Loading...
HomeMy Public PortalAbout12-0127 Powers_1of2i� USX INTERNATIONAL CODE COUNCIL MEMBER City- of Tybee Island • Planning & Zoning Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472.5032 • Fax 912.786.9539 Permit No. Date Requested Owner's Name Gen. Contractor 1 [t Contact Information ?)NY-1- Project Address I/ D© 1 tj Scope of Work )BCD f Inspector 1 Date of Inspection Inspection I - Pass 0- Fee Date Needed Subcontractor Inspection Pass Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee City of . , oee Island • Community Develo1. _,ent Dept. Inspection Report 403 Butler Ave. • P.Q. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 R -m INTERNATIONAL CODE COUNCIL MEMBER Permit No. 12. -OI Zr7 Date Requested Owner's Name Date Needed Gen. Contractor '11-1-1,;, i i I =. r kir:-, Subcontractor Contact Information --It -‘1J -'7b37 Project Address (∎_ Scope of Work )6.-r_.) I i U � r >72..c7.:1-( Inspector 7// Date of Inspection j ! a - Inspection eri� JAG Pass EJ Fail El Fee Z.L _5 4443 Inspection Pass (" Fail ❑ Fee Inspection Pass Fail Fee Inspection Pass ❑ Fail ❑ Fee Permit No. City of .ee Island • Community Develoi.. nt Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 - Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 ) Date Requested iak mina* INTERNATIONAL CODE MUNCH: MEMBER Owner's Name L Date Needed Gen. Contractor 14,5 Subcontractor Contact Information --"01-0/1 Z.:: 4 - 0&/1 Project Address 1/)0.0 Scope of Work Inspector Date of Inspectio I L.- f Inspection - Bcy., Pass Fee Inspection Pass El Fail 1:1 Fee Inspection Pass El Fail El Fee Inspection Pass Fail Fee DATE ISSUED: 03 -6 -2012 WORK DESCRIPTION CITY OF TYBEE ISLAND BUILDING PERMIT SWIMMING POOL /FENCE - RESIDENTL WORK LOCATION 1700 INLET AVE OWNER NAME MICHAEL POWERS ADDRESS 1234 RIVER OAKS DR CITY, ST, ZIP KINGSTON TN 37763 -2356 PHONE NUMBER CONTRACTOR NAME ARCHITECTURAL POOLS & SPAS ADDRESS 1370 E HWY 80 STE L CITY STATE ZIP POOLER GA 31322 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 259.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $15,300.00 PERMIT #: 120127 TOTAL BALANCE DUE: $ 259.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org CITY OF TYBEE ISLAND COMMUNITY DEVELOPMENT DEPARTMENT P.O. Box 2749 •403 Butler Ave., Tybee Island, GA 31328 Phone (9121786 -4573 • Fax (9121786 -9539 Swimming Pool, Spa and Hot Tub Permit Application * *OWNER & CONTRACTOR SIGNATURES REQUIRED ** Location of work (street address) / OO v ennit Number Contractor N 6i1 L PbOL Address of contractor 101 CQPI) CA 1,/ t) L OTC so i7e {' S14v/)()//)r Sig 31 yP 6 Contact name & telephone number of contractor bE 11(); -ref - y/2- - 2 g y --1'61l Name of property owner cliAEL f/(/ s Mailing address of property owner Op ; iV ti Div • Telephone number of property owner � 231- 55( 7( Details of project ',),/ Js' b1 // 66E4 440 ‹W i r/? I N C "DD L Residential / Commercial Estimated cost of construction ATTENTION PROPERTY OWNER: All swimming pool, spa and hot tub installations are required by law to have a fmal inspection. Do not make final payment to the contractor without first requiring a copy of the fmal inspection to assure the work is co de complirnt. Do not use the pool, spa or hot tub until it has passed fmal ip spec >'on. Owner sign ture 104 et. Pow $ er printe Contractor stigh ty R j a Contractor printed name Submittals required with application: Is 1 copy of survey depicting locations of pool/spa/hot tub, equipment, fencing, etc. • 2 sets of specifications of the equipment servicing the pool/spa/hot tub • 3 sets of post - construction drainage plan, if applicable • 3 sets of soil erosion/sediment control plan • $250 Plan Review Deposit (fee applied to permit; forfeited if project is abandoned) Date Date ECEIVED Q2-2.1 -12. Inspection requirements: 1. Electrical Rough -in (minimum of one inspection; multiple inspections if applicable) 2. Electrical Final 3. Project Final (includes inspection of required barrier, access gates, self - latching devices, door alarms, etc., as applicable) Land Development Code, Article 3, General Provisions Section 3 -190. Swimming pool requirements and placement. All swimming pools, spas, and saunas shall comply with the following requirements: (A) Application for a permit to construct a swimming pool, spa, or sauna must be submitted to the building official. The structural plans must be approved by the building official prior to the issuance of a permit and the beginning of construction and/or excavation. A drainage plan prepared by a registered professional engineer will be required unless the city staff determines that due to the size, method of construction, location, or other characteristics of the proposed swimming pool, spa, or sauna, a drainage plan is unnecessary under the circumstances. (B) Swimming pools, spas, and saunas and supporting electrical and mechanical equipment may be located in either the side or rear yard and shall be at least five feet from the property line. (C) Swimming pool, spa, and sauna construction must meet all requirements of the codes adopted by the City of Tybee Island. (D) Once a swimming pool, spa, or sauna and its accessories have passed a final inspection it shall be a violation of this ordinance to remove or alter any of the equipment that is required by: the International Residential Code — Appendix G, the International Building Code — Section 3109, the National Electrical Code, and the Georgia State Amendments. Failure to maintain the safety related and/or electrical equipment in good and working order shall constitute a violation of this ordinance. (E) No swimming pools, spas, or saunas shall be placed across, on, or beneath any utility easements nor shall any utility easement be granted which bisects a swimming pool, nor be located within five (5) feet of any marsh buffers as delineated by the Georgia Department of Natural Resources. When a swimming pool, its deck, or other accessory to a swimming pool is proposed for construction on a site that has already been improved, the swimming pool plans and permit application will be reviewed by the City Engineer. (a) If there is an approved drainage plan for the site the City Engineer will review the plans for the swimming pool, deck and accessory structure to ensure that the proposed improvements will not materially affect the drainage of the site. If they will materially affect the drainage of the site the applicant will have to have a drainage plan prepared by a design professional before a permit for the swimming pool, deck or accessory will be issued. (b) If the site was improved without a drainage plan, the City Engineer will review the pool plans and permit application to ensure that the swimming pool, deck or accessory structure will not increase the amount of run -off leaving the site. (G) Any permit for a swimming pool is required to contain a soil and erosion plan for the proposed site prior to the issuance of a permit and commencement of any construction related activity. (Code as amended 10/28/2010) (F) MAk v- DAVIS ENGINEERING, INC. P.O. Box 1663 Tybee Island, GA 31328 Phone (912) 395 -7262 email: dkdbus(@.qmail.com INVOICE March 6, 2012 Invoice #21200901 Diane Otto City of Tybee Island P.O. Box 2749 Phone (912) 786 -4573 Fax: (912) 786 -9539 RE: RE: 1700 Inlet Avenue Tybee Island, GA 31328 02- -12 0.50 hours Site visit and permit review. 0.50 hours @ $175 = $87.50 Total Due This Invoice Based on my observations and experience, within the scope of my services, to the best of my knowledge and belief, the grading, drainage and erosion control portion of the design meets the requirements of the Land Development Code of the City of Tybee Island. 3 -c, -12 12 -oIz'7 4-0 AP Dianne Otto From: Downer Davis [dkdbus @gmail.com] Sent: Tuesday, March 06, 2012 10:42 AM To: Dianne Otto Subject: Re: swimming pool application - 1700 Inlet Ave. Attachments: 21200901.pdf Diane, Tree removal was my only concern discussed with you. Now that the City has signed off on all but my areas, I offer my concurrence with issuing this permit. Downer On Tue, Feb 21, 2012 at 5:09 PM, Dianne Otto <Dotto@a cityoftybee.org> wrote: See attachments. Dianne K. Otto, CFM City of Tybee Island phone 912.786.4573 ext. 136 fax 912.786.9539 From: oceprinter @oce.com [mailto:oceprinter @ oce.com] Sent: Tuesday, February 21, 2012 5:46 PM To: Dianne Otto Subject: Scan from Economic Development This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of The City of Tybee Island. The recipient should check this email and any attachments for the presence of viruses. The City of Tybee Island accepts no liability for any damage caused by any virus transmitted by this email. City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328 1 Water's ed Pool Copin 16' 6' Outside Dimension ool Coping All or ntitteuelo;., must coma /7 w; Sta147 .! S':1mr :.? . Cotb 11,:its7.': ' S " Over di TA 0 oL Ali Electrical Ins tslia :6onts comply with The Notional Electrd• co«t _Zbil_':ditior and sing-11. ci Ceorr ;ia Aner',! me:itW iv! rnt.c.tt r: m ly !with The Lie;nodengi Pl:lm:k 2004 Edifier; and Sta.7t 'f • �.:i� "` "' is rl'r �.'? 3' -11" 12' -15' Over dig Water's Edege 4'Base Alt measurements to water's edge. Add 1' over dig. BARRIER REEF POOLS USA Pixie DIG PLAN SCALE! NTS Rev. 1 -B Date'12 /17/10 200 Gallons approx 900 lbs approx 125 Sq Ft, Perimeter= 43' -5' 'hen the fill and },as reacbed the bottom of the return inlet fittings, run.all the pool piping to the luipmcnt site. Agpecation 1: Sp ills AppacReop ii: Swimming Pocks the posit is equipped with a light or other in wall accessory, run the appropriate conduit or piping. nrinue the sand back fill and wafer compaction process until fiiiisb grade is reached. :part for the concrete deck or collar by digging with a Hit shovel under the coping to the pool wall hllustrated in figure #12. This will. allow concrete to be worked in under and over the coping lip to k in the top of the pool. If the deck area around the pool is to be something other than concrete,. a crttt culiar must be installed, The collar will reduce the chances. of erosion or abnormal setting cb may Icad to distortion or structural damage to the pool wall. �ALl. •t Ctw►vci -4-141144a. cavcl sro WM. 12.• at • Z.—E.., (Mate rkeA.0O rl