Loading...
HomeMy Public PortalAboutChange Order No. 1 to Contract No. 85-2016 - Engineering - INDOT - Coordination on Manor Drive - R -34206 - (1173174)Contract No:R -34206 Change Omer No.: 001 INDIANA Department of Transportation Page: 1 Construction Change Order and Time Extension Summary Contract Information Contract No.: R -34206 Letting Date:09/14/2016 District:GREENFIELD DISTRICT AE:Anthony, Oliver R. PE/S:Stevens, Mark Status:Draft Change Order Information Change Order No.: 001 EWA: Y or Force Acct: N Date Generated: 06/13/2017 Date Approved: 00/00/0000 Reason Code: CHANGED COND, Geotechnical Related Description: Undercut Foundation Soils Original Contract Amount $ 1,095,465.00 Current Change Order Amount $ 30,546.65 Percent: 2.789 % Total Previous Approved Changes $ 0.00 Percent: 0.000 % Total Change To -Date $ 30,546.65 Percent: 2.789 % Modified Contract Amount $ 1,126,011.66 Time Extension Information Date Initiated 00/00/0000 Date Completed 00/00/0000 Original Contract Time SS Completion Date 11/30/2017 or SS Calendar/Work Days 0 SP Date 00/00/0000 or SP Days (SS = Standard Specification, SP = Special Provision) Time Element Description: 1 day needed for installing the No. 2 stone into the foundation soils undercut areas. Current Time Extension SS Days 0 SP Days 0 SP Days Value $ 0.00 Previous Time Approved SS Days by AE: DCE: SCE: DDCM: SS Days SP Days Value $ Revised Contract Time SS Completion Date 12/01/2017 or SS Calendar/Work Days 1 SS Date 00/00/0000 or SP Days 0 Contract No:R -34206 Change Order No.: 001 INDIANA Department of Transportation Page: 2 Construction Change Order and Time Extension Summary Review and Approval Information Required Approval Authority AE: DCE: SCE: " DDCM: ($ per Change Order) (- LE $ 250K-) (- LE $ 750K -) (— LE $ 2 M —) (— GT $ 2 M — ) (Days per Contract) ( 50 SS days ) (100 SS days) ( 200 SS Days) ( GT 200 SS days) Verbal Approval Required? Y / N If Y, by Total Change To-Date>5%? Scope/Design Recommendation Required? Date Issued Y / N If Y, Copy to Program Budget Manager Y / N If Y, Referred to Project Manager(PM) Date to PM Date Returned Approval Authority Concurs with PM? Y / N If Y, Concurrence by Date LPA Signatures Required? FHWA Signatures Required? If N,Resolution: Approved Disapproved Resolved by Date Y / N If Y, Date to LPA Date Returned Y / N If Y, Date to FHWA Date Returned • Field Engineer Recommendation (Required for SCE or DDCM Approval) Field Engineer Comments: Date Contract No:R -34206 Change Order No:001 Contract: Project Change Order Nbr. Change Order Description Reason Code: INDIANA Department of Transportation R -34206 1173174 - State:1173174 001 Undercut Foundation Soils CHANGED COND, Geotechnical Related CLN PCN PLN Item Code Unit Unit Price CO Qty Comment 0018 1173174 0018 203-02000 CYS 16.000 604.500 C Item Description: EXCAVATION, COMMON Supplemental Descriptionl: Supplemental Description2: 0055 1173174 0055 616-02320 SYS Rem Description: GEOTEXTILES Supplemental Descriptionl: Supplemental Descripdon2: 0068 1173174 0068 715-05048 LFT Rem Description: PIPE, TYPE 4, CIRCULAR, 6 IN. Supplemental Descriptionl: Supplemental Description2: 0078 1173174 0078 718-52610 CYS Item Description: AGGREGATE FOR UNDERDRAINS Supplemental DesWptionl: Supplemental Description2: 0108 1173174 0108 206-09543 TON Item Description: NO 2 STONE Supplemental Descriptionl: Supplemental Description2: 2.650 1399.700 C 5.750 148.000 C Date:06/28/2017 Page: 3 Amount Change Amount:$ 9,672.00 Amount:$ 3,709.20 Amount:$ 851.00 50.000 15.400 C Amount:$ 770.00 19.450 799.200 C Amount:$ 15,544.44 Total Value for Change Order 001 = $ 30,546.64 Contract Completion Daft Time Adjustment original Completion dt: 11/30/2017 Adj compl dt 12/01/2017 Adj No. of Days 1 Explanation: 1 day needed for installing the No. 2 stone into the foundation soils undercut areas. Whe►eas, the standard specifications for this contract provides for such work to be performed, the following change Is recommended. General or Standard Change Order Explanation Even though the GeoTech Report for this project states that, The foundation sods below the proposed subgrade treatment may exhibit wet, soft and unstable condition under proofrolling and or construction traffic. If these soils cannot be compacted, it is recommended that 2 feet of the soft sons be removed and replaced with B borrow. - The extent of the soft soils was not noted in the contract documents and exceeds the allowance that was noted in the GeoTech report. After further discussions with the INDOT AE, the LPA, the GeoTech Report Engineer, and the contractor, it was determined that the 2 foot undercut area would be filled with a bottom layer of geotextiles, 2 feet of No. 2 stone, and another layer of geotextiles with fill placed on top of that. The area that Is being undercut is from station 15+74 to 17+79. To allow for the No. 2 stone to drain in the bottom of this area, which is at structure 113, INGOT, the LPA, the contractor and the PENS decided to have a 6 In. drain pipe and No. 8 stone installed along both sides of structure 113. This Change Order includes the overrun of items 0018, 0055, 0068, and 0078. A new item No. 0108-No. 2 Stone was added and the contractor has asked for 1 additional day to be added onto the contract. The unit price for the new pay item is reasonable, based on a review of documents included in the cost analysis file located in the field office. The Project Manager for INDOT, Joe Steady, is aware of this Change Order and a draft copy will be sent to him. The work is necessary to complete the original contract scope and as such is considered participating. Change Order Explanation for Specific Line Rem NHNfMNNNfMYMffIYfNf!'MlffYHtf 1tRf1RiN NfMNirlfiMffNkiNfNNf 1f►fl,N►MffliNRftMNa,Mf f NHNNtMfNNMfN It is the intent of the parties that this change order is full and complete compensation for the work describe above. Contract No:R -34206 INDIANA Date:06/2812017 Change Order No:001 Department of Transportation Page: 4 Notification and consent to this change order is hereby admowledged. :: J"e Contractor �; Signed By: Date: � — 30 — I q NOTE: Other required State and Fl-WA signatures MU be obtained electronically through the SiteManeger system. Contract NOR -34206 INDIANA Change Order No:001 Department of Transportation APPROVED FOR LOCAL PUBLIC AGENCY JSIQNATURE}-, (TITLE) �� �w Au-, b c-/-- SUBMITTED FOR CONSIDERATION Date:06/28/2017 Page: 5 (DATE) 7-&-/7 (DATE) �i APPROVED FOR INDIANA DEPARTMENT OF TRANSPORATION Approval Level Name of Approver Date Status