Permit No. 3333 Date Requested (J - '12..
Owner's Name ;JC Q C v -Pia-2a.. Date Needed (0 ' ? -. 12
Gen. Contractor yeas- 'Po L.) Ac Pi ok Subcontractor
Contact Information \ e r \ ¢TT (Cg tf ) 2i4.^7- 19 2-
Project Address l 0 1 S4-1-0. nd
Scope of Work `(? cted "1:) -31 c,ra,rN5
Inspector ;V) Date of Inspection ���
Inspection 0 J\--) J m6 ,(� act Pass ❑ Fail ❑ Fee
PAS
Inspection
Pass
Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
DATE ISSUED: 06 -8 -2012
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
CITY OF TYBEE ISLAND
BUILDING PERMIT
REPL DRAIN ON POOL
1401 STRAND S POOL 2
OCEAN PLAZA
15TH AND STRAND
TYBEE ISLAND GA 31328
YEAR ROUND POOL COMPANY INC
1484 FORDING ISLAND ROAD
BLUFFTON SC 29910
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 416.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION
$7,500.00
PERMIT #: 120333
TOTAL BALANCE DUE: $ 416.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
t,,
Location: Li 01 t c✓tei- DCP_ av) -PI 07a
NAME
ADDRESS
TELEPHONE
Owner
Sp -;mss
Architect
or Engineer
Building
Contractor
VQ� -R' '-'d
++ Po �5
N 44 . b r4
Ki : n
(Check all that apply)
❑ Repair
❑ Renovation
❑ Minor Addition
❑ Substantial Addition
❑ Other
❑ Residential
❑ Single Family
❑ Duplex
❑ Multi - Family
Commercial
Details of Project: 61tbqi OUP N1tAl4OPAt.ts5
-9.p ► 4) V A 1 'x.\5T1N4Ck aw
Estimated Cost of Construction: $ J71 So 0
S14-3-24`7-(
❑ Footprint Changes
(1 Discovery
Fl Demolition
UNe. t w\`'h N J oa�Es� ?,�12CAQF
re.0a ra;rr
fir% Pont
Con truction Type (Enter appropriate number)
(1) ood Frame (4) Masonry (6) Other (please specify)
(2) •od & Masonry (5) Steel & Masonry
(3) Brit Ven:-r
Propose. use-
Remarks:
ATTACH COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following rmation based on the construction drawings and site plan:
# Units
Lot Are
# Off -st
Trees lo
Access:
Drive
Setbac
# Stor
grade
units
et parki
ated & li
y
s: Front
# Bedrooms
# Bathrooms
Living space (total sq. ft.)
g spaces
ed on site plan
ft.)
es Heig t
of the building to the
ventilation ducts, air co
With culvert?
Rear
With swale?
Sides (L) (R)
Vertical distance measured from the average adjacent
xtreme high point of the building, exclusive of chimneys, heating
itioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provided by
Construction debris will be disposed by
by means of
1 understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
1 understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that 1 must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. 1 accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: (Q •S P• Signature of Applicant: WC-r De ) A, iL61'\
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone
Approved rezoning /variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals:
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm /Drainage
Inspections
City Manager
Date
Lo -8 -12.
rk
o. pe rm,4-
N1-2- # Z So
FEES
Permit
Inspections 3 3.00
Water Tap
Sewer Stub
Aid to Const.
TOTAL
%00