Loading...
HomeMy Public PortalAboutChange Order No. 3 to Contract No. 155-2017 - Aquatic Renovation System - Pool Liner for Municipal (2)RerioSys- Coq)ora ion Aquatic Renovation Systems, Inc. RenoSys Corporation Change Order 3 Project/Facility Name Cordell Park Pool 9 S.W. 13th Street Richmond, IN 47347 Change Order - #003 Repair/weld leaks in stainless steel gutter. January 31, 2018 Your change order, dated January 31, 2018 is hereby being designated for: To isolate and repair leaks to the stainless steel gutter/slide main drain box connection to include a one-time pressure test to verify that no more voids exist. NOTE: if after the pressure test additional voids are found the Owner will be informed, at which point they will have the option of having us to continue the fix or not. Should they choose to have us continue it will be charged at a rate $290.00 per man hour. This is a NOT TO EXCEED price and includes all material and labor. Original Contract Value: Previous Increases/Decreases Value after prior CO/Amend This CO/Amend Increases Current Contract Value Subcontractor: Aquatic Renovation Systems Inc. 2825 E 55th Place Indianapolis, IN 46220 Signatuy Gary Novitski - 3 "l/ Date $170,309.18 $5,722.81 $176,031.99 $2,880.00 $176,031.99 Owner: City of Richmond Dar c .7 D �e r2 V Richmond, IN 47374 Signature 4 Date