HomeMy Public PortalAbout12-0186 GaineyCall
City of 'i yoee Island • Community Develop__.ent Dept. SJ
Inspection Report C C P SS
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
intik
INTERNATIONAL
CODE COUNCIL'
MEMBER
Permit No. I �'' D 1 Date Requested 4 -1 , - Z
Owner's Name `) 0 , n e Date Needed 14 ` I -7 -( )---
Gen. Contractor c, r34 e.`-4, E 4. Subcontractor
0 re-, 5D I -F O2CD
Contact Information
Project Address
Scope of Work rep A L () , r
Inspector
Inspection (� 3\)e c-t , r\GL'
e T1.
Date of Inspection
Pass
Fee
Inspection Pass ® Fail Fee
Inspection Pass ❑ Fail Fee
Inspection Pass ❑ Fail ❑ Fee
-.
C�,
114 --
�‘'
,,7,' ,, -.F.-
TIMELINE VINYL PRODUCTS,
Vinyl DH
Clear IG Dual LowE \LowE w /Argon
7/8 SDL
Standard Spacer
Air Gap =.514
INC.
I
I
ENERGY PERFORMANCE RATINGS
U- FACTOR
0.30
(U.S. /l_P)
SOLAR HEAT GAIN
COEFFICIENT
0.26
ADDITIONAL PERFORMANCE RATINGS
VISIBLE
TRANSMITTANCE
0.48
Manufacturing stipulates that these ratings conform to
applicable NFRC procedures for determining whole product
performance. NFRC ratings are determined for a fixed set of
environmental conditions and a specific product size.
Consult manufacturers literature for more information.
www.NFRC.org
Florida #
FL -6542
MAXIMUM SIZE TESTED
35-1/2 x 71-1/2"
GLAZING: Clear IG DUAL LoE2
DESIGN PRESSURE
H -R50
Single Unit Rating Only
IMPACT RATED
N\A
Order #: 200514
Line #: 5
Unit #: 1
Sash #: 1
DATE ISSUED: 04 -3 -2012
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
REPLACE WINDOWS
6 TWELFTH PL
PHILIP C GAINEY
PO BOX 2882
TYBEE ISLAND GA 31328
FIRST CITY ENTERPRISES
PO BOX 1016
TYBEE ISLAND GA 31328
P
$ 195.00
$18,700.00
PERMIT #: 120186
TOTAL BALANCE DUE: $ 195.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
[2-DrV&
Location: /pko7 7jiip (i'fi._)
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
j,
ADDRESS
PIN #
fm,\
So7 b
TELEPHONE
Owner
•
PhLi2 64)941
Architect
or Engineer
1 A
Building
Contractor
r.....
_t_
Ct
e /QAT WS
(Check all that apply)
❑ Repair
'i Renovation
❑ Minor Addition
❑ Substantial Addition
❑ Other
gl Residential
lg S• ingle Family
❑ D• uplex
❑ Multi - Family
❑ Commercial
Details of Project: 4,,IC_.).).)0,iit/iljobviv..S %lt�1,, JS'�' 32.:r DP' S� V 1? I +
n Footprint Changes
n Discovery
❑ Demolition
itviNPS
Estimated Cost of Construction: $ f e) '7 0 0 -- 00
Construction Type „ (Enter appropriate number)
Wood Frame (4) Masonry (6) Other (please specify)
1 )
Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units
Lot Area
# Off - street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.)
Setbacks: Front
# Bedrooms
Living space (total sq. ft.)
With culvert?
Rear
# Bathrooms
U1 -027
Oct-012g
OR.p2SY
poretVskPs/ .�: 38`oz
C,S ort 5-D0
Z S 000
l�swale� �
ra,t42099
# Stories Height Vertical distance measured from the average adjacent pCf 300
grade of the building to the extreme high point of the building, exclusive of chimneys, heating /
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
7 a°
During construction:
On -site restroom facilities will be provided through _') iAjp42 -1-
On -site waste and debris containers will be pr vided y
Construction debris will be disposed by C�7Vl�L by means of
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: j Z. Signature of Applicant:/ ?
