RenoSys Corporation
Change Order 3
Project/Facility Name
Cordell Park Pool
9 S.W. 13th Street
Richmond, IN 47347
Change Order - #003 Repair/weld leaks in stainless steel gutter.
January 31, 2018
Your change order, dated January 31, 2018 is hereby being designated for:
To isolate and repair leaks to the stainless steel gutter/slide main drain box connection to
include a one -tune pressure test to verify that no more voids exist. NOTE: if after the
Pressure test additional voids are found the Owner will be informed, at which point they
will have the option of having us to continue the fax or not. Should they choose to have us
continue it will be charged at a rate $290.00 per man hour. This is a NOT TO EXCEED
price and includes all material and labor.
Original Contract Value:
$170,309.18
Previous Increases/Decreases
$5,722.81
Value after prior CO/Amend
$176,031.99
This CO/Amend Increases
$2,880.00
Current Contract Value
$176,031.99
Subcontractor:
Aquatic Renovation Systems Inc.
2825 E 55th Place
Indianapolis, IN 46220
Signature
Gary Novitski
Date
Owner:
City of Richmond
Parks and Recreation
2200 E. Main Street
Richmond, IN 47374
Signature
City of Richmond Parks &
Recreation
Date