Loading...
HomeMy Public PortalAbout2016-09 Approving a change to the contract with Williams Paving Co. IncRESOLUTION NO. 2016-9 A CAPITAL PROJECT AUTHORIZING RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF KEY BISCAYNE, FLORIDA, APPROVING A CHANGE TO THE CONTRACT FOR CONSTRUCTION BETWEEN THE VILLAGE AND WILLIAMS PAVING CO., INC. FOR FOUR ADDITIONAL SPEED TABLES ON NORTH/SOUTH MASHTA DRIVE; AUTHORIZING THE VILLAGE MANAGER TO EXECUTE AN AMENDMENT TO CONTRACT OR CHANGE ORDER FOR SUCH WORK; PROVIDING FOR IMPLEMENTATION; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on January 12, 2016, the Village of Key Biscayne (the "Village") awarded a contract to Williams Paving Company Co., Inc. ("Contract") to construct speed tables within the 700 block of Woodcrest Road and at the intersection of W. Heather Drive and Femwood Road (the "Project"); and WHEREAS, the Village Council desires to authorize additional work pursuant to the Contract for the construction of two (2) speed tables on North Mashta Drive and two (2) speed tables on South Mashta Drive, at an additional cost of $81,525.12; and WHEREAS, the Village Council desires to approve the additional speed tables and authorize the Village Manager to execute an Amendment to the Contract or Change Order for such additional work; and WHEREAS, the Village Council finds that this Resolution is in the best interest and welfare of the residents of the Village. NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE VILLAGE OF KEY BISCAYNE, FLORIDA, AS FOLLOWS: Section 1. Recitals Adopted. Each of the above stated recitals are hereby adopted, confirmed and incorporated herein. Section 2. Additional Work Approved; Amendment or Change Order Authorized. The Village Council hereby approves the additional work or speed tables in the amount of $81,525.12, with the total cost for the Project not to exceed $261,851.98. The Village Manager is hereby authorized to execute an Amendment to the Contract or Change Order for such additional work and increase in the Contract price, and related or necessary documentation on behalf of the Village, once approved as to final form, content and legal sufficiency by the Village Attorney. Section 3. Implementation. That the Village Manager is hereby authorized to take any and all action necessary to implement the Project and the purposes of this Resolution. Section 4. Effective Date. This Resolution shall be effective immediately upon adoption. PASSED AND ADOPTED this 8th day of March , 2016. ATTEST: CONCHITA H. ALVAREZ, MMC, VILLAGE CLERK APPROVED AS TO FORM AND LEGAL SUFFICIENCY VILLAGE A G TTO Y E 44A MAI' 1KAYRA PEIVA LINDS11Y 2 IC"e Stantec February 17, 2016 File: 215612626 Attention: John C. Gilbert, Village Manager Village of Key Biscayne 88 West McIntyre Street Key Biscayne, Florida 33149 Dear Mr. Gilbert, Reference: Traffic Calming at Fernwood/Heather Intersection North/South Mashta 8 Woodcrest Speed Tables Stantec Project No. 215612626 As requested by the Village, we have reviewed the number of speed tables to be installed on North and South Mashta Drives. We have determined that two (2) speed tables on each street will be most effective and we have placed them to evenly divide the street into thirds. The total distance from West Mashta to Mashta Place is 1,800'; therefore the speed tables have been spaced at approximately 600'. The final placement is dependent on existing conditions such as driveways. The bid previously awarded to Williams Paving Co. Inc., included a unit price of $20,381.28 for each Mashta speed table. The total cost to install all four (4) speed tables is therefore $81,525.12. All contract terms shall match those of the previously awarded contract. Based on our findings, it is our opinion that this Contractor is qualified and capable of performing the work. Therefore, we recommend that the project be awarded to the lowest responsible responsive bidder, Williams Paving Co., Inc. The award is subject to acceptance by the Village Council, execution of the Contract Agreement, submittal by the Contractor of the required Performance and Payment Bonds, and Certificates of Insurance. Sincerely, Stantec Consulting Services Inc. Sean Compel, PE, LEED AP Associate Phone: 305-445-2900 Fax; 305-445-3366 sean.compel@stantec.com Design with community in mind 16 a: Rl? cr 25 ]15 NORTH MASHTA DRIVE AND SOUTH MASHTA DRIVE SPEED TABLES PROPOSEDD LOCATIONS. I ]O1 nag 655 „,,r________________,____. _,,,,,, 720 /10 700 L60 721 711 701 720 i t 716 1 650 631 621 6m 611- 1, 591 571 /.� 56I. N MASHTA DR. "5' 13 aMam a '_man - -arm MUa BOW amaa - seem awe .uam 6,10 651 6,11 Ic MUMS ZiaMlaa .9922221 700 610 '63' 660 650 670 610 600 90 560 550 590 621 fill .1 591 5 MASHTA DR ! moral ..aw _ _Mom. _lakal _ 9FaFW =ale— 1Y�oa _ JITem” =ago b90 VALCA0TAir r AP 610 600 594 PROP. SPEED rABLEJ 1 4SPEED TABLES @ p%381.28. $81,525.12 ® stantec V.,. Of KEY MCKIM AIME WIDE TRAFFIC CALMING bymwaxwe.. Rea MASHTA ISLAND - SPEED HUMP Mafia Mt= SEE PLANS maw gm, w® CO7 9 9