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning /variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
NFIP Flood Zone
Existing
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm/Drainage
Inspections
City Manager
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL
oaca
NATURAL
waAxa
GEORGIA
Permit Acknowledgement of
Asbestos /Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
S V � ?� �'� 9/3/1 2,
ndersigned �I J Dat
77713-Yrcet362Z
Printed Nam
Once Use Only:
Project Address:
Permit Number:
LEAD -BASED PAINT
Adapted from http: / /www.epa.govead /pubs /renovation.htm. Please use that site to access the following information.
Information for Property Owners of Rental Housing, Child- Occupied Facilities
Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space
rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard
information pamphlet Renovate Right: Important Lead Hazard Information for Families Child Care Providers,
and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample
pre- renovation disclosure form may be used for this purpose.
After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented
by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation,
Repair and Remodeling rule. To become certified, property owners must submit an application for firm
certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for
certification to approve or disapprove the application.
Property owners who perform renovation, repairs, and painting jobs in rental property should also:
• Take training to learn how to perform lead -safe work practices.
• Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeepino checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
• Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
Information for Homeowners Working at Home
If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project.
However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home
and planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1 -800-
424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint.
Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools
As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is
performed in your home, or in the child care facility or school that your child attends.
• Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants
sign a pre- renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information
pamphlet.
• Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of
children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child
care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet.
Information for Contractors
As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create
dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation,
repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and
child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families,
Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre- renovation disclosure form may
be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work
practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm
certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application.
Contractors who perform renovation, repairs, and painting jobs should also:
Take training to learn how to perform lead -safe work practices.
• Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair,
and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may
take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to become a
certified renovator. Click here for a list of eligible courses.
• Provide a copy of your EPA or state lead training certificate to your client.
• Tell your client what lead -safe methods you will use to perform the job.
• Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010.
• Ask your client to share the results of any previously conducted lead tests.
• Provide your client with references from at least three recent jobs involving homes built before 1978.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeepinq checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
