HomeMy Public PortalAbout12-0086 NikolaDATE ISSUED: 02 -13 -2012
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
CITY OF TYBEE ISLAND
BUILDING PERMIT
DEMOLITION - SF
20 TAYLOR
KYLE NIKOLA
5 WHITAKER ST 304
SAVANNAH GA 31401
B & B DEMOLITION AND
BOBBY L ADAMS
SAVANNAH GA 31405
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 250.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION
$33,500.00
PERMIT #: 120086
TOTAL BALANCE DUE: $ 250.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
1-2 -o bg�
Location: 2 �f)- /C; % 5r
NAME
ADDRESS
PIN # ><.
TELEPHONE
Owner
(I � \15t'
IV
Architect
or Engineer
Building
n
47/,
Contractor
Deno.
.O
I
MIT 1 a�
�1 •�/ ye S
512 /'ih
/i
(Check all that apply)
❑ Repair
❑ Renovation
❑ Minor Addition
❑ Substantial Addition
❑ Other
Details of Project:
j.
❑ Residential
❑ Single Family
❑ Duplex
❑ Multi- Family
❑ Commercial
n Footprint Changes
n discovery
Demolition
Remo r(2 {/oiJ$' d f (- T 7/1 z /V
& &Y u ke r L 4tv1•� /IL e r ik
Estimated Cost of Con ':'Rion: $ 33 c'n�a
onstruction Type
(1 Wood Frame
(2) ood & Masonry
(3) B ' k Vener r
Propose. se:
Remarks:
(Enter appropriate number)
(4) Masonry (6) Other (please specify)
(5) Steel & Masonry
ATTACH COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
followin nform.tion based on the construction drawings and site plan:
# Unit
Lot ea
# 0 - street parking spa. -s
Tr :-s located & listed on ' to plan
A cess:
riveway (f)
etbacks: Front
# Bedrooms # Bathrooms
Living space (total sq. ft.)
With culvert?
Rear
With swale?
Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through Pc t '-ftd
On -site waste and debris containers will be provided by Co f\) fifA -/-or
Construction debris will be disposed by Goh; trm -C by means of NO 1 . 1 9 P A ,
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: Fes®, a
Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning /variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and /or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
NFIP Flood Zone
Existing
RECEIVED
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm /Drainage
Inspections
City Manager
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL
LEAD -BASED PAINT
Adapted from http: / /www.epa.gov /lead /pubs /renovation.htm. Please use that site to access the following information.
Information for Property Owners of Rental Housing, Child- Occupied Facilities
Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space
rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard
information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers,
and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample
pre- renovation disclosure form may be used for this purpose.
After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented
by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation,
Repair and Remodeling rule. To become certified, property owners must submit an application for firm
certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for
certification to approve or disapprove the application.
Property owners who perform renovation, repairs, and painting jobs in rental property should also:
• Take training to learn how to perform lead -safe work practices.
• Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
• Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
Information for Homeowners Working at Home
If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project.
However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home
and planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1 -800-
424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint.
Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools
As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is
performed in your home, or in the child care facility or school that your child attends.
• Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants
sign a pre- renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information
pamphlet.
• Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of
children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child
care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet.
Information for Contractors .-
As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create
dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation,
repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and
child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families,
Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre- renovation disclosure form may
be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work
practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm
certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. •
Contractors who perform renovation, repairs, and painting jobs should also:
• Take training to learn how to perform lead -safe work practices.
• Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair,
and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may
take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to become a
certified renovator. Click here for a list of eligible courses.
• Provide a copy of your EPA or state lead training certificate to your client.
• Tell your client what lead -safe methods you will use to perform the job.
• Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010.
• Ask your client to share the results of any previously conducted lead tests.
• Provide your client with references from at least three recent jobs involving homes built before 1978.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeepinq checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
• Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
S.{
1F YOU'RE NOT
LEAD-SAFECERTIFIED,
.DISTURBING
JUST SIX
SQUARE FEET
:COULD COST YOU
-BIG TIME.
atY
shh4Iy f 1.j j
Printed Name
;2pj:Je(/2
Date
DEPT. OF
111110UKES
GEORGIA
Permit Acknowledgement of
Asbestos /Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
Undersigned
Printed Name
Date
Office Use Only:
Project Address:
Permit Number:
02/13/2012 13:04 9127866538 TYBEE ISL HIST SOC
Febrl 1+13, 2012
Ms. Die Otto
Adminiitrative Assistant
City of tybee Island
Buildini and Zoning
P.O. Bo il 2749
Tybee I4Iand, Georgia 31328-2749
1
V
PAGE 01
swt7
FEB 13 2012 Sj:
Dear Dame;
I have Made a site visit to #2o Taylor Street in regards to the request f
Please pitceed with the request as the building cannot be moved. The
has alre‘tly been negatively impacted.
Sincerelir,
Cullen *ambers
HistoriciPreservation Advisor
Tybee land Historic Preservation Commission
•7j 931
(Wolin
tic i gitty
TX Result Report
P 1
02/02/2012 19:34
Serial N0. CM35228060004
TC: 313408
Destination
Start Time
Time
Prints
Result
Note
7866538
02 -02 19:34
00:00:38
001/001
OK
Note
TMR: Timer TX. POL: Polling. RS: Original Size Setting. FME: Frame Erase TX.
MIX: Mixed Original TX. CALL: Manual TX. CSRC: CSRC. FWD: Forward. PC: PC -Fax.
