Change Order No.: 017
INDIANA
Department of Transportation Page: 1
Construction Change Order and Time Extension Summary
Contract Information
Contract No.: R -32799 Letting Date:08/07/2013
District:GREENFIELD DISTRICT
AE:Anthony, Oliver R. PE/S:Randle, Scott Status: Draft
Change Order Information
Change Order No.: 017 EWA: N or Force Acct: N
Date Generated: 00/00/0000
Date Approved: 00/00/0000
Reason Code: FINAL QUANTITY ADJUSTMENT
Description: Over / Under Runs
Original Contract Amount
$ 2,957,957.00
Current Change Order Amount
$ 115,058.93 Percent: 3.890 %
Total Previous Approved Changes
$ 563,098.56 Percent: 19.037 %
Total Change To -Date
$ 678,157.49 Percent: 22.927 %
Modified Contract Amount
$ 3,636,114.49
Time Extension Information
Date Initiated 00/00/0000 Date Completed 00/00/0000
Original Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0
SP Date 00/00/0000 or SP Days
(SS = Standard Specification, SP = Special Provision)
Time Element Description:
Current Time Extension SS Days 0 SP Days 0 SP Days Value $ 0.00
Previous Time Approved SS Days by AE: DCE: SCE: DDCM:
SS Days SP Days Value $
Revised Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0
SS Date 00/00/0000 or SP Days 0
Contract No. 120-2013
Contract No:R -32799
INDIANA Department of Transportation
Construction Change Order and Time Extension Summary
Review and Approval Information
Required Approval Authority
($ per Change Order)
(Days per Contract)
Verbal Approval Required?
Total Change To-Date>5%?
Scope/Design Recommendation
Required?
Change Order No.: 017
Page: 2
AE: DCE: SCE: * DDCM:
(-LE$250K-)(-LE$750K-)(--LE$2 M--)(--GT$2 M--)
( 50 SS days) ( 100 SS days ) ( 200 SS Days) ( GT 200 SS days)
Y / N If Y, by Date Issued
Y / N If Y , Copy to Program Budget Manager
Y / N If Y, Referred to Project Manager(PM)
Date to PM Date Returned
Approval Authority Concurs with PM? Y / N If Y, Concurrence by Date_
If N,Resolution: Approved Disapproved
Resolved by Date
LPA Signatures Required? Y / N If Y, Date to LPA
FHWA Signatures Required? Y / N If Y, Date to FHWA
" Field Engineer Recommendation (Required for SCE or DDCM Approval)
Field Engineer Date
Comments:
Date Returned
Date Returned
Contract No:R -32799 INDIANA
Date:11/16/2016
Change Order No:017 Department of Transportation
Page: 3
Contract: R -32799
Project: 0800343 - State:0800343
Change Order Nbr: 017
Change Order Description: Over / Under Runs
Reason Code: FINAL QUANTITY ADJUSTMENT
CLN PCN PLN Item Code Unit Unit Price CO Qty Comment
Amount Change
0013 0800343 0013 203-02000 CYS 8.940-8784.210
C Amount:$
-78,530.83
Item Description: EXCAVATION, COMMON
Supplemental Descriptionl:
Supplemental Description2:
0014 0800343 0014 205-06932 LFT 22.100 20.000
C Amount:$
442.00
Item Description: TEMPORARY CHECK DAM, STRAW BALES
Supplemental Descriptionl:
Supplemental Description2:
0015 0800343 0015 205-06933 EACH 95.000 9.000
C Amount:$
855.00
Item Description: TEMPORARY INLET PROTECTION
Supplemental Descriptionl:
Supplemental Description2:
0019 0800343 0019 211-09264 CYS 29.000 2108.000
C Amount:$
61,132.00
Item Description: STRUCTURAL BACKFILL, TYPE 1
Supplemental Descriptionl:
Supplemental Description2:
0020 0800343 0020 303-01180 TON 18.000-384.940
C Amount:$
-6,928.92
Item Description: COMPACTED AGGREGATE, NO. 53
Supplemental Descriptionl:
Supplemental Description2:
0021 0800343 0021 303-07449 TON 18.000-405.440
C Amount:$
-7,297.92
Item Description: COMPACTED AGGREGATE, NO. 73
Supplemental Descriptionl:
Supplemental Description2:
0024 0800343 0024 401-07321 TON 67.000-62.500
C Amount:$
-4,187.50
Item Description: QC/QA-HMA, 2, 64, SURFACE, 9.5 mm
Supplemental Descriptionl:
Supplemental Description2:
0025 0800343 0025 401-07390 TON 58.750 99.780
C Amount:$
5,862.07
Item Description: QC/QA-HMA, 2, 64, INTERMEDIATE, 19.0 mm
Supplemental Descriptionl:
Supplemental Description2:
0026 0800343 0026 401-07423 TON 54.500 173.180
C Amount:$
9,438.31
Item Description: QC/QA-HMA, 2, 64, BASE, 19.0 mm
Supplemental Descriptionl:
Supplemental Description2:
0027 0800343 0027 401-07429 TON 55.500 584.030
C Amount:$
32,413.66
Item Description: QC/QA-HMA, 5, 76, INTERMEDIATE, OG, 19.0 mm
Supplemental Descriptionl:
Contract No:R -32799 INDIANA
Change Order No:017 Department of Transportation
Supplemental Description2:
0039 0800343 0039 605-06140 LFT
11.000 307.000
Item Description: CURB AND GUTTER, CONCRETE
Supplemental Descriptionl: MODIFIED
Supplemental Description2:
0040 0800343 0040 610-07487 TON
82.590 373.140
Item Description: HMA FOR APPROACHES, TYPE B
Supplemental Descriptionl:
Supplemental Description2:
0041 0800343 0041 610-08446 SYS
39.000 53.170
Item Description: PCCP FOR APPROACHES, 6 IN
Supplemental Descriptionl:
Supplemental Description2:
0046 0800343 0046 621-02770 SYS
1.460 8184.600
Item Description: EROSION CONTROL BLANKET
Supplemental Descriptionl:
Supplemental Description2:
0052 0800343 0052 628-09402 MOS
1,550.000 2.500
Item Description: FIELD OFFICE, B
Supplemental Descriptionl:
Supplemental Description2:
0055 0800343 0055 715-05024 LFT
72.000 888.110
Item Description: PIPE, TYPE 2 CIRCULAR 36 IN
Supplemental Descriptionl:
Supplemental Description2:
0056 0800343 0056 715-05032 LFT
29.000 597.000
Item Description: PIPE, TYPE 2 CIRCULAR 15 IN
Supplemental Descriptionl:
Supplemental Description2:
0057 0800343 0057 715-05048 LFT
2.900-665.000
Item Description: PIPE, TYPE 4 CIRCULAR 6 IN
Supplemental Descriptionl:
Supplemental Description2:
0059 0800343 0059 715-05152 LFT
38.000 125.000
Item Description: PIPE, TYPE 2 CIRCULAR 18 IN
Supplemental Descriptionl:
Supplemental Description2:
0060 0800343 0060 715-05154 LFT
62.000-61.000
Item Description: PIPE, TYPE 2 CIRCULAR 24 IN
Supplemental Descriptionl:
Supplemental Description2:
0061 0800343 0061 715-05156 LFT
69.000-853.000
Item Description: PIPE, TYPE 2 CIRCULAR 30 IN
Supplemental Descriptionl:
Supplemental Description2:
Date: 11 /16/2016
Page: 4
C Amount:$ 3,377.00
C Amount:$ 30,817.63
C Amount:$ 2,073.63
C Amount:$ 11,949.51
C Amount:$ 3,875.00
C Amount:$ 63,943.92
C Amount:$ 17,313.00
C Amount:$-1,928.50
C Amount:$ 4,750.00
C Amount:$-3,782.00
C Amount:$-58,857.00
Contract No:R -32799 INDIANA
Change Order No:017 Department of Transportation
0066 0800343 0066 71852610
CYS
41.220
-227.410 C
Item Description: AGGREGATE FOR UNDERDRAINS
Supplemental Descriptionl:
Supplemental Description2:
0068 0800343 0068 720-01092
EACH
3,600.000
-1.000 C
Item Description: MANHOLE, J15, MODIFIED
Supplemental Descriptionl:
Supplemental Description2:
0072 0800343 0072 720-45045
EACH
1,900.000
3.000 C
Item Description: INLET, J10
Supplemental Descriptionl:
Supplemental Description2:
0073 0800343 0073 720-45069
EACH
2,775.000
-1.000 C
Item Description: INLET, P12
Supplemental Descriptionl:
Supplemental Description2:
0074 0800343 0074 720-45270
EACH
800.000
