Loading...
HomeMy Public PortalAboutORD-CC-1977-15City of Moab, Utah Ordinance No. 15-77 AN AMENDEMENT TO CHAPTER 26, WATERS AND SEWERS, MOAB CITY CODE 1965, AS AMENDED BY THE REVISION OF SEC. 26-39: CONNECTIONS - ISSUANCE; TERMS: AND SEC. 26-40: CONNECTION FEES: AND SEC. 26-41: LIABILITY FOR COSTS OF MAKING CONNECTIONS; CONSTRUCTION REQUIREMENTS; SECTION 26-55: WATER METERS - TO BE INSTALLED BY CITY AT COST OF USER. Section 26-39; Connections - Issuance; Terms; is hereby amended to read as follows: Upon the payment of all connection fees as set forth in this Article and upon the approval of the Plumbing Inspector and the Waterworks Super- intendent, the City Recorder shall issue a permit to connect with the City water or sewer system. The permit shall be for each connection and shall give the type of occupancy and address and show thereon the rules and regulations for sewer and water connections. The City Recorder shall also issue an order to the Waterworks Super- intendent to extend the water and sewer service lines from the mains to the 'property line and install the meter. The subdivider shall install these service lines in new subdivisions under the direction of the Waterworks Superintendent. In all cases the City shall furnish and install water meters. (p. O. 1958, Secs. 3-2-4, 3-2-32). Section 26-40: Connection Fees: (a) Water Connection Fees; is hereby amended by adding new subsections (8) and (9) as follows: (a) Water Connection Fees: (8) In a subdivision, the subdivider shall pay the city a connection fee of one hundred fifty ($150.00) per lot for a three -fourths inch (3/4") meter. The cost of larger meter installationswill be prorated. (9) The cost for crossing a paved street shall be $2.00 per linear foot on any existing paved street. Section 26-40: Connection Fees; (b) Sewer Connection Fees; is hereby amended by adding new subsections (6) and (7) as follows: (b) Sewer Connection Fees: (6) In a subdivision, the subdivider shall pay the city a connection fee of one hundred fifty ($150.00) per lot for a four inch (4") connection. (7) The cost for crossing a paved street shall be $2.00 per linear foot on any existing paved street. Ordinance No. 15-77 Section 26-41: Liability for Costs of Making Connections; Construction Requirements; is hereby amended to read as follows: Section 26-41: Liability for Costs of Making Connections; Construction Requirements: "Any individual applicant which adjoins an existing water and, or sewer line within seventy-five (75') of the property line may connect to said service by paying to the City the connection and deposit fee as stipulated under Section 26-40: Connection Fees; and the City shall construct and connect the water and, or sewer line to the property line, and furnish the meter.. A11 costs in connection with the construction of the water and sewer service lines from the point of use to the property line shall be paid by the applicant. A11 workmanship and materials shall be made in accordance with this Chapter and with the plumbing regulations of the City. (R. O. 1958, Sec., 3-2-33)" Section 26-55: Water Meters --To be Installed by City at Cost of User; is hereby amended to read as follows: Section 26-55: Water Meters --To be Installed by City: "Meters of the type approved by the city council shall be furnished and maintained by the city. A11 water meters shall be installed in a meter box that is approved by the Water Superintendent, on the curb, except where in the opinion of the waterworks superintendent it would not be practicable. (R. 0. 1958, @ 3-2-6.)" THAT the City Council finds and declares that it is necessary for the immediate preservation of the peace, health and safety of this City and that this Ordinance shall take effect upon its passage and publication. PASED by the unanimous vote of all members of the City Council of the City of Moab, Utah, this 16th day of August, 1977. ATTEST APPROVED David J. $xetzke, City Recorder Wm. Dean McDouga d, Mayo (SEAL)