HomeMy Public PortalAbout20220125 2022 RoadProgram_BoylstonStreet (rev CW_Sharrows)_202201251345387100PREPARED FOR:
TITLE: WATERTOWN- 2022 ROADWAY REHABILITATION
DATE:
SCALE:
FIGURE
& RELATED WORK
DEC. 2021
N.T.S.
CONCEPT PLAN
3 of 4
PREPARED BY
W*RL!JTEC I-f
BOYLSTON STREET
ING
ENGINEE5580
300 TRADE CENTER,
WOBURN, MASSACHUSETTS 01801
PHONE: 781.933.4800
A
CONTINUED ON I
PREVIOUS SHEET
1
1
NO
�� xARNINn �
LEGEND:
_
PROPOSED CEMENT CONCRETE
SIDEWALK
_
PROPOSED HOT MIX ASPHALT ROADWAY
& DRIVEWAY
SPROPOSED
LOAM AND SEED
PROPOSED CEM. CONC. SIDEWALK AT
DRIVEWAY
y,
!
PROPOSED CEM. CONC. PEDESTRIAN
CURB RAMP
•
• —'
__ .,
®
� y
` 1
.
f
�
O
a,+
w
PREPARED FOR:
TITLE: WATERTOWN- 2022 ROADWAY REHABILITATION
DATE:
SCALE:
FIGURE
& RELATED WORK
DEC. 2021
N.T.S.
CONCEPT PLAN
4 of 4
PREPARED BY
W*RL!JTEC I-f
BOYLSTON STREET
NG
ENGINEER80
300 TRADE CENTER,
WOBURN, MASSACHUSETTS 01801
PHONE: 781.933.4800