HomeMy Public PortalAbout12-0184 Smith_1of3CITY OF TYBEE ISLAND
CERTIFICATE OF OCCUPANCY
DATE COMPLETED: 05/02/2012
This Certificate issued pursuant to the requirements of the Standard Building Code
Certifying that at the time of issuance this structure was in compliance with the various
ordinances of the Jurisdiction regulating building construction or use.
PERMIT #: 12 -0184
PROPOSED USE: CONVERT TO DENTIST OFFICE
OCCUPANCY TYPE: P
CONTACT NAME JESSANNA SMITH
CONTACT ADDRESS PO BOX 186
CONTACT CITY STATE ZIP TYBEE ISLAND GA 31328
PROPERTY ADDRESS 1018 HWY 80
APPROVED BY:
P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -5737
www.cityoftybee.org
-
CHATHAM COUNTY DE .2TMENT OF BUILDING SAFETY d EGULATORY SERVICES
FIRE SAFETY INSPECTION DIVISION
FOR THE CITY OF TYBEE ISLAND
YEAR OF
_APPROVED
DISAPPROVED
DATE
You are hereby notified that this is an Official Order of the County Fire Marshall, stating the defects
found to exist in the referenced structure, and further requiring that you, as owner, agent or person in
charge of structure, shall have days to complete specified repairs or improvements.
Business Phone Owner 1,3=1 >, - H
Occupant Load
Name of Facility / ! = -i-1)
Address
Occupancy:
usiness
Personal
1. Number of Exit Doors
2. Blocked
3. Exit Sign
4. Emergency Lights
5. Panic Hardware
6. Self- Closing Device
Care Home
a2
Locked
Good
Good
Good
Good
7. Fire Alarm Yes
8. Smoke/Heat Detectors Yes
9. Sprinkler System Yes
10. Standpipe Yes
11. Number of Fire Extinguishers
Inspected/Charged Yes
12. Fixed Hood System Yes
13. Date of Last Service
Assembly Storage
Mercantile Factory
Educational Day Care
Residential Hazardous
101 -SEC 5
OK V 101 -SEC 5
1,•' Unsatisfactory NA 101 -SEC 5
✓ Unsatisfactory NA 101 -SEC 5
✓ Unsatisfactory NA 101 -SEC 5
Unsatisfactory NA
No NA NFPA 72
No a/ NA NFPA 73
No NA NFPA 13
No ✓ NA NFPA 13
Proper Type? y c S NFPA 10
No - NA NFPA 10
No 4..-- NA NFPA 96
(REQUIRED EVERY 6 MONTHS)
Unsatisfactory
No
No i/
14. Electrical Good V Fair NFPA 70
15. Overloaded Sockets /Outlets Yes NFPA 70
16. Missing Electrical Covers Yes NFPA 70
17. Other (explain)
18. Excessive Storage of Combustibles
Yes No NFPA 30
List Details
The signature below of Owner, Occupant, Agent, signifies Inspecti
Owner /Occupant/Agent Signature
as made.
Chatham County Fire Marshall
C:\Docu,nents and SettifgsVIMMY\Desktop \City Tybee 3 Part\Fire Inspection Fonn.doc
City of raee Island • Community Develop..,ent Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
allIN
inn
INTERNATIONAL
CODE COUNCIL'
MEMBER
Permit No. ( Z -0184 Date Requested
Owner's Name �i i i , -4 1--- Date Needed
Gen. Contractor C C2N3 S . rl . Subcontractor
Contact Information -7,i) J 7 G) - %Z
Project Address j r` ) Lk 1)
Scope of Work -' , -H/ i I
Inspector 'i Date of Inspection // Z'
Inspection - I- , ; .1 t' Pass Fail L_._! Fee
Inspection Pass Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
City of Yyoee Island • Community Development Dept. r'•
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
INTERNATIONAL
CODE COUNCIL
MEMBER
Permit No. ` °, "'i Date Requested }
Owner's Name 37c1-, ,41--) Date Needed
Gen. ContractorL ,„3
c .) c('w S Subcontractor
Contact Information n
Project Address 1 ., W .
Scope of Work :1 �`; ,? i� 'F :s T c.- e..
Inspector ` Date Inspection
Inspection: =� Pass J Fail Fee
Inspection
Inspection
Inspection
sat
Pass Fail ❑ Fee
Pass 0 Fail ❑ Fee
Pass
Fail n Fee
'� ss--1 4 -3 0 41-
rPaaNE
4 - 748 -(0843
?re.ss 1)' ex4. 3 2 SSSo
32.85-io
RELEASES FOR ELECTRIC SERVICE FROM TYBEE ISLAND
FOR FAX TO:41-Brettnim 9-37 Pho
eorq;a. loocve r-
/2.0 8 FAX : i -138T- 251 - 44411
'get -5.2galt3o-g-
leas
Location Address:
Type of Release:
Electrician:
Owner/Builder:
/.0//3 'o
Temporary I✓ Permanent Subd Name:
/USSR —// /E /eCAZ Electrician Phone Number:
Lot # Release Date:
0-'4_/30 7
,.3 �GLti.C, S Phone Number: (S-73 -7234
Location Address:
Type of Release:
Electrician:
Temporary Permanent
Owner/Builder:
Lot # Release Date:
Subd Name:
Electrician Phone Number:
Phone Number:
Location Address:
Type of Release: Temporary
Electrician:
Lot # Release Date:
Permanent Subd Name:
Owner/Builder:
Electrician Phone Number:
Phone Number:
IX Result Report
P 1
04/20/2012 10:43
Serial No. CH35228060004
TC: 330064
Destination
Start Time
Time
Prints
Result
Note
18888514411
04 -20 10:42
00:01:03
001 /001
OK
Note
MIX: Timer Origginal_TX11CALL:wManual1TX. Original Size gFWD:FForward. PC: PC -Fax.
BM: LV: Double-Sided MBX: Confidential. : BulletPinC1SIP rSIPnFax.FIPADR :FIP Address Fax.
I -FAX: Internet Fax
Result OK: Communication OK, S -OK: Stop Communication, PW -OFF: Power Switch OFF,
TEL: RH from TEL, NG: Other Error, Cont: Continue, No Ans: No Answer,
Refuse: Receipt Refused, Busy: Busy, M- Full:Memory Full,
LOVR:Receiving length Over, POVER:Receiving page Over, FIL:File Error,
DC:Decode Error, MDN:MDN Response Error, DSN:DSN Response Error.
`pNo14 E
1- 8�8- -74$- loE ?-4a
!J ex-F. 3 2 &' �l�,
SS. - 111%14-- 3285(0 - -'i
RELEASES FOR ELECTRIC SERVICE FROM TYSEE ISLAND
FORS _ -> _ __ - -- 1._ FAX T O: t a,.. _ 9-3b2=9.1..$37 Pho
@rg:ae heart r / Lo
i2 oiS VAX : 1 - 588 -851 - II
Location Address: /Q /fry
Lot # Release Date:
Type of Release: Temporary ✓ P ermanent Subd Name:
Electrician: Electrician Phone Number: j5;4t,G— /gyp
Owner/fluilder:
Phone Number:
Location Address:
'Type of Release: Temporary Permanent
Electrician:
Lot #
Release Date:
Subd Name:
Electrician Phone Number:
t wner/Builder: Phone Number:
Location Address:
Lot #
Release Date:
Type of Release: Temporary Permanent Subd Name:
Electrician:
OwnerBuilder:
Electrician Phone Number:
Phone Number:
City of lyuee Island • Community Develop. _nt Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
Permit No. f Date Requested 1.,
Owner's Name Date Needed
Gen. Contractor Subcontractor
Contact Information /C.LL G -
Project Address e
Scope of Work f` s' ,.,
Inspector '7/ / Date of , 417/4 -'
Inspection L. [
f Q Pass t " Fee
(5,40-4//6,6 ,_ _i
INTERNATIONAL
CODE COUNCIL
MEMBER
Inspection Pass ❑ Fail Fee
Inspection Pass El Fail U Fee
Inspection Pass ❑ Fail ❑ Fee
RECEIVED
.04 -(q -I2
12- 01.8'4
Re: Tybee Teeth — Front Door Swing
To whom it may concern,
Wubbena
Architectural Design
and Development
Per the drawings the front door was scheduled to change its swing. We approve the door swing to
remain as it exists currently. The occupant load should allow us this exception and our firm has no
objections. If you have any questions please feel free to contact us directly to discuss.
Thank you,
Jim Wubbena
Principal Architect
Jim @wubbenapc.com
35 Barnard Street, Suite 300 I Savannah, Georgia 31401 I P 912.660.5438 F 912.525.3088 I www.wubbenapc.com
City of 1,Jee Island • Community Develop „ent Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
Permit No. (-2. - 0 I `4
INTERNATIONAL
CODE COUNCIL
MEMBER
Date Requested 4-10-r2_
Owner's Name Date Needed 4- 12 I2._
Gen. Contractor Q 3,n5 D 1 , Sr ✓L s
Subcontractor
Contact Information ' 0 (1 (p SD -7 2 3 9
�y Pv-11. � Project Address 1 .DI D CWO
.
Scope of Work C 0 r1 V eH-- - �,P n 1•-s. D -C-C , 4-
Inspector - / Date of Inspection,/ i /i21-2/
Thisscil El”
Inspection r o J a h P_' e• Pass 0 'Fail'` Fee
r-
Inspection f J,) g k � m C.
C l � r►-• a �
Inspection r D J Sk H SAC.
Pass
Fa Fee
Pass aif� �" J Fee
Inspection Pass
Fail Fee
DATE ISSUED: 04 -4 -2012
WORK DESCRIPTION
WORK LOCATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
CONVERT TO DENTIST OFFICE
1018 HWY 80
OWNER NAME JESSANNA SMITH
ADDRESS 602 FIRST ST B
CITY, ST, ZIP TYBEE ISLAND GA 31328
PHONE NUMBER
CONTRACTOR NAME CONSOLIDATED SERVICES
ADDRESS PO BOX 60593
CITY STATE ZIP SAVANNAH GA 31420
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE U
TOTAL FEES CHARGED $ 576.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $48,500.00
PERMIT #: 120184
TOTAL BALANCE DUE: $ 576.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
I2ot4
Location: 1018 HWY 80 Tybee Island GA 31328
NAME
ADDRESS
PIN # 4- 0026 -11 -006
TELEPHONE
Owner
Jessanna Smith
1018 HWY 80 Tybee island 31328
912.786.9433
Architect
or Engineer
71M
Wvb b QJIA
35 gyp,.N,a -ar s-r Soilkr- 3o0
q I Z- b 4 Sy3i
Building
Contractor
Co,-'s,/,dgf ed
`1°�vic.`�S -
,bN4 �2�/`e�t
AO • ice.- 1 o sy 3
■era ��Ds'A14-64. �,s 3/ Sze'
9�Z- !os g -7239
(Check all that apply)
X Repair
X Renovation
Minor Addition
Substantial Addition
Other
Residential
Single Family
Duplex
Multi- Family
XCommercial
X- Discovery
XDemolition
Details of Project: Convert existing building into Dentist office SEE Attached Plans.
O.14 -12 acid Ti000
Estimated Cost of Construction: $ 40,500 (re, 6Z. ea4c :f�Zi�rGD) . a r .
Construction Type 2
(1) Wood Frame
(2) Wood & Masonry
(3) Brick Veneer
Proposed use: Dentist
Remarks:
(Enter appropriate number)
(4) Masonry (6) Other (please specify)
(5) Steel & Masonry
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
it)/14-
# Units # Bedrooms # Bathrooms
Lot Area Living space (total sq. ft.)
# Off - street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.) With culvert? With swale?
following information based on the construction drawings and site plan:
Setbacks: Front Rear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
/1 ("I S 1
On -site restroom facilities will be provided through — y1 -«-�- L ' 4- t 4"
On -site waste and debris containers will be provided by - <-O "-) ` o / '�s ?c-s" S R r ��
Construction debris will be disposed by 3 °
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: 3 - 2 cp ` 1 Z Signature of Applicant: 4-+/I/1(----1
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning/variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and /or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
NFIP Flood Zone
Existing
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals:
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm/Drainage
Inspections
City Manager
Signature
Date
(1 -0113
FEES
Permit 1-k (43
Inspections t2 Z
Water
Sewer
Aid to Const.
TOTAL `Tb Ce
Permit Acknowledgement of
Asbestos/Environmental Notification to Georgia EPD for
Projects Involving Demolition. Wrecking. or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
vt‘
Undersigned
L•
Printed Name
Date
LEAD —BASED PAINT
Adapted from http:// www. epa .govIlead/pubs/renovation.htm. Please use that site to access the following information.
Information for Property Owners of Rental Housing, Child- Occupied Facilities
Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space
rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard
information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers,
and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample
pre- renovation disclosure form may be used for this purpose.
After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented
by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation,
Repair and Remodeling rule. To become certified, property owners must submit an application for firm
certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for
certification to approve or disapprove the application.
Property owners who perform renovation, repairs, and painting jobs in rental property should also:
Take training to learn how to perform lead -safe work practices.
Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010.
Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010.
Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
Information for Homeowners Working at Home
If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project.
However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home
and planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1 -800-
424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint.
Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools
As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is
performed in your home, or in the child care facility or school that your child attends.
Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants
sign a pre- renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information
pamphlet.
Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of
children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child
care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet.
Information for Contractors
As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create
dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation,
repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and
child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families,
Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre- renovation disclosure form may
be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work
practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm
certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application.
Contractors who perform renovation, repairs, and painting jobs should also:
Take training to learn how to perform lead -safe work practices.
Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair,
and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may
take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to become a
certified renovator. Click here for a list of eligible courses.
Provide a copy of your EPA or state lead training certificate to your client.
Tell your client what lead -safe methods you will use to perform the job.
Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010.
Ask your client to share the results of any previously conducted lead tests.
Provide your client with references from at least three recent jobs involving homes built before 1978.
Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements.
Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
Read about how to u -IE<ad-safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
1F YOU`Rt NOT
JIM} SAFE CERTIFIED,
. DISTURBING
JUST SIX
SQUARE FEET
COULD COST YOU
BIG TIM
3- 2c. -tz
Signature Date
o
Printed Name
. • u- u.1vL.IVICI• I P1%..1 GPO, I
NATIONAL FLOOD INSURANCE PROGR/'"
ELEVATION CERTIFICATt
Important: Read the instructions on pages 1- 7.
O.M.B. No. 3067 -0077
Expires December 31, 200E
SECTION A - PROPERTY OWNER INFORMATION
For Insurance Company Use:
BUILDING OWNERS NAME
DALE E. WILLIAMS
Policy Number
BUILDING STREET ADDRESS (Including Apt., Unit, Suite, and/or Bldg. No.) OR P.O. ROUTE AND BOX NO.
1018 HIGHWAY 80 EAST
Company NAIC Number
CITY
TYBEE ISLAND
STATE ZIP CODE
GA 31328
PROPERTY DESCRIPTION (Lot and Block Numbers, Tax Parcel Number, Legal Description, etc.)
PORTIONS OF LOTS 1 & 2 AND ALL OF LOTS 11 & 12, GARDEN WARD, TYBEE ISLAND
BUILDING USE (e.g., Residential, Non - residential, Addition, Accessory, etc. Use a Comments area, if necessary.)
