 Background Traffic Volumes – Morning Peak Hour Zerex/FraserZerex/Eastom Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/4/2022 Fraser, CO Koselig on Main TIS Version 2022 (SP 0-2) Generated with Figure 10 – Year 2023 Background Traffic Volumes – Evening Peak Hour Zerex/FraserZerex/Eastom Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/4/2022 Fraser, CO Koselig on Main TIS Version 2022 (SP 0-2) Generated with Figure 11 – Year 2023 Total Traffic Volumes – Morning Peak Hour Doc Susie/AlleyDoc Susie/Site AccessZerex/FraserZerex/Eastom Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/4/2022 Fraser, CO Koselig on Main TIS Version 2022 (SP 0-2) Generated with Figure 12 – Year 2023 Total Traffic Volumes – Evening Peak Hour Doc Susie/AlleyDoc Susie/Site AccessZerex/FraserZerex/Eastom Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/4/2022 Fraser, CO Koselig on Main TIS Version 2022 (SP 0-2) Generated with Figure 13 – Year 2042 Background Traffic Volumes – Morning Peak Hour Zerex/FraserZerex/Eastom Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/4/2022 Fraser, CO Koselig on Main TIS Version 2022 (SP 0-2) Generated with Figure 14 – Year 2042 Background Traffic Volumes – Evening Peak Hour Zerex/FraserZerex/Eastom Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/4/2022 Fraser, CO Koselig on Main TIS Version 2022 (SP 0-2) Generated with Figure 15 – Year 2042 Total Traffic Volumes – Morning Peak Hour Doc Susie/AlleyDoc Susie/Site AccessZerex/FraserZerex/Eastom Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/4/2022 Fraser, CO Koselig on Main TIS Version 2022 (SP 0-2) Generated with Figure 16 – Year 2042 Total Traffic Volumes – Evening Peak Hour Doc Susie/AlleyDoc Susie/Site AccessZerex/FraserZerex/Eastom Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/4/2022 Fraser, CO Koselig on Main TIS Version 2022 (SP 0-2) Generated with Sustainable Traffic Solutions, Inc. Koselig on Main Traffic Impact Study Byson Real Estate Co. Fraser, Colorado March 4, 2022 Appendix A Traffic Count Data Ye a r Ja n u a r y Fe b r u a r y Ma r c h Ap r i l Ma y Ju n e Ju l y Au g u s t Se p t e m b e r Oc t o b e r No v e m b e r De c e m b e r 20 2 2 45 2 0 0 0 0 0 0 0 0 0 0 0 20 2 1 52 2 45 8 52 3 57 8 79 2 1, 1 8 7 1, 3 0 1 1, 1 0 8 1, 2 4 7 92 2 74 1 52 8 20 2 0 51 7 49 6 47 2 42 0 80 1 1, 2 6 8 1, 4 9 0 1, 3 2 3 1, 4 1 4 76 3 67 8 54 7 20 1 9 48 2 50 4 49 4 48 5 71 6 1, 0 7 6 1, 3 6 1 1, 2 5 3 1, 2 8 1 94 8 66 0 52 3 20 1 8 49 6 49 2 52 1 53 0 84 3 1, 1 3 2 1, 2 8 2 1, 1 8 2 1, 2 3 4 84 2 64 6 50 3 20 1 8 / 2 0 1 9 A v e r a g e 48 9 49 8 50 8 50 8 78 0 1, 1 0 4 1, 3 2 2 1, 2 1 8 1, 2 5 8 89 5 65 3 51 3 20 2 1 - 2 0 1 8 / 2 0 1 9 A v e r a g e 33 -4 0 16 71 13 83 -2 1 -1 1 0 -1 1 27 88 15 % I n c r e a s e 7% -8 % 3% 14 % 2% 8% -2 % -9 % -1 % 3% 13 % 3% 20 2 2 - 2 0 1 8 / 2 0 1 9 A v e r a g e -3 7 % I n c r e a s e -8 % Co u n t S t a t i o n 0 0 0 2 1 6 - A v e r a g e D a i l y V o l u m e s o n S H 1 2 5 N o r t h o f U S 4 0 Co u n t S t a t i o n 0 0 0 2 1 6 Su m m a r y 3/ 1 / 2 0 2 2 10 : 2 2 A M LT TH RT LT TH RT LT TH RT LT TH RT Co l l e c t e d 1 24 6 4 2 54 2 5 2 0 2 1 0 1 Fa c t o r e d 1 26 6 4 2 58 5 5 2 0 2 1 0 1 LT TH RT LT TH RT LT TH RT LT TH RT Co l l e c t e d 14 24 1 4 0 52 4 16 8 0 14 4 0 3 Fa c t o r e d 15 26 0 4 0 56 6 17 9 0 15 4 0 3 Ze r e x S t r e e t / E a s t o m A v e n u e No r t h b o u n d So u t h b o u n d Ea s t b o u n d W e s t b o u n d Fa c t o r e d T r a f f i c V o l u m e s - M o r n i n g P e a k H o u r Ze r e x S t r e e t / F r a s e r A v e n u e No r t h b o u n d So u t h b o u n d Ea s t b o u n d W e s t b o u n d Ko s e l i g o n M a i n Fa c t o r e d V o l u m e s 3/ 1 / 2 0 2 2 10 : 1 9 A M LT TH RT LT TH RT LT TH RT LT TH RT Co l l e c t e d 16 63 9 5 6 43 0 9 3 0 12 3 0 1 Fa c t o r e d 17 69 0 5 6 46 4 10 3 0 13 3 0 1 LT TH RT LT TH RT LT TH RT LT TH RT Co l l e c t e d 16 62 9 1 1 41 0 6 6 0 17 3 0 5 Fa c t o r e d 17 67 9 1 1 44 3 6 6 0 18 3 0 5 Fa c t o r e d T r a f f i c V o l u m e s - E v e n i n g P e a k H o u r Ze r e x S t r e e t / F r a s e r A v e n u e No r t h b o u n d So u t h b o u n d Ea s t b o u n d W e s t b o u n d Ea s t b o u n d W e s t b o u n d Ze r e x S t r e e t / E a s t o m A v e n u e No r t h b o u n d So u t h b o u n d Ko s e l i g o n M a i n Fa c t o r e d V o l u m e s 3/ 1 / 2 0 2 2 10 : 2 0 A M ZEREX ST ZEREX STFRASER AVEFRASER AVE (303) 216-2439 www.alltrafficdata.net Location:1 ZEREX ST & FRASER AVE AM Wednesday, February 9, 2022Date: Peak Hour - All Vehicles Traffic Counts Note: Total study counts contained in parentheses. Peak Hour - Pedestrians/Bicycles on Crosswalk Peak Hour:08:00 AM - 09:00 AM Peak 15-Minutes:08:30 AM - 08:45 AM 549 249 2 6 251545 4 6 0.95 N S EW 0.94 0.50 0.77 0.33 (490)(979) (8) (12) (10) (5) (493)(973) 5 02 1 0 1 2 0 2 0 0 54 2 1 24 6 40 FRASER AVE FRASER AVE ZEREX ST ZEREX ST 0 0 0 1 N S EW 0 0 00 0 0 0 1 Left Thru Right Total EastboundInterval Start Time Rolling Hour West East South North Pedestrian Crossings U-Turn Westbound Northbound Southbound Left Thru RightU-Turn Left Thru RightU-Turn Left Thru RightU-Turn 7:00 AM 0 0 39 0 2 750 0 0 0 0 0 117 0 0 0 06790 1 0 0 7:15 AM 0 0 56 0 0 1210 1 0 0 0 0 185 0 0 0 07550 1 4 2 7:30 AM 0 1 79 0 0 1090 0 0 0 1 1 192 0 0 0 07580 1 0 0 7:45 AM 0 0 63 0 0 1210 0 0 0 1 0 185 0 0 0 17790 0 0 0 8:00 AM 0 0 46 0 0 1460 0 0 0 0 0 193 0 0 0 08060 0 1 0 8:15 AM 0 0 53 0 0 1290 2 0 0 0 0 188 0 0 0 01 1 0 2 8:30 AM 0 0 80 0 0 1280 0 0 0 0 0 213 1 0 0 01 0 2 2 8:45 AM 0 1 67 0 2 1390 0 0 0 1 0 212 0 0 0 00 0 1 1 Count Total 7842 1,4859684048320130030 101 0 Peak Hour 0 2 0 0 1 0 0 1 246 0 2 542 8062 1 4 5 1 0 0 0 ZEREX ST ZEREX STEASTOM AVEEASTOM AVE (303) 216-2439 www.alltrafficdata.net Location:2 ZEREX ST & EASTOM AVE AM Wednesday, February 9, 2022Date: Peak Hour - All Vehicles Traffic Counts Note: Total study counts contained in parentheses. Peak Hour - Pedestrians/Bicycles on Crosswalk Peak Hour:08:00 AM - 09:00 AM Peak 15-Minutes:08:30 AM - 08:45 AM 540 252 7 4 259542 22 30 0.95 N S EW 0.90 0.35 0.79 0.55 (496)(1,004) (13) (8) (37) (28) (502)(1,006) 16 00 3 0 4 14 0 8 0 0 52 4 14 24 1 40 EASTOM AVE EASTOM AVE ZEREX ST ZEREX ST 1 0 0 3 N S EW 0 0 00 0 1 1 2 Left Thru Right Total EastboundInterval Start Time Rolling Hour West East South North Pedestrian Crossings U-Turn Westbound Northbound Southbound Left Thru RightU-Turn Left Thru RightU-Turn Left Thru RightU-Turn 7:00 AM 0 0 40 0 0 780 0 0 0 0 0 119 0 0 0 07190 0 1 0 7:15 AM 0 1 57 0 1 1270 1 0 0 3 0 192 2 0 0 28030 2 0 0 7:30 AM 0 1 79 0 0 1370 1 0 0 0 0 221 0 0 0 08081 1 0 1 7:45 AM 0 1 62 0 1 1160 1 0 0 0 0 187 0 0 0 08052 0 1 3 8:00 AM 0 0 47 0 0 1470 1 0 0 0 0 203 0 0 0 08282 0 1 5 8:15 AM 0 0 54 0 0 1310 3 0 0 0 0 197 3 0 0 01 0 0 8 8:30 AM 0 5 75 0 0 1270 0 0 0 1 0 218 0 0 0 15 1 2 2 8:45 AM 0 9 65 0 0 1190 4 0 0 3 0 210 0 0 0 06 2 1 1 Count Total 206617 1,547982204791700700110 305 0 Peak Hour 0 8 0 0 4 0 0 14 241 0 0 524 82814 3 4 16 3 0 0 1 ZEREX ST ZEREX STFRASER AVEFRASER AVE (303) 216-2439 www.alltrafficdata.net Location:1 ZEREX ST & FRASER AVE PM Wednesday, February 9, 2022Date: Peak Hour - All Vehicles Traffic Counts Note: Total study counts contained in parentheses. Peak Hour - Pedestrians/Bicycles on Crosswalk Peak Hour:04:30 PM - 05:30 PM Peak 15-Minutes:05:00 PM - 05:15 PM 445 643 4 11 660449 15 21 0.94 N S EW 0.93 0.75 0.90 0.71 (1,154)(809) (9) (18) (48) (29) (1,185)(812) 9 06 1 0 3 12 0 3 0 0 43 0 12 63 9 54 FRASER AVE FRASER AVE ZEREX ST ZEREX ST 7 3 0 10 N S EW 1 2 00 2 5 4 6 Left Thru Right Total EastboundInterval Start Time Rolling Hour West East South North Pedestrian Crossings U-Turn Westbound Northbound Southbound Left Thru RightU-Turn Left Thru RightU-Turn Left Thru RightU-Turn 4:00 PM 1 3 134 0 2 860 0 0 0 1 0 231 5 3 0 01,0270 0 1 3 4:15 PM 0 4 136 0 0 990 1 0 0 1 0 251 5 1 0 21,0942 1 1 6 4:30 PM 2 4 152 0 0 1050 1 0 0 0 0 275 0 1 0 11,1244 0 2 5 4:45 PM 0 3 140 0 4 1150 1 0 0 2 0 270 7 0 0 11,0773 0 1 1 5:00 PM 0 3 178 0 0 1080 0 0 0 1 0 298 2 1 0 41,0054 1 2 1 5:15 PM 2 2 169 0 2 1020 1 0 0 0 0 281 1 1 0 11 0 0 2 5:30 PM 0 2 130 0 0 840 1 0 0 1 0 228 0 0 0 04 0 2 4 5:45 PM 0 2 108 0 0 770 0 0 0 1 0 198 5 0 0 06 0 1 3 Count Total 2510224 2,032776801,147235070050 9025 7 Peak Hour 0 3 0 0 3 0 4 12 639 0 6 430 1,12412 1 5 9 10 3 0 7 ZEREX ST ZEREX STEASTOM AVEEASTOM AVE (303) 216-2439 www.alltrafficdata.net Location:2 ZEREX ST & EASTOM AVE PM Wednesday, February 9, 2022Date: Peak Hour - All Vehicles Traffic Counts Note: Total study counts contained in parentheses. Peak Hour - Pedestrians/Bicycles on Crosswalk Peak Hour:04:30 PM - 05:30 PM Peak 15-Minutes:05:00 PM - 05:15 PM 417 640 8 2 646430 23 22 0.97 N S EW 0.92 0.75 0.91 0.78 (1,153)(756) (12) (6) (39) (47) (1,162)(779) 6 01 5 0 3 17 0 6 0 0 41 0 16 62 9 10 EASTOM AVE EASTOM AVE ZEREX ST ZEREX ST 0 2 1 1 N S EW 1 1 10 0 0 1 0 Left Thru Right Total EastboundInterval Start Time Rolling Hour West East South North Pedestrian Crossings U-Turn Westbound Northbound Southbound Left Thru RightU-Turn Left Thru RightU-Turn Left Thru RightU-Turn 4:00 PM 0 4 131 0 0 810 5 0 0 0 0 228 0 2 2 11,0025 0 1 1 4:15 PM 0 5 131 0 0 960 2 0 0 0 0 244 0 1 0 01,0575 2 1 2 4:30 PM 0 3 150 0 0 1020 2 0 0 1 0 266 0 0 1 01,0944 1 1 2 4:45 PM 0 4 137 0 1 1120 2 0 0 0 0 264 0 1 0 01,0486 2 0 0 5:00 PM 0 4 174 0 0 980 0 0 0 1 0 283 1 1 0 09753 2 0 1 5:15 PM 0 5 168 0 0 980 2 0 0 1 0 281 0 0 0 04 0 0 3 5:30 PM 0 2 128 0 1 810 3 0 0 1 0 220 0 0 0 02 1 0 1 5:45 PM 0 2 110 0 0 760 0 0 0 0 0 191 0 0 0 02 0 1 0 Count Total 104831 1,977744201,1292900400160 131 5 Peak Hour 0 6 0 0 3 0 0 16 629 0 1 410 1,09417 5 1 6 1 2 1 0 Pa g e 1 Da t e S t a r t : 0 9 - F e b - 2 2 Si t e C o d e : 3 St a t i o n I D : 3 ZE R E X S T N . O . F R A S E R A V E Al l T r a f f i c D a t a S e r v i c e s ww w . a l l t r a f f i c d a t a . n e t St a r t 09 - F e b - 2 2 Ti m e We d NB SB To t a l 12 : 0 0 A M 34 13 47 01 : 0 0 15 4 19 02 : 0 0 4 4 8 03 : 0 0 3 3 6 04 : 0 0 12 22 34 05 : 0 0 24 61 85 06 : 0 0 54 14 7 20 1 07 : 0 0 24 1 43 0 67 1 08 : 0 0 24 9 54 9 79 8 09 : 0 0 27 7 43 4 71 1 10 : 0 0 31 0 41 3 72 3 11 : 0 0 36 4 43 7 80 1 12 : 0 0 P M 40 7 46 3 87 0 01 : 0 0 38 9 39 3 78 2 02 : 0 0 45 5 42 8 88 3 03 : 0 0 53 0 36 4 89 4 04 : 0 0 56 6 42 6 99 2 05 : 0 0 58 8 38 3 97 1 06 : 0 0 34 9 24 5 59 4 07 : 0 0 23 6 11 8 35 4 08 : 0 0 13 9 97 23 6 09 : 0 0 10 3 56 15 9 10 : 0 0 68 69 13 7 11 : 0 0 21 20 41 To t a l 54 3 8 55 7 9 11 0 1 7 Pe r c e n t 49 . 4 % 50 . 6 % AM P e a k - 11 : 0 0 08 : 0 0 - - - - - - 11 : 0 0 Vo l . - 36 4 54 9 - - - - - - 80 1 PM P e a k - 17 : 0 0 12 : 0 0 - - - - - - 16 : 0 0 Vo l . - 58 8 46 3 - - - - - - 99 2 Gr a n d T o t a l 54 3 8 55 7 9 11 0 1 7 Pe r c e n t 49 . 4 % 50 . 6 % AD T AD T 1 1 , 0 1 7 AA D T 1 1 , 0 1 7 Sustainable Traffic Solutions, Inc. Koselig on Main Traffic Impact Study Byson Real Estate Co. Fraser, Colorado March 4, 2022 Appendix B CDOT Straight Line Diagram The information contained in this map is based on the most currently available data and has been checked for accuracy. CDOT does not guarantee the accuracy of any information presented, is not liable in any respect for any errors or omissions, and is not responsible for determining "fitness for use". Legend Route Milepoint Structures Major Structure Minor Structure .Created: Route 040A From 226 to 227 Date: 1/17/2022 Time: 6:52:02 AM 0 0.08 0.16 0.24 0.32 Miles Fr o m 2 2 6 T o 2 2 7 Ro u t e 0 4 0 A Ra m p s Ov e r p a s s Un d e r p a s s St r u c t u r e s 22 6 22 7 Co Rd 5 Co Rd 8 Park Ave Easton Ave Fraser Ave Eisenhower Dr Doc Susie Ave Byers Ave Clayton Ave E-13-W CL A S S I F I C A T I O N Ac c e s s C o n t r o l R- A : R e g i o n a l H i g h w a y NR - B : N o n - R u r a l A r t e r i a l Fu n c t i o n a l C l a s s 3 P r i n c i p a l A r t e r i a l - O t h e r SA F E T Y Pr i m a r y S p e e d L i m i t 65 50 40 35 TR A F F I C Of f P e a k T r u c k Pe r c e n t a g e 5. 4 0 4. 5 0 4. 9 0 Pe a k T r u c k P e r c e n t a g e 0. 5 0 0. 3 0 0. 3 7 Ye a r 2 0 F a c t o r 1. 0 8 1. 1 6 1. 1 3 It m a y a p p e a r t h a t i n f o r m a t i o n i s m i s s i n g f r o m t h e s t r a i g h t l i n e d i a g r a m . I f s o , r e d u c e t h e n u m b e r o f m i l e s / p a g e a n d r e - s u b m i t t h e r e q u e s t . Sustainable Traffic Solutions, Inc. Koselig on Main Traffic Impact Study Byson Real Estate Co. Fraser, Colorado March 4, 2022 Appendix C VISTRO Analysis Results Year 2022 Volumes Intersection Analysis Summary 3/2/2022Report File: C:\...\Existing AM.pdf Scenario 1 Existing AMVistro File: C:\...\AM.vistro Koselig on Main TIS V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. C18.50.022EB LeftHCM 7th EditionTwo-way stopZerex/Fraser2 B14.40.028WB LeftHCM 7th EditionTwo-way stopZerex/Eastom1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 1: 1 Existing AM Version 2022 (SP 0-2) Generated with 0.028Volume to Capacity (v/c): BLevel Of Service: 14.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 1: Zerex/Eastom Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Eastom AvenueZerex StreetZerex StreetName Intersection Setup 000Pedestrian Volume [ped/h] 91162905348Total Analysis Volume [veh/h] 231570187Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.35000.35000.90000.90000.79000.7900Peak Hour Factor 3456604275Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3456604275Base Volume Input [veh/h] Eastom AvenueZerex StreetZerex StreetName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 1: 1 Existing AM Version 2022 (SP 0-2) Generated with BIntersection LOS 0.24d_I, Intersection Delay [s/veh] BAAApproach LOS 12.250.000.00d_A, Approach Delay [s/veh] 3.023.020.000.000.000.0095th-Percentile Queue Length [ft/ln] 0.120.120.000.000.000.0095th-Percentile Queue Length [veh/ln] ABAAAAMovement LOS 9.5914.440.007.990.000.00d_M, Delay for Movement [s/veh] 0.010.030.010.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 1: 1 Existing AM Version 2022 (SP 0-2) Generated with 0.022Volume to Capacity (v/c): CLevel Of Service: 18.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 2: Zerex/Fraser Intersection Level Of Service Report NoNoNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Fraser AvenueFraser AvenueZerex StreetZerex StreetName Intersection Setup 0000Pedestrian Volume [ped/h] 2026065622253451Total Analysis Volume [veh/h] 101202115611860Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.50000.50000.50000.33000.33000.33000.94000.94000.94000.77000.77000.7700Peak Hour Factor 1012025585242661Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1012025585242661Base Volume Input [veh/h] Fraser AvenueFraser AvenueZerex StreetZerex StreetName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 1: 1 Existing AM Version 2022 (SP 0-2) Generated with CIntersection LOS 0.25d_I, Intersection Delay [s/veh] BBAAApproach LOS 12.4814.520.030.03d_A, Approach Delay [s/veh] 0.620.620.622.382.382.380.000.040.080.000.000.0895th-Percentile Queue Length [ft/ln] 0.020.020.020.100.100.100.000.000.000.000.000.0095th-Percentile Queue Length [veh/ln] ACCBCCAAAAAAMovement LOS 9.3619.6115.6010.5719.8418.470.000.007.990.000.008.79d_M, Delay for Movement [s/veh] 0.000.000.010.010.000.020.000.010.000.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 1: 1 Existing AM Version 2022 (SP 0-2) Generated with Intersection Analysis Summary 3/2/2022Report File: C:\...\Existing PM.pdf Scenario 1 Existing PMVistro File: C:\...\PM.vistro Koselig on Main TIS V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. D27.10.024WB LeftHCM 7th EditionTwo-way stopZerex/Fraser2 C20.50.017WB LeftHCM 7th EditionTwo-way stopZerex/Eastom1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 1: 1 Existing PM Version 2022 (SP 0-2) Generated with 0.017Volume to Capacity (v/c): CLevel Of Service: 20.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 1: Zerex/Eastom Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Eastom AvenueZerex StreetZerex StreetName Intersection Setup 000Pedestrian Volume [ped/h] 7448211765Total Analysis Volume [veh/h] 2112000191Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.75000.75000.92000.92000.91000.9100Peak Hour Factor 5344311696Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 5344311696Base Volume Input [veh/h] Eastom AvenueZerex StreetZerex StreetName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 1: 1 Existing PM Version 2022 (SP 0-2) Generated with CIntersection LOS 0.13d_I, Intersection Delay [s/veh] BAAApproach LOS 14.530.020.00d_A, Approach Delay [s/veh] 2.182.180.000.090.000.0095th-Percentile Queue Length [ft/ln] 0.090.090.000.000.000.0095th-Percentile Queue Length [veh/ln] BCAAAAMovement LOS 11.1220.490.009.270.000.00d_M, Delay for Movement [s/veh] 0.010.020.000.000.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 1: 1 Existing PM Version 2022 (SP 0-2) Generated with 0.024Volume to Capacity (v/c): DLevel Of Service: 27.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 2: Zerex/Fraser Intersection Level Of Service Report NoNoNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Fraser AvenueFraser AvenueZerex StreetZerex StreetName Intersection Setup 0000Pedestrian Volume [ped/h] 1041804114996676719Total Analysis Volume [veh/h] 0015013125211925Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.75000.75000.75000.71000.71000.71000.93000.93000.93000.90000.90000.9000Peak Hour Factor 1031303104646569017Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1031303104646569017Base Volume Input [veh/h] Fraser AvenueFraser AvenueZerex StreetZerex StreetName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 1: 1 Existing PM Version 2022 (SP 0-2) Generated with DIntersection LOS 0.46d_I, Intersection Delay [s/veh] CBAAApproach LOS 23.9312.350.110.20d_A, Approach Delay [s/veh] 1.971.971.973.363.363.360.000.130.250.000.001.3895th-Percentile Queue Length [ft/ln] 0.080.080.080.130.130.130.000.010.010.000.000.0695th-Percentile Queue Length [veh/ln] BDDBDCAAAAAAMovement LOS 11.3729.5727.0710.1529.3222.220.000.009.300.000.008.49d_M, Delay for Movement [s/veh] 0.000.000.020.020.000.020.000.000.010.000.010.02V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 1: 1 Existing PM Version 2022 (SP 0-2) Generated with Year 2023 Traffic Volume Scenarios Intersection Analysis Summary 3/2/2022Report File: C:\...\2023 Back AM.pdf Scenario 2 2023 Back AMVistro File: C:\...\AM.vistro Koselig on Main TIS V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. C18.70.022EB LeftHCM 7th EditionTwo-way stopZerex/Fraser2 B14.50.028WB LeftHCM 7th EditionTwo-way stopZerex/Eastom1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 2: 2 2023 Back AM Version 2022 (SP 0-2) Generated with 0.028Volume to Capacity (v/c): BLevel Of Service: 14.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 1: Zerex/Eastom Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Eastom AvenueZerex StreetZerex StreetName Intersection Setup 000Pedestrian Volume [ped/h] 91163605352Total Analysis Volume [veh/h] 231590188Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.35000.35000.90000.90000.79000.7900Peak Hour Factor 3457204278Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.01001.00001.00001.0100Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3456604275Base Volume Input [veh/h] Eastom AvenueZerex StreetZerex StreetName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 2: 2 2023 Back AM Version 2022 (SP 0-2) Generated with BIntersection LOS 0.24d_I, Intersection Delay [s/veh] BAAApproach LOS 12.320.000.00d_A, Approach Delay [s/veh] 3.043.040.000.000.000.0095th-Percentile Queue Length [ft/ln] 0.120.120.000.000.000.0095th-Percentile Queue Length [veh/ln] ABAAAAMovement LOS 9.6014.540.008.000.000.00d_M, Delay for Movement [s/veh] 0.010.030.010.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 2: 2 2023 Back AM Version 2022 (SP 0-2) Generated with 0.022Volume to Capacity (v/c): CLevel Of Service: 18.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 2: Zerex/Fraser Intersection Level Of Service Report NoNoNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Fraser AvenueFraser AvenueZerex StreetZerex StreetName Intersection Setup 0000Pedestrian Volume [ped/h] 2026065629253491Total Analysis Volume [veh/h] 101202115711870Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.50000.50000.50000.33000.33000.33000.94000.94000.94000.77000.77000.7700Peak Hour Factor 1012025591242691Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.01001.00001.00001.01001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1012025585242661Base Volume Input [veh/h] Fraser AvenueFraser AvenueZerex StreetZerex StreetName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 2: 2 2023 Back AM Version 2022 (SP 0-2) Generated with CIntersection LOS 0.25d_I, Intersection Delay [s/veh] BBAAApproach LOS 12.5514.640.030.02d_A, Approach Delay [s/veh] 0.630.630.632.412.412.410.000.040.080.000.000.0895th-Percentile Queue Length [ft/ln] 0.030.030.030.100.100.100.000.000.000.000.000.0095th-Percentile Queue Length [veh/ln] ACCBCCAAAAAAMovement LOS 9.3719.8315.7310.6020.0718.680.000.008.000.000.008.81d_M, Delay for Movement [s/veh] 0.000.000.010.010.000.020.000.010.000.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 2: 2 2023 Back AM Version 2022 (SP 0-2) Generated with Intersection Analysis Summary 3/2/2022Report File: C:\...\2023 Back PM.pdf Scenario 2 2023 Back PMVistro File: C:\...\PM.vistro Koselig on Main TIS V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. D27.40.024WB LeftHCM 7th EditionTwo-way stopZerex/Fraser2 C20.70.017WB LeftHCM 7th EditionTwo-way stopZerex/Eastom1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 2: 2 2023 Back PM Version 2022 (SP 0-2) Generated with 0.017Volume to Capacity (v/c): CLevel Of Service: 20.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 1: Zerex/Eastom Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Eastom AvenueZerex StreetZerex StreetName Intersection Setup 000Pedestrian Volume [ped/h] 7448611773Total Analysis Volume [veh/h] 2112100193Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.75000.75000.92000.92000.91000.9100Peak Hour Factor 5344711703Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.01001.00001.00001.0100Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 5344311696Base Volume Input [veh/h] Eastom AvenueZerex StreetZerex StreetName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 2: 2 2023 Back PM Version 2022 (SP 0-2) Generated with CIntersection LOS 0.13d_I, Intersection Delay [s/veh] BAAApproach LOS 14.640.020.00d_A, Approach Delay [s/veh] 2.212.210.000.090.000.0095th-Percentile Queue Length [ft/ln] 0.090.090.000.000.000.0095th-Percentile Queue Length [veh/ln] BCAAAAMovement LOS 11.1620.730.009.300.000.00d_M, Delay for Movement [s/veh] 0.010.020.000.000.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 2: 2 2023 Back PM Version 2022 (SP 0-2) Generated with 0.024Volume to Capacity (v/c): DLevel Of Service: 27.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 2: Zerex/Fraser Intersection Level Of Service Report NoNoNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Fraser AvenueFraser AvenueZerex StreetZerex StreetName Intersection Setup 0000Pedestrian Volume [ped/h] 1041804115046677419Total Analysis Volume [veh/h] 0015013126211945Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.75000.75000.75000.71000.71000.71000.93000.93000.93000.90000.90000.9000Peak Hour Factor 1031303104696569717Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.01001.00001.00001.01001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1031303104646569017Base Volume Input [veh/h] Fraser AvenueFraser AvenueZerex StreetZerex StreetName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 2: 2 2023 Back PM Version 2022 (SP 0-2) Generated with DIntersection LOS 0.45d_I, Intersection Delay [s/veh] CBAAApproach LOS 24.2312.410.110.20d_A, Approach Delay [s/veh] 2.002.002.003.393.393.390.000.130.250.000.001.3995th-Percentile Queue Length [ft/ln] 0.080.080.080.140.140.140.000.010.010.000.000.0695th-Percentile Queue Length [veh/ln] BDDBDCAAAAAAMovement LOS 11.4130.0027.4410.1829.7422.470.000.009.330.000.008.50d_M, Delay for Movement [s/veh] 0.000.000.020.020.000.020.000.010.010.000.010.02V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 2: 2 2023 Back PM Version 2022 (SP 0-2) Generated with Intersection Analysis Summary 3/2/2022Report File: C:\...\2023 Total AM.pdf Scenario 3 2023 Total AMVistro File: C:\...\AM.vistro Koselig on Main TIS V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. A8.60.002EB LeftHCM 7th EditionTwo-way stopDoc Susie/Alley4 A8.60.002EB LeftHCM 7th EditionTwo-way stopDoc Susie/Site Access3 C18.70.022EB LeftHCM 7th EditionTwo-way stopZerex/Fraser2 B14.60.028WB LeftHCM 7th EditionTwo-way stopZerex/Eastom1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 3: 3 2023 Total AM Version 2022 (SP 0-2) Generated with 0.028Volume to Capacity (v/c): BLevel Of Service: 14.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 1: Zerex/Eastom Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Eastom AvenueZerex StreetZerex StreetName Intersection Setup 000Pedestrian Volume [ped/h] 171163615352Total Analysis Volume [veh/h] 431590188Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.35000.35000.90000.90000.79000.7900Peak Hour Factor 6457214278Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 300100Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.01001.00001.00001.0100Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3456604275Base Volume Input [veh/h] Eastom AvenueZerex StreetZerex StreetName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 3: 3 2023 Total AM Version 2022 (SP 0-2) Generated with BIntersection LOS 0.33d_I, Intersection Delay [s/veh] BAAApproach LOS 11.590.010.00d_A, Approach Delay [s/veh] 3.843.840.000.060.000.0095th-Percentile Queue Length [ft/ln] 0.150.150.000.000.000.0095th-Percentile Queue Length [veh/ln] ABAAAAMovement LOS 9.6414.610.008.010.000.00d_M, Delay for Movement [s/veh] 0.020.030.010.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 3: 3 2023 Total AM Version 2022 (SP 0-2) Generated with 0.022Volume to Capacity (v/c): CLevel Of Service: 18.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 2: Zerex/Fraser Intersection Level Of Service Report NoNoNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Fraser AvenueFraser AvenueZerex StreetZerex StreetName Intersection Setup 0000Pedestrian Volume [ped/h] 2086065629263491Total Analysis Volume [veh/h] 102202115712870Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.50000.50000.50000.33000.33000.33000.94000.94000.94000.77000.77000.7700Peak Hour Factor 1042025591252691Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 003000000100Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.01001.00001.00001.01001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1012025585242661Base Volume Input [veh/h] Fraser AvenueFraser AvenueZerex StreetZerex StreetName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 3: 3 2023 Total AM Version 2022 (SP 0-2) Generated with CIntersection LOS 0.34d_I, Intersection Delay [s/veh] BBAAApproach LOS 14.6614.640.030.02d_A, Approach Delay [s/veh] 2.012.012.012.412.412.410.000.040.080.000.000.0895th-Percentile Queue Length [ft/ln] 0.080.080.080.100.100.100.000.000.000.000.000.0095th-Percentile Queue Length [veh/ln] ACCBCCAAAAAAMovement LOS 9.5620.0315.9310.6020.0918.680.000.008.000.000.008.81d_M, Delay for Movement [s/veh] 0.000.000.020.010.000.020.000.010.000.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 3: 3 2023 Total AM Version 2022 (SP 0-2) Generated with 0.002Volume to Capacity (v/c): ALevel Of Service: 8.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 3: Doc Susie/Site Access Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Site AccessDoc Susie AvenueDoc Susie AvenueName Intersection Setup 000Pedestrian Volume [ped/h] 221571Total Analysis Volume [veh/h] 110120Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.85000.85000.85000.85000.85000.8500Peak Hour Factor 221461Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 221201Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 000260Base Volume Input [veh/h] Site AccessDoc Susie AvenueDoc Susie AvenueName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 3: 3 2023 Total AM Version 2022 (SP 0-2) Generated with AIntersection LOS 2.29d_I, Intersection Delay [s/veh] AAAApproach LOS 8.480.000.90d_A, Approach Delay [s/veh] 0.290.290.000.000.040.0495th-Percentile Queue Length [ft/ln] 0.010.010.000.000.000.0095th-Percentile Queue Length [veh/ln] AAAAAAMovement LOS 8.358.600.000.000.007.23d_M, Delay for Movement [s/veh] 0.000.000.000.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 3: 3 2023 Total AM Version 2022 (SP 0-2) Generated with 0.002Volume to Capacity (v/c): ALevel Of Service: 8.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 4: Doc Susie/Alley Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach AlleyDoc Susie AvenueDoc Susie AvenueName Intersection Setup 000Pedestrian Volume [ped/h] 220690Total Analysis Volume [veh/h] 110120Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.85000.85000.85000.85000.85000.8500Peak Hour Factor 220580Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 220120Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 000460Base Volume Input [veh/h] AlleyDoc Susie AvenueDoc Susie AvenueName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 3: 3 2023 Total AM Version 2022 (SP 0-2) Generated with AIntersection LOS 1.78d_I, Intersection Delay [s/veh] AAAApproach LOS 8.480.000.00d_A, Approach Delay [s/veh] 0.290.290.000.000.000.0095th-Percentile Queue Length [ft/ln] 0.010.010.000.000.000.0095th-Percentile Queue Length [veh/ln] AAAAAAMovement LOS 8.368.600.000.000.007.23d_M, Delay for Movement [s/veh] 0.000.000.000.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 3: 3 2023 Total AM Version 2022 (SP 0-2) Generated with Intersection Analysis Summary 3/2/2022Report File: C:\...\2023 Total PM.pdf Scenario 3 2023 Total PMVistro File: C:\...\PM.vistro Koselig on Main TIS V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. A8.60.001EB LeftHCM 7th EditionTwo-way stopDoc Susie/Alley4 A8.60.001EB LeftHCM 7th EditionTwo-way stopDoc Susie/Site Access3 D27.60.031WB LeftHCM 7th EditionTwo-way stopZerex/Fraser2 C20.90.017WB LeftHCM 7th EditionTwo-way stopZerex/Eastom1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 3: 3 2023 Total PM Version 2022 (SP 0-2) Generated with 0.017Volume to Capacity (v/c): CLevel Of Service: 20.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 1: Zerex/Eastom Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Eastom AvenueZerex StreetZerex StreetName Intersection Setup 000Pedestrian Volume [ped/h] 9448641773Total Analysis Volume [veh/h] 2112110193Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.75000.75000.92000.92000.91000.9100Peak Hour Factor 7344741703Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 200300Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.01001.00001.00001.0100Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 5344311696Base Volume Input [veh/h] Eastom AvenueZerex StreetZerex StreetName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 3: 3 2023 Total PM Version 2022 (SP 0-2) Generated with CIntersection LOS 0.17d_I, Intersection Delay [s/veh] BAAApproach LOS 14.190.080.00d_A, Approach Delay [s/veh] 2.482.480.000.360.000.0095th-Percentile Queue Length [ft/ln] 0.100.100.000.010.000.0095th-Percentile Queue Length [veh/ln] BCAAAAMovement LOS 11.1820.940.009.320.000.00d_M, Delay for Movement [s/veh] 0.010.020.000.000.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 3: 3 2023 Total PM Version 2022 (SP 0-2) Generated with 0.031Volume to Capacity (v/c): DLevel Of Service: 27.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 2: Zerex/Fraser Intersection Level Of Service Report NoNoNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Fraser AvenueFraser AvenueZerex StreetZerex StreetName Intersection Setup 0000Pedestrian Volume [ped/h] 1051804115046977419Total Analysis Volume [veh/h] 0015013126221945Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.75000.75000.75000.71000.71000.71000.93000.93000.93000.90000.90000.9000Peak Hour Factor 1041303104696869717Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 001000000300Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.01001.00001.00001.01001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1031303104646569017Base Volume Input [veh/h] Fraser AvenueFraser AvenueZerex StreetZerex StreetName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 3: 3 2023 Total PM Version 2022 (SP 0-2) Generated with DIntersection LOS 0.47d_I, Intersection Delay [s/veh] CBAAApproach LOS 24.9612.410.110.20d_A, Approach Delay [s/veh] 2.482.482.483.393.393.390.000.130.250.000.001.3995th-Percentile Queue Length [ft/ln] 0.100.100.100.140.140.140.000.010.010.000.000.0695th-Percentile Queue Length [veh/ln] BDDBDCAAAAAAMovement LOS 11.5730.1927.6310.1829.8422.470.000.009.340.000.008.50d_M, Delay for Movement [s/veh] 0.000.000.030.020.000.020.000.010.010.000.010.02V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 3: 3 2023 Total PM Version 2022 (SP 0-2) Generated with 0.001Volume to Capacity (v/c): ALevel Of Service: 8.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 3: Doc Susie/Site Access Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Site AccessDoc Susie AvenueDoc Susie AvenueName Intersection Setup 000Pedestrian Volume [ped/h] 114474Total Analysis Volume [veh/h] 001121Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.85000.85000.85000.85000.85000.8500Peak Hour Factor 113363Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 113103Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 000260Base Volume Input [veh/h] Site AccessDoc Susie AvenueDoc Susie AvenueName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 3: 3 2023 Total PM Version 2022 (SP 0-2) Generated with AIntersection LOS 2.19d_I, Intersection Delay [s/veh] AAAApproach LOS 8.490.002.63d_A, Approach Delay [s/veh] 0.150.150.000.000.170.1795th-Percentile Queue Length [ft/ln] 0.010.010.000.000.010.0195th-Percentile Queue Length [veh/ln] AAAAAAMovement LOS 8.358.630.000.000.007.24d_M, Delay for Movement [s/veh] 0.000.000.000.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 3: 3 2023 Total PM Version 2022 (SP 0-2) Generated with 0.001Volume to Capacity (v/c): ALevel Of Service: 8.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 4: Doc Susie/Alley Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach AlleyDoc Susie AvenueDoc Susie AvenueName Intersection Setup 000Pedestrian Volume [ped/h] 110880Total Analysis Volume [veh/h] 000220Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.85000.85000.85000.85000.85000.8500Peak Hour Factor 110770Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 110310Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 000460Base Volume Input [veh/h] AlleyDoc Susie AvenueDoc Susie AvenueName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 3: 3 2023 Total PM Version 2022 (SP 0-2) Generated with AIntersection LOS 0.94d_I, Intersection Delay [s/veh] AAAApproach LOS 8.480.000.00d_A, Approach Delay [s/veh] 0.140.140.000.000.000.0095th-Percentile Queue Length [ft/ln] 0.010.010.000.000.000.0095th-Percentile Queue Length [veh/ln] AAAAAAMovement LOS 8.368.600.000.000.007.23d_M, Delay for Movement [s/veh] 0.000.000.000.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 3: 3 2023 Total PM Version 2022 (SP 0-2) Generated with Year 2042 Traffic Volume Scenarios Intersection Analysis Summary 3/2/2022Report File: C:\...\2042 Back AM.pdf Scenario 4 2042 Back AMVistro File: C:\...\AM.vistro Koselig on Main TIS V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. C22.20.028EB LeftHCM 7th EditionTwo-way stopZerex/Fraser2 C16.30.033WB LeftHCM 7th EditionTwo-way stopZerex/Eastom1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 4: 4 2042 Back AM Version 2022 (SP 0-2) Generated with 0.033Volume to Capacity (v/c): CLevel Of Service: 16.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 1: Zerex/Eastom Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Eastom AvenueZerex StreetZerex StreetName Intersection Setup 000Pedestrian Volume [ped/h] 91174205411Total Analysis Volume [veh/h] 2318601103Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.35000.35000.90000.90000.79000.7900Peak Hour Factor 3466804325Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.18001.00001.00001.1800Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3456604275Base Volume Input [veh/h] Eastom AvenueZerex StreetZerex StreetName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 4: 4 2042 Back AM Version 2022 (SP 0-2) Generated with CIntersection LOS 0.23d_I, Intersection Delay [s/veh] BAAApproach LOS 13.410.000.00d_A, Approach Delay [s/veh] 3.493.490.000.000.000.0095th-Percentile Queue Length [ft/ln] 0.140.140.000.000.000.0095th-Percentile Queue Length [veh/ln] ACAAAAMovement LOS 9.8916.290.008.160.000.00d_M, Delay for Movement [s/veh] 0.010.030.010.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 4: 4 2042 Back AM Version 2022 (SP 0-2) Generated with 0.028Volume to Capacity (v/c): CLevel Of Service: 22.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 2: Zerex/Fraser Intersection Level Of Service Report NoNoNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Fraser AvenueFraser AvenueZerex StreetZerex StreetName Intersection Setup 0000Pedestrian Volume [ped/h] 2026065734254081Total Analysis Volume [veh/h] 1012021184111020Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.50000.50000.50000.33000.33000.33000.94000.94000.94000.77000.77000.7700Peak Hour Factor 1012025690243141Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.18001.00001.00001.18001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1012025585242661Base Volume Input [veh/h] Fraser AvenueFraser AvenueZerex StreetZerex StreetName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 4: 4 2042 Back AM Version 2022 (SP 0-2) Generated with CIntersection LOS 0.24d_I, Intersection Delay [s/veh] BCAAApproach LOS 13.7616.690.020.02d_A, Approach Delay [s/veh] 0.730.730.732.912.912.910.000.040.080.000.000.0995th-Percentile Queue Length [ft/ln] 0.030.030.030.120.120.120.000.000.000.000.000.0095th-Percentile Queue Length [veh/ln] ACCBCCAAAAAAMovement LOS 9.5923.5717.9411.1723.9322.210.000.008.150.000.009.18d_M, Delay for Movement [s/veh] 0.000.000.010.010.000.030.000.010.000.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 4: 4 2042 Back AM Version 2022 (SP 0-2) Generated with Intersection Analysis Summary 3/2/2022Report File: C:\...\2042 Back PM.pdf Scenario 4 2042 Back PMVistro File: C:\...\PM.vistro Koselig on Main TIS V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. E35.40.033WB LeftHCM 7th EditionTwo-way stopZerex/Fraser2 D25.30.022WB LeftHCM 7th EditionTwo-way stopZerex/Eastom1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 4: 4 2042 Back PM Version 2022 (SP 0-2) Generated with 0.022Volume to Capacity (v/c): DLevel Of Service: 25.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 1: Zerex/Eastom Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Eastom AvenueZerex StreetZerex StreetName Intersection Setup 000Pedestrian Volume [ped/h] 7456811902Total Analysis Volume [veh/h] 2114200226Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.75000.75000.92000.92000.91000.9100Peak Hour Factor 5352311821Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.18001.00001.00001.1800Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 5344311696Base Volume Input [veh/h] Eastom AvenueZerex StreetZerex StreetName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 4: 4 2042 Back PM Version 2022 (SP 0-2) Generated with DIntersection LOS 0.13d_I, Intersection Delay [s/veh] CAAApproach LOS 16.790.020.00d_A, Approach Delay [s/veh] 2.692.690.000.100.000.0095th-Percentile Queue Length [ft/ln] 0.110.110.000.000.000.0095th-Percentile Queue Length [veh/ln] BDAAAAMovement LOS 11.8925.350.009.820.000.00d_M, Delay for Movement [s/veh] 0.010.020.010.000.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 4: 4 2042 Back PM Version 2022 (SP 0-2) Generated with 0.033Volume to Capacity (v/c): ELevel Of Service: 35.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 2: Zerex/Fraser Intersection Level Of Service Report NoNoNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Fraser AvenueFraser AvenueZerex StreetZerex StreetName Intersection Setup 0000Pedestrian Volume [ped/h] 1041804115896690419Total Analysis Volume [veh/h] 0015013147212265Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.75000.75000.75000.71000.71000.71000.93000.93000.93000.90000.90000.9000Peak Hour Factor 1031303105486581417Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.18001.00001.00001.18001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1031303104646569017Base Volume Input [veh/h] Fraser AvenueFraser AvenueZerex StreetZerex StreetName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 4: 4 2042 Back PM Version 2022 (SP 0-2) Generated with EIntersection LOS 0.44d_I, Intersection Delay [s/veh] DBAAApproach LOS 30.8113.700.100.18d_A, Approach Delay [s/veh] 2.672.672.673.973.973.970.000.130.250.000.001.4995th-Percentile Queue Length [ft/ln] 0.110.110.110.160.160.160.000.010.010.000.000.0695th-Percentile Queue Length [veh/ln] BEEBEDAAAAAAMovement LOS 12.4139.1035.4110.6138.5327.590.000.009.840.000.008.77d_M, Delay for Movement [s/veh] 0.000.000.030.030.000.020.000.010.010.000.010.02V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 4: 4 2042 Back PM Version 2022 (SP 0-2) Generated with Intersection Analysis Summary 3/2/2022Report File: C:\...\2042 Toal PM.pdf Scenario 5 2042 Total PMVistro File: C:\...\PM.vistro Koselig on Main TIS V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. A8.60.001EB LeftHCM 7th EditionTwo-way stopDoc Susie/Alley4 A8.60.001EB LeftHCM 7th EditionTwo-way stopDoc Susie/Site Access3 E35.80.041WB LeftHCM 7th EditionTwo-way stopZerex/Fraser2 D25.60.022WB LeftHCM 7th EditionTwo-way stopZerex/Eastom1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 5: 5 2042 Total PM Version 2022 (SP 0-2) Generated with 0.022Volume to Capacity (v/c): DLevel Of Service: 25.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 1: Zerex/Eastom Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Eastom AvenueZerex StreetZerex StreetName Intersection Setup 000Pedestrian Volume [ped/h] 9456841902Total Analysis Volume [veh/h] 2114210226Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.75000.75000.92000.92000.91000.9100Peak Hour Factor 7352341821Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 200300Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.18001.00001.00001.1800Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 5344311696Base Volume Input [veh/h] Eastom AvenueZerex StreetZerex StreetName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 5: 5 2042 Total PM Version 2022 (SP 0-2) Generated with DIntersection LOS 0.17d_I, Intersection Delay [s/veh] CAAApproach LOS 16.130.070.00d_A, Approach Delay [s/veh] 3.013.010.000.400.000.0095th-Percentile Queue Length [ft/ln] 0.120.120.000.020.000.0095th-Percentile Queue Length [veh/ln] BDAAAAMovement LOS 11.9125.630.009.830.000.00d_M, Delay for Movement [s/veh] 0.020.020.010.010.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 5: 5 2042 Total PM Version 2022 (SP 0-2) Generated with 0.041Volume to Capacity (v/c): ELevel Of Service: 35.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 2: Zerex/Fraser Intersection Level Of Service Report NoNoNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Fraser AvenueFraser AvenueZerex StreetZerex StreetName Intersection Setup 0000Pedestrian Volume [ped/h] 1051804115896990419Total Analysis Volume [veh/h] 0015013147222265Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.75000.75000.75000.71000.71000.71000.93000.93000.93000.90000.90000.9000Peak Hour Factor 1041303105486881417Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 001000000300Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.18001.00001.00001.18001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1031303104646569017Base Volume Input [veh/h] Fraser AvenueFraser AvenueZerex StreetZerex StreetName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 5: 5 2042 Total PM Version 2022 (SP 0-2) Generated with EIntersection LOS 0.46d_I, Intersection Delay [s/veh] DBAAApproach LOS 31.9113.700.100.18d_A, Approach Delay [s/veh] 3.343.343.343.973.973.970.000.130.250.000.001.4995th-Percentile Queue Length [ft/ln] 0.130.130.130.160.160.160.000.010.010.000.000.0695th-Percentile Queue Length [veh/ln] BEEBEDAAAAAAMovement LOS 12.6839.4435.7510.6138.6827.590.000.009.860.000.008.77d_M, Delay for Movement [s/veh] 0.000.000.040.030.000.020.000.010.010.000.010.02V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 5: 5 2042 Total PM Version 2022 (SP 0-2) Generated with 0.001Volume to Capacity (v/c): ALevel Of Service: 8.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 3: Doc Susie/Site Access Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Site AccessDoc Susie AvenueDoc Susie AvenueName Intersection Setup 000Pedestrian Volume [ped/h] 114474Total Analysis Volume [veh/h] 001121Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.85000.85000.85000.85000.85000.8500Peak Hour Factor 113363Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 113103Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 000260Base Volume Input [veh/h] Site AccessDoc Susie AvenueDoc Susie AvenueName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 5: 5 2042 Total PM Version 2022 (SP 0-2) Generated with AIntersection LOS 2.19d_I, Intersection Delay [s/veh] AAAApproach LOS 8.490.002.63d_A, Approach Delay [s/veh] 0.150.150.000.000.170.1795th-Percentile Queue Length [ft/ln] 0.010.010.000.000.010.0195th-Percentile Queue Length [veh/ln] AAAAAAMovement LOS 8.358.630.000.000.007.24d_M, Delay for Movement [s/veh] 0.000.000.000.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 5: 5 2042 Total PM Version 2022 (SP 0-2) Generated with 0.001Volume to Capacity (v/c): ALevel Of Service: 8.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 4: Doc Susie/Alley Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach AlleyDoc Susie AvenueDoc Susie AvenueName Intersection Setup 000Pedestrian Volume [ped/h] 110880Total Analysis Volume [veh/h] 000220Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.85000.85000.85000.85000.85000.8500Peak Hour Factor 110770Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 110310Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 000460Base Volume Input [veh/h] AlleyDoc Susie AvenueDoc Susie AvenueName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 5: 5 2042 Total PM Version 2022 (SP 0-2) Generated with AIntersection LOS 0.94d_I, Intersection Delay [s/veh] AAAApproach LOS 8.480.000.00d_A, Approach Delay [s/veh] 0.140.140.000.000.000.0095th-Percentile Queue Length [ft/ln] 0.010.010.000.000.000.0095th-Percentile Queue Length [veh/ln] AAAAAAMovement LOS 8.368.600.000.000.007.23d_M, Delay for Movement [s/veh] 0.000.000.000.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 5: 5 2042 Total PM Version 2022 (SP 0-2) Generated with Intersection Analysis Summary 3/2/2022Report File: C:\...\2042 Total AM.pdf Scenario 5 2042 Total AMVistro File: C:\...\AM.vistro Koselig on Main TIS V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. A8.60.002EB LeftHCM 7th EditionTwo-way stopDoc Susie/Alley4 A8.60.002EB LeftHCM 7th EditionTwo-way stopDoc Susie/Site Access3 C22.20.028EB LeftHCM 7th EditionTwo-way stopZerex/Fraser2 C16.40.033WB LeftHCM 7th EditionTwo-way stopZerex/Eastom1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 5: 5 2042 Total AM Version 2022 (SP 0-2) Generated with 0.033Volume to Capacity (v/c): CLevel Of Service: 16.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 1: Zerex/Eastom Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000100No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Eastom AvenueZerex StreetZerex StreetName Intersection Setup 000Pedestrian Volume [ped/h] 171174215411Total Analysis Volume [veh/h] 4318601103Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.35000.35000.90000.90000.79000.7900Peak Hour Factor 6466814325Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 300100Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.18001.00001.00001.1800Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3456604275Base Volume Input [veh/h] Eastom AvenueZerex StreetZerex StreetName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 5: 5 2042 Total AM Version 2022 (SP 0-2) Generated with CIntersection LOS 0.30d_I, Intersection Delay [s/veh] BAAApproach LOS 12.450.010.00d_A, Approach Delay [s/veh] 4.334.330.000.070.000.0095th-Percentile Queue Length [ft/ln] 0.170.170.000.000.000.0095th-Percentile Queue Length [veh/ln] ACAAAAMovement LOS 9.9216.360.008.160.000.00d_M, Delay for Movement [s/veh] 0.020.030.010.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 5: 5 2042 Total AM Version 2022 (SP 0-2) Generated with 0.028Volume to Capacity (v/c): CLevel Of Service: 22.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 2: Zerex/Fraser Intersection Level Of Service Report NoNoNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 0.000.000.000.000.000.000.000.000.000.000.000.00Exit Pocket Length [ft] 000000000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000000001No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Fraser AvenueFraser AvenueZerex StreetZerex StreetName Intersection Setup 0000Pedestrian Volume [ped/h] 2086065734264081Total Analysis Volume [veh/h] 1022021184121020Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.50000.50000.50000.33000.33000.33000.94000.94000.94000.77000.77000.7700Peak Hour Factor 1042025690253141Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 003000000100Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.18001.00001.00001.18001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1012025585242661Base Volume Input [veh/h] Fraser AvenueFraser AvenueZerex StreetZerex StreetName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 5: 5 2042 Total AM Version 2022 (SP 0-2) Generated with CIntersection LOS 0.33d_I, Intersection Delay [s/veh] CCAAApproach LOS 16.5516.690.020.02d_A, Approach Delay [s/veh] 2.402.402.402.912.912.910.000.040.080.000.000.0995th-Percentile Queue Length [ft/ln] 0.100.100.100.120.120.120.000.000.000.000.000.0095th-Percentile Queue Length [veh/ln] ACCBCCAAAAAAMovement LOS 9.8623.8618.2211.1723.9522.210.000.008.160.000.009.18d_M, Delay for Movement [s/veh] 0.000.000.030.010.000.030.000.010.000.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 0000Number of Storage Spaces in Median NoNoTwo-Stage Gap Acceptance 0000Storage Area [veh] NoNoFlared Lane StopStopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 5: 5 2042 Total AM Version 2022 (SP 0-2) Generated with 0.002Volume to Capacity (v/c): ALevel Of Service: 8.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 3: Doc Susie/Site Access Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Site AccessDoc Susie AvenueDoc Susie AvenueName Intersection Setup 000Pedestrian Volume [ped/h] 221571Total Analysis Volume [veh/h] 110120Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.85000.85000.85000.85000.85000.8500Peak Hour Factor 221461Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 221201Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 000260Base Volume Input [veh/h] Site AccessDoc Susie AvenueDoc Susie AvenueName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 5: 5 2042 Total AM Version 2022 (SP 0-2) Generated with AIntersection LOS 2.29d_I, Intersection Delay [s/veh] AAAApproach LOS 8.480.000.90d_A, Approach Delay [s/veh] 0.290.290.000.000.040.0495th-Percentile Queue Length [ft/ln] 0.010.010.000.000.000.0095th-Percentile Queue Length [veh/ln] AAAAAAMovement LOS 8.358.600.000.000.007.23d_M, Delay for Movement [s/veh] 0.000.000.000.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 5: 5 2042 Total AM Version 2022 (SP 0-2) Generated with 0.002Volume to Capacity (v/c): ALevel Of Service: 8.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 7th EditionAnalysis Method: Two-way stopControl Type: Intersection 4: Doc Susie/Alley Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 0.000.000.000.000.000.00Exit Pocket Length [ft] 000000No. of Lanes in Exit Pocket 100.00100.00100.00100.00100.00100.00Entry Pocket Length [ft] 000000No. of Lanes in Entry Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach AlleyDoc Susie AvenueDoc Susie AvenueName Intersection Setup 000Pedestrian Volume [ped/h] 220690Total Analysis Volume [veh/h] 110120Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 0.85000.85000.85000.85000.85000.8500Peak Hour Factor 220580Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 220120Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 000460Base Volume Input [veh/h] AlleyDoc Susie AvenueDoc Susie AvenueName Volumes Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 5: 5 2042 Total AM Version 2022 (SP 0-2) Generated with AIntersection LOS 1.78d_I, Intersection Delay [s/veh] AAAApproach LOS 8.480.000.00d_A, Approach Delay [s/veh] 0.290.290.000.000.000.0095th-Percentile Queue Length [ft/ln] 0.010.010.000.000.000.0095th-Percentile Queue Length [veh/ln] AAAAAAMovement LOS 8.368.600.000.000.007.23d_M, Delay for Movement [s/veh] 0.000.000.000.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Sustainable Traffic Solutions, Inc. Joseph L. Henderson, PE, PTOE3/2/2022 Fraser, CO Koselig on Main TISScenario 5: 5 2042 Total AM Version 2022 (SP 0-2) Generated with