HomeMy Public PortalAbout12-0243 DanaCity of Ty.,ee Island • Community Development Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
Permit No. 12 -0 Z �z
Owner's Name -L r.)�
Date Requested s7 i L
Date Needed ��� f ►7J.
Gen. Contractor Subcontractor &D(A) c), )
Contact Information I I S(4-:; - ZW? - iOJ�
Project Address
Scope of Work
Inspector
Mak
:ie :,
INTERNATIONAL
CODE COUNCIL
MEMBER
I-� 'mac_.,..
(fir ='t- �S1c r3
7/ ro4 Date of Inspection S 791 / /. .
Inspection „aQ 1 -
0
Pass Fail ❑ Fee
Inspection Pass Fail (""j Fee
Inspection Pass Fail El Fee
Inspection Pass ❑ Fail ❑ Fee
r
DATE ISSUED: 04 -25 -2012
WORK DESCRIPTION
CITY OF TYBEE ISLAND
BUILDING PERMIT
MECH - SUPPRESSION FOR HOOD
WORK LOCATION 16 TYBRISA
OWNER NAME MARK DANA
ADDRESS PO BOX 1767
CITY, ST, ZIP TYBEE ISLAND GA 31328
PHONE NUMBER
CONTRACTOR NAME LOW COUNTRY FIRE & SAFETY LLC
ADDRESS 26 JOE KENNEDY BLVD STE 23
CITY STATE ZIP STATESBORO GA 30458
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 55.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $2,000.00
PERMIT #: 120243
TOTAL BALANCE DUE: $ 55.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
1�,
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
CITY OF TYBEE ISLAND
COMMUNITY DEVELOPMENT DEPARTMENT
P.O. Box 2749 • 403 Butler Ave., Tybee Island, GA 31328
Phone (912) 786 -4573 • Fax (912) 786 -9539
MECHANICAL PE ' MIT APPLICATION
Location of work (street address) 1 '47 I 0A)e,40 \'t`)
Contractor i -cv (o F ;cc- t_c6,44,
Address of contractor 71'2 „,, E Z
Contact name & telephone number of contractor --- xs; i gL --- 27-17 —70'32'
Name of property owner
t/0,11,
Mailing address of property owner
Telephone number of property owner
Residential Commercial
New Work Replacement �,, 1
Details of project 1(15-6-\J r '� �'” 5 �' ""'`" I -64
Estimated cost of construction
Date work will be ready for inspection, if known
ATTENTION:
Permit Number
Inspections for Mechanical Permits are required and will be in accordance with the
International Residential Code or the International Mechanical Code and the Georgia
Amendments.
Requirements for `change- outs" will not be less than the requirements for new installations. In
addition, elevation of outside condensing units for FEMA compliance is required. Plan
accordingly. Please ask if you have any questions.
/7
Owner /Contractor signature Date
r i G-.- ers i+7
Owner /Contractor printed name