Loading...
HomeMy Public PortalAbout12-0314 FreeJLee LLC_2of2T. C. 9.72 G. 9.22 T. C19. 81 T/C. 9.37/ G.6.28 \ ; Conc. Sidewalk I Power Pole - P — / 1 /..c \T / / / In _ 21J tot yl f1m ItokUtlrr o wer 7/e AREA ALONG PROPERTT LINE TO HAVE RAISED PLANTING, BED OR BE SLIGHTLY RAISED TO PREVENT RUN -OPP PROM LEAVING TNT sire N 0 S rime 17-'PROVE . GARR= I L,. .y.._: / I / I / / 1X.9.8. / T.C.9.89 ,/ / 9.33/ / G.9., 8 11/r / Curb & 6u Her I / / ;/ Q T '9.99/ o / .9.51. I %' C. g 9. 4 16 T.C. 10.13 G. 9.68 VNOI103010 s O o, /,// Conc, Conc. \fA N o CH' EXTO ELEV.. 4 S.T. DUMPED STONE RIP -RAP Ili P r eke 9 Cit A7LAPIlA . I I.qt d vr!, wZ I A M7{ ,.: a A 'I. / / e" B echmark \ Top X° \\ E/. /7.80 (NGV01929) AREA ALONG - ROPERTY LINE TO HA RAISED PLANTING GED OR OE SL HTI.Y RAISED TO PREVENT RUN -OFF PROM LEAVING THE S 6 Power Pole Guardrail x x LOT 210 PAVING, GRADING AND DRAINAGE PLAN p. ro• I Q0) GUTTER NOTES L GUTTERS SHALL be UTILIZED TO DIRECT NEW RUN -OPP TO NEW SWALE! AND TO UTRJZS NATURAL DRAINAGE 2. DOWNSPOUTS SHALL Of INSTALLED SO AS TO DIRECT POOP RUN-OPP TO INC SOUTH OR EAST. 2. NEW RUN -OPP SHALL NOT SE ALLOWED TO THE NORTH OR WEST. Power 9. L See sneer C3 POR LEGEND. 2. LIMITS OP GRADING AND GRASSING ARE INDICATED ON PLANS AS RANTS OP CONSTRUCTTONR 2. CONTRACTOR IS RESPONSIBLE POR LOCATING ALL EXISTING UTILITIES PRIOR TO COMMENCING OP CONSTRUCTION AND FOR AVOIDING cONPLICr WITH SAME ANY DAMAGE TO EXISTING UTILITIES SHALL OE REPAIRED AT THE EXPENSE OP THE CONTRACTOR. S. AU. o:ITLRBey AREAS PROM NEW CONSTRUCTION ACTMne5 WILL Be sewwer, MULCHES PERTILIZED AND WATERED TO PROMOTE A SUPPICIENT GROUND COVER THAT WILL PREVENT' SOIL EROSION SUPPICIoNT COVERAGE SHALL SE AS SPECIFIED IN '.EROSION CONTROL GRASSING! 5. DRAINAGE, ALL EXCAVATION SHALL SO PERFORMED 90 THAT THE SITE AND THE AREA IMMGOLATELY SURROUNDING THE SITE WHICH EPPECTS THE OPERATIONS WILL SE PERCHED CONTINUALLY DWHICH MIGHT DC ENCOUNTERED DIMINO EXCAVATIONS SHALL SE REMOVED SY ANY ACCEPTABLE MEANS APPROVED ST THE ENGINEER S ELEVATIONS ARE GAGED DR MEAN SEA LEVEL DATUM T. CONTRACTOR TO VERIFY ALL DRAINAGE STRUCTURE LOCATIONS, TOPS ANO DEPTHS PRIOR TO ORDERING MATERIALS OR BEGINNING CONSTRUCTION SPECIAL DRAINAGE NOTES: L THE LOT WILL Neely TO DE GRADED AS SHOWN AND AS DICTATED sr EXISTING COMMONS WHICH CAN NOT SE PORSE0N TO ALLOW FOR PROPER DRAINAGE 2 STRONWATER DETENTION WILL NOT BE REQUIRED POR THIS PROJECT. 3. ALL AREAS WHICH ARE NOT TO SE COVERED ST THE BUILDING OR THE ACCESS DRIVES ARE TO se PERVIOUS GENERAL BUILDING INFORMATION NOTES PER PROPOSED IUQ.DDIG PINIONED FLOOR ELEVATIONS ARE TO Or SET AS PER PE ORDINANCES MAPS AND Al PER THE crTY or TYREE ISLAND, MIANCES 2. WHICH LLD SATISPTOPEN4 ELEVATISUPPORTED AND ENA ZONE REQUIREMENTS. GEORGIA 110.T. NOTES, L ANY AND ALL WORE WITHIN ANY GEORGIA DOT. RISHT -OP -WAYS MUST BE APPROVED AND PERMITTED THROUGH THE aeoRGIA MOT. EASEMENT NOTES, L THE OWNe ENGINEER AND SURVEYOR ARE TO COORDINATE ALL. EASEMENTS PRIOR TO PUNAL PLAT APPROVAL AND RECORDING. 2 ALL DRAINAGE EASEMENTS 70 BE PRIVATELY MAINTAINED. Special Tree Notes : 0 Great care Is to be taken to not damage Tees to be relocated. 2. All effort shall be made to reboots any Palms (not relocated 'on .site( to another part of Typo* Island of the expense of M.. reeld.t Special Pre - Construction Note Contractor to verify oil existing and proposed structure locations (drainage, sanitary, eta(, tops and depths prior to ordering meteriols or beginning construction R'MA NAP NOTES , L THIS DEVELOPMENT IS WITHIN MINIMAL ZONING AREA UV ACCORDING ' O FRSJ4 M COMRNITY PANEL NUMOER 726754 0001 C, MAP REVISED JUNE I. THIS SITE IS IN ZONE 4W AND IS LOCATED WITHIN THE 100 YEAR FLOOD ZONE. A UIOIRNN ELEVATION OP 12.0 HAS SEEN SET. ANY CONSTRUCTION ACTITITIE6 NA ELEVATIONS PRIOR TO '°" MI PUNS SWALE DETAIL Rat to man RECENni srcclAL CONSTRUCTION NOTE. _ IP ANY DISCREPANCIES BETWEEN THE PLANS OR CONSTRUCTION STAKES AND ACTUAL SITE CONDITIONS ARE ENCOUNTERD DURING THE COURSE OF CONSTRUCTION THE CONTRACTOR SHALL NOTIFY THE ENGINEER, SURVEYOR OR OWNER OR HIS REPRESENTATIVE PRIOR TO CONSTRUCTING SAID INCONSISTANT ENTITY IF THE CONTRACTOR KNOWS OR CAN RESONABLY BE EXPECTED TO HAVE KNOWN OF AN ERROR, DISCREPANCY OR CONFLICT IN THE PLANS, SPECIFICATIONS OR CONSTRUCTION STAKING AND PAILS TO REPORT THE PROBLEM PRIOR TO CONSTRUCTION, HE SHALL NOT BE ENTITLED TO COMPENSATION POR ANY WORK OR EXPENSE INCURRED SY HIM FOR WORK REQUIRED TO BE RE- CONSTRUCTED BECAUSE OF SAID ERROR, DISCREPANCY OR CONFLICT. SCALE: 1- _ 1D a 10 20 25• 111 I G s _1 g 8 pC N o k 80 8 010 Z =D ZO 9 (2� ZN mild 0W of 2 a 0 0 t7 DRAWING NUMBF]i C -4 4 OF II SHFEIS