• zRead about how to us- lead- •fe work practices in EPA's Steps to Leq,d Safe Renovation, Repair and Painting.
IF YOU'RE NOT
LEA:, SA E CfR1I'IED
.DISTURBING
JUST SIX
SQUARE FEET
"COULD COST YOU
.BIG TIME.
/4/
Signature
'o,M".S
rinted Name
Date
Chatham County Board of Assessors: 2" 1 Property Record Card 4- 0007- 03 -01'
2011 Chatham County Board of Assessors
Property Record Card
APPRAISER
LAST INSP
APPR ZONE
MT
03/31/2010
000008
MIDDLE PT OF LOT 76 WD 4 TYBEE
GAINEY PHILLIP C
7400 ABERCORN ST
STE 705 PMB 334
SAVANNAH GA 31406
SALES BOOK / INS VI QU RSN PRICE
PAGE
26 Nov 347C 0745 QC I U UN
12008
GRANTOR:SPG LLC
GRANTEE.:GAINEY PHILLIP C
130 Apr 269S 0091 QC I U UN
!2004
GRANTOR: GAINEY PHILIP C
GRANTEE:SPG LLC
28 Mar 267W 0047 QC I U UN
2004
GRANTOR:SPG LLC
GRANTEE:GAINEY PHILIP C
'01 Apr 24910745 WD I Q 785,000
12003
GRANTOR:DAVIS SALLY J & ARCHIE H
GRANTEE:SPG LLC
.14 Nov 189H 0352 WD I Q
.1997
GRANTOR:KOMICH MARY L
GRANTEE:DAVIS SALLYJ & ARCHIE H
277,000
IPERMITS TYPE DATE AMOUNT
090148 GM 04 Feb 2010 Comp 25,000
090128 GM 04 Feb 2010 Comp 500
COMMENTS:
10 Jan 2011
19 Mar 2010
18 Feb 2009
18 Feb 2009
22 Dec 2008
03 Mar 2008
04 May 2005
16 Mar 2004
16 Sep 1998
27 Jan 1995
TY011 QC /D 366D549
TY10 REF QC DEED 357T/323
RICHARD E PARE TO SPG
LLC
1995 DIMENSION
CORRECTION
ADD CHG PER ATTNY IN
FACT
PLAT CALCULATED
RRTN VALUE ENT 3/3/8 AMW
ADD CHG PER NOTE 05/04/05
JLM
LAND AT 11,760 VALUED AS
PER 4- 0007 -04 -003
ADD CHG 9 -16 -98 DH PER
P/O 98
DUE TO A RE- EXAMINATION
OF DEEDS & PRB Q 78
1/27/95
LAND
ID#
109987
136135
[Click for larger picture]
1146 Chatham County
Tax Commissioner
(23,zoo
(o (, o o
- I4 OOO
131(0,00
Page 1 of 2
4- 0007 -03 -011
6 12TH PL TYBEE ISLAND
CAMA ASMT
393,600 393,600 LAND 2
123,200 123,200 BLDG 1
OBXF 0
516,800 516,800 Cost - MS
CODES
PROPERTY 0006 RESIDENTIAL
USE
UTA
NBHD
EXEMPTIONS
0004 Tybee Island
020213.00 T213 TYBEE BTL
BEACH
HISTORY LAND IMPR TOTAL
2011 393,600 123,200 516,800 Cama
2010 869,500 130,500 1,000,000 Over
2010 969,500 130,500 1,100,000 Over
2009 869,500 130,500 1,000,000 Over
2009 969,500 130,500 1,100,000 Over
2008 1,529,000 131,000 1,660,000 Cama
2008 1,000,000 A/C
2007 1,529,000 129,500 1,658,500 Cama
2006 829,000 103,000 932,000 Cama
2005 733,000 142,500 875,500 Cama
2004 560,000 142,500 702,500 Cama
2003 470,500 130,000 600,500 Cama
2002 282,500 282,500 Over
2001 282,500 282,500 Over
2000 282,500 A/C
1999 162,500 69,000 231,500 Cama
1998 162,500 69,000 231,500 Cama
1997 229,000 NC
1996 59,100 67,660 126,760 Cama
1995 59,100 70,950 130,050 Cama
1994 67,770 59,380 127,150 Cama
1993 67,770 40,810 108,580 Over
1992 67,770 40,810 108,580 Over
r p t rel-44
USE DESC FRONT DEPTH UNITS / TYPE PRICE ZONING
2 -4 FAMILY 0 0 8,000.00 -SF 40.00 R2
SINGLE FAMILY RES 3,680.00 -SF 40.00
LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE
320000
SZ -50 73600
http: // boa. chathamcounty. org /DesktopModules/ ChathamCounty / BoardofAssessors /PropertyRecordCard. aspx... 4/3/201
Chatham County Board of Assessors: 2' " 1 Property Record Card 4- 0007 -03 -011 Page 2 of 2
2011 Chatham County Board of Assessors
Property Record Card
BUILDING SECTION
85551 -1
4- 0007 -03 -011
6 12TH PL TYBEE ISLAND
CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PHYS ECON FUNC OBSV / % TOTAL DEP % RCNLD U.FACTOR MKT VAL
Residential 202,689 1920 1980 MS 36.00 0.00 0.00 0.00 36.00 129,721 123,200
22
SI
U'
• to
FM
17'
17'
33'
so
10' 000.0.0.0:0 .N
2.1 II'
u'
32'
M'
[Click for larger picture]
SECTION TYPE
AREA
TYPE
FRAME
STYLE
QUALITY
CONDITION
# UNITS
# OF BEDS / BATHS
1 - Main
2284
1 - Single- family Residence
1 - Stud Frame
5 - 1 1/2 Story Finished
4.00
3.00
0
/ 2.00
COMPONENTS
R1 108 Frame, Siding, Wood
R2 208 Composition Shingle
R3 352 Heat Pump
R4 402 Automatic Floor Cover Allowance
R6 601 Plumbing Fixtures ( #)
R6 602 Plumbing Rough -ins ( #)
R6 622 Raised Subfloor (% or SF)
R11 907 Enclosed Porch (SF), Screened Walls
R11 907 Enclosed Porch (SF), Screened Walls
R16 1637 Storage Building, Wood (SF)
Units
8.00
1.00
QUAL
100.00
100.00
100.00
100.00
256.00
824.00
120.00
http: //boa. chathamcounty. org /DesktopModules /ChathamCounty /B oardofAssessors /PropertyRecordCard. aspx... 4/3/201: