Loading...
HomeMy Public PortalAbout12-0333 Ocean PlazaINTERNATIONAL CODE COUNCIL MEMBER City of Tybee Island • Planning & Zoning Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472.5032 • Fax 912.786.9539 Permit No. 3333 Date Requested (J - '12.. Owner's Name ;JC Q C v -Pia-2a.. Date Needed (0 ' ? -. 12 Gen. Contractor yeas- 'Po L.) Ac Pi ok Subcontractor Contact Information \ e r \ ¢TT (Cg tf ) 2i4.^7- 19 2- Project Address l 0 1 S4-1-0. nd Scope of Work `(? cted "1:) -31 c,ra,rN5 Inspector ;V) Date of Inspection ��� Inspection 0 J\--) J m6 ,(� act Pass ❑ Fail ❑ Fee PAS Inspection Pass Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee DATE ISSUED: 06 -8 -2012 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP CITY OF TYBEE ISLAND BUILDING PERMIT REPL DRAIN ON POOL 1401 STRAND S POOL 2 OCEAN PLAZA 15TH AND STRAND TYBEE ISLAND GA 31328 YEAR ROUND POOL COMPANY INC 1484 FORDING ISLAND ROAD BLUFFTON SC 29910 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 416.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $7,500.00 PERMIT #: 120333 TOTAL BALANCE DUE: $ 416.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT t,, Location: Li 01 t c✓tei- DCP_ av) -PI 07a NAME ADDRESS TELEPHONE Owner Sp -;mss Architect or Engineer Building Contractor VQ� -R' '-'d ++ Po �5 N 44 . b r4 Ki : n (Check all that apply) ❑ Repair ❑ Renovation ❑ Minor Addition ❑ Substantial Addition ❑ Other ❑ Residential ❑ Single Family ❑ Duplex ❑ Multi - Family Commercial Details of Project: 61tbqi OUP N1tAl4OPAt.ts5 -9.p ► 4) V A 1 'x.\5T1N4Ck aw Estimated Cost of Construction: $ J71 So 0 S14-3-24`7-( ❑ Footprint Changes (1 Discovery Fl Demolition UNe. t w\`'h N J oa�Es� ?,�12CAQF re.0a ra;rr fir% Pont Con truction Type (Enter appropriate number) (1) ood Frame (4) Masonry (6) Other (please specify) (2) •od & Masonry (5) Steel & Masonry (3) Brit Ven:-r Propose. use- Remarks: ATTACH COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following rmation based on the construction drawings and site plan: # Units Lot Are # Off -st Trees lo Access: Drive Setbac # Stor grade units et parki ated & li y s: Front # Bedrooms # Bathrooms Living space (total sq. ft.) g spaces ed on site plan ft.) es Heig t of the building to the ventilation ducts, air co With culvert? Rear With swale? Sides (L) (R) Vertical distance measured from the average adjacent xtreme high point of the building, exclusive of chimneys, heating itioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by by means of 1 understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. 1 understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that 1 must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. 1 accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: (Q •S P• Signature of Applicant: WC-r De ) A, iL61'\ Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning /variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Zoning Administrator Code Enforcement Officer Water /Sewer Storm /Drainage Inspections City Manager Date Lo -8 -12. rk o. pe rm,4- N1-2- # Z So FEES Permit Inspections 3 3.00 Water Tap Sewer Stub Aid to Const. TOTAL %00 6,4