RLY: Double-Sided MBX: Confidential. : BulletPinC1SIP rSIPnFax.FIPADR:FIPOAddress Fax,
I -FAX: Internet Fax
Result OK: Communication OK, S -OK: Stop Communication, PW -OFF: Power Switch OFF,
TEL: RX from TEL, NG: Other Error, Cont: Continue, No Ans: No Answer,
Refuse: Receipt Refused, Busy: Busy, M -Full :Memory Full,
LOVR:Receiving length Over, POVER:Receiving page Over, FIL:File Error,
DC:Decode Error, MDN:MDN Response Error, DSN:DSN Response Error.
Date:
City of Tybee Island
BUIJ.DING AND ZONING
P.O. Box 2749 — 403 tler Avenue, Tybee Island, Georgia 31328 -2749
(912) 786-4573 — FAX (912) 786 -9539
www_cityortybee _ org
FAX TRANSMITTAL SHEET
_!2
Number of Pages Including Cover Sheet: 1
To: Cullen Chambers
Company Name: Tybee Island Historic Review Commission
Faz Number: 786 -6538
From: Dianne K. Otto
Title: Administrative Assistant
Phone Number: 786 -4573 extension 1 14
Fax Number: 786 -9539
NOTICE OF APPLICATION F'OR DEMOLITION
Date of Application
Name of Applicant
Phone Number
Location of Structure
.2- —f
*-12,
C G?tz�CoSS— (01 ov
Tove. 6�..i=
L- eav:..s !c -erin a
December 12, 2011
/�
WHITAKER LABORATORY, INC.
P.O. Box 7078 2500 Tremont Road Savannah, Georgia 31418
(912) 234 -0696 Fax (912) 233 -5061 Email: info aC�.whitakerlab.net
www.whitakerlab.net
Report No: 12 -12 -11 -503
��I
Client: de Levis Designs
41 Park of Commerce Way, Suite 301
Savannah, Georgia 31405 0.912- 236 -5757; C. 912 -547 -1300
Attn: Paul de Levis delevis.com
Job: Lead Based Paint & Asbestos Containing Materials
Assessment for 20 Taylor Street, Tybee Island, Georgia
Subject: Preliminary Asbestos Tests
Limited Lead Assessment
Lead Donald R. Martin, Jr.
Assessor: 2500 Tremont Road, Savannah, Georgia
(912) 234 -0696
Certified GA EPD Lead Inspector / Risk Assessor
License: # 50 CMB 02107087
Lead
Assistant:
Lead Firm:
Christian Lamont, EPA Lead Inspector
Whitaker Laboratory, Inc.
2500 Tremont Road
Savannah, Georgia 31405
GA EPD Lead Firm
License: # 1002102373
Asbestos Christian Lamont
Inspector: 2500 Tremont Road, Savannah, Georgia
(912) 234 -0696
License # BI- 001075
Page 2 Lead Based Paint & Asbestos Containing Materials
Assessment for 20 Taylor Street, Tybee Island, Georgia
Dear Paul:
On December 7, 2011, Whitaker Laboratory, Inc. performed a limited sampling
event within the home located at 20 Taylor Street, Tybee Island, Georgia.
Samples of suspect exterior stucco, interior caulk, interior stucco, sheetrock,
sheetrock mud, exterior caulk, roof shingles and roof paper (felt) were obtained from this
home in order to determine if any asbestos containing materials (ACM's) were present
before limited demolition can begin.
As directed, the samples collected on December 7, 2011 have been analyzed for
the presence of asbestos.
These samples were received, bagged and sealed, tagged and shipped overnight to
EMC Labs, Inc. of Arizona, (NVLAP #101926 -0) a nationally accredited US EPA
laboratory for bulk asbestos analyses by polarized light microscopy (PLM).
Upon analyses of the results, the collected suspect samples were found NOT
to contain asbestos. Therefore, no specialized abatement of these individual, specific
materials appears necessary at this time.
Due to the nature and suspected age of paints within the home, a sample of each
type and character were received, bagged and sealed, tagged and shipped overnight to
EMC Labs, Inc. of Arizona, (NVLAP #101926 -0) a nationally accredited US EPA
laboratory for lead in paint chip samples (EPA SW -846, Method 7420) by weight by
volume.
This report documents technical data generated by the collection of paint chip
sampling and analyses as submitted to and performed by EMC Labs, Inc., via SOP
Method #L01/1 and EPA SW-846 Method 7420.
All physical sampling and collection of paint chip samples were performed within
general accordance to the EPA §745.227 (f) sampling protocol methodology.
Lead Based Paint (LBP) is determined as positive when the percentage of lead by
dry weight is equal to or greater than (1.0 mg /cm2) or (0.5 %, 5,000 ug /g or 5,000 pprn).
Upon review of the laboratory analyses, please be aware that one (1) of the
ten (10) paint samples from the home contains a detectable level for lead. However,
this sample (number 4, Step Red Paint) as collected does not exceed the federal
maximum contamination level (MCL) as established by the US EPA for the
determination of a "positive" action level reading for lead based paint.
Therefore, no specialized abatement of any of these individual, sampled
paints should require specialized abatement procedures.
Sample
Number
Sample
Location
Sample
Description
Action
Level
Detected ?
Percent
Lead
Federal
MCL*
4
Exterior
Step Red Paint
N
0.045
0.5%
Page 3 Lead Based Paint & Asbestos Containing Materials
Assessment for 20 Taylor Street, Tybee Island, Georgia
Please find the certified analytical results from EMC Labs, Inc. attached to this
report.
