Loading...
HomeMy Public PortalAboutPCM 1999-02-24ERASER PLANNING COMMISSION FEB. 24, 1999 The regular meeting of the Planning Commission was called to order at 7:30 p.m. Present were Chairman Buchheister, Johnston, Sanders and Wirsing. Staff present were Trotter, Reid, Stone and Winter. Wirsing made a motion to approve the minutes of Dec. 9, 1998 meeting, 2nd Sanders, carried. MOUNTAIN VIEW TOWNHOMES III Johnston moved to open the public hearing, 2nd Wirsing, carried. Trotter presented the proposed plat fora 3 unit townhome and advised of staff recommendation pending certain items. Johnston moved to close the hearing, 2nd Wirsing, carried Johnston made a motion to approve the plat for Mountain View Townhomes III with the following conditions: 1. Making the technical plat changes as discussed by Trotter. 2. Pay both the park and school fees prior to Town Board review. Motion 2nd by Sanders, carried. GRAND COUNTY WA x arc AND SAI~x CATION DISTRICT WASTEWATER TREATMENT FACILITY SPECIAL REVIEW Trotter gave the Board background of the project. Allan Pratt and the other parties gave a brief overview of the project as submitted Two variance are being requested. One for an on-site water well and the other for height variance. Trotter reviewed items or concerns that are still pending and need to be addressed in some manner. After lengthy discussion on the issues, Wirsing made a motion to recommend to the Town Board that a height variance be granted, 2nd Johnston, carried. Johnston made a motion to recommend a variance to allow a water well on site, following the state guidelines for wells, and subject to the condition that the well is abandoned when a water main becomes adjacent to the site and within 100' feet of the South end of the property, 2nd Sanders, carried. Jeff Kirkendall asked what requirements were for set backs from a wastewater treatment plant as Maryvale has a devel.,r..,ent parcel adjacent to the site. Pratt stated that it was 100 feet. ýÿ Wirsing made a motion to approve the GCW5D site application with the following conditions: 1. Approval of the 201 Plan. 2. Approval of the site application by CDPHE. 3. Dust controlled during construction. 4. An impervious barrier is placed under the primary detention area extending an additional 2 feet in elevation. 5. Outdoor lights to be unobtrusive. 6. As bunts of the existing site specifically regarding the clay liner, provided to the Town. 7. A specific timeframe for the pond reclamation will be approved by the Town. S. Site regrading will NOT impact the existing clay liner. A11 construction documents relating to site excavation will be provided to the Town and 48 hour notice prior to any excavation work will be provided to the Town. 9. Prior to issuance of the temporary CO, GCWSD will provide a plat of the entire 24 acre site that clearly delineates the developable parcel and the open space parcel. 10. Prior to issuance of a building permit, GCWSD will provide the Town a copy of the state required storm water management plan. 11. Prior to final grading, construction grading will insure no run-off fi.,.,, the site will enter the basin excavation site. 12. Proof of site access and easements identified. 13. Roof dormers added over the man doors. 14. Landscaping beefed up! more trees in back side and change out some Aspen for evergreens. Motian 2nd by Johsnton, carried STAFF CHOICE Trotter reviewed that the Staff is studying the Zoning and subdivision regulations as they relate to accommodating employee housing. A workshop will be held on this issue. No further business, meeting adjourned at 10:40 p.m.