HomeMy Public PortalAbout12-0314 FreeJLee LLC_2of2T. C. 9.72
G. 9.22
T. C19. 81 T/C. 9.37/
G.6.28 \ ;
Conc. Sidewalk
I
Power
Pole - P —
/
1
/..c
\T / /
/ In _
21J
tot yl f1m
ItokUtlrr
o wer
7/e
AREA ALONG PROPERTT
LINE TO HAVE RAISED PLANTING,
BED OR BE SLIGHTLY RAISED
TO PREVENT RUN -OPP PROM
LEAVING TNT sire
N
0
S
rime
17-'PROVE
. GARR=
I
L,. .y.._: / I / I /
/
1X.9.8. / T.C.9.89 ,/
/
9.33/ / G.9., 8 11/r /
Curb & 6u Her I
/ /
;/ Q
T '9.99/ o /
.9.51. I %'
C.
g 9.
4
16
T.C. 10.13
G. 9.68
VNOI103010
s
O
o,
/,//
Conc,
Conc.
\fA
N o
CH' EXTO
ELEV..
4
S.T. DUMPED
STONE RIP -RAP
Ili
P
r eke
9 Cit A7LAPIlA . I I.qt d vr!, wZ I A M7{ ,.: a A
'I. /
/
e" B echmark
\ Top X°
\\ E/. /7.80 (NGV01929)
AREA ALONG - ROPERTY
LINE TO HA RAISED PLANTING
GED OR OE SL HTI.Y RAISED
TO PREVENT RUN -OFF PROM
LEAVING THE S
6
Power
Pole
Guardrail x x
LOT 210
PAVING, GRADING AND DRAINAGE PLAN
p. ro•
I
Q0)
GUTTER NOTES
L GUTTERS SHALL be UTILIZED TO DIRECT NEW RUN -OPP TO
NEW SWALE! AND TO UTRJZS NATURAL DRAINAGE
2. DOWNSPOUTS SHALL Of INSTALLED SO AS TO DIRECT POOP
RUN-OPP TO INC SOUTH OR EAST.
2. NEW RUN -OPP SHALL NOT SE ALLOWED TO THE NORTH OR WEST.
Power
9.
L See sneer C3 POR LEGEND.
2. LIMITS OP GRADING AND GRASSING ARE INDICATED ON
PLANS AS RANTS OP CONSTRUCTTONR
2. CONTRACTOR IS RESPONSIBLE POR LOCATING ALL EXISTING UTILITIES PRIOR TO COMMENCING
OP CONSTRUCTION AND FOR AVOIDING cONPLICr WITH SAME ANY DAMAGE TO EXISTING
UTILITIES SHALL OE REPAIRED AT THE EXPENSE OP THE CONTRACTOR.
S. AU. o:ITLRBey AREAS PROM NEW CONSTRUCTION ACTMne5 WILL Be sewwer,
MULCHES PERTILIZED AND WATERED TO PROMOTE A SUPPICIENT GROUND COVER THAT
WILL PREVENT' SOIL EROSION SUPPICIoNT COVERAGE SHALL SE AS SPECIFIED IN
'.EROSION CONTROL GRASSING!
5. DRAINAGE, ALL EXCAVATION SHALL SO PERFORMED 90 THAT THE SITE AND THE AREA
IMMGOLATELY SURROUNDING THE SITE WHICH EPPECTS THE OPERATIONS WILL SE
PERCHED
CONTINUALLY DWHICH MIGHT DC ENCOUNTERED DIMINO EXCAVATIONS SHALL SE
REMOVED SY ANY ACCEPTABLE MEANS APPROVED ST THE ENGINEER
S ELEVATIONS ARE GAGED DR MEAN SEA LEVEL DATUM
T. CONTRACTOR TO VERIFY ALL DRAINAGE STRUCTURE LOCATIONS, TOPS ANO DEPTHS
PRIOR TO ORDERING MATERIALS OR BEGINNING CONSTRUCTION
SPECIAL DRAINAGE NOTES:
L THE LOT WILL Neely TO DE GRADED AS SHOWN AND AS DICTATED
sr EXISTING COMMONS WHICH CAN NOT SE PORSE0N TO ALLOW
FOR PROPER DRAINAGE
2 STRONWATER DETENTION WILL NOT BE REQUIRED POR THIS PROJECT.
3. ALL AREAS WHICH ARE NOT TO SE COVERED ST THE BUILDING OR
THE ACCESS DRIVES ARE TO se PERVIOUS
GENERAL BUILDING INFORMATION NOTES
PER PROPOSED IUQ.DDIG PINIONED FLOOR ELEVATIONS ARE TO Or SET AS
PER PE ORDINANCES
MAPS AND Al PER THE crTY or TYREE ISLAND,
MIANCES
2. WHICH LLD SATISPTOPEN4 ELEVATISUPPORTED AND ENA ZONE REQUIREMENTS.
GEORGIA 110.T. NOTES,
L ANY AND ALL WORE WITHIN ANY GEORGIA DOT.
RISHT -OP -WAYS MUST BE APPROVED AND PERMITTED
THROUGH THE aeoRGIA MOT.
EASEMENT NOTES,
L THE OWNe ENGINEER AND SURVEYOR ARE TO COORDINATE
ALL. EASEMENTS PRIOR TO PUNAL PLAT APPROVAL AND
RECORDING.
2 ALL DRAINAGE EASEMENTS 70 BE PRIVATELY MAINTAINED.
Special Tree Notes :
0 Great care Is to be taken to not damage
Tees to be relocated.
2. All effort shall be made to reboots any Palms
(not relocated 'on .site( to another part of Typo* Island
of the expense of M.. reeld.t
Special Pre - Construction Note
Contractor to verify oil existing and proposed
structure locations (drainage, sanitary, eta(,
tops and depths prior to ordering meteriols or
beginning construction
R'MA NAP NOTES ,
L THIS DEVELOPMENT IS WITHIN MINIMAL ZONING AREA UV ACCORDING
'
O FRSJ4 M COMRNITY PANEL NUMOER 726754 0001 C, MAP REVISED JUNE
I. THIS SITE IS IN ZONE 4W AND IS LOCATED WITHIN THE 100 YEAR
FLOOD ZONE. A UIOIRNN ELEVATION OP 12.0 HAS SEEN SET.
ANY CONSTRUCTION ACTITITIE6 NA ELEVATIONS PRIOR TO
'°"
MI PUNS
SWALE DETAIL
Rat to man
RECENni
srcclAL CONSTRUCTION NOTE. _
IP ANY DISCREPANCIES BETWEEN THE PLANS OR CONSTRUCTION STAKES
AND ACTUAL SITE CONDITIONS ARE ENCOUNTERD DURING THE COURSE OF
CONSTRUCTION THE CONTRACTOR SHALL NOTIFY THE ENGINEER, SURVEYOR
OR OWNER OR HIS REPRESENTATIVE PRIOR TO CONSTRUCTING SAID
INCONSISTANT ENTITY IF THE CONTRACTOR KNOWS OR CAN RESONABLY
BE EXPECTED TO HAVE KNOWN OF AN ERROR, DISCREPANCY OR CONFLICT
IN THE PLANS, SPECIFICATIONS OR CONSTRUCTION STAKING AND PAILS TO
REPORT THE PROBLEM PRIOR TO CONSTRUCTION, HE SHALL NOT BE ENTITLED
TO COMPENSATION POR ANY WORK OR EXPENSE INCURRED SY HIM FOR WORK
REQUIRED TO BE RE- CONSTRUCTED BECAUSE OF SAID ERROR, DISCREPANCY
OR CONFLICT.
SCALE: 1- _ 1D
a
10 20 25•
111
I
G s _1 g
8
pC
N o
k 80 8 010
Z =D
ZO
9 (2� ZN
mild 0W
of
2
a
0
0
t7
DRAWING NUMBF]i
C -4
4 OF II SHFEIS