HomeMy Public PortalAbout12-0242 BodineCity of Tybee Island • Planning & Zoning Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.472.5032 • Fax 912.786.9539
Permit No. /2 -0 ZU 1 Date Requested
Owner's Name i�.nT.; . Date Needed
Gen. Contractor Subcontractor
Contact Information %/% /C/14'`".�
Project Address / /
Scope of Work �r!
Inspector
Inspection ) : % 1= A Pass J F+4 Fee
MOW
i�s�s�
INTERNATIONAL
CODE COUNCIL
MEMBER
Date of Inspection
s
? LA:46 VL. Di..)0-2. 1.----0(1-) I:* /2r-',,--/ )
eel CA 4 im<
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
mot
INTERNATIONAL
CODE COUNCIL
MEMBER
eee
y City of ,ee Island • Community Develor ant Dept.
Inspection Report
/j 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
t / Phone 912.786.4573 ext. 114 • Fax 912.786.9539
Permit No. // °- bli /4?74 Date Requested .063A.1-
Owner's Name -BO/)/1lf Date Needed 0 'e //5ho2 --
Gen. Contractor OG.l7 -1 Subcontractor
Contact Information A41.511/4 J55 h 5e
Project Address U%_
Welyi
Scope of Work De. a/t D Dkv .K e 6 Ti4 /�°S
Inspector /'11`7
Inspection C ihC f /' A/A L,
Inspection .Ll rec. 1 Ji4
Date of Inspection > 1 I
Pass El Fail ❑ Fee
Pass ❑ Fail Fee j\
��1=• A�1`�1 ovl`rZ "n�ii�- 'vv�lz Q0-j- , NN
eorJ J 1?JG tic P-1 twit- ?) ?u iDT. FUtlt)4Ji ,J6 FPIL`'\
Inspection 1 Pass El Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
City of T, ee Island • Community Develop►._..nt Dept.
Inspection Report
403 Butler Ave. • P.U. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
INTEP,NM ONAL
CODE COUNCIL'
MEMBER
Permit No. ( 2 - 3 2 (4 2- Date Requested ` / - I -•-
Owner's Name • r)-Q'' Date Needed 6- ` " I 2-
Gen. Contractor 5 J'-i, 5'k -� r Ci Subcontractor
Contact Information
Project Address
Scope of Work
Inspector
s ASS- 8'x33
I td
b
re I� dck -+-
�.
,rs
Inspection
Date of Inspection
1)0414-. , f yW r.) L.)
Pass
Fee
Inspection Pass El Fail ❑ Fee
Inspection Pass ❑ Fail [J Fee
Inspection Pass ❑ Fail ❑ Fee
DATE ISSUED: 04 -25 -2012
WORK DESCRIPTION
CITY OF TYBEE ISLAND
BUILDING PERMIT
REBUILD DECK/STAIRS
WORK LOCATION 3 NAYLOR
OWNER NAME & RICE BODINE
ADDRESS 3 NAYLOR AVE
CITY, ST, ZIP TYBEE ISLAND GA 31328
PHONE NUMBER
CONTRACTOR NAME SOUTH SHORE BUILDERS INC
ADDRESS BARNEY PADEREWSKI
CITY STATE ZIP SAVANNAH GA 31416
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 99.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $6,800.00
PERMIT #: 120242
TOTAL BALANCE DUE: $ 49.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
I) -D2�Z
Location: 3 flc /[ �V
Y
NAME
J
ADDRESS
PIN #
TELEPHONE
Owner
Pit-6d' Mlle,
3 /96Q% i�
Architect
or Engineer
I
U ao,,,,_
/
Building
Contractor
r
GRC�,Pet,OS
-7 `1�---
�V ,
_
� Sb
//
't/ (0 %5''11 b
cif Z
�g03
)
(Check all that appl )
Repair 'Dec ❑ Residential
❑ Renovation ❑ Single Family
❑ Minor Addition ❑ Duplex
❑ Substantial Addition ❑ Multi - Family
❑ Other ❑ Commercial
Details of Project: E' Yy) r Ex
�0 ntm cod e
Estimated Cost of Construction: $ 6 d
VvitC, A 4 Ls
S ›I
Construction Type (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use: D etk
Remarks:
n Footprint Changes
❑ Discovery
❑ Demolition
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units / # Bedrooms # Bathrooms
Lot Area Living space (total sq. ft.) (2i, -,
# Off - street parking spaces ii-
Trees located & listed on site plan �- o
Access: Y ( ) ��l /� �C/1J Ii-Py'
"v `.` (,-
Driveway ft. With culvert? With swale?
Setbacks: Front Rear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provided
Construction debris will be disposed by
y
)vs % ✓' 5 1. v ►&
by means ofpu, ,p�
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as-built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. . ept
responsibility for any corrective action that may be necessary to re tore- drainage ' . ai d by this
permitted • nstruction.
Date:
Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning/variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
NFIP Flood Zone
Existing
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm/Drainage
Inspections
City Manager
I2- OI(oco
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL
co
LEAD -BASED PAINT
Adapted from htto:// www. epa .gov/lead/pubs /renovation.htm. Please use that site to access the following information.