RESIDENTIAL
LATITUDE/LONGITUDE (OPTIONAL)
( # /O - ##' - ##.##" or ##.##### °)
HORIZONTAL DATUM:
❑ NAD 1927 ❑ NAD 1983
SOURCE: ❑ GPS (Type):
❑ USGS Quad Map ❑ Other.
SECTION B - FLOOD INSURANCE RATE MAP (FIRM) INFORMATION
B1. NFIP COMMUNITY NAME & COMMUNITY NUMBER
TYBEE ISLAND, GEORGIA - 135164
B2 COUNTY NAME
CHATHAM
B3. STATE
GA.
B4. MAP AND PANEL
NUMBER
130030-0120
B5. SUFFIX
C
B6. FIRM INDEX DATE
9/20/95
B7. FIRM PANEL
EFFECTIVEIREVISED DATE
5/19/87
BB. FLOOD ZONE(S)
AE
B9. BASE FLOOD ELEVATION(S)
(Zone AO, use depth of flooding)
13
B10. Indicate the source of the Base Flood Elevation (BFE) data or base flood depth entered in B9.
❑ FIS Profile ® FIRM ❑ Community Determined 0 Other (Describe):
B11. Indicate the elevation datum used for the BFE in B9: ® NGVD 1929 ❑ NAVD 1988 ❑ Other (Describe):
B12. Is the building located in a Coastal Barrier Resources System (CBRS) area or Otherwise Protected Area (OPA)? ❑ Yes ® No Designation Date NIA
SECTION C - BUILDING ELEVATION INFORMATION (SURVEY REQUIRED)
C1. Building elevations are based on: ❑ Construction Drawings* ❑ Building Under Constudion* ® Finished Construe ion
*A new Elevation Certificate will be required when construction of the building is complete.
C2. Building Diagram Number 7 (Select the building diagram most similar to the building for which this certificate is being completed - see pages 6 and 7. If no diagram
accurately represents the building, provide a sketch or photograph.)
C3. Elevations — Zones A1-A30, AE, AH, A (with BFE), VE, V1 -V30, V (with BFE), AR, AR/A, AR/AE, AR/A1 -A30, AR/AH, AR/A0
Complete Items C3. -a-i below according to the building diagram specified in Item C2. State the datum used. If the datum is different from the datum used for the BFE in
Section B, convert the datum to that used for the BFE. Show field measurements and datum conversion calculation, Use the space provided or the Comments area of
Section D or Section G, as appropriate, to document the datum conversion.
Datum NGVD 1929 Conversion/Comments NONE
Elevation reference mark used LOCAL Does the elevation reference mak used appear on the FIRM? ❑ Yes ® No
U a) Top of bottom floor (including basement or enclosure)
❑ b) Top of next higher floor
❑ c) Bottom of lowest horizontal structural member (V zones only)
❑ d) Attached garage (top of slab)
❑ e) Lowest elevation of machinery and/or equipment
servicing the building (Describe in a Comments area)
❑ f) Lowest adjacent (finished) grade (LAG)
❑ g) Highest adjacent (finished) grade (HAG)
h) No. of permanent openings (flood vents) within 1 ft. above adjacent grade 2
U i) Total area of all permanent openings (flood vents) in C3.h 225 sq. in. (sq. cm)
8. 06 ft(m)
17.12 fL(m)
WA . _ft.(m)
8. 06 ft(m)
14.76ft(m)
7.6 ft(m)
8. 0 ft(m)
SECTION D - SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION
This certification is to be signed and sealed by a land surveyor, engineer, or architect authorized by law to certify elevation information.
I certify that the information in Sections A, B, and Con this certificate represents my best efforts to interpret the data available.
understand that any false statement may be punishable by fine or imprisonment under 18 U.S. Code, Section 1001.
