Loading...
HomeMy Public PortalAbout12-0087 DeSoto Beach B&BCity of Tyi,e Island • Community Developm...it Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 iti* -- - INTERNATIONAL CODE COUNCIL' MEMBER Permit No. Date Requested Owner's Name Date Needed ` ' s�' == Subcontractor ,=��1 Gen. Contractor - � . � Contact Information �� ` ; — - ! ' L Project Address Scope of Work / 1, r . Inspector % /f� ,CA/ Date of Inspection �/ // / //L Inspection ' J i3 1- Pass Fail U Fee Qas Inspection Pass ❑ Fail ❑ Fee Inspection Pass El Fail El Fee Inspection Pass ❑ Fail ❑ Fee City of Tybee Island • Community Developn .t Dept. Inspection Report 4 03 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 : IM 1111111111101 INTEP.NATID AL CODE COUNCIL ` MEMBER Permit No. Date Requested Owner's Name Date Needed Gen. Contractor. ,;,��� ; Subcontractor ("yfinz.D . Contact Information 1%1 Aq- -- Project Address Scope of Work Inspector,.';£,`: Date of Inspection ' Inspection J Pass Vi Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass El Fail Fee Inspection Pass ❑ Fail ❑ Fee DATE ISSUED: 02 -14 -2012 WORK DESCRIPTION CITY OF TYBEE ISLAND BUILDING PERMIT FIRE ALARM WORK LOCATION 210 BUTLER APTS OWNER NAME DESOTO BCH B &B, LLC ADDRESS PO BOX 1398 CITY, ST, ZIP TYBEE ISLAND GA 31328 -1398 PHONE NUMBER CONTRACTOR NAME GUARDIAN SECURITY SYSTEMS ADDRESS 7 SOUTH LAKE DR CITY STATE ZIP SAVANNAH GA 31410 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 59.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $2,800.00 PERMIT #: 120087 TOTAL BALANCE DUE: $ 59.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org CITY OF TYBEE ISLAND BUILDING & ZONING DEPARTMENT P.O. Box 2749, Tybee Island, GA 31328 Phone (912) 786 -4573 Fax (912) 786 -9539 ELECTRIC PERMIT APPLICATION & TEMPO RY SERVICE AFFIDAVIT Date ai /3 1 New Work Replacement Location of work (street address) a i I, 6t41 g'._ Contractor c-/ - o'4.4 -2GU /' 575-414- elephone �/ 1 ? g t/ / e Address of Contractor 5-3,' ! Ai e Property Owner .6 e711, F1-. /7/- Telephone Date work will be ready for inspecxion, if known Estimated cost of construction 80p Permit Number ALL WIRING, SERVICE INCLUDED, MUST BE COPPER. NO ALUMINUM ALLOWED. APPLICATION FOR TEMPORARY SERVICE RESMICIEQUIPMENT- DISCONNECTING In requesting temporary electrical service, the undersigned understands and agree 1. •a shall be ' �.- ��Q �!+s�c*on all 1. Connection of temporary electrical service does not remove the requireirb shall be pro Apottticio i re Georgia minimum construction codes. from the service- entrance conductors. 2. Temporary electrical power is intended for completion of the construction process and testing equipment installed within the structure. 3. Issuing approval for temporary power connection does not constitute approval to occupy the structure. A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy. 4 The owner and contractor are hereby held responsible for any violations of this policy. A violation of this policy ma result in . 'sconn�ction of the electrical service until all violations and deficiencies are corrected. D-/13// Own. /Contractor Signature Date Ownet /Contractor Printed Name • APPROVAL Fee Building Official 0049 Date • A/C Unit and Heat Pump Attic Ventilation Fan Bell Transmitter - low voltage Border /Outline Lighting Building Saw Exit Lights - life safety Heat Pump Meter Box Motor(s): hp Outlets - 110 volts circuit Parking Lot Lights Pool Lights - grounding Range - commercial Permit Number ALL WIRING, SERVICE INCLUDED, MUST BE COPPER. NO ALUMINUM ALLOWED. APPLICATION FOR TEMPORARY SERVICE RESMICIEQUIPMENT- DISCONNECTING In requesting temporary electrical service, the undersigned understands and agree 1. •a shall be ' �.- ��Q �!+s�c*on all 1. Connection of temporary electrical service does not remove the requireirb shall be pro Apottticio i re Georgia minimum construction codes. from the service- entrance conductors. 2. Temporary electrical power is intended for completion of the construction process and testing equipment installed within the structure. 3. Issuing approval for temporary power connection does not constitute approval to occupy the structure. A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy. 4 The owner and contractor are hereby held responsible for any violations of this policy. A violation of this policy ma result in . 'sconn�ction of the electrical service until all violations and deficiencies are corrected. D-/13// Own. /Contractor Signature Date Ownet /Contractor Printed Name • APPROVAL Fee Building Official 0049 Date • Range Hood - commercial Service: amps Sign Circuit - wattage Smoke Detector - low voltage Spa or Tub - grounding Special Outlet Swimming Pool - grounding Water Heater Welder - 220 volts circuit Well Pump - grounding ray Other - 41/4r2,,,, Ac,b, Permit Number ALL WIRING, SERVICE INCLUDED, MUST BE COPPER. NO ALUMINUM ALLOWED. APPLICATION FOR TEMPORARY SERVICE RESMICIEQUIPMENT- DISCONNECTING In requesting temporary electrical service, the undersigned understands and agree 1. •a shall be ' �.- ��Q �!+s�c*on all 1. Connection of temporary electrical service does not remove the requireirb shall be pro Apottticio i re Georgia minimum construction codes. from the service- entrance conductors. 2. Temporary electrical power is intended for completion of the construction process and testing equipment installed within the structure. 3. Issuing approval for temporary power connection does not constitute approval to occupy the structure. A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy. 4 The owner and contractor are hereby held responsible for any violations of this policy. A violation of this policy ma result in . 'sconn�ction of the electrical service until all violations and deficiencies are corrected. D-/13// Own. /Contractor Signature Date Ownet /Contractor Printed Name • APPROVAL Fee Building Official 0049 Date • f -11.4Limgcm identify y;i7, by thl „A uthority r Let aside .wmces. The 41 (IJrL A-1( pc--1( 5 HA (t) 5.. Of' nA)tv 1-1/3 -0,t) 4c/4,47/a_ tt\-)