We believe we have prepared this report in accordance with the applicable
standard of care necessary and scope of work as requested. It is possible, however, for
unknown and /or hidden site conditions to exist that were not revealed during this
inspection. It is, therefore, our recommendation that a licensed asbestos inspector be
available to you during all phases of renovation and /or demolition.
Please note this report only encompasses the type of material(s) actually tested
and /or evaluated, and does not warrant nor guarantee that the entire site is homogeneous
in nature.
We would like to take this opportunity to thank you for your confidence in our
ability to serve your Environmental Testing needs. We welcome the opportunity to assist
you with your testing needs and look forward to a continuing relationship in the future.
If at any time you feel the need to contact us, our staff is readily available to
answer your questions or to schedule new or additional testing for your construction
requirements.
Sincerely:
Donald Martin, Jr.
Environmental Professional
Asbestos Program Manager
GA EPD Lead Inspector Assessor
License # - SMB 50 210 7087
Joseph Whitaker, PE
Project Engineer
Christian Lamont
US EPA, AHERA / Licensed Asbestos Inspector
License # - SC BI- 001075
CERTIFIED ANALYTICAL
RESULTS
EMC LABS, INC.
9830 S. 51st Street, Suite B109, Phoenix, AZ 85044
Phone: 800- 362 -3373 or 480- 940 -5294 - Fax: (480) 893 -1726
Bulk Asbestos Analysis by Polarized Light Microscopy
NVLAP #101926 -0
Client: WHITAKER LABORATORY Job# / P.O. #:
Address: 2500 TREMONT RD Date Received:
SAVANNAH, GA 31418 Date Analyzed:
Collected: 12/06/2011 Date Reported:
Project Name/ 420 TAYLOR ST, TYBEE ISLAND, GA EPA Method:
Address: Submitted By:
Collected By:
Laboratory Report
0107185
12/08/2011
12/09/2011
12/09/2011
EPA 600/M4 -82 -020
DONALD MARTIN
Lab ID Sample
Client ID Location
Layer Name /
Sample Description
Asbestos Asbestos Type Non - Asbestos
Detected ( %) Constituents
0107185 -001 LAYER 1 No
1 Ext. Stucco - Scratch Coat, Gray Gypsum
Carbonates
Mica
Quartz
Binder/Filler 100%
LAYER 2 No Cellulose Fiber <1"/
Ext Stucco - Finish Coat, White Gypsum
Mica
Quartz
Carbonates
Binder/Filler 99%
0107185 -002 LAYER 1 No Cellulose Fiber <1%
2 Ext Stucco - Scratch Coat, Gray Gypsum
Carbonates
Mica
Quartz
Binder/Filler 99%
LAYER 2 No
Ext. Stucco- Finish Coat, White Gypsum
Mica
Quartz
Carbonates
Binder/Filler 100%
0107185 -003 Interior Caulk, White No
3 Gypsum
Carbonates
Binder/Filler 100%
0107185 -004 Interior Caulk, White No
4 Gypsum
Carbonates
Binder/Filter
l00%
Page 1 of 6
Client:
Address:
EMC LABS, INC.
9830 S. 51st Street, Suite B109, Phoenix, AZ 85044
Phone: 800 - 362 -3373 or 480- 940 -5294 - Fax: (480) 893 -1726
Bulk Asbestos Analysis by Polarized Light Microscopy
NVLAP #101926 -0
WHITAKER LABORATORY
2500 TREMONT RD
SAVANNAH, GA 31418
Collected: 12/06/2011
Project Name/ #20 TAYLOR ST, TYBEE ISLAND, GA
Address:
Job# / P.O. #:
Date Received:
Date Analyzed:
Date Reported:
EPA Method:
Submitted By:
Collected By:
Laboratory Report
0107185
12/08/2011
12/09/2011
12/09/2011
EPA 600/M4 -82 -020
DONALD MARTIN
Lab ID
Client ID
Sample
Location
Layer Name /
Sample Description
Asbestos Asbestos Type
Detected ( %)
Non - Asbestos
Constituents
0107185 -005
5
0107185 -006
6
0107185 -007
7
LAYER 1
Int Stucco- Scratch Coat, Gray
LAYER 2
Int Stucco - Finish Coat, White
LAYER 1
Int. Stucco- Scratch Coat, Gray
LAYER 2
Int Stucco - Finish Coat, White
LAYER I
Sheetrock, White/ Brown
LAYER 2
Joint Compound, White
No
No
No
No
No
No
Cellulose Fiber <1%
Gypsum
Carbonates
Mica
Quartz
Binder/Filler 99%
Carbonates
Gypsum
Mica
Quartz
Binder/Filler 100%
Cellulose Fiber <1%
Gypsum
Carbonates
Mica
Quartz
Binder/Filler
Cellulose Fiber <1%
Carbonates
Gypsum
Mica
Quartz
Binder /Filler
Cellulose Fiber 10%
Fibrous Glass 1%
Gypsum
Mica
Binder/Filler 89%
Cellulose Fiber <1%
Carbonates
Mica
Binder/Filler 99%
99%
99%
Page 2 of 6
EMC LABS, INC.
9830 S. 51st Street, Suite B109, Phoenix, AZ 85044
Phone: 800 - 362 -3373 or 480 - 940 -5294 - Fax: (480) 893 -1726
Bulk Asbestos Analysis by Polarized Light Microscopy
NVLAP #101926 -0
Laboratory Report
0107185
Client: WHITAKER LABORATORY Job# / P.O. #:
Address: 2500 TREMONT RD Date Received: 12/08/2011
SAVANNAH, GA 31418 Date Analyzed: 12/09/2011
Collected: 12/06/2011 Date Reported: 12/09/2011
Project Name/ #20 TAYLOR ST, TYBEE ISLAND, GA EPA Method: EPA 600/M4 -82 -020
Address: Submitted By: DONALD MARTIN
Collected By:
Lab ID Sample Layer Name / Asbestos Asbestos Type Non - Asbestos
Client ID Location Sample Description Detected ( %) Constituents
0107185 -008 Sheetrock, White/ Brown No Cellulose Fiber 10%
8 Fibrous Glass 1%
Gypsum
Mica
Binder/Filler 89%
0107185 -009 I.AYF.R I No Cellulose Fiber <1%
9 Sheetrock Mud, White Carbonates
Mica
Binder/Filler 99%
LAYER 2 No Cellulose Fiber 95%
Tape, Off White Binder /Filler 5%
LAYER3 No
Texture, White/ Off White Carbonates
Mica
Binder/Filler 100%
0107185 -010 LAYER 1 No
10 Shectrock Mud, White Carbonates
Mica
Binder/Filler 100%
LAYER 2 No Cellulose Fiber 95%
Tape, Off White Binder/Filler 5%
LAYER3 No
Texture, White/ Off White Carbonates
Mica
Binder /Filler 100%
0107185 -011 Sheetrock, White/ Brown No Cellulose Fiber 10%
11 Gypsum
Mica
Binder/Filler 90%
Page 3 of 6
EMC LABS, INC.
9830 S. 51st Street, Suite B109, Phoenix, AZ 85044
Phone: 800 - 362 -3373 or 480 -940 -5294 - Fax: (480) 893 -1726
Bulk Asbestos Analysis by Polarized Light Microscopy
NVLAP #101926 -0
Laboratory Report
0107185
Client: WHITAKER LABORATORY Job# / P.O. #:
Address: 2500 TREMONT RD Date Received: 12/08/2011
SAVANNAH, GA 31418 Date Analyzed: 12/09/2011
Collected: 12/06/2011 Date Reported: 12/09/2011
Project Name/ #20 TAYLOR ST, TYBEE ISLAND, GA EPA Method: EPA 600/M4 -82 -020
Address: Submitted By: DONALD MARTIN
Collected By:
Lab ID Sample
Client ID Location
Layer Name /
Sample Description
Asbestos Asbestos Type Non - Asbestos
Detected ( %) Constituents
0107185 -012
12
LAYER 1 No Cellulose Fiber l0%
Sheetrock, White/ Brown Fibrous Glass l%
Gypsum
Mica
Binder/Filler 89%
LAYER 2 No Cellulose Fiber <I%
Joint Compound, White/ Beige
Carbonates
Mica
Binder/Filler 99%
0107185 -013 LAYER I No
13 Sheetrock Mud, White Carbonates
Binder/Filler 100%
LAYER 2 No Cellulose Fiber 95%
Tape, Off White °
Binder/Filler 5/°
LAYER 3 No Cellulose Fiber <1%
Texture, White/ Beige Carbonates
Mica
Binder/Filler 99%
0107185 -014 LAYER I No
14 Sheetrock Mud, White Carbonates
Mica
Binder/Filler 100%
LAYER 2 No Cellulose Fiber 95%
Tape, Of White Binder/Filler 5%
LAYER 3 No Cellulose Fiber <1%
Texture, White/ Beige
Carbonates
Mica
Binder/Filler 99%
0107185 -015 Exterior Door Caulk, White/ Off No
15 White
Gypsum
Carbonates
Binder/Filler 100%
Page 4 of 6
EMC LABS, INC.
9830 S. 51st Street, Suite B109, Phoenix, AZ 85044
Phone: 800 - 362 -3373 or 480 - 940 -5294 - Fax: (480) 893 -1726
Bulk Asbestos Analysis by Polarized Light Microscopy
NVLAP #101926 -0
Laboratory Report
0107185
Client: WHITAKER LABORATORY Job# / P.O. #:
Address: 2500 TREMONT RD Date Received: 12/08/2011
SAVANNAH, GA 31418 Date Analyzed: 12/09/2011
Collected: 12/06/2011 Date Reported: 12/09/2011
Project Name/ #20 TAYLOR ST, TYBEE ISLAND, GA EPA Method: EPA 600/M4 -82 -020
Address: Submitted By: DONALD MARTIN
Collected By:
Lab ID Sample
Client ID Location
Layer Name /
Sample Description
Asbestos Asbestos Type Non - Asbestos
Detected ( %) Constituents
0107185 -016 Exterior Door Caulk, White/ Off No
16 White
Gypsum
Carbonates
Quartz
Binder /Filler 100%
0107185 -017 Exterior Window Caulk, White/ Off No Wollastonite <1 %
17 White Gypsum
Carbonates
Quartz
Binder /Filler 99%
0107185 -018
18
Exterior Window Caulk, White/ Off No Wollastonite <1%
White
Gypsum
Carbonates
Quartz
Binder/Filler 99%
0107185 -019 Shingles, Gray/ Black No Fibrous Glass 15%
19 Gypsum
Carbonates
Quartz
Binder/Filler 85%
0107185 -020 Shingles, Gray/ Black No Fibrous Glass 15%
20 Gypsum
Carbonates
Quartz
Binder /Filler 85%
0107185 -021 Roof Paper, Black/ Brown/ Gray No Fibrous Glass 15%
21 Carbonates
Quartz
Binder/Filler 85%
0107185 -022 Roof Paper, Black/ Brown/ Gray No Fibrous Glass 15%
22 Gypsum
Carbonates
Binder/Filler 85%
Page 5 of 6
EMC LABS, INC.
9830 S. 51st Street, Suite B109, Phoenix, AZ 85044
Phone: 800- 362 -3373 or 480- 940 -5294 - Fax: (480) 893 -1726
Bulk Asbestos Analysis by Polarized Light Microscopy
NVLAP #101926 -0
Laboratory Report
0107185
Client: WHITAKER LABORATORY Job# / P.O. #:
Address: 2500 TREMONT RD Date Received: 12/08/2011
SAVANNAH, GA 31418 Date Analyzed: 12/09/2011
Collected: 12/06/2011 Date Reported: 12/09/2011
Project Name/ #20 TAYLOR ST, TYBEE ISLAND, GA EPA Method: EPA 600/M4 -82 -020
Address: Submitted By: DONALD MARTIN
Collected By:
Lab ID
Client ID
Sample
Location
Layer Name / Asbestos Asbestos Type Non - Asbestos
Sample Description Detected ( %) Constituents
Analyst - Paul Hofer
KAA-
Signatory - Lab Director - Kurt Kettler
Ds'.ncty shaLbed easry separable layers or samples are merged at subsamples of he whole one are moaned sep.raley 01 each Recemable layer N andys.s are decayed from ealbralrd woad stmt,[ and mna..rred
m peight p.rcenl orders ouu.M.e noted The report appl.a lathe standard: or procedures iden0'.d and to he sarnete(,) tested. The leaf resuts are not necessary arduted of rep rsentabaa of he 10 00l1es of Ine IM
Mom whch om eamptr ors Won of al appaaenhy .dnobcah w iamb, podacb. not do they repreaml an engang warty nstwanee rowan unless so noted These reports are for he occlusive use 01 lb{ addressed e.em .t,7
Dud they eel not be reproduced May of an part for edvnwing or Mar ;sagest, over our aprranue or in ennnecten wcm our name v/hout special wt•aen perm-Men The report shag not be rep:educed except m Mt.
Morsel wtnen appovd Dy awe laboratory The samples not destroyed n testing are retuned a maradum of that, days 101040,0.0014 meawremonl al uncertainly for dm lest method n apprenmately • IV, by vreoht
&cradled by the Nalwnal Institute of Standards and Technology. Voluntary Laboratory &eradiation Program for selected teal meted for *abetros The accrodt.bon or any report, generated by Ras laberateryn no sway
comalufes ., enptes podr1 eerb0crtwn, approved or endorsement by the Netond test ode el Stalely& and Technology The report most net Ds wed by any 000141e clean product endorsement by NVLAP or any agency
of he V S Government Parented Light M.rooa :opy ',myna? be tonsotenty reha0le n detecting asoe.to. n star eavn0ga and svmle, e100- 01.bre orgone.sy bowb re arena?,
Page 6 of 6
EMC LABS, INC.
9830 South 51't Street, Suite 8 -109 / PHOENIX, ARIZONA 85044 / 480 -940 -5294 or 800 -362 -3373 / FAX 480 -893 -1726
emclab @emclabs com
LEAD (Pb) IN PAINT CHIP SAMPLES
EMC SOP METHOD #L01/1 EPA SW -846 METHOD 7420
EMC LAB #: L43994
DATE RECEIVED: 12/08/11
CLIENT: Whitaker Laboratory
REPORT DATE: 12/09/11
DATE OF ANALYSIS: 12/09/11
CLIENT ADDRESS: 2500 Tremont Rd.
Savannah, GA 31418
P.O. NO.:
PROJECT NAME: #20 Taylor St. Tybee Island, GA
PROJECT NO.: Paul de
Levis
EMC #
L43994-
SAMPLE
DATE /11
CLIENT
SAMPLE #
DESCRIPTION
REPORTING
LIMIT
( rPbbyweight)
%Pb BY
WEIGHT
1
12/06
Ll
Exterior Paint Tan
0.010
BRL*
2
12/06
L2
Gray Step Paint
0.010
BRL*
3
12/06
L3
Wall Paint Blue
0.081
BRL#
4
12/06
L4
Step Paint Red
0.010
0.045
5
12/06
L5
Interior Wall Tan
0.010
BRL*
6
12/06
L6
Ceiling Paint Pink
0.010
BRL
7
12/06
L7
Floor Paint Tan
0.017
BRL*
8
12/06
L8
Floor Paint Yellow
0.010
BRL
9
12/06
L9
Exterior Paint White
0.010
BRL*
10
12/06
L10
Trim Paint
0.010
BRL
^ = Dilution Factor Changed * = Excessive Substrate May Bias Sample Results SRL = Below Reportable Limits # = Very Small Amount Of Sample Submitted, May Affect Resu
This report applies to the standards or procedures identified and to the samples tested only The test results are not necessarily indicative or representative of the qualities of ttre lot from which the sample was taken or
cf apparently identical or similar products, nor do they represent an ongoing quality assurance program unless so noted Unless otherwise noted, alt quality control analyses for the samples noted above were within
acceptable limits
Where it is noted that a sample with excessive substrate was submitted for laboratory analysis, such analysis may be biased The lead content of such sample may, In actuality, be greater than reported EMC makes
no warranty, express or implied, as to the accuracy of the analysis of samples noted to have been submitted with excessive substrate Resampting is recommended in such situations to verify original laboratory results,
These reports are for the exclusive use of the addressed client and are rendered upon the condition that they will not be reproduced wholly or in part for advertising or other purposes over our signature or in
connection with our name without spedal written permission Samples not destroyed in testing are retained a maximum of sixty (60) days
ANALYST: QA COORDINATOR:
Jason Thompson
Rev 11/30/08
Kurt Kettler
Page 1 of 1
FIELD NOTES and
CHAINS OF CUSTODY
UP5rR,rz,5
'9F1/4Thefo
a,..� �:...:.
r
"--' S1*-'Ar2 s
1
page ,•j. of A.
COMPANY NAME:
CONTACT:
PhonolFarx
Email:
Now Accepting:
CHAIN OF CUSTODY
EMC Laboratories
9830 S. 51" St, Ste 13.109
Phoenix, AZ 65044
(800) 3624373 Fax (480) 893 -1726
WHITAKER LABORATORY
2500 Tremont Rd
Savannah, GA 31418
Natasha Smith
(912) 2340696 / (912 233 -5061
nareahas�whltakertab.not�
VISA — MASTERCARD
y
E
1.4130 : 107 if8s
Rec d: r 01�
Eric um cz5L('
BILL TO: of Different Location)
•
Prier Quoted: $ / Sample $ / Layers
COMPLETE ITEMS 1-4; (Failure to complete any Inns may cause a delay In processing or enalyzing your samples)
1. TURNAROUND TIME: [4hr rush} [Shr rush)
"" oonflrmation of tumaround time la ;LAW
""••Addltlonai charges for rush analysis (plea.
"'laboratory analysis may be subject to
2. TYPE OF ANALYSIS:
3. DISPOSAL INSTRUCTION
Bulk
) [2 -Day) [3-Day) 15 -Day) [6-10 Day)
tali marketing dap'ET6nent for pricing details)
credit terms are OM TM/
M fr -PCMJ [Lead] [Point Count) [Fungi: AOC, W-C, Sulk, Swab, 'Tape)
i Isp • • e of samples at EMC) / [Return samples to me at ) n�lsf
asference EMC wl!! d /sAase of samples from enfvsts.)
4. Project
Name: ?.0y /..� 1:viet / J
1 P.O. Number:
' Number•
Project
EMC
SAMPLE
$1
CLIENT
SAMPLE #
DATE & Th.4E
SAMPLED
_
LOCATIOWMAArER)AI.
TYPE
Samples
Accepted
Yoc / No
,ua aum INFO r CO.4 SNTO
ol+ OFF FLOW
NAVR
/
Ai -d►- 1
4y. karrC«I. S /u�c4
Y N
Y N
ME
t
a rl
3
'nit', Alt R w1k
Y N
,I 11
X�=
II t1
ri �7,P4e
Sr
` /
7
r
>"lls...-ft reee e yt, f 1 st,
N
Y
i
� 6•/
ii f
/1
._
r �I
ket' eed( -
Y N
/
fir,' = 1,�'ir �l �yl; 00
I 1Y
`4 V
1 +��
,' +t 'a 4nv1%4
Ma
SPECIAL INSTRUCTIONS:
Sample Collector: (Print)
'4" Gj► - b c ' (Sinnahrte)
ot/
Relinquished by: a Dat &TTime:1/ Received by: °It'm
Detefrime :12/7 6 Received b
Relinquished by: _ OA-01
Relinquished by: , -_z Date/Tlma
£/Z d 6905£02664 "
66£Z£ #41
Date/Time: "Z
Date/Time:
O :90 60- Zb-160Z
Page 2 of
CHAIN OF CUSTODY
EMC Laboratories
9830 S. 51" St, Ste B•109
Phoenix, AZ 85044
(800) 3623373 Fax (480) 893 -1726
COMPANY NAME; WHITAKER LASORATORY BILL TO:
2500 Tremont Rd
Savannah, GA 31418
CONTACT: Natasha Smtth '
Phone/Fax: J912) 23406961(912) 233 -5061
noteeha=4whttakerlab.not �
Now Accepting: VISA - MASTERCARD Price Quoted: $ / Sample $ / Layers
COMPLETE ITEMS 14: (Failure to complete any items may cause a delay in processing or analyzing your samples)
LAB
Reed:
t E21C 17SE ONLY
(M DIffnront Location)
1. TURNAROUND 11ME: [4hrrush) IBhr rush} Il -Day) [2 -Day] [3 -Day) [5•Day) [6-10 Day)
'""apt confirmation of turnaround ttmo is Lam
`"'"Add�lonol ctwrpoa for rush analysts jplaaaa call marketing dapartmont for pricing dotelis)
•'"'•Laboratory /Wye; ratty bo subject to delay N cr,dit terms aro not mat
2, TYPE OF ANALYSIS: [Bulk -PLR [A lr -PCM) heed) (Pont i Count] [Fungi; AOC, WC, Sulk, Swab, Tape]
3. DISPOSAL INSTRUCTIONS: [Dlspose of samples at EMC) / [Return samples to me at rnv Ax enval
(Jf you do net indicate prmferanre EMC wA1 dlspoce of samples s from anal
4. Project - 1
Name: "to ' Al • , ,. p/
P.O. Number. prof
I Number:
EMC ~`mow
SAMPLE
dY
CUENT
SAMPLE#
DATE & TIMIE
SAMPLED
LOCATlONIMMTERIAL
TYPE
Sample
Acc.ptod
Yen / No
AIR sompix a ro1CCMNII!NTa
ow daft snTQ
17
�A' krh re. k.Jo..i to&
Y N
le
k t ti
Y N
I9
$its IBS
I4
Y N
Y N
q44
t I
s., �ir 1e-
Y N
22
`U
t r
.. Y K
Y N
Y N
Y N
Y N
J
Y N
--�.r-
-
......r -
Y N
--
- . -.
_............r
SPECIAL INSTRUCTIONS.
Sample Collector: (Print) e+rliltlel tItild utt+v�l _�,�; _0107 (Signature)
Reiinquished by: Dale/Time:
Relinquished by: Iv! : } Date/Time:
Relinquished by: Date/Tlmre
£!£ d 6905£EM,66 «
Received by: Qatetfime:,
- Re3t:eivate/Tima r
66£z£ #Q [ X0:80 60- zt-b6oz
Page _L.of 1
COMPANY NAME:
CONTACT;
Phone/FOk:
Email:
Now Accepting:
CHAIN OF CUSTODY
EMC Labalatorlos
9830 S. 51" St, Ste B -109
Phoenix, AZ 85044
(800) 3624373 Fax (480) 893.1726
WHITAKER LABORATORY
2500 Tremont Rd
Savannah, CA 31418
Natasha Smith
(912) 234-0696 f (912) 2331061
naueneigmr aocertebmm
VISA — MASTERCARD
COMPLETE ITEMS 14: (Failure to complete any
1. TURNAROUND TIME: (4hr rush) (8hr rush)
"..& confirmation of turnaround thno lF gga 4
""Addfionol charges for rue' analysts (please call marketing dapnrtrnon
"^"laboratory analysis rosy be subject** delay If credit terms ars not
2. TYPE OF ANALYSIS: (Sulk -P PCM)
3, DISPOSAL. INSTRUCTIONS: l�
ttfvaado not !n•
Y Al
epos:.
BILL TO:
LA.B..4=7":13. ti
TAT: f
Rec'd:j
ls'MC USE ! I
(If (lfl r nt Location)
Price Quoted: $ /Sample $ / Layers
may cause a delay In processing or analyzing your samples)
(2 -Day] , (3 -Day] (5-Day) (6-10 Day)
ng details)
[Point Count] (Fungi: AOC, W -C, Buik, Swab, Tape]
of samples at EMC) / (Return samples to me at ggyjamfail'
renre EMC wit! dl boo of semnlos �C).itts from enalysls)
4, project
P.O. Number;
Number.
Project
t�
de
Pau• - rj
1 EMC
I SAMPLE
IT
DATE &TIME
SAMPLED
LLCATIONNATERIAL
TYPE
Samples
Accoptid
Ysc ! No
AHISAWINAWOICOMMaN7a
0+4 or * now
rota
1111311111111111111111111111111111111111111111EMEMIIIIIMIll
r��r�irr�
I�
11111111111M111111111
11131111111111=1111111
111110111111111116110111111
=1111111
11111111111111111111111111111111111111
Mill
7-
r��
.1'04 -. 'AJ f !t -k
11111111111111111111111111111
11111111111111111111111111111
11ort
MN
/-.4 6,.1-
11111
OIIIINIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
v N
Y N
Y N
NM
IIIII
IIIIIIIIIIIIIIIIIIIII
Ms
Min
SPECIAL INSTRUCTIONS'
Sample Collector: (Print)
Relinquished by: a.
Relinquished by
cQ.aa� -1 8I; a/07r ,(Signature
Date/Time
Date/Time:
5'' Received by '
Received by
Relinquished by: Date/Time._�
Z%Z d 490S££ZZ464
66£Z£ #41
Date/Time:
Date/Time:
9£ :04 60-24 -4402
CHAIN OF CUSTODY
Asbestos
Lead
LICENSURE
• demi& ail. .ii.ii►.d&411.4iir .
fAPPLIED BUILDING SCIENCES INC.
!!!� ENDINEEAS, ARCHITECTS AND
ENYIAONMENTAL CONSULTANTS
I ago Milford Street, Charleston, South Carolina z9 io5 e r t -7zt -1475
Christian Lamont 55N xxx -xx -911 s
This is to certify that the above named student has completed the requ.stc training foras6cstos
accreditation under( 5CATitle 11 and has met the requirements of and passed the examination for an
EPA approved:
AHEIZA Asbestos Inspector initial
Course Locat,on: Charleston 5C Certificate (fnmbenzollo ?zsAbjoo -at :I!
5tartDate -July zs,zo11 End pate July z7, WI 1
Exam prte: July z�7,zolt Expiration Date July z6,zoiz 1
ijii P,:-.y.I 1,...r,x; T....g Ad.....� T A R..1.,4 Ill D..
I. it
LICENSURE
bomb Enteuntal Protectlai Division
Lead -eased Pabt sad Asbestos Prooram
cartlf btbl. Aaradltat* IAtaniAq Ott
F. Allen Barnes. Director
4244 International Parkway. Suite 104
Atlanta, Georgia 30354
Certification To Conduct Georgia Regulated Lead -Based Paint Activities
jay Cw't111at10B Tyr Combined Inspector /Risk Assessor
/021412/ ' 50 CMB 0210 7087
wax to Donald Martin, Jr.
