Loading...
HomeMy Public PortalAbout12-0089 FreeJLee, LLCCITY OF TYBEE ISLAND BUILDING PERMIT WATER METER PICKUP FORM DATE ISSUED: 02 -14 -2012 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # INSTALL WTR MTR FOR STE A 602 FIRST ST A FREEJLEE LLC 602 FIRST ST STE A TYBEE ISLAND GA 31328 912 - 308 -0444 TYBEE ISLAND PLUMBING PO BOX 21 TYBEE ISLAND GA 31328 P $ 720.00 PROJECT VALUATION $ 200.00 PICKUP 1 METER (3/4 -INCH) PERMIT #: 120089 TOTAL BALANCE DUE: $ 720.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: r/� P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org DATE ISSUED: 02 -14 -2012 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT INSTALL WTR MTR FOR STE A 602 FIRST ST A FREEJLEE LLC 602 FIRST ST STE A TYBEE ISLAND GA 31328 912 - 308 -0444 TYBEE ISLAND PLUMBING PO BOX 21 TYBEE ISLAND GA 31328 P $ 720.00 $ 200.00 PERMIT #: 120089 TOTAL BALANCE DUE: $ 720.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.eityoftybee.org (2_ 12 -12 Date CITY OF TYBEE ISLAND BUILDING & ZONING DEPARTMENT P.O. Box 2749 Tybee Island, GA 31328 Phone (91 2) 786 -4573 Fax (912) 786 -9539 PLUMBING PERMIT APPLICATION Location of work (street address) Q 0 \ — � ,C L Contractor �j.ti;R M (\ Address of Contractor piu0,11,‘„J Telephone number of Contractor 1 a� �� to —470- Name of Property Owner Fre-31-ZQI62 ( �-. L C ( � k ee,d- 6-- Mailing address of Property Owner Telephone number of Property Owner \a ()WY Date work will be ready for inspection, if known Estimated cost of construction New Work 2_ • Replacement Oil Gas Permit Number (2 -o r? Electric • -t- „e.,. ex :s4-,,s rv2 -der'. Backflow Preventor Disposal Unit Domestic Water Connection to Main Drain Roof or Area Drainage or Vent Piping Fire Protection Sprinkler System; Number of Heads/Nozzles Grease / Oil Trap Hose Bib Hot Water Heater Icemaker Lawn Sprinkler System Plumbing Fixture Residential House Sewer Connection to Main Sewer Cleanout Sewer Stub ••Vacuum Breaker t/r Water Meter 3' 4 - 1 n G1 -Co r " A ' Water Service Line – New Residence Water Service Line – Replacement Water Softener Other • -t- „e.,. ex :s4-,,s rv2 -der'. Dianne Otto From: Diane Schleicher Sent: Tuesday, February 14, 2012 10:12 AM To: George Reese; Dianne Otto Subject: RE: 602 First Street - water meters George, I agree. Thanks, Diane From: George Reese Sent: Tuesday, February 14, 2012 7:47 AM To: Dianne Otto Cc: Diane Schleicher Subject: RE: 602 First Street - water meters Diane Otto He is not making a new water tap, just separating lines, it already has a 2" feed line go to the building. Which is plenty of water feed. What do you think Diane Schleicher? George From: Dianne Otto Sent: Sunday, February 12, 2012 7:03 PM To: George Reese Subject: 602 First Street - water meters George, Dr. Jerry Williams came to the office Friday afternoon and applied for a plumbing permit to add a 3/- inch water meter to Suite A at 602 First Street. That is the Urgent Care site. He said the units B and C are the dentist and she will stay on the existing water meter. Dr. Williams said he was told by you and John Dowell that he would not have to pay a tap fee. Does he mean that I should not charge him the $2,000 Capital Cost Recovery fee which is normal for a new meter? If that is the case then he will be paying $670 for the new water meter plus $50 for the permit fee. Thanks, Dianne K. Otto, CFM City of Tybee Island phone 912.786.4573 ext. 136 fax 912.786.9539 1