Information for Property Owners of Rental Housing, Child- Occupied Facilities
Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space
rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard
information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers,
and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample
pre- renovation disclosure form may be used for this purpose.
After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented
by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation,
Repair and Remodeling rule. To become certified, property owners must submit an application for firm
certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for
certification to approve or disapprove the application.
Property owners who perform renovation, repairs, and painting jobs in rental property should also:
• Take training to learn how to perform lead -safe work practices.
• Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
• Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
Information for Homeowners Working at Home
If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project.
However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home
and planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1 -800-
424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint.
Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools
As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is
performed in your home, or in the child care facility or school that your child attends.
• Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants
sign a pre- renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information
pamphlet.
• Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of
children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child
care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet.
Information for Contractors
As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create
dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation,
repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and
child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families,
Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre- renovation disclosure form may
be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work
practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm
certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application.
Contractors who perform renovation, repairs, and painting jobs should also:
• Take training to learn how to perform lead -safe work practices.
• Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair,
and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may
take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to become a
certified renovator. Click here for a list of eligible courses.
• Provide a copy of your EPA or state lead training certificate to your client.
• Tell your client what lead -safe methods you will use to perform the job.
• Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010.
• Ask your client to share the results of any previously conducted lead tests.
• Provide your client with r ences from at least three recent jobs involving homes built before 1978.
• Keep records to demonstrat that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on th job. To make recordkeeping easier, you may use the sample recordkeepinq checklist that EPA has
de - _ - d to help contra rs comply with the renovation recordkeeping requirements.
• e. e ... ut how t. com y with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
ad about ho o e lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
YOU'RE NOT
EAD- SAFECERTIFIED,
ISTURBING
JUST SIX
SQUARE FEET
COULD COST YOU
BIG TI
Si nature / Date
Printed Name
DM. O
KEMAL
RESOURCES
GEORGIA
Permit Acknowledgement of
Asbestos/Environmental Notification to Georg a EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or ,site . site conditions may have EPD regulations that could affect the
projec
i
Und signed
Printed Name
Date
Office Use Only:
Project Address:
Permit Number:
An Apprixasd Set 4 Plans Must
Regiu-4..,1 on v`.ab ite at :4t I limas"
FOR CO COMPUANC1,2
Every egort hos been mz..,Je te- idenZity
code vio:ationn, overt by the
reviewer sii b6. -..siistruee as authority
to violate, co,nr-.A, t6; .z..4 set aside
any applicable E.00a rir ordinances. The
review OA permit should bt: construed
as a warranty or ;;uarantee.
/
Reidewne f'
ALL CONRTPITTION MUST COMPLY WITH THE
SSTO to _ AND THF !RC 'Or AND TWO
i.Pauty- --cODE
P STATE Ot ORGIA -AMENDMENTS
.
••••••••■•••
I I 11 TF I
■
W*Ae're-
Gag"
it I,
C.Z,I31> 1.IaChrli A) 4,
$P4cie-ert)
c't-s1 1-$4f
riCIAtc11.5.6, IBC 1012.1
-IANDRAILS REQUIRED.
34" to 38" in height with continuous,
uninterrupted grip.
IRC 312, IBC 1013
GUARDS REQUIRED.
Porches, balconies, decks, ramps, stel
more than 30" above floor or grade:
RESIDENTIAL — minimum height 36"
COMMERCIAL — minimum height 42"
1---1 0 Largest opening permitted is 4".4K
d‘x 41 5
Cop
57G, Hanata;
4g
axP. cke-tS
.514-Y becki/w
,
••¶._!... 1 •
I,
•
P,1.11 rtif
• C.:0-‘1.Y*1.‘
5ca.14e, -----
1.'1mPa:41 PeAtasta6t
+/P
IJ Se.
L+f4.111-.-
C14100*Te-
•
6)fooi-ex st
N
3&`1(
• .- ■•#,A3
144444 1),
NEW
Th—Oarv)(a6 -L -
1 (I 1-4 s 8
A
_0.0( R jr.i ILA 4.CP ,04im 4/Pic_ckf
Fr o...Nrn 'If.N a it rilick4( ;Al Ps T
_6c9,1e.
;2y10 E 743'0
•
Scale
Naylor
Ave
6.4' ±0.0
L
I
8.1' ±0.0
Existing
deck
rL
I
/I
N
Hosti
IMVTY
!i!¢1/1cb ►1G5
t AVem u�
sovw
T lu 44.0o'aO`E
LO
qo.
1'
net
L-o-r
sa,
CK
n►Vasuur 03 a
30 bB revisor
.M.
WS
5 7 poerfo,J 'F
I tar
C.0.4
Oct
ZikS
lb A¢AD0-
Clot Ftoatt )
-'• um,
PW.ke. otrh,n�
6,.•
MD-
POILlaa
P14J *
105 .t�.
eax»i ' �rid r 1.z•
r R't AII
74 • Sr/
ICI
FEiJG!!.
•
--
0119-
74• -Sr/ l
w
Feb 14 04 04:01p Bonnie Gaster
1
(912)78G -8703
p•G
ji
t I•
4 ,. -y
a L •:;1-: 1
UIC•Kt R/1) 0, AN