Gofer INN kW of 111-4A
Male 6 0 245 7/9/1964
CBapsy
Whitaker Laboratory, Inc.
Ulm
2500 Tremont Road
aty ttlt!
Savannah Georgia
•
Row
31405 '1912)234-0696
flirelmatImMu kb I drltlathnW 1tiwleu t tratttAeeliralldty
7/29/2011 5/17/2012 5/17/2011
Rh arttlltsta arras al sh I orstad dry lbw Ell No 311-3-2t std abuts tie abon 9x911 MNId to
mesdo)
Combined Inspector/Risk Assessor
arollau mot M It yew Isaaa& with NMI% whines e'aOter ly balls hha 2814 24-
esrtMootlmIt sly yid tartlMls 'fsoaof enrols r di kat olkittlos s1 who an*yedby
a Carib (*MI Masud tent Fin A rsawal sat M sYytai at leant thirty till deya Irlar
tlr 1*111 n •u ahanL sr a rolholr tai al ono sat be tarts Won no hat Iota of trabitt
Issue Date I Expiration Date
7/29/2011 5/17/2012
Georgia Lead Finn License Number
50 CMB 0210 790
tli dk ,i !here l'rnyrnnr Alnnagrr
Lead - Based Paint and Asbestos Program
(404) 363 -7016
lsarrt 8vdh
Georgia Environmental Protection Division
Lead -Based Paint Certified Firm License
F. Allen Barnes, Director
4244 International Parkway, Suite 104
Adams, Georgia 30354
This Is To Certify Thai
Mita@La6oratory, Inc.
Joseph M. Whitaker
Owner/President
Having Satisfied the Requirements of The Georgia Lead Poisoning Prevention Act, O.CG.A. 31 -41 -1, a seq and the
Rules for Lead -Bared Paint Abatement Certification. and Accreditation, Chapter 391 -3-24, The Above Referenced
Firer it Hereby Certified To Perform Lead-Bated Paint Activities lie the State of Georgia. This License May Be Subject
to
.Revocation, Suspension, or Mod cation by the Director for Cause Including Evidence ofNom+amplianee or For
Airy Misrepresentation Made In the Application, Supporting Data or Subsequent Submittals Emend Therein or
Attached Thereto. or bailed to Maintain Required Reeords. The Certiflectlon Holder Agrees to Use Only Georgia
Certified individuals When Conducting Georgia Regulated Lead -Baud Pain) Activities Granted By This License.
issue Dale Expiration Date
1126r2011 112612012
Georgia Lead Firm License Nunrher
�44ts I f OLIAC4 _
' l
AlJo* Larkins, Technical Assistant
(404) 363 -7026
Print Date Wrduesaor. Amway 26.2011
ACORD..
INSURANCE CERTIFICATION
Client#. 718232 62WHITALAB
CERTIFICATE OF LIABILITY INSURANCE
1 DATE eaiamoIYYY'I)
9/26/2011
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND. EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. 11115 CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER
IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED, the policy(i es) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the pollcy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsemenlis)
PRODUCER
BB &T Insurance Services, Inc.
2280 East Victory Drive
PO Box 3597
Savannah, GA 31414
Cp,rC-
NAVE
PHONE
no; No E't1912 353.3980 flc.Nnl 8005638661
INSURERISI AFFORDING COVERAGE NAICR
Hartford UnderwrttefSlnsunnce 30104
INSURED
Whitaker Laboratory Inc.
PO Box 7078
Savannah, GA 31418
disu R a Hartford Casualty Insurance Com _29424
mune; c Hartford Accident & Indemnity 1 22357
INSURER D Evanston Insurance Company 325378
NSURER E
INSURE.. F
y THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMEDABOVE FOR THE POLICY PERIOD
INDICATED NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS
.1R
A
GENERAL
X
X
ADCLSUap
TYPE OF INSURANCE M'R 1wp
LIABILITY
,
1
131 /PD Ded:5,000
.-
POLICY NUMBER
04RHUOJ3605
aOLEer
NM.,. 'e eve
09102/2011
PM4CAYI LIMTS
R.14d;
0910212012_ 11.000900
_a 300,000
x10.000
,r 1.000_000 •
_ < - . ,::,..,,. 'x2.000.000
Xi .. 1
112.000,000
A
AUTOMOBILELIAEIUTV
—
X
%pnve
X
Oth Car
04RHUOJ3605
04RHUOJ3605
04WE0J3604
79/0212011
09102/2011
09/02/2011
0910212012`. ,11,000,000
09/02/2012 - .t4.000 000
t4.000,000
O
O
X
UMBRELLA LIAR
EXCESS LIAR
(X
IL
-
,
X -.: -
.
-. 00000
09/02/2012 X 1 1
umeuRLO.ERa,
�..
NrA
Wand...,y e, Ntn _
11,000,000
[1.000.000
41,000,000
0
Professional
Liability
AE821176
0910212011
0910212012 S1, 000,000 Occur
x1,000,000 Aggregate
DESCRIPTION OF OPERATIONS/ LOCATIONS I VEHICLES (Attach ACORD 101 Additional Rom arMs Sohed4 .1 II101 e'puce FregsINdi
CERTIFICATE HOLDER CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
AUTHORIZED REPRESENTATIVE
Lhtt.tna.a CoJ..Lttc.laie g
ACORD 2512010/05) 1 of 1 The ACORD name and Togo are registered marks of ACORD
#S7489630/M7403656 LSO