HomeMy Public PortalAbout2022 Road Presentation 101821� 2
� 0
Public Works Subcommittee Presentation
October 181 2021
Road Program Updates
Pavement Management Goals
2022 Road Reconstruction List
Long Streets & Collector Program
Recommendations
Questions
2020/2021 Construction Updates
• Nichols Ave. (Boylston Street to Quimby Street)
• Wheeler Lane
• Alden Road
• Sheldon Road
• Hazel Street (Quimby Street to Dexter Ave.)
• Gertrude Street
• Goldie Street
• Elmwood Ave.
Grandview Ave. (Chapman St. to Copeland St.)
Complete Streets/Green Streets
^^iT�
Raised intersections
Curb extensions
ADA compliance
qW Completing the sidewalk network
Complete Streets/Green Streets
7 drywells
0 13 stormwater tree trenches
9 4.75 Ibs/year of phosphorus treated
Waverley Ave.
Maintenance, Repair & Reconstruction
Use a variety of preservation treatments to prolong the
useful life of our roadways
Coordinate road repairs and reconstruction activities
with capital planning and utility work
Take a "Complete Streets" approach to roadway
reconstruction to improve pedestrian and bicycle
facilities, connectivity, and streetscape
Seek alternative funding sources for large-scale
projects
Pavement Management Techniques
" Pavement Preservation Techniques
• Limited mill and overlay repairs
• Full depth patch
• Crack sealing
` Road Reconstruction Techniques
Road reclamation (reconstruction)
Pavement Preservation Techniques
Prolong the useful life of
road surfaces
Cost-effective overtime
versus complete
reconstruction
10 Does not address other
needs or desires, such as
sidewalks and curbing
,z
Y '
Pavement Reconstruction Techniques
40 Roadway reclamation
Addresses the structural integrity of the roadway
Fully replaces the pavement surface (4-inch thickness)
Scope of work also includes:
Installation of granite curbing, concrete sidewalks, driveway
aprons and handicap ramps
• Rehabilitation or addition of a planting strip
• Review of driveway openings for compliance with Zoning
• Drainage and stormwater management improvements
41 Tree plantings
Streets proposed for road reconstruction are
submitted to Town Council for review
Pavement Management Metrics
' PCI —Pavement Condition Index
' Scaled from 0 to 100 based on level of distress of the road
surface
100 — perfect, no repairs necessary
0—roadway failure
Based on field surveys of all streets in Town
2016 Town -Wide Pavement Condition Index: 65 (2012 — 59)
' 2016 Total Work Backlog: $88 million (2012 - $92 million)
2020 Pavement Management Study underwa J
r
I
RCi
-0-20
- 20-40
40.60
60-80
-84-100
Streetscan
" Uses three dimensional video recording and
GPS to survey street and sidewalks
` Computerized algorithms develop PCI map
` Maps roadway conditions, such as patches,
cracking, bumps, etc.
Streetscan
" Other useful information also collected
Street trees, manhole covers, sign locations
` Similar process used to develop a sidewalk
condition index
9 Bumps and settlement, uplifting due to trees
U
Data from 3D
camera
Alligator cracks
Longitudinal and
transverse cracks
Block cracks
Crack seal
Bumps and
surface
distortions
Potholes
Patches
PCI
0-100
ed, 100 = Excellent
0
WATERTOWN
Oepnrlmem of PUMC IWAS
Status
" All field work complete
` Draft mapping being reviewed
` Updating for recent mill/overlay work
` Expect PCI to be similar or lower than 2016
YII
7 Miles of Roadway Reconstructed Since 2017
Roadway Rehabilitation, 2017-2021
- - FundingSource
Roadways
Chapter 90.' Local Funds
MassDOT Complete Streets
Mitigation
Sate Routes to School
* MassDOT Complete Streets
* Mitigation
Developing a "Universe of Projects"
It 2012 & 2016 Pavement Management Inventory
' Windshield surveys
10 Maintenance records
Capital projects (proposed and completed)
Resident input (work orders)
Developing the List
Prioritize streets in greatest state of disrepair
Consider project readiness
Develop a program that fits within funding
constraints
• Continue ongoing preventative maintenance
• Consider alternative funding sources
• Consider geographic equity
Utility Coordination & Capital Planning
9 Water main replacement program (1,500 feet)
Bromfield Street
Highland Ave. (Olney St. to Lexington St.)
Sewer and drain repairs and replacements
Robbins Road Extension
Howard Street (200 feet)
• Substandard water service replacements-90 locations
• National Grid gas main replacements (3 miles)
Proposed Streets
9 Boylston Street (Fairfield Street to Porter Street)
Chester Street
Locke Street
40 Chapman Street (Main Street to Highland Ave.)
• Gas main replacement in 2017
• Sewer replacement in 2012
• Alligator cracking, trench patches
• Concrete sidewalks in poor condition
• No curb
WATERTOWN
Oeponmem ojN�6lic works
ioad Reconstruct -IC
J
Q
Porter St to Mount Auburn St
(included in Mount Auburn St project)
Fairfield St to Porter St
2022
MOUNT AUBURN STREET
Assisted/Senior Housin
i Hosmer SchooTl
Hancock St to Fairfield St
2018
(Hosmer Safe Routes to School Project)
m
r
O
G
10�0 Z
C
m
■
■
Assisted/Senior Housing
V
WATERTOWN
NN'r—r of,101ic w.A.
2022 Road Reconstruction List
Boylston Street— Fairfield Street to Porter Street
a, t�
4
= Potential location for bioretention
,� Green Infrastructure Planning Grant
Chester Street
`��
Y� k
_ JW�I F
r•-
1 -a.
'Aj,'
n
Locke Street
A al- " z
t 6 'tt:'
��
i*
x
srzxoisi
'Si11
m
Next Steps
• Review driveways with DCDP
• Review street trees with Tree Warden
• Review water services and fire hydrants
0 Green infrastructure review
• Finalize concepts, where applicable
• Complete Streets working group review
• Supplemental survey, where necessary
• Notify residents of future work
• Maintain schedule for December bid
Description
$1.5 million supplemental funding from Town
Council for longer streets & collectors
Short list streets:
Waverley Ave. Under construction
Highland Ave.
Morse Street
Considerations
41 Future utility needs
Traffic volumes
Connection to existing bike and pedestrian facilities,
and important destinations
Highland Ave.
Included in Town's Complete Streets
Prioritization Plan (#11) for pedestrian safety
improvements
• Pedestrian facility and complete streets priority
area in Bicycle and Pedestrian Plan
• Key walking route to Cunniff School & Middle
School
0 Preparation for temporary Watertown High
School at Moxley Field
http://www.watertowndpw.org/DocumentCenter/View/303/Watertown-Complete-
Streetes-Plan-Final M
Highland Ave.
"' 2016 gas main replacement
' 2021 water main replacement— Lexington to
Olney
10 2021 water service repairs
11
3
r
Highland Ave.
40 Next steps
41 Survey
41 Complete Streets review
Develop concept plans
Consider bidding with Chapman Street for work in
2022 construction season
Morse Street
2014 gas main replacement
' 2020 improvements at Watertown St.
' 2021 sewer repairs (planned)
10 2021 water service replacements (planned)
Lhar/.,
s .
Pedestrian R�PrGr
Bridge ee
,11111■n�,
Stop n Shop
Park
10 v
WATERTOWN
vePVI—mojNOH V.A.
Morse Street & Fifth Ave.
' Wide width on Fifth Ave. provides
opportunities for improved bike/ped
accommodations
s�: m
P
Morse Street & Fifth Ave.
0 Next steps
41 Gas main replacement on Fifth Ave.
41 Complete sewer repairs
Sub -standard water service replacements
Complete Streets review
Develop concept plans
Bid for 2023 construction season
?�v
V
WATERTOWN
DoNamem of Public works
Proposed Streets
9 2022 Road Program Streets
41 Boylston Street (Fairfield Street to Porter Street)
41 Chester Street
Locke Street
Chapman Street (Main Street to Highland Ave.)
' Long Streets/Collector Program
• Highland Ave.--2022
• Morse St. &Fifth Ave.--2023
For Further Consideration
9 Accelerate street and sidewalk repairs
Account for price escalations in capital planning
Dedicate funding for drainage/stormwater repairs
Increase mill/overlays as a pavement preservation
technique
Review bidding processes and requirements to
complete more work per year
PROP.
SIDEWALK
4` LOA1A do SEED 4
EAST. GROUND , 1_5v (TYP.) MAX, 1 �2,4A(TYP.)
a—
4 CEW CONC- /
WALK SURFACE`
8- GRAVEL BORROW, TYPE B
WHERE REQUIRED/DIRECTED BY
DPW SUPERINTENDENT (Typ)
EAST, ROADWAY
PROP. ROADWAY
VARES MATCH E76ST.
?.Ox [TYP
L FVLL DEPTH PAVEMENT RECLAvATION
"—GRAN. CURB - TYPE VA-4
4' LOAM do SEED
11' I to
Z 31' I. Mr-AlyJ30MOM14..
■
PROP.
31"ALK
1:10 °
MAX y1.51* TYP
4` LOAM dt S1@ED
(TYP.)
EXIST WOUND
-.{..
4" CEM. CONC.
WALK SURFACE
- 4' LOAM do SEED
GRAN. CURS - TYPE VA-4
*CONSTRUCTION TOLERANCE 10,5%
B
WATERTOWN
ii¢pn,�,n¢rrr oJN�,61¢ works