3.000 C
Item Description: PIPE CATCH BASIN, 18 IN
Supplemental Descriptionl:
Supplemental Description2:
0075 0800343 0075 720-45410
EACH
2,700.000
-6.000 C
Item Description: MANHOLE, C4
Supplemental Descriptionl:
Supplemental Description2:
0076 0800343 0076 720-95422
EACH
3,900.000
12.000 C
Item Description: MANHOLE, J4
Supplemental Descriptionl:
Supplemental Description2:
0077 0800343 0077 720-98174
EACH
2,200.000
-2.000 C
Item Description: INLET, B15
Supplemental Descriptionl:
Supplemental Description2:
0078 0800343 0078 801-03290
EACH
305.000
14.000 C
Item Description: CONSTRUCTION SIGN, C
Supplemental Descriptionl:
Supplemental Description2:
0080 0800343 0080 801-06203
LFT
0.550
6214.000 C
Item Description: TEMPORARY PAVEMENT
MARKING,
4 IN
Supplemental Descriptionl:
Supplemental Description2:
0081 0800343 0081 801-06207
LFT
1.100
-1700.000 C
Item Description: TEMPORARY PAVEMENT
MARKING,
REMOVABLE, 4 IN
Supplemental Descriptionl:
Supplemental Description2:
0084 0800343 0084 801-06640
EACH
264.000
15.000 C
Date: 11 /16/2016
Page: 5
Amount:$-9,373.84
Amount:$
-3,600.00
Amount:$
5,700.00
Amount:$
-2,775.00
Amount:$ 2,400.00
Amount:$-16,200.00
Amount:$ 46,800.00
Amount:$-4,400.00
Amount:$ 4,270.00
Amount:$ 3,417.70
Amount:$-1,870.00
Amount:$ 3,960.00
Contract No:R -32799
Change Order No:017
Item Description: CONSTRUCTION SIGN, A
Supplemental Descriptionl:
Supplemental Description2:
INDIANA
Department of Transportation
Date: 11 /16/2016
Page: 6
Total Value for Change Order 017 = $ 115,058.93
Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended.
General or Standard Change Order Explanation
Item 0013 Common Excavation There was a redesign on the project in 2014 construction season. Due to the redesign the common excavation
quanity decreased which caused the the item to under -run.
General or Standard Change Order Explanation
Pay Item 0019 Structural Backfll, Type 1 Due to redesign of the storm sewer the pipe size changed which caused the structual backfill to
over -run.
General or Standard Change Order Explanation
Pay Item 0020 Compacted Aggregate Number 53 Stone Actual field measurment quanitity is lower than plan quanitity.
General or Standard Change Order Explanation
Pay Item 0021 Compacted Aggregate number 73 stone Item not utilized
General or Standard Change Order Explanation
Pay Item 0025 QC/QA HMA Intermediate 19mm The City of Richmond wanted to re-locat the underdrain to under the curb and gutter which
cauased the asphalt to over -run
General or Standard Change Order Explanation
Pay Item 0026 QC/QA HMA Base 19mm The City of Richmond wanted to re-locat the underdrain to under the curb and gutter which cauased the
asphalt to over -run
General or Standard Change Order Explanation
Pay Item 0027 QC/QA HMA Intermediate Open Grade 19mm The City of Richmond wanted to re -locate the underdrain to under the curb and
gutter which cauased the asphalt to over -run
General or Standard Change Order Explanation
Pay Item 0040 HMA for Appraoches Type B The actual tons used measured in the field is differant than plan quanitity
General or Standard Change Order Explanation
Pay Item 0046 Erosion Control Blanket The plans show erosion control blanket to the construction limits of the project. The City of Richmond
wanted to have seed and erosion control blanket to the end of righ of way. Placing the extra erosion control blanket caused the item to over -run.
General or Standard Change Order Explanation
Pay Item 0056 36in Circular Type 2 Pipe See Change Order 001 for details
General or Standard Change Order Explanation
Pay Item 0056 15in Circular Type 2 Pipe See Change Order 001 for details
General or Standard Change Order Explanation
Pay Item 0061 30in Circular Type 2 Pipe See Change Order 001 for details
General or Standard Change Order Explanation
Pay Item 0066 Aggregate for underdrain Actual field measurement is different from plan quantity
General or Standard Change Order Explanation
Pay Item 0072 Inlet J10 See Change Order 003 for details
General or Standard Change Order Explanation
Pay Item 0076 Manhole J4 See Change Order 001 and Change Order 003 for details
General or Standard Change Order Explanation
Contract No:R -32799 INDIANA Date:11/16/2016
Change Order No:017 Department of Transportation Page: 7
Pay Item 0076 Manhole J4 See Change Order 001 and Change Order 003 for details
General or Standard Change Order Explanation
Pay Item 0024 QC/QA HMA Surface 9.5mm Actual field measurement tons is different from plan quantity
General or Standard Change Order Explanation
Pay Item 0039 Curb and Gutter Modified Actual field measurement is higher than plan quantity
General or Standard Change Order Explanation
Pay Item 0041 PCCP for Approaches bin Actual field measurement is higher than plan quantity
General or Standard Change Order Explanation
Pay Item 0052 Field Office The actual time needed to complete the project went longer than orginally expected due to delays. See time extension
change orders for details
General or Standard Change Order Explanation
Pay Item 0057 6in Circular Type 4 Pipe Actual field measurement is lower than plan quantity
General or Standard Change Order Explanation
Pay Item 0059 18in Circular Type 2 Pipe See Change Order 001 and Change Order 003 for details
General or Standard Change Order Explanation
Pay Item 0060 24in Circular Type 2 Pipe See Change Order 001 and Change Order 003 for details
General or Standard Change Order Explanation
Pay Item 0068 Manhole J15 Modified Item not utilized See Change Order 001 and Change Order 002 for details
General or Standard Change Order Explanation
Pay Item 0072 Inlet P12 Item not utilized see Change Order 001 and Change Order 003 for details
General or Standard Change Order Explanation
Pay Item 0074 181n Catch Basin See Change Order 001 and Change Order 003 for details
General or Standard Change Order Explanation
Pay Item 0077 Inlet B15 See Change Order 001 and Change Order 003 for details
General or Standard Change Order Explanation
Pay Item 0078 Construction Sign C The City of Richmond wanted to add additional signs to help the public avoid the construction site causing
the item to over -run
General or Standard Change Order Explanation
Pay Item 0080 Temporary Pavement Markings The project had several delays due to Frontier and HMA Asphalt. Addtional stripping was needed
to allow the road to be open to the public.
General or Standard Change Order Explanation
Pay Item 0081 Temporary Marking Removable 4in Actual field measurement is lower than plan quantity
General or Standard Change Order Explanation
Pay Item 0084 Construction Sign A The City of Richmond wanted to add additional signs to help the public avoid the construction site causing the
item to over -run
General or Standard Change Order Explanation
Pay Item 0014 Additional Straw Bails needed for Erosion Control
General or Standard Change Order Explanation
Pay Item 0015 Additional Inlet Protection needed for additional inlets added through re -design.
Change Order Explanation for Specific Line Item
#ffff###ilfYtkif**#f#Y#YY**}*#ffffYif#*f*i##fiti#*ff*fY#Y*4tff*f*#*f#iYt#fftf#*f#i#tfYff*f}*}}#ifYflff#*t*iffYfff*f*#*ftY#tf
Contract No:R -32799 INDIANA
Change Order No:017 Department of Transportation
It is the intent of the parties that this change order is full and complete compensation for the work describe above.
Notification and consent to this change order is hereby acknowledged.
Contractor: Signed
Date:
NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system.
Date: 11/16/2016
Page: 8
Contract No:R -32799 INDIANA Date:11/16/2016
Change Order No:017 Department of Transportation Page: 9
/ APPROVED FOR LOCAL PUBLIC AGENCY
l i
IGNATURE) (TITLE) (DATE)
,
(SIGNATURE) (TITLE) (DATE)
lflflflflfltt!!!!t!!!f!!!!ltit4lfifflifl4fllff!l111f111ffl11111l1111flffflltflllfl11llRflf!!!flfllt!!1!!!f!!!f!fl1fR!!!!fflf
SUBMITTED FOR CONSIDERATION
PENS
APPROVED FOR INDIANA DEPARTMENT OF TRANSPORATION
Approval Level Name of Approver Date Status