HomeMy Public PortalAbout12-0247 SkaggsCity of '1,.,ee Island • Community Develop._.ent Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
Permit No. " l� Z t4 I
Date Requested 14 - Z b ( .
Owner's Name S ka 3 g S Date Needed
Gen. Contractor a [ Q_ -'..-._\e6... Subcontractor
Contact Information ' L k \,s212.. . 313- (.a4 D
Project Address 3 4 ---r-k . C 4-e_2_ ^ 4k S�
r
INTERNATIONAL
CODE COUNCIL
MEMBER
Scope of Work P \ e
Sepdro, 5erv,c_e a ei
Inspector 1/ Date of Inspection %�= / t�
Inspection -i- . Gz e \ e L . Pass ® -I D Fee
A
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass El Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
TX Result Report
P 1
05/04/2012 16:19
Serial No. CM35228060004
TC: 331847
Destination
Start Time
Time
Prints
Result
Note
18888514411
18888514411
05 -04 16:14
05 -04 16:18
00:00:46
00:00:59
000 /001
001 /001
Cont
OK
Note
TM: IX: Timer Origginal_TX11CALL:OManual1TX. Original Size 9FWD:FForward. PC: PC -Fax.
RLY: Relay. MBX: Confidential. : BulletPinC1SIP rSIPnFax.FIPADR:FIP Address Fax.
I -FAX: Internet Fax
Result OK: Communication OK, S -OK: Stop Communication, PW -OFF: Power Switch OFF,
TEL: RX from TEL, NG: Other Error, Cont: Continue, No Ans: No Answer,
Refuse: Receipt Refused, Busy: Busy, M- Full:Memory Full,
LOUR:Receiving length Over, POVER:Receiving page Over, FIL :File Error,
DC:Decode Error, MDN:MDN Response Error, DSN:DSN Response Error.
e_ }G�>c.t n �-
1> ot4
I - 888 --74 S -1a '4
-pr-ss 1. ex-f-- 3 2 SSSor
2.13 _Ste)
RELEASES FOR ELECTRIC SERVICE FROM TYBEE ISLAND
FOR :. _ VAX TO❑ Tom..___- - - -- 93.2=9:4.1=3w Pho
crj@org:at moo. 9
2
ozs�n FA : i- SSS- SSi -�-1 it
Location Address: Lot # Release Date_ ��ij•y
Type of Release: Temporary ✓ Permanent Subd Name:
Electrician:
Owner/Builder:
Electrician Phone Number:
Phone Number:
.. /1'› �Sg
r ds
Qs
12 / (p �o r..a_S ve.-" v g
Location Address:
Type of Release: Temporary Permanent Subd Name:
Electrician:
Lot #
Release Date:
OwnerBuilder:
Electrician Phone Number:
Phone Number:
Location Address: Lot #
Type of Release: Temporary Permanent Subd Name:
Electrician:
Release Date:
Owner/Builder:
Electrician Phone Number:
Phone Number:
e-Pa0NE
I-'? S- 748 -(0 '43
-press l) ex4.32P6So
32850
RELEASES FOR ELECTRIC SERVICE FROM TYBEE ISLAND
FOR . FAX TO: 9-37 Pho
Fieorg ;a Pocver / z45- (4 - 26)4,4c.
/2 •afr7 FAX : I -g88 -251 - 44 U - ,
74414 /40,5Z '141'
Location Address: '% 7,(C%5�:�= Jl� S' Lot # Release Date: 1 no
Type of Release: Temporary ✓ Permanent Subd Name:
Electrician: -por_.
Owner/Builder: ' leAeosfr$
Electrician Phone Number: 3 f 1j. -GC°0
Phone Number:
10 ovf reeargs GiS (2I(p rte-s Avenae.
Location Address:
Type of Release: Temporary
Electrician:
Lot # Release Date:
Permanent Subd Name:
Owner/Builder:
Electrician Phone Number:
Phone Number:
Location Address:
Type of Release: Temporary
Electrician:
Owner/Builder:
Lot # Release Date:
Permanent Subd Name:
Electrician Phone Number:
Phone Number:
TX Result Report
P 1
05/01/2012 12:22
Serial No. CM35228060004
TC: 331288
Destination
Start Time
Time
Prints
Result
Note
18888514411
05 -01 12:21
00:00:55
001 /001
OK
Note
TMR: Timer TX. POL: Polling. ORB: Original Size Setting. FME: Frame Erase TX.
MIX: Mixed Original TX. CALL: Manual TX. CSRC: CSRC. FWD: Forward. PC: PC -Fax,
BND: Double -Sided Binding Direction. SP: Special original. FCODE: F -code. RTX: Re -TX.
RLY: Relay. MBX: Confidential. BUL: Bulletin. SIP: SIP Fax. IPADR: IP Address Fax.
I -FAX: Internet Fax
Result OK: Communication OK, S -OK: Stop Communication, PW -OFF: Power Switch OFF,
TEL: RX from TEL, NG: Other Error, Cont: Continue, No Ans: No Answer,
Refuse: Receipt Refused, Busy: Busy, M- Full:Memory Full,
LOUR:Receiving length Over, POVER:Receiving page Over, FIL:File Error,
DC:Decode Error, MDN :MDN Response Error, DSN:DSN Response Error.
[aaNE
! -8�d 8 -'74 - lv '4 3
`Pee -SS! e. 4. 32SSSor
3 2. 8"...5-40
RELEASES FOR ELECTRIC SERVICE FROM TYBEE ISLAND
FOR - - .. _ FAX TO: 9-1,2=944=3.537 Phu.
2 Borg : ado 4.00 or f V 20-420.11 407
OZ�J Xr 1 -$$8 -551 -•i.i 11
Location Address: �,..,,�� Lot # Release Date: c,-2r
Type of Release: Temporary ✓ Permanent Subd Name:
Electrician: rf
OwnerBuilder:
". 3t- 92 .r
Electrician Phone Number:
Phone Number:
Location Address:
Type of Release: Temporary Permanent
Electrician:
OwnerBuilder:
Lot #
Release Date:
Subd Name:
Electrician Phone Number:
Phone Number:
Location Address:
Type of Release: Temporary Permanent Subd Name:
Electrician:
Lot #
Release Date:
t wner/Builder:
Electrician Phone Number:
Phone Number:
61bccvunt Managemen Read Only) ___
File Edit Options Functions Consoles Help
x�
1 I X 0 ?OP 0a11EdQn*
Account
count Number
Address
304
THIRTEENTH ST
IG
Zone
01
Notes " Name
SK GGS, JAMES
Et.
General' Metered Non- Metered 1
Financial Information 1 Comments 1 History 1 Consumption History 1 Service Orders' Devices
Sery /Tbl
040
RES
p
RESIDENTIAL
Quantity
Amount
0.00
Status
On
E.
0.00
Units
2.00
Step E1
r Apply to Address
Sery
040
Tbl
RES
Description
RESIDENTIAL
Status
On
Units
2.00
Step
Quantity
Amount
0 -00
Pickup
Containers
Cubic Ft
050
MU
GARBAGE -MULTI UNIT
On
2.00
1
24 -0E
052
052
SURCHARGE - GARBAGE
On
2.00
1
0.00
051
REC
RECYCLING
On
2.001
6-04
LJ
1
T
Clear
View I dotto
4-2(0-t2.
ay, 1
` v�kQ X 1.^1 Il Du r U-LV41 Qt. 404.)
bU - ',-\- ' ►s a 6 ∎e-N3 ,— OlrY■A• orN ChQ4",a�■ COL
u- r e C-0 C c�.rci . ',�c.k QC e (_, e Ina-5
are 11e4 .4 - l)Qre.."- -k separ - a ec rstc_cLk S.erviLe
a Y� Z t"^J1- -t.o tw o �/vtQ 255 .
`�J
Chatham County Board of Assessors: 7011 Property Record Card 4- 0007 -09 -006 Page 1 of 2
2011 Chatham County Board of Assessors
Property Record Card
4- 0007 -09 -006
304 13TH ST TYBEE ISLAND
APPRAISER nsanders
LAST INSP 05/15/2007
APPR ZONE 000008
LOT 72 -B WARD 4 TYBEE ISLAND
SKAGGS JAMES WILLIAM CAMA ASMT
PO BOX 2442 161,200 161,200 LAND 1
TYBEE ISLAND GA 31328 -2442 58,100 58,100 BLDG 1
4,200 4,200 OBXF 2
223,500 223,500 Cost - MS
SALES BOOK/ INS VI QU RSN PRICE
PAGE
15 Oct 1998 201N 11 QC I U UN
GRANTOR:SKAGGS &MIKELL JAMES& MONA
GRANTEE:SKAGGS JAMES WILLIAM
30 Dec 164N 0075 WD I Q 66,900
1993
GRANTOR:KLINGER THOMAS S JR
GRANTEE:SKAGGS & MIKELL JAMES W &
01 Sep I U U6 62,000
1991
GRANTOR:
GRANTEE:
!COMMENTS:
08 Jan 2004
22 Feb 1994
TY04 10S ENT 1/8/04 APW
1982 BOE NS /NC
[Click for larger picture]
vaSAGIS
ti r Chatham County
Tax Commissioner
, Property Ta. Staten*n!
CODES
PROPERTY 0006 RESIDENTIAL
USE
UTA
NBHD
0004 Tybee Island
020225.00 T225 TYBEE
INNER
EXEMPTIONS L1 L9 S1 L8
HISTORY LAND IMPR TOTAL
2011 161,200 62,300 223,500 Cama
2010 282,000 95,100 377,100 Cama
2009 282,000 111,500 393,500 Over
2008 282,000 111,500 393,500 Cama
2007 282,000 60,500 342,500 Cama
2006 282,000 56,000 338,000 Cama
2005 150,000 71,500 221,500 Cama
2004 89,500 84,500 174,000 Cama
2003 71,000 54,000 125,000 Cama
2002 71,000 54,000 125,000 Cama
2001 74,500 55,500 130,000 Cama
2000 55,000 46,000 101,000 Cama
1999 31,500 46,000 77,500 Cama
1998 31,500 46,500 78,000 Cama
1997 31,500 43,000 74,500 Cama
1996 15,000 66,660 81,660 Cama
1995 15,000 67,380 82,380 Cama
1994 15,000 53,710 68,710 Cama
1993 15,000 41,910 56,910 Over
1992 15,000 41,910 56,910 Over
EXTRA FEATURES
ID# BLDG # SYSTEM DESC DIM 1 DIM 2 UNITS QL UNIT PRICE RCN AYB EYB DT ECON FUNC SP SP% RCNLD MKT VALUE
139166 85635 Roof Scr Por /Slab AV 0 0 332.00 A 18.40 6,109 1970 1970 6R 3,238 3,200
139167 85635 Solid Wall /Slab AV 0 0 48.00 A 38.09 1,828 1970 1970 6R 969 1,000
LAND
ID# USE DESC FRONT DEPTH UNITS / TYPE PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE
110097 SINGLE FAMILY RES 60 79 4,740.00 -SF 34.00 R2 161200
http: // boa. chathamcounty. org /DesktopModules/ ChathamCounty / BoardofAssessors /PropertyRecordCard. asp... 4/26/201:
Chatham County Board of Assessors: 2011 Property Record Card 4- 0007 -09 -006
2011 Chatham County Board of Assessors
Property Record Card
Page 2 of 2
4- 0007 -09 -006
304 13TH ST TYBEE ISLAND
BUILDING SECTION
85635 -1
CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PHYS ECON FUNC OBSV / % TOTAL DEP % RCNLD U.FACTOR MKT VAL
Residential 91,811 1945 1975 MS 45.00 0.00 0.00 0.00 45.00 50,496 58,100
20'
1e'
Screen Porch Only
yea
Roof
za'
9'
4'■ T 4'
Pnrc.
36
SPO
screen l
hOny
- -1St
[Click for larger picture]
SECTION TYPE
AREA
TYPE
FRAME
STYLE
QUALITY
CONDITION
# UNITS
# OF BEDS / BATHS
1 - Main
1355
5 - Duplex
3 - Masonry Frame
1 - One Story
3.00
3.00
0
3 / 2.00
COMPONENTS
R1 163 Masonry, Concrete Block
R2 208 Composition Shingle
R3 352 Heat Pump
R4 402 Automatic Floor Cover Allowance
R6 601 Plumbing Fixtures ( #)
R6 621 Slab on Grade (% or SF)
R11 904 Slab Porch (SF) with Roof
R11 904 Slab Porch (SF) with Roof
Units % QUAL
100.00
100.00
100.00
10.00
100.00
16.00
24.00
http: // boa. chathamcounty. org /DesktopModules / ChathamCounty/ BoardofAssessors /PropertyRecordCard. asp... 4/26/201
DATE ISSUED: 04 -26 -2012
WORK DESCRIPTION
WORK LOCATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
ELEC - INSTALL METER
304 THIRTEENTH ST
OWNER NAME JAMES SKAGGS
ADDRESS PO BOX 2442
CITY, ST, ZIP TYBEE ISLAND GA 31328 -2442
PHONE NUMBER
CONTRACTOR NAME PACE ELECTRICAL CONTRACTORS
ADDRESS 9 -A EXECUTIVE CIRCLE
CITY STATE ZIP SAVANNAH GA 31406
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 50.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $ 760.00
PERMIT #: 120247
TOTAL BALANCE DUE: $ 50.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.eityoftybee.org
gin3
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
/Y
2- {
%� 134 Location: 30q S-d k1 1')
NAME
ADDRESS
PIN #
TELEPHONE
Owner
"Si `t�1 c
i 13�� 1
54-re(-4
i j v< '
t�`5 )
Architect
or Engineer
Building
Contractor
P2fA 'r/ �F,cr,
V 4 L
(Check all that apply)
Repair
Li Renovation
n Minor Addition
7 Substantial Addition
f Other
[1]-:'Residential
fl Single Family
❑ Duplex
Multi- Family
11 Commercial
313 48
❑ Footprint Changes
❑ Discovery
❑ Demolition
Qi
eofjik
q3145
G•
Details of Project: 1nG� -(r.V eAte �� t \
Estimated Cost of Construction: $ VQ
Construction Type CO (Enter appropriate number)
(I) Wood Frame nr
(2) Wood & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
(4) Masonry (6) Other (please specify)
(5) Steel & Masonry E I f c{- (-t CCG
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units
Lot Area
# Off - street parking spaces
# Bedrooms # Bathrooms
Living space (total sq. ft.)
Trees located & listed on site plan
Access:
Driveway (ft.)
Setbacks: Front
With culvert?
Rear
With swale?
Sides (L) (R)
# Stories height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provided by
Construction debris will be disposed by
by means of
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: Li ° '"l— ,7Zl ea
Signature of Applicant.
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning /variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
NFIP Flood Zone
Existing
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm/Drainage
Inspections
City Manager
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL
LEAD -BASED PAINT
Adapted from http : / /www.epa.govllead /pubs /renovation.htm. Please use that site to access the following information.
Information for Property Owners of Rental Housing, Child- Occupied Facilities
Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space
rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard
information pamphlet Renovate Ri ght: Important Lead Hazard Information for Families Child Care Providers
and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample
pre- renovation disclosure form may be used for this purpose.
After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented
by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation,
Repair and Remodeling rule. To become certified, property owners must submit an application for firm
certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for
certification to approve or disapprove the application.
Property owners who perform renovation, repairs, and painting jobs in rental property should also:
• Take training to learn how to perform lead -safe work practices.
• Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
• Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation. Repair and Painting.
Information for Homeowners Working at Home
If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project.
However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home
and planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families. Child
Care Providers. and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1 -800-
424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint.
Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools
As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is
performed in your home, or in the child care facility or school that your child attends.
Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants
sign a pre - renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information
pamphlet.
Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of
children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child
care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet.
Information for Contractors
As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create
dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation,
repairs, and painting jobs in pre -1978 housing and child - occupied facilities must, before beginning work, provide owners, tenants, and
child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families,
Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre- renovation disclosure form may
be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work
practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm
certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application.
Contractors who perform renovation, repairs, and painting jobs should also:
• Take training to learn how to perform lead -safe work practices.
• Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair,
and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may
take the 4 -hour refresher course instead of the 8-hour initial course from an accredited training provider to become a
certified renovator. Click here for a list of eligible courses.
• Provide a copy of your EPA or state lead training certificate to your client.
• Tell your client what lead -safe methods you will use to perform the job.
• Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010.
• Ask your client to share the results of any previously conducted lead tests.
• Provide your client with references from at least three recent jobs involving homes built before 1978.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
Read about how to u e lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
Si. _Cure i 1 r , Date
IF YOU RE NOT
,iC..DS >.P(RIO tt
.DISTURBING
JUST SIX
SQUARE FEET
'COULD COST YOU
BiG TIME.
Permit Acknowledgement of
Asbestos /Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
Und rsigned Date
Eck
Printed Name
(ZL
Office Use Only:
Project Address:
Permit Number: