HomeMy Public PortalAbout12-0039 Sanks1111 6.1
mma
Emma-
INTERNATIONAL
CODE COUNCIL
MEMBER
e:/�\
/ ��kIO�
City of Tybee Island • Planning & Zoning Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.472.5032 • Fax 912.786.9539
Permit No. 12 - 0 b» Date Requested -7/Z5 /1...
Owner's Name - '��ALJt�.. Date Needed
Gen. Contractor Subcontractor; i i i,
Contact Information
Project Address Wits 'jr:�
Scope of Work
Inspector `e%/9 Date of Inspection
Inspection I /3 4 (- Pass El Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
P
DATE ISSUED: 01 -23 -2012
WORK DESCRIPTION
WORK LOCATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
R &R ROOF WIND RATED
1108 JONES AVE
OWNER NAME BETTY C. SANKS
ADDRESS PO BOX 1661
CITY, ST, ZIP RICHMOND HILL GA 31324 -1661
PHONE NUMBER
CONTRACTOR NAME EXTERIOR HOME IMPROVEMENT
ADDRESS 604 SUNCREST BLVD
CITY STATE ZIP SAVANNAH GA 31410
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 73.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $2,500.00
PERMIT #: 120039
TOTAL BALANCE DUE: $ 73.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
/1,4111W_
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
Location:
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
100 tie2a
NAME
ADDRESS
PIN #
Owner
Eel1/2`1 Szv\ s
H 09 'Sd h-e.S
Architect
or Engineer
iN
Building
Contractor
(� \
C �' �� z1 d --G
6 C� 0�,ckies+$� 1 ��
•
c'j tz RG� '5- !
j( v4c1v
(Check all that apply)
❑ Repair
❑ Renovation
❑ Minor Addition
❑ Substantial Addition
❑ Other
Details of Project:
i.vt .. ,,e r \A m. \
❑ Residential
❑ Single Family
❑ Duplex
❑ Multi- Family
❑ Commercial
R e Y-\co ,
PS
❑ Footprint Changes
❑ Discovery
❑ Demolition
P
Estimated Cost of Construction: $
Construction Type (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units
Lot Area
# Off - street parking spaces
Trees located & listed on site plan
Access:
# Bedrooms # Bathrooms
Living space (total sq. ft.)
Driveway (ft.) With culvert? With swale?
Setbacks: Front Rear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provided by
Construction debris will be disposed by
by means of
4% \r-E v. -off
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: r -L Signature of Applicant: _AS„cAt
Note: Apermit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning/variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
NFIP Flood Zone
Existing
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm/Drainage
Inspections
City Manager
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL
Permit Acknowledgement of
Asbestos /Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
proj ect.
Undersigned
Printed Name
Date
Office Use Only:
Project Address:
Permit Number:
REQUIRED FOR: Building Permits
Relocation Permits
Sign Permits
Demolition Permits
Land Clearing, Disturbance or Excavation Permits
Tree Removal Permits
Relocation Permits
Special Review Permits
Site Plan Approval
Subdivision of Land
Sketch Plan Approval
Preliminary Plan Approval
Final Plat Approval
Minor Subdivision Plat Approval
Major Subdivision Plat Approval
In addition to specific requirements for the above permits and approvals, applicants must
demonstrate that they are in compliance with the City of Tybee Island Storm Water Management
requirements as outlined in Chapter 5 -4, Code of Ordinances.
Section 5 -4 -9 Prohibition provides, in part, as follows:
(4.) It is unlawful for any person to cause or permit any storm water to flow from their
property onto the property of another person, unless such storm water naturally
flowed thereon prior to any development activity.
(5.) It is unlawful for any person to interrupt the flow of any storm water runoff from
adjacent property onto their property by any development activity.
As part of the City's approval process applicants must illustrate how these storm water
management prohibitions will be met, including a showing of how storm water naturally flowed
on the affected property (prior to any development activity), and what changes in storm water
flow have occurred or are expected to occur, as attachments to this form. The City's approval or
permit does not guarantee that the applicant's plans will result in meeting requirements. The final
product must actually meet the City Ordinance requirements.
Applicant name:`
Project I.D.:
Attachments approved by:
Date:
June 30, 2010
The following deficiencies have reached an unacceptable level on the projects in the City of Tybee
Island. While the deficiencies are not necessarily the fault of the Owner or his agent, they are their
responsibilities. The two areas of deficiencies are in the two most basic and common BMPs on local
projects. They are:
Co — Construction Exit
Shc — Sediment Barrier
Correct installation information can be found not only in the "Green Book" but in the Field Manual for
Erosion and Sediment Control in Georgia, Fourth Edition 2002, 4310 Lexington Road, P.O. Box 8024,
Athens, GA 30603, telephone 706.542.3065, www.gaswcc.org, Georgia Soil and Water Conservation
Commission; http: / /www.gaswcc.org/docs/
field manual_4ed.pdf.
Problems with the Co is not limited to the installation, but to the material. Specifically, the job site
personnel are telling me the stone delivered is the 1.5 " -3.5" stone they requested. I have experienced on
my own projects suppliers not adhering to the specs they are given with the orders. While I regret this
situation, I will no longer be accepting any deviation from the State requirements. The stone will be a
representation of 1.5 " -3.5" stone or larger. Gradations that are obviously smaller will no longer be
tolerated. The smaller stone allows for a smoother surface with smaller voids, thereby reducing the
function of the construction exit.
Similarly, I am finding Type A sediment barriers installed where Type C is required and shown on the
permit drawings. I have attempted to work with the Owners through increased inspections, additional
backup BMPs, etc. This has evidently become common knowledge based on the installations I am
finding. Where two rows are called for they will be installed with a separation that allows for the first one
to fail (fall over) without impacting the second one. The complete assembly and installation must be
compliant; steel or wood posts, post spacing, Type C or A.
There has been no discharge into state waters due to previous occasional deficiencies. However, the
increased frequency has created unnecessary exposure to:
1) Sediment discharge into nearby waters of the State,
2) Increased maintenance efforts by the DPW on downstream lines.
3) Due to #2, higher cost to island taxpayers.
I will be adhering strictly to the manual on all BMPs and not just these two.
Downer Davis
City of Tybee Island Consulting Engineer
AC, 1S kC)
Signature of Owner /Contractor