HomeMy Public PortalAboutr 14-024�Rnvftdlolt of the oroug1l of Tar#eret,
No. 14 -24
Date of Adoption Jarx> I Z0 14
APPROVING CHANGE ORDER #2
2013 ROAD IMPROVEMENT PROGRAM PROJECT
WHEREAS, the Governing Body of the Borough of Carteret has previously awarded a
contract to S. Brothers, Inc., in the amount of $1,237,263.75 for the 2013 Road
Improvement Program Project; and
WHEREAS, the Borough's Consulting Engineer for the project, T &M Associates, has
advised the Governing Body that a modification of the contract is reasonable and
necessary and has recommended that the aforesaid contract be modified in accordance
with Change Order #2 (see attached); and
WHEREAS, Change Order #2 includes a. change in the description of work to increase
or decrease quantities to reflect as -built conditions, and to provide for cenain
supplementary items; and
WHEREAS, Change Order #2 provides for a net increase in the contract price in the
amount of $30,730.00, resulting in a revised contract price of $1,316,363.75 including all
previously approved change orders; and
WHEREAS, the Borough's Consulting Engineer, T &M Associates has advised that the
above described changes and/or modifications to the project were unforeseen at the time
of the award of the original contract.
NOW, THEREFORE, BE IT RESOLVED by the Mayor and Council of the Borough
of Carteret as follows:
L That Change Order 92 attached hereto and made a part hereof, resulting in
a net increase of $30,730.00 and resulting in a revised contract price of
$1,316,363.75.is hereby approved.
2. That the appropriate Borough Officials are hereby authorized to execute
Change Order #2, based upon the recommendation of the Borough
Engineer acrd subject to attorney review of the maintenance bond.
3. A copy of this resolution and a fully executed copy of Change Order #2 to
T &M Associates for distribution to S. Brothers, Inc. and the Borough
Purchasing Department.
Adopted this 30" day of January, 2014
and certified as a trice copy of the
original on January 31, 20114.
KATHLEEN M. BARNEY, ivhMC
Municipal Clerk
RECORD OF COUNCIL VOTE
COUNCILMAN
YES
NO
NV
A.B.
COUNCILMAN
YES
NO
NV
A,B,
2FLL.M
DIAZ
y
}{
DPi IVCIO
X - Indicate Vote An - Absent NV - Not Voting
XOR- Indicates Vole to Overrate Veto
Adopted at a meeting of the Municipal Council
.Ja[AL 2'
4
�5
J
i
OFFICE OF
KATHLEEN hf. EARXEY, Rh1C/ChIC
MUNICIPAL CLERK
1
T �� �Zi1 -iE.
MIOOL- COUNTY
TEL