CERTIFIER'S NAME BERT B. BARRETT, JR. UCENSE NUMBER GA. 2225
TITLE PRESIDENT COMPANY NAME BERT BARRETT, JR. LAND SURVEYING, P.C.
ADDRESS
145 RUNNER ROAD
SIGNATURE
FEMA Form 81 -31, January 2003
CITY STATE
SAVANNAH GA
ZIP CODE
31410
DATE TELEPHONE
10/27/04 912-897-0661
See reverse side for continuation. Replaces all previous editions
IMI'UM I AN I : In these spaces, copy the corresponding information from Section A
BUILDING STREET ADDRESS (Including Apt, Unit, Suite, and/or B' ').) OR P.O. ROUTE AND BOX NO.
1018 HIGHWAY 80 EAST
CITY STATijt ZIP CODE
TYBEE IISLAND GA 31328
SECTION D - SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION (CONTINUED)
Copy both sides of this Elevation Certificate for (1) community official, (2) insurance agent/company, and (3) building owner.
COMMENTS
THE ELEVATION OF THE OUTSIDE HEATPUMP UNIT (CONDENSER) IS AT 13.31 FT. NGVD 1929
For Insurance Company Use:
Policy Number
Company NAIC Number
1
❑ Check here if attachments
SECTION E - BUILDING ELEVATION INFORMATION (SURVEY NOT REQUIRED) FOR ZONE AO AND ZONE A (WITHOUT BFE)
For Zone AO and Zone A (without BFE), complete Items El through E4. If the Elevation Certificate is intended for use as supporting information for a LOMA or LOMR -F,
Section C must be completed.
E1. Building Diagram Number _(Select the building diagram most similar to the building for with this certificate is being completed — see pages 6 and 7. If no diagram accurately
represents the building, provide a sketch or photograph.)
E2. The top of the bottom floor (including basement or enclosure) of the building is _ ft(m) _in.(an) ❑ above or El below (diedc one) the highest aclacent grade. (Use
natural grade, if available).
E3. For Building Diagrams 6-8 with openings (see page 7), the next higher floor or elevated floor (elevation b) of the building is tt.(m) _in.(am) above the highest adjacent
grade. Complete items C3.h and C3.i on front of form.
E4. The top of the platform of machinery and/or equipment servidng the building is _ ft(m) _in.(an) ❑ above or ❑ below (check one) the highest adjacent grade. (Use
natural grade, if available).
E5. For Zone AO only: If no flood depth number is available, is the top of the bottom floor elevated in accordance with the community's floodplain management ordinance?
❑ Yes ❑ No ❑ Unknown. The local official must certify this information in Section G.
SECTION F - PROPERTY OWNER (OR OWNER'S REPRESENTATIVE) CERTIFICATION
The property owner or owner's authorized representative who completes Sections A, B, C (Items C3.h aid C3.i only), and E for Zone A (without a FEMA- issued or community-
issued BEE) or Zone AO must sign here. The statements in Sections A B, C, and E are cared to the best of my knowledge.
PROPERTY OWNER'S OR OWNER'S AUTHORIZED REPRESENTATIVES NAME
N/A
ADDRESS
N/A
SIGNATURE
NN
COMMENTS N/A
N/A
CITY STATE ZIP CODE
N/A NA NN
DATE TELEPHONE
WA NIA
N/A
❑ Check here if attachments
SECTION G - COMMUNITY INFORMATION (OPTIONAL)
The local o ffiidal who is authorized by law or ordinance to administer the community's floodplain management ordinance can complete Sections A, B, C (or E), and G of this Elevation
Certificate. Complete the applicable item(s) and sign below.
G1. ❑ The information in Section C was taken from other documentation that has been signed and embossed by a licensed surveyor, engineer, or architect who is authorized by state
or local law to certify elevation intonation. (Indicate the source and date of the elevation data in the Comments area below.)
G2. ❑ A community official completed Section E fora building located in Zone A (without a FEMA- issued or oo mmunityassued BFE) or Zone AO.
