HomeMy Public PortalAbout12-0229 Berankl
INTERNATIONAL
CODE COUNCIL
MEMBER
City of Tybee Island • Planning & Zonii.y Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.472.5032 • Fax 912.786.9539
Permit No. r7 -OZ. 2..'i
Owner's Name ..- "}J
Date Requested
Date Needed %. ////2/
Gen. Contractor f 47 7 Subcontractor
Contact Information 'S: L
Project Address 7'_ -2 Fir--;"/ -% ,44)
Scope of Work /7-PD
Inspector Date of Inspection
Inspection Pass Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
DATE ISSUED: 04 -18 -2012
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
f
CITY OF TYBEE ISLAND
BUILDING PERMIT
ADD SCREENED PORCH UNDR EXSTG
1003 FIFTH AVE
CHARLOTTE &PAUL BERAN
6831 GLENDORA AVE
DALLAS TX 75230 -5223
214 - 977 -8168
FIRST CITY ENTERPRISES
PO BOX 1016
TYBEE ISLAND GA 31328
P
$ 121.00
$9,500.00
PERMIT #: 120229
TOTAL BALANCE DUE: $ 121.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
D )6
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
Location: 1603 j- e%'u'0.
NAME
ADDRESS
PIN #
T
Owner
A.'i „�. ho 1)
1��
03 1 AU l02 ,
Architect
or Engineer
Building
Contractor
fi el n CON
19y ,
P o 6 tr' 10 i �L;
� �.L&
7r6-r302)0
(Check all that apply)
❑ Repair
Renovation
Minor Addition
❑ Substantial Addition
❑ Other
Details of Project: ,pi)
mod(
►_:. Residential
Single Family
❑ Duplex
❑ Multi- Family
❑ Commercial
Estimated Cost of Construction: $
Construction Type
(1) Wood Frame
(2) Wood & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
❑ Footprint Changes
❑ Discovery
❑ Demolition
scieszgird a��c
AC, 4 0-401z__.5 Ae*C SS'
(Enter appropriate number)
(4) Masonry (6) Other (please specify)
(5) Steel & Masonry
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units # Bedrooms # Bathrooms
Lot Area Living space (total sq. ft.)
# Off - street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.) With culvert? With swale?
Setbacks: Front Rear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be pr l k
Construction debris will be disposed by r' , by means of IA) Osri ti.+ /V.
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: I L Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning /variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
NFIP Flood Zone
Existing
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm/Drainage
Inspections
City Manager
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL
Permit Acknowledgement of
Asbestos /Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
ikqer/Asa
Printed Name
YeA 4/)L
Dat
Office Use Only:
Project Address:
Permit Number:
LEAD -BASED PAINT
Adapted from http: / /www.epa.gov/lead /pubs /renovation.htm. Please use that site to access the following information.
Information for Property Owners of Rental Housing, Child- Occupied Facilities
Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space
rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard
information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers,
and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample
pre- renovation disclosure form may be used for this purpose.
After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented
by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation,
Repair and Remodeling rule. To become certified, property owners must submit an application for firm
certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for
certification to approve or disapprove the application.
Property owners who perform renovation, repairs, and painting jobs in rental property should also:
• Take training to learn how to perform lead -safe work practices.
• Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeepinq checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
• Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
Information for Homeowners Working at Home
If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project.
However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home
and planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schoo /s lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1 -800-
424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint.
Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools
As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is
performed in your home, or in the child care facility or school that your child attends.
Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants
sign a pre- renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information
pamphlet.
Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of
children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child
care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet.
Information for Contractors
As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create
dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation,
repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and
child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families
Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre- renovation disclosure form may
be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work
practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm
certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application.
Contractors who perform renovation, repairs, and painting jobs should also:
Take training to learn how to perform lead -safe work practices.
• Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair,
and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may
take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to become a
certified renovator. Click here for a list of eligible courses.
• Provide a copy of your EPA or state lead training certificate to your client.
• Tell your client what lead -safe methods you will use to perform the job.
• Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010.
• Ask your client to share the results of any previously conducted lead tests.
• Provide your client with references from at least three recent jobs involving homes built before 1978.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeepinq checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements.
• Read about how to comply w'th EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
Read about how to us: lea. =-afe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
I F YOU'RE NOT
_LEAD SAFE CERTIFIED.
_DISTURBING
-JUST SIX
SQUARE FEET
.COULD COST YOU
'BIG TIME.
Printed Name
Date
14.A.G.S. = MAG NAIL SET
C.M.F. = CONCRETE MONUMENT FOUND
R.B.F. - REBAR FOUND
CONC. = CONCRETE
S 65'00'00" E
PORTION OF FIFTH AVENUE
NOW OR FORMERLY DANIEL J. O'LEARY
0.8. 313B -164
LOT 144
NOW OR FORMERLY DANIEL J. O'LEARY
D.B. 313E -164
S 65'00'00" E -- 80.00'
▪ 11.25' •
ad m
d
49.79'
CONCRETE SLAB
PORTION OF
HIGH GROUND
JACQUELYN R. BROWN
D.B. 302Q -576
0.8. 323J -446
48.59'
R.B.F.
�I
60.50' - - l 19.50'
20' ACCESS EASEMENT JV
o W D.B. 2020 -264
N 1 Io
cC ui x WOOD XENXE ->- -x
-� x x x— x —x—f0 ,„,,,,,,,„,
,„ , '8.95j0 t9
( / , ,
o+, rn
�'
/4,
EXISTING 1 -1/2 STORY % o 1
FRAME RESIDENCE IE % c§ P �/% : WOOD PRIVACY • 20 81 ., r .,
r., _ o 8.94' c�0
o
89.61' `O 110.81'
4 --- N 65' '00" W f 1;
�cS a ci
3 4
00
C
4
S 65'21'53" E
'Sc =max N 6 21'53" W m
80.00'
PORTION OF FIFTH AVENUE
NOW OR FORMERLY CECIL R. & ELIZABETH JOHNSON
D.B. 1591 -375
10th STREET R/W VARIES
201.97'
LOT 145
STATE OF GEORGIA
CHATHAM COUNTY
PLAT OF A PORTION OF' FIFTH AVENUE AND 10th STREET
LOCATED IN WARD 3, ON TYBEE ISLAND AND KNOWN AS
No. 1003 FIFTH AVENUE, TYBEE ISLAND, GEORGIA.
FOR: PAUL & Q'lAR1,OTTE BERM
DATE OF SURVEY: NOVEMBER 18, 2008
DATE OF PLAT: NOVEMBER 19, 2008
BERT BARRETT JR LAND SURVEYING. PC
145 RUNNER ROAD
SAVANNAH, GA. 31410
(912) 897 -0661
20
GRAPHIC SCALE
O 20
40
1 inch = 20 ft.
m
U
-- N 65'21'53" W
109.9 3'
REFERENCES:
1. DEED BOOKS 109G -240, 2020 -264,
211M-691. 2660-187. 3020 -576.
323J -446 & 305D -246.
2. PLAT RECORD BOOK 33P -02.
E.O.C. FIELD
< ERROR/POINT
ADJ. METHOD
E.O.C. PLAT
TOTAL STATION
1/ 18,000
1"
NONE
1/ 30,322
GEODIMETER 610
IN MY OPINION THIS PLAT IS A CORRECT
REPRESENTATION OF THE LAND PLATTED
PROJECT \00101 -C 11 -19 -08 9:23:31 am EST
0
a
"An Approved Set of Plans Must
Rannain on Job Site at All Times"
LINE OF 20' ACCESS
EASEMENT PER SURVEY
p10' 0.,
j
1U
Q
LNES OF ROOF
BELOW (DASHED/
IVES OF ROOF
ABOVE(DASHED/
:`!LL CONSTRUCTION MUST COMPLY WITH THE
a-461 AND THE IRC ONE AND TWO
- 14L'1 DWELLING CODE "ZZO40 EDITION
C F GEORGIA AMENDMENTS
LINE OF 10' ACCESS
EASEMENT PER SURVEY
W
SSTD 10-
REPLACE NEW PAR OF FRENCH DOORSwAND mc 3
EXISTING CD O ARE NDOWS, (
APPROVED
POSITIVE A
EXISTING MAST R BR
NEW TREX DECKING OVER
STRUCTURAL WOOD FRAMING
AS DESIGNED BY STRUCTL
ENGINEER
PLAN NORTH
EXISTING
MASTER CLOS
1
REVIEW FOR CODE COMPLIANCE
Every effort has been made to Identify
code violations, no oversight by the
reviewer shall be construed as authority
to violate, cancel, alter or set aside
any applicable codes or ordinances. The
review and permit should not be construed
as a warranty or u rantee.
Reviewed By_.. _,...pate
— I3(eln.) 11iO�IC. s i7U1na,�, y
• ✓1OJ STAr&T$ Arr /
NEW PAIR OF FRENCH DOORS
TO REPLACE EXISTING WINDOWS
(SHOWN GASHED). ADJUST HEIGHT
TO MAXIMIZE ! CLEARANCE AT SOFFIT
RS AND SKYLI
2A1, 602A2, 602A3, S
ND SKYL
LLED TO COMPLY WIT
VE PRESSURES,
EXISTING
MASTER BATH
3RD FLOOR PLAN
1/8" = 1' 0"
rbitaNit?
Pa12ch
w�l
iiiz
RW1
APPROX. 4'
Sect. R- 311.5.6 HANDRAILS & R•312 GUARDRAILS
Stairs more than 30" in height require
3411311" handrails.
Porches, balconies, ramp & decks more
then 30" above grade require 36" guardrails.
Largest opening permitted Is 4"
WOOD PICKETS SPACED
TO PREVENT A P SPHERE
FROM PASSING THROUGH
1
TOP OFRECK LEVEL
TO BE A MERGER OF
EXISTIN( ROOF { SONG
EXISTINR FINISH
FLOOR OASHEDI
LL
EW REINFORCED
BLOCK COLUMNS W'
INISH TO MA CHE
CRET?
STUCO
IND
REAR (WEST) ELEVATION
118 " =1' -0"
HERON HIDEAWAY
1003 10TH STREET
CITY OF TYBEE ISLAND GEORGIA
INTERIOR PIERS
PER FEMA REQUIREMENTS
MINIMUM FOOTING 36 INCHES BY 36 INCHES
WIDE BY 20 INCHES THICK.
BOTTOM OF FOOTING MUST BE A
t,11liIMUM 36 INCHES BELOW GRADE.
NOTE. NEW REJNFORCED CONCRETE
BLOCK COLUMNS 1 FOUNDATION AND
NEW DECK FRAMMG TO BE DESIGNED
AND DETAILED BY STRUCTURAL
ENGINEER WITH GEORGIA. REGISTRATION
\isp
�> >
DI LIj
OK arc
as i tna
WOOD NETS SPACED
TO PR T AA SPHERE
SING THROUGH
TOP
TO BE
EXIST!
IIIIIIIIIIH1IUIIJJhIIIIJ1U
LER
iGER 0
SOMA P
IF tSYOWG
�I ON CRETE
yY1TN STUCCO
%ISTING
5.81' PER
SURVEY
1
�r
u
10.0"
20.81' PER SURVEY
SIDE (SOUTH) ELEVATION
118" : 1'- 0"
IIIII1I1IIIVIIIIIIIIIII
11111111111111 1111' 111111111
HERON HIDEAWAY
1003 10TH STREET
CITY OF TYBEE ISLAND GEORGIA
NEW REWFOE
BLOCK COLOR
F WISH TO MA1
NOTE NEW RENFORCEO CONCRETE
BLOCK COLUMNS I FOUNDATION AND
NEW DECK FRAMNO TO SE DESIGNED
ARO DETAILED BY STRUCTURAL
ENGINEER WITH GEORGIA REGISTRATION
WOOD PICKETS SPACED
TO PREVENT A 4" SPHERE
FROM PASSING THROUGH
I II IpIp II --'e- TOP OF RAIL
111111 �I��I�IA��I�III�� FINISH DECK
SIDE (NORTH) ELEVATION
178 " = 1'• 0"
TOP OF " CK IEVEI.
S TORE AT OO ER OF
EXISTI T ROOT / S
" 111111~ PA° SI
w
z_
z>
a lc
a»
OY
CLU
aL
HERON HIDEAWAY
1003 10TH STREET
CITY OF TYBEE ISLAND GEORGIA
5.81' PER
10' -0" SURVEY
20 81' PER SURVEY
APPROX. 2'
1003 10TH STREET
EXISTING 1 1/2 STORY
FRAME RESIDENCE ON
• RS / R
'1,4-1-1.1"1
tore dr Os •
— 5 Dot-
PROP.
V F-
EXISTING
NEIGHBOR'S
RESIDENCE
PLAN NORTH
w
z
a
0
0
a
7
5' ACCESS EASEMENT
APPROXI 4'
0
SITE PLAN APPROXIMATE
AND BASED ON SURVEY
FOR PAUL & CHARLOTTE
BERAN DATED 11/18/08
BY BERT BARRETT JR.
LAND SURVEYING, PC
,I❑
gutgetied
4-462pitizater
PR POSED RAISED^'' O.C.
IN D K SERVING TOP
FL OR / MASTER BR i II
PROP. LINE
80.00'
LINE OF 20' ACCESS
EASEMENT PER SURVEY
T
❑ �...S�Lrrov�-
10.87' (P R SURVEY) 10'- 0"
SITE PLAN
1^.: gyp•
0
U
W
LL
wa
APPROX.
9'- 3"
80.00'
PROP. LINE
0
PROP. LINE
VARIES 8.94'
TO 8.95'
20' FRONT SETBACK PER ZONING
MA.GS. a MAC NAIL SET
C.M.F. a CONCRETE MONUMENT FOUND
R.B.F. - REBAR FOUND
CONC. - CONCRETE
PORTION OF FIFTH AVENUE
NOw OR FORMERLY DANIEL J. O'LEARY
0.8. 313B -164
S 65'00'00' E --- S 65'00'00' E ---
11.25' 49.79'
ai m
d �
--4
CONCRETE SLAB
PORTION OF
HIGH GROUND
JACQUELYN R. BROWN
D.B. 3020 -576
D.B. 323J -446
48.59'
R.B.F.
I
4
LOT 144
NOW OR FORMERLY DANIEL J. O'LEARY
D.B. 3138 -164
80.00' i- 89.c11'
4
60 50' / 19.50' 4iK
20' ACCESS EASEMENT ✓ 4-`.0 v 0S
D.B. 2020 -264 v 3 %Y
O
wOOD »_ x x - x —x x- 1P
"8.95` o
to
(NI
7//////4Q4, / / / / / / / / //i
CIC EXISTING 1 -1/2 STORY
S 65'21'53" E
STATE OF GEORGIA
CHATHAM COUNTY
PLAT OF A PORTION OF FIFTH AVENUE AND 10th STREET
LOCATED IN WARD 3, ON TYBEE ISLAND AND KNOWN AS
No. 1003 FIFTH AVENUE, TYBEE ISLAND, GEORGIA.
FOR: PAUL at CHARLOTTE_ BERAN
DATE OF SURVEY: NOVEMBER 18, 2008
DATE OF PLAT: NOVEMBER 19, 2008
BERT BARRETT JR LAND SURVEYING, PC
145 RUNNER ROAD
SAVANNAH, GA. 31410
(912) 887 -0661
X
FRAME RESIDENCE
ON PIERS
/
/
/iii / / / ///// /// /iii //%
20.81'
6' HIGH o WOOD PRIVACY FENCE
Sc =x —)s = '.
80.00' N 6
PORTION OF FIFTH AVENUE
N
m
6500'00' w
10th STREET R/W VARIES
201.97'
LOT 145
NOW OR FORMERLY CECIL R. & ELIZABETH JOHNSON
0.8. 1591 -375
20
GRAPHIC SCALE
0 20
40
1 inch s 20 it
REFERENCES:
1. DEED 800KS 1090 -240, 2020 -264,
211M-691. 2660-187. 3020 -576.
323J -446 & 3050 -246.
2. PLAT RECORD 8000( 33P -02.
E.O.C. FIELD
< ERROR/POINT
ADJ. METHOD
E.O.C. PLAT
TOTAL STATION
1/ 18,000
1'
NONE
1/ 30.322
GEOMETER 610
N 65'21'53` W
109.93'
o;
d
4
U
IN MY OPINION THIS PLAT IS A CORRECT
REPRESENTATION OF THE LAND PLATTED
PROJECT \00101 -C 11 -19 -08 9:23:31 am EST
U.S. DEPARTMENT OF HOMELAND SEC...., n
Federal Emergency Management Agency
National Flood Insurance Program
ELEVATION CERTIFICATE
Important: Read the instructions on pages 1-8.
OMB No. 1660 -0008 '
Expires February 28.2009
SECTION A - PROPERTY INFORMATION
A1. Building Owner's Name PAUL AND CHARLOTTE RERAN
For Insurance Company Use:
Policy Number
A2. Building Street Address (including Apt, Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No.
1003 5T" AVENUE
Company NAIC Number
City TYBEE ISLAND
States GA ZIP Code 31328
A3. Property Description (Lot and Block Numbers, Tax Paroei Number, Legal Description, eta)
PORTION OF10T31 STREET & 5"' AVENUE, WARD 3, TYBEE ISLAND. GEORGIA
A4. Building Use (e.g., Residential. Non - Residential, Addition, Accessory, etc.)
A5. Latitude/Longitude: Lat. 32.00195 Long. $0.84883
A6. Attach at bast 2 photographs of the building if the CertMcate is being used
A7. Building Diagram Number ;?
A8. For a budding with a crawl space or endosure(s), provide
a) Square footage of crawl space or enclosure(s) NIA sq ft
b) No. of permanent hood openings in the crawl apace or
endosure(s) wails within 1.0 foot above adjacent grade y(_q
c) Total net area of hood openings in A8.b WA sq in
RESIDENTIAL
Horizontal Datum: ❑ NAD 1927 NAD 1963
to obtain flood insurance.
A9. For a building with an attached garage, provide:
a) Square footage of attached garage PIA sq ft
0) No. of permanent flood openings in the attached garage
walls within 1.0 foot above adjacent grade yL
c) Total net area of flood openings in A9.b
sq in
SECTION B - FLOOD INSURANCE RATE MAP (FIRM) INFORMATION
131. NFIP Commurrty Name & Community Number
TYBEE ISLAND, GEORGIA - 135164
B2. County Name
CHATHAM
IR3 State
GA.
B4. Map/Panel Number
85. Suffix
B6. FIRM Index
87. FIRM Panel
B8. Flood
B9. Base Flood Elevation(s) (Zone
Date
Efective/Revised Date
Zone(s)
AO, use base flood depth)
130510:3213
F
9/2808
9/26/08
AE
11
610. Indicate the source of the Base Flood Elevation (BFE) data or base flood depth entered in Item 89.
❑ FIS Profile ® FIRM ❑ Community Determined ❑ Other (Describe)
B11. Indicate elevation datum used for BFE in Item 89: ❑ NGVD 1929 IS NAVD 1988 ❑ Other (Describe)
812. Is the building located in a Coastal Barrier Resources System CBRS) area or Otherwise Protected Area (OPA)? ❑Yes No
Designation Date N/A 0 CBRS ❑ OPA
SECTION C - BUILDING ELEVATION INFORMATION (SURVEY REQUIRED)
C1. Building elevations are based on: ❑ Construction Drawings' ❑ Budding Under Construction' IS Finished Construction
'A new Elevation Certificate will be required when construction of the building le complete.
C2. Elevations - Zones A1-A30, AE, AM, A (with BFE). VE, V1 -V30, V (with BFE), AR, AR/A, AR/AE, AR/A1-A30, AR/AH, AR/AO. Complete Items C2.e-g
below according to the hooding diagram specified in item AT.
Benchmark Utilized LQL Vertical Datum NAVD 1988
Conversion/Comments NONE
a) Top of bottom floor (including basement, crawl space, or enclosure floor)_
b) Top of the next higher floor
c) Bottom of the lowest horizontal structural member (V Zones only)
d) Attached garage (top of stab)
e) Lowest elevation of machinery or equipment servicing the building
(Describe type of equipment in Comments)
Lowest adjacent (finished) grade (LAG)
Highest adjacent (finished) grade (HAG)
f)
9)
Check the measurernert used.
7,5 ® feet ❑ meters (Puerto Rico only)
25.1§ ® feet ❑ meters (Puerto Rico only)
N /A._ ® feet ❑ meters (Puerto Rico only)
NIA._ IS feet ❑ meters (Puerto Rico onty)
§a.COMMENT8 ® feet ❑ meters (Puerto Rico onty)
5.8
6.)}
® feet
IS feet
D meters (Puerto Rico only)
❑ meters (Puerto Rico only)
SECTION D - SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION
This certification is to be signed and sealed by a land surveyor, engineer, or architect authorized by law to certify elevation
information. / certify that the information on this Certificate represents my best efforts to interpret fhe date available.
I understand that any false statement may be punishable by Tine or imprisonment under 18 U.S. Code, Section 1001.
El Check here if comments are provided on back of form.
Certifier's Name BERT 8. BARRETT, JR. License Number GA 2225
Title PRESIDENT Company Name BERT BARRETT, JR. LAND SURVEYING. P.C.
