Loading...
HomeMy Public PortalAboutBellevue Road Neighborhood Informational LetterTOWN OF WATERTOWN DEPARTMENT OF PUBLIC WORKS (P) 617-972-6420 124 ORCHARD STREET (F) 617-972-6402 WATERTOWN MA 02472 Gerald S. Mee Jr. Superintendent March 22, 2019 NAME ADDRESS Watertown, MA 02472 RE: Bellevue Road Reconstruction Dear resident: The Honorable Town Council approved a list of streets to be reconstructed as part of our 2019 Road Reconstruction Program, including Bellevue Road, from Channing Road to Common Street. We are sending you this letter to provide some additional background and information related to the upcoming work. What is the scope of work? The work includes roadway reclamation, a process by which the surface and sub -surface of the road is ground up and recycled to create a new "base" for the road. The base is then shaped, graded and compacted to accept the new roadway surface. In addition to a new roadway surface, granite curbing and concrete sidewalk/aprons will be installed. As part of the work, a new grass border will be provided that can also accommodate tree plantings. All sidewalk work will compl with Americans with Disabilities Act (ADA) requirements. TYPICAL SECTION allqM 2 FOOT MIN. GRASS STRIP GRANITE CURBING ITVVF VA,11 I:IWM2019 letters0ellevue RoadlBellevue Road Neighborhood Informational Letter.doc A concept plan of the work is attached. As part of the work, the guard rail between Channing Road and Bradford Road will also be replaced. What is the schedule for work? The Town intends to select a contractor to perform the work later this winter, in accordance with public bidding laws. Work will be performed during the 2019 construction season (spring through fall 2019) and may also be completed in spring 2020. How will I be notified of the work? The Town will provide door flyers at least 48-hours prior to the work beginning and updates at important milestones. Any impacts to roadway or driveway access will be noted. Due to the nature of the various phases of work and scheduling of crews, there may be periods where work is not being performed. What if I want to replace my water or sewer service or install a gas line? After the road is reconstructed, there is a five year moratorium on new excavations/digging in the road. We strongly recommend that individuals make any desired utility improvements prior to our work. If you have a question regarding your water or sewer service, please call the Water Department at 617-972-6420. Questions regarding gas services should be directed to National Grid, at 1-800-732-3400. Why Plant Trees? • Trees cool the community by fighting the heat island effect —they reduce high temperatures created by pavement, cars and buildings. • Trees clean the air by making oxygen and absorbing pollutants. • Trees help prevent flooding by keeping rain out of storm drain systems. • Trees protect wildlife. • Trees can give you privacy. • Trees increase value to properties. Will my driveway, b�pacted? What about street trees? The Town Tree Warden will evaluate the condition of existing street trees and identify potential locations for new plantings. Any removal of a non -hazardous street tree will require a tree hearing, in accordance with the Public Shade Tree law, M.G.L. Chapter 87. Please consider requesting a street tree in front of your property. To report a concern about a street tree or request a new one, please contact Chris Hayward, Tree Warden at 617-972-6420. Additional information is attached. Driveways within the work area have been inspected by the Zoning Enforcement Officer (ZEO) for compliance with the Town's Zoning Ordinance. A notice has been included with this mailing if your driveway opening requires modification. A brochure summarizing residential driveway requirements is also attached with this letter. If you wish to relocate, widen, or add a driveway, you must receive approval from the ZEO. Public Works will not alter driveway openings without an approved plan from the ZEO. Public Works will coordinate work to the maximum extent practicable, however we cannot change driveway openings once curbing is installed. If you have any questions regarding driveway openings, please contact the ZEO at 617-972-6427. I:IWM2019 letters0ellevue RoadlBellevue Road Neighborhood Informational Letter.doc Additional information about the Town's annual road reconstruction program, please visit the DPW web -site at: http://www.watertowndpw.org/191/Annual-Road-Program. If you have any questions in regards to this notice or in regards to the paving project in general, feel free to contact us at 617-972-6420 or e-mail dpwdept&watertown-ma. gov. Sincerely, Gerald S. Mee, Jr. Superintendent I:IWM2019 letterslBellevue RoadlBellevue Road Neighborhood Informational Letter.doc