Loading...
HomeMy Public PortalAboutChange Order No. 1 to Contract No. 87-2015 - Metro - Star Development - Grant Writing for Indiana and Committee Development., CHANGE ORDER # 1 City of Richmond CDBG Owner Occupied Rehabilitation Project DR20R-015-006 Contract #R-8-2016 Address: 443 South 14'' Street Richmond, IN 47374 Original Contract Amount $12,699.00 Change Order $ 500.00 Revised Contract Amount $13,199.00 CHANGE ORDER #1 ITEMS: Contractor: Aluminum Bros LLC 1346 Northwest 11 ' Street Richmond, IN 47374 #1: Front Steps: Install new wood steps $500.00 *While working on front porch contractor noticed the front steps had deteriorated during the winter and needed to be replaced. This was not included in the original scope of work. TOTAL $500.00 Paid through IHCDA Grant Funds APPROVED through Richmond Board of Public Works: DATE: 3 i COMMERCIAL, RESIDENTIAL S ALUMINUM ESTIMATE AND VOICE BROS. 1346 NorthWest 11th Street Home Improvement Richmond, IN 47374 765-966-4451 INVOICE PURCHASER DATEl/ 3// 7 NUMBER ADDRESS -(� V lt'I s�Crry/STATE `( VN�Y� ! I �J ZP I73 7'/ HOME PHONE ( ) DATE COMPLETED LJNEAR FEET OF GUTTER BUS. PHONE ( ) OUTSIDE MITERS @ 2' 1 VALLEY SHIELDS @ 2' 1'4'bo - COPPER GUTTER FEET of DOWNSPOUT ` DOWNSPOUT EXTENSIONS • _W TOTAL FEET FEET Q@ $ PER = $ OVER -SIZE DOWNSPOUTS 1." x 2" TRIM STRIPS ROOFING FASCIA 1" x 6" FASCIA BOARD TEAR OFF OLD GUTTERS VINYL SIDING SOFFIT ALUMINUM I_EAFGUARD WINDOWS LABOR DRIP EDGE SET UP FEE SALES TAx TOTAL PRICE $ DOWN PAYMENT $ _ BALANCE DUE ON COMPLETION $ _ ONE-STORY 3 Ida �Wa l A-0 1-0006 Sys. COLOR TWO-STORY 4%-9W sav Opp Material: ❑ Hidden Hangers w/Lag Screws ❑ 5" ❑ 6" ❑ .027 gauge seamless aluminum ❑ 2" x 3" ❑ 3" x 4' 1 have been thoroughly advised by the estimator of the exact location of the guttering and downspouts as diagrammed above; also as to color, type hanger, extensions over flower beds and to the direction of the bottom elbow on all downspouts. We are responsible only for our work, not bad fascia/bad roof. I further understand that ALUMINUM BROS. guarantees workmanship for one year from the date of installation. i understand that the above diagrammed work will cost me $ , C.O.D. I further understand that any changes made from the above after installation will include a service charge of $27.50, plus any extra material and labor used. In the event I am not home when the work is completed, I agree to mail (within three days) this amount to yobr office. Any payment for work completed not received in our office within 10 days will be past due and materials and mechanics liens procedures under the Hardeman Act, Article 5452, et sez., will bd filed -at that time. ALUMINUM BROS. GUTTERING agrees to warrant all gutter workmanship for a period of one year. In order to validate the warranty, the contract must be signed by the purchaser. The warranty shall in no way cover acts of nature: Such as high winds, hail, or other forces to which we have no control over. NOCASHACCEPTED. WE ACCEPT CHECKOR MONEY OMER 6NLY. JOB ESTIMATED & ORDER DRAWN BY DATE 5% will be added to any account 10 days past due. Please sign the top co . f the Tact 1 HAVE READAND T UG Y STAND AB AND HEREBY ACC PAN 0 HE WO DO SIGNATURE DATE