Address 1 R N - ROAD
City SAVANNAH State GA ZIP Code 31410
Date 10/29/08 Telephone 912 -897 -0661
FEMA Form 81 -31, February 2006
See reverse side for continuation.
Replaces all previous editions
WARNING: Due to the possibility that changes may have been done to this residence after this elevation certificate was signed and dated by the
surveyor, it is recommended that caution be taken in using this elevation certificate by anyone other than the person indicated in section Al
IMPORTANT: In these spaces, copy -.,a corresponding Information from Section A.
Building Street Address (including Apt., Unit, Suits, and/or Bldg. No.) or P.O. Route and Box No.
1003 5TH AVENUE
City TYBEE ISLAND State GA ZIP Code 31328
For Insurance Company Use:
Policy Number
Company NAiC Number
SECTION D - SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION (CONTINUED)
Copy both sides of this Elevation Certificate for (1) community cricial, (2) insurance agenGcampenY, and (3) building comer.
Comments 1, THE ELEVATION OF THE OUTSIDE HATPUMP UNIT (CONDENSER) IS M 11.57 NAVD 1988.
2. ALL MACHINERY WiTHIN THE FOUNDATION WALLS SERVICING THE BUILDING ARE AT AN ELEVATION OF 1625 NAVD 1988.
3. GAR N ETREX LEG ND GPS UNR USED TO OBTAIN LAT/LONG
Signature
Date 10129/08
❑ Check here If attachments
SECTION E - ISUILDINZs ELEVATION INFORMATION (SURVEY NOT REQUIRED) FOR ZOt4E AO AND ZONE A (WITHOUT BFE)
For Zones AO and A (without BFE), complete Items E1-E5. if the Certificate is intended to support a LOMA or LOMR -F request, complete Section A, 8,
and C. For Items E1-E4, use natural grade, if available. Check the measurement used. In Puerto Rico only, enter meters.
E1. Provide elevation information for the following and check the appropriate boxes to show whether the elevaton is above or below the highest adjacent
grade (HAG) and the lowest adjacent grade (LAG).
a) Top of bottom floor (including basement, crawl space, or enclosure) is La. ❑ feel ❑ meters ❑ above or ❑ below the HAG.
b) Top of bottom floor (including basement, crawl space, or enclosure) Ia 19(g. ❑ feet ❑ meters ❑ above or 0 below the LAG.
E2. For Buidding Diagrams 6-8 with permanent flood openings provided in Section A Items 8 and/or 9 (see page 8 of Instructions), the next higher loos
(elevation C2b in the diagrams) of the building Is N(g. 0 feet ❑ meters ❑ above or ❑ below the HAG.
E3. Attached garage (top of slab) is &A. ❑ feet ❑ meters ❑ above or ❑ below the HAG.
E4. Top of platform of machinery end/or equipment servicing the bulkiing Is ,W.A. ❑ feet ❑ meters 0 above or ❑ below the HAG.
E5. Zone AO only: if no flood depth number is avatabte, is the top of the bottom /nor elevated In accordance with the community's itoodplain management
ordinance? ❑ Yes ❑ No ❑ Unknown. The local official must certify this information in Section G.
SECTION F - PROPERTY OWNER (OR OWNER'S REPRESENTATIVE) CERTIFICATION
The property owner or owner's authorized representative who completes Secbons A, 8, and E for Zone A (without a FEMA-issued or community-issued BFE)
or Zone AO moat sign here. The statements it Sections A, B. and E ere correct to the beat (Only knowledge.
Property Owners or Owner's Authorized Representative's Name
WA
Address N/A
City NIA
State N/ ZIP Code WA
Signaha>a N/A
Date WA Telephone N/A
Comments N/A
SECTION G - COMMUNITY INFORMATION (OPTIONAL)
❑ Check here ii attachments
The local offidal who is authorized by law or ordinance to administer the community's floodptaln management ordinance can convicts Sections A B. C (or E),
and G of this Elevation Certificate. Complete the appticeble item(s) and sign below. Check the measurement used in Items G8. end G9.
G1- ❑ The information in Section C was taken from other documentation that has been signed and sealed by a licensed surveyor, engineer, or architect who
Is authorized by law to certify elevation information. (Indicate the source and date of the elevation data in the Comments area below.)