G3. ❑ The following information (Items G4 G9) is provided for community floodplain management purposes.
to
G4. PERMIT NUMBER
N/A
G5. DATE PERMIT ISSUED
MN
G6. DATE CERTIFICATE OF CONPUANCE/OCCUPANCY ISSUED NIA
G7. This permit has been issued for ❑ New Construction ❑ Substantial Improvement
G8. Elevation of as -built lowest floor (including basement) (Jibe building is:
G9. BFE or (in Zone AO) depth of flooding at the building site is:
NN. _fl.(m)
NA/._ft(m)
Datum: N/A
Datum: N/A
LOCAL OFFICIAL'S NAME N/A
TITLE NN
COMMUNITY NAME N/A
TELEPHONE MN
SIGNATURE N/A
DATE N/A
COMMENTS N/A
N/A
N/A
❑ Check here if attachments
FEMA Form 81 -31, January 2003
Replaces all previous editions
Chatham County Board of Assessors: 2011 Property Record Card 4- 0026 -1' -)06
2011 Chatham County Board of Assessors
Property Record Card
APPRAISER LALOWRIM S PT OF LOTS 1 & 2 AND N PT OF LOTS 11 & 12 BLK 14 GARDEN
LAST INSP 10/07/2010 WARD SAVANNAH BEACH
APPR 000008
OZONE
SALES BOOK / INS VI QU RSN PRICE
PAGE
346D 0587 QC I U UR
28 Oct
2008
GRANTOR:D & D PROPERTIES LLP
GRANTEE :WILLIAMS & KEARNEY DALE E
25 Aug 275N 0694 WD I U UN
'2004
GRANTOR: WILLIAMS & KEARNEY DALE E
GRANTEE:D & D PROPERTIES LLP
26 Aug
2003
GRANTOR: FERRARI TONY J & GAY S
GRANTEE:WILLIAMS & KEARNEY DALE E
257N 0172 NA I Q 400,000
22 Mar 201S 531 QC V U U5
,1999
GRANTOR:FERRARI TONY J
GRANTEE:FERRARI TONY J & GAY S
1'01 Jun 160H 0627 QC V U U5
:1993
GRANTOR:FERRARI & SEGARS TONY J &
GRANTEE:FERRARI TONY J
PERMITS TYPE DATE
1080228 RN
080237
070266
1,98-00052 CP
97 -00238 AD
0400040 RN
030534 GM
COMMENTS:
16 Feb 2010
19 Nov 2008
12 Apr 2007
09 Dec 2003
03 Sep 2002
10 Jun 2002
13 Apr 2001
18 Sep 2000
23 Jul 1999
23 Aug 1993
15 Jan 2009
15 Jan 2009
08 Jan 2008
09 Mar 2005
09 Mar 2005
15 Jul 2004
15 Jul 2004 Comp 10,000
AMOUNT
Comp 500
Comp 620
Comp 1,600
Comp 1,500
Comp 800
Comp 1
TY010 RET VAL ENT
*TY09 SURVS
2007, PROPERTY REVIEWED,
LAL
TY04 HS1OS REMVD NJV 12-
9-03
FOR SALE 08/30/02 $439,500
FOR SALE 06/07/02 $439,500
FOR SALE 04/13/01 $539,900
FOR SALE 09/15/00 $539,900
*TY2000 SURVS
1984 PIN # CHG FROM 1 -17-
11-6 TO 4- 26 -11 -6 *SURVS
EXTRA FEATURES
ID# BLDG #
'143176
143177
143178
1177810
SYSTEM DESC
Comm porch good
Slab w /walls Under
Fr Cpt Gable Rf
CARPORT
Storage /Utility avg
Page 1 of
4- 0026 -11 -006
1018 US HIGHWAY 80 TYBEE ISLAND
WILLIAMS & KEARNEY DALE E & CAMA ASMT
DEBORAH A* 362,300 362,300 LAND 1
PO BOX 1741 167,700 173,300 BLDG 1
TYBEE ISLAND GA 31328
33,200 15,300 OBXF 4
563,200 550,900 OVERRIDE
[Click for larger picture)
