Loading...
HomeMy Public PortalAboutAddendum No. 1 to Contract No. 84-2015 - Airport - Butler Fairman and Seufert - Runway 15-33 - MaitnenanceAMENDMENT NUMBER 1 TO AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES THIS AMENDMENT, made and entered into this 12 day of � , 20 0, by and between the CITY OF RICHMOND BOARD OF VIATION COMMISSIONERS (OWNER) and BUTLER, FAIRMAN and SEUFERT, INC. (ENGINEER) shall be attached to and made a part of the AGREEMENT made on July 6, 2015, between OWNER and ENGINEER providing for professional engineering services. WHEREAS, the PROJECT requires additional services of the ENGINEER to complete the project. The FAA has requested geometric modifications requiring additional design and administration effort. The project will require additional administration with FAA coordination, project reporting, and grant administration for an additional year. NOW THEREFORE, pertaining to the required additional services services for the PROJECT, the OWNER and ENGINEER in consideration of their mutual covenants and purposes of completing the PROJECT herein agree to amend or supplement the AGREEMENT as set forth below. UNDER APPENDIX "A", "SERVICES BY ENGINEER", SECTION B. Phase 2 — Pavement Rehabilitation and Geometry Correction Add to Paragraph 1.2.4: Modify the final drawings and specifications to show the general scope, extent and character of the work to be constructed. Specifically, the design effort will address the width of the runway and the runway thresholds per meetings with the FAA in October of 2016. 2. SPECIAL DESIGN SERVICES Add a Section 2.9: Fiscal Year 2017 Project Administration (Assumes all work elements are awarded for construction in the same fiscal year. In the event the work elements are awarded in separate fiscal years additional project administration will be required.) 2.9.1 Prepare up to 2 FAA grant applications, 1 for the design phase and 1 for the construction phase of the project. 2.9.2 Prepare up to 12 FAA and INDOT partial pay requests. 2.9.3 Prepare 1 closeout document and report of final findings. 2.9.4 Report project status in up to 12 monthly airport Board meetings. Page 1 of 2 Addendum No. 1 to Contract No. 84-2015 UNDER APPENDIX "C", "Schedule" Replace Section 3 with the following: 1. Geometry finalization meeting - Prior to March 1, 2017 2. 90% Plans and Specification to FAA and INDOT - Prior to May 1, 2017 2. Final Design all Phases - Prior to June 2017 UNDER APPENDIX "D", "SCHEDULE OF BILLING BY ENGINEER", PARAGRAPH 2. Phase 2 — Pavement Rehabilitation and Geometry Correction Increase: Phase 2 — Pavement Rehabilitation and Geometry Correction from $78,500.00 to $105,500.00 Increase: Project Administration from $18,000.00 to $36,000.00 IN WITNESS WHEREOF, the OWNER and the ENGINEER have signed this Amendment in duplicate. One counterpart each has been delivered to the OWNER and the ENGINEER. Page 2of3 m This Amendment will be effective on the date given on page one of this Amendment. ENGINEER: BUTLER, FAIRMAN and SEUFERT, INC By: ��� U- Bradley D. Watson, Executive Vice - President OWNER: RICHMOND BOARD OF AVIATION COMMISSIONERS WA POREENEME President, Dave Stevens test f avid M. Sn w; ayor Page 3 of 3