HomeMy Public PortalAboutResolution 2022-09-01 Conroy Excavation for Lions Ponds Bathroom Foundation and Stub-OutTOWN OF FRASER
RESOLUTION NO. 2022-09-01
A RESOLUTION AUTHORIZING THE TOWN MANAGER TO EXECUTE A CONTRACT WITH
CONROY EXCAVATING LLC FOR THE LIONS PONDS BATHROOM FOUNDATION AND
UTILITY STUB -OUT.
WHEREAS, the need for facilities at the Lions Ponds was identified in the Fraser River
Corridor Master Plan,
WHEREAS, the town received a $299,000 grant from DOLA for the project, and an
extension to expend the funds has been granted to December 2022.
WHEREAS; a contract was executed with Green Flush for the construction of the
modular bathroom that are expected to be delivered in October 2022.
WHERAS; the foundation and utility stub -out must be complete prior to the delivery of
the modular bathroom.
NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF
FRASER, COLORADO THAT:
1. The Town Manager is authorized to execute a contract with Conroy Excavating LLC for
construction of the Lions Pond bathroom foundation and utility stub -out for a cost of
$95,787.00.
READ, PASSED ON ROLL CALL VOTE, AND ADTOPTED BY THE BOARD OF TRUSTEES
THIS 7th DAY OF SEPTEMBER 2022.
Votes in favor: 7
Votes opposed: 0
Abstained: 0
Absent: -0—
BOARD OF TRUSTEES OF THE
TOWN QF_FRASEB..-COLORADO
BY: \ v
Mayor
ATTEST:
Town Clerk Q�-