f SAGIS
a ' am . unty
Tax Commissioner
Prapetty Tax Statement
DIM 1 DIM 2 UNITS QL UNIT PRICE RCN AYB EYB DT
0 0 682.00 A 19.12 13,040 1993 1993 45
0 0 1298.00 A 16.48 21,391 1993 1993 45
20 20 400.00 A 10.48 4,192 2000 2000
554.00 A 9.84
LAND
ID# USE DESC FRONT DEPTH UNITS / TYPE
CODES
PROPERTY 0002 COMMERCIAL
USE
UTA
,NBHD
0004 Tybee Island
020500.00 T500 TYBEE TO
BULL R
EXEMPTIONS
COMMCATEG 1800 Hotel /Motel -Misc
HISTORY
!2011
2010
2010
2009
2008
2007
2006
2005
4,2004
2003
2002
2001
2000
1999
1998
'1997
1996
1995
1994
1993
11992
LAND IMPR TOTAL
362,300 188,600 550,900 Over
362,300 203,900 566,200 Cama
362,300 188,600 550,900 Over
494,000 331,000 825,000 Over
494,000 331,000 825,000 Over
825,000 NC
425,000 154,000 579,000 Cama
212,500 180,000 392,500 Cama
161,000 209,000 370,000 Cama
145,000 166,500 311,500 Cama
109,000 130,500 239,500 Cama
100,500 122,000 222,500 Cama
100,500 122,000 222,500 Cama
42,000 137,500 179,500 Cama
42,000 150,000 192,000 Cama
181,500 NC
20,000 65,370 85,370 Over
20,000 65,370 85,370 Over
20,000 65,370 85,370 Over
20,000 20,000 Over
20,000 20,000 Over
ECON FUNC SP SP% RCNLD MKT VALUE
10,693 9,600
17,541 15,800
4,192 3,800
5,451 1993 1993 45 4,470 4,000
PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE
http: //boa. chathamcounty. org/DesktopModules/ ChathamCounty / BoardofAssessors /PropertyRecordCard. aspx... 3/8/201
Chatham County Board of Assesso-c: 2011 Property Record Card 4- 0026 -11 006 Page 2 of 3
112610 HOTEUMOTEUINN 0 0 13,174.00 -SF 25.00 RA 362300
http: // boa. chathamcounty. org /DesktopModules/ ChathamCounty / BoardofAssessors /PropertyRecordCard.aspx... 3/8/201
Chatham County Board of Assessc' 2011 Property Record Card 4- 0026 -11 006 Page 3 of 3
2011 Chatham County Board of Assessors
Property Record Card
BUILDING SECTION
107898 -1
4- 0026 -11 -006
1018 US HIGHWAY 80 TYBEE ISLAND
CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PHYS ECON FUNC OBSV / % TOTAL DEP % RCNLD U.FACTOR MKT VAL
Commercial 202,09 1993 993 MS 17.00 0.00 0.00 0.00 17.00 167,736 167,736
[Click for larger picture
AREA 1994
STORIES 1.0
PERIMETER / SHAPE 326
OCCUPANCIES AREA % CLASS HEIGHT QUAL
539 Bed and Breakfast Inn 920 46.14 D 10.00 3.00
539 Bed and Breakfast Inn 554 27.78 D 10.00 3.00
539 Bed and Breakfast Inn 520 26.08 D 10.00 3.00
COMPONENTS Units % QUAL
C2 617 Complete HVAC 100.00
C4 681 Sprinklers 100.00
C1 887 Stud - Hardboard Siding 100.00
http: // boa. chathamcounty. org /DesktopModules/ ChathamCounty / BoardofAssessors /PropertyRecordCard. aspx... 3/8/201