G2. ❑ A community official completed Section E for a building located in Zone A (without a FEMA- issued or community-issued BFE) or Zone AO.
G3. ❑ The following information (Items G4. -G9.) is provided for community floodplain ranagement purposes.
G4. Permit Number
N/A
G5. Date Permit Issued
N/A
G6. Date Certificate Of Compliance/Occupancy Issued
N/A
G7. This permit has been issued for: ❑ New Construction ❑ Substantial improvement
G8. Elevation of as -buttt lowest hoof (including basement) of the building: iI/A. A feet ❑ meters (PR) Datum N/A
G9. BFE or (in Zone AO) depth of flooding at the building site: N/A ❑ feet ❑ meters (PR) Datum NSA
Local Officials Name N/A
Title WA
Community Name N/A
Telephone N/A
Signatue WA
Date N/A
Comments N/A
FEMA Form 81 -31, February 2006
Replaces at previous editions
Building Photographs
See Instructions for Item A6.
For Insurance Company Use:
Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No.
1003 5TH AVENUE
Policy Number
City TYBEE ISLAND State GA ZIP Code 31328
Company NAIC Number
If using the Elevation Certificate to obtain NFIP flood insurance, affix at least two building photographs below according to
the instructions for Item A6. Identify all photographs with: date taken; "Front View" and "Rear View"; and, if required, "Right
Side View" and "Left Side View." If submitting more photographs than will fit on this page, use the Continuation Page,
following.
RIGHT SIDE VIEW
FRONT VIEW
REAR VIEW
Chatham County Board of Assessors: 21)11 Property Record Card 4-0012-01-01c
2011 Chatham County Board of Assessors
Property Record Card
Page 1 of 2
4- 0012 -01 -015
1003 5TH ST TYBEE ISLAND
APPRAISER LESTEPH
LAST INSP 06/21/2010
APPR ZONE 000008
INTERSECTION OF TENTH ST + FIFTH AVE TYBEE PRB 33P 2 PRB 41P 43 BERAN PAUL & CHARLOTTE
6831 GLENDORA AVE
DALLAS TX 75230
CAMA ASMT
151,700 151,700 LAND 2
161,100 161,100 BLDG 1
OBXF 0
312,800 312,800 Cost - MS
SALES BOOK / INS VI QU RSN PRICE
PAGE
23 Oct 347L 0712 WD I U FS 317,000
2008
GRANTOR:JP MORGAN CHASE BANK NAT
GRANTEE:BERAN PAUL & CHARLOTTE
05 Aug 344Z 0331 NA I U FC 507,516
2008
GRANTOR:BROWN JONATHAN WILLIAM &J
GRANTEE:J P MORGAN CHASE BANK
NATIONAL ASSOCIATION
14 Apr 305D 0246 QC I Q QX
'2006
GRANTOR:BROWN
GRANTEE:BROWN JACQUELINE B
26 Aug 257T 397 NA I U UG
2003
GRANTOR:BROWN JONATHAN
GRANTEE:BROWN JACQUELINE BARDETTE
21 Apr 202Q 263 NA V U UG
1999
GRANTOR:BROWN JACQUELYN R
GRANTEE:BROWN JONATHAN WILLIAM
PERMITS TYPE DATE AMOUNT
10 -0046 WO 21 Jun 2010 Comp 12,200
080438 GM 17 Oct 2008 Issued 9,800
COMMENTS:
13 Oct 2008
25 Mar 2008
13 Mar 2007
12 Jun 2006
26 Apr 2002
TY09 10S REM 10/13/08 LN
FOR SALE 5/29/07
ADD CNG PER ONR 3/1/07
APW
2007 DIMENSION CHG PER
PRB 33P 2 6/1/206 PL
CODE 10S ENT SYI 4 -26 -02
LAND
ID# USE DESC
111306 SINGLE FAMILY RES
111307 SINGLE FAMILY RES
[Click for larger picture]
'.f
.. .t Chatham County
Tax Commissions r
CODES
PROPERTY 0006 RESIDENTIAL
USE
UTA 0004 Tybee Island
NBHD 020222.00 T222 TYBEE
HORSE PEN
EXEMPTIONS
HISTORY LAND
2011 151,700
2010 186,000
2009 186,000
2008 286,000
2007 240,000
2006 69,500
2005 69,500
2004
2003
2002
2001
2000 12,000
1999 12,000
1998 12,000
1997
1996 9,840
1995 9,840
1994 9,840
1993 9,840
1992 9,840
IMPR
161,100
132,500
132,500
133,500
133,500
187,000
187,000
194,000
194,000
TOTAL
312,800
318,500
318,500
419,500
373,500
256,500
256,500
256,500
194,000
194,000
194,000
12,000
12,000
12,000
12,000
9,840
9,840
9,840
9,840
9,840
Cama
MAV
Over
Cama
Cama
Over
Over
A/C
Over
Over
A/C
Cama
Cama
Cama
A/C
Over
Over
Over
Over
Over
FRONT DEPTH UNITS / TYPE PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE
0 0 4,500.00 -SF 62.00 R2 147900
0 0 460.00 -SF 62.00 R2 SZ -75 3800
http: //boa. chathamcounty. org/DesktopModules/ ChathamCounty / BoardofAssessors /PropertyRecordCard. asp... 4/18/201:
Chatham County Board of Assessors: 7611 Property Record Card 4-0012-01-01c
2011 Chatham County Board of Assessors
Property Record Card
BUILDING SECTION
86648 -1
Page 2 of 2
4- 0012 -01 -015
1003 5TH ST TYBEE ISLAND
CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PHYS ECON FUNC OBSV / % TOTAL DEP % RCNLD U.FACTOR MKT VAL
Residential
177,060 2000 2000 MS 9.00 0.00 0.00 0.00 9.00 161,125 161,100
Or-srr Pawl
2113
10
12•
18'
x+63
Weed beck
34
Woo
Base 2Alor..cr.
N
.13.11
Or- star Nrtr
28'
10 •sm
_�— „L1.cbu4 Pact Sccecan W
10'
.41
Ores etas Palo►
Y
11901
Orr. sloe Parr
236
[Click for larger picture]
SECTION TYPE
AREA
TYPE
FRAME
STYLE
QUALITY
CONDITION
# UNITS
# OF BEDS / BATHS
1 - Main
1822
1 - Single- family Residence
1 - Stud Frame
5 - 1 1/2 Story Finished
4.00
3.00
0
3 / 2.10
COMPONENTS Units % QUAL
R1 108 Frame, Siding, Wood 100.00
R2 208 Composition Shingle 100.00
R3 352 Heat Pump 100.00
R4 402 Automatic Floor Cover Allowance
R6 601 Plumbing Fixtures ( #) 12.00
R6 602 Plumbing Rough -ins ( #) 1.00
R6 622 Raised Subfloor (% or SF) 100.00
R6 642 Single 2 -Story Fireplace ( #) 1.00
R11 901 Open Slab Porch (SF) 40.00
R11 901 Open Slab Porch (SF) 236.00
R11 901 Open Slab Porch (SF) 598.00
R11 901 Open Slab Porch (SF) 208.00
R11 901 Open Slab Porch (SF) 34.00
R11 903 Wood Deck (SF) 180.00
R11 90,3 Wood Deck (SF) 34.00
R11 904 Slab Porch (SF) with Roof 40.00
R11 904 Slab Porch (SF) with Roof 384.00
R11 907 Enclosed Porch (SF), Screened Walls 236.00
http: //boa. chathamcounty. org/DesktopModules/ ChathamCounty / BoardofAssessors /PropertyRecordCard. asp... 4/18/201:
Printing: Layout Page Page 1 of 1
914Gl9Savannah Area GIS
9avonnah Area Geographic
Information System
1
Owner:
PIN:
Property Address: 1003 5TH ST
Zoning: RR =2
Flood Zone:
Aldermanic Code:
BERAN PAUL Et CHARLOTTE
4 -0012 -01 -015
AE
Unincorporated Chatham County
4
Commissioner Code: Patrick K. Farrell
Phone: 912 - 355 -6699
Voting Precinct: 4 -11C
Elementary School: HOWARD ELEMENTARY
Middle School: ISLANDS
High School: COASTAL
Zip Code: 75230
Neighborhood Code:
Calculated Acreage: 0.1081484
Land Value: 151700
Building Value:
Real - estate Value:
Sale Price:
Sale Month:
Sale Day:
Sale Year:
Legal Description:
Property Card:
Powered by BInaryBus
317000
10
23
2008
INTERSECTION OF TENTH ST + FIFTH
Click Here
http: // www.sagis.org/app /NET /print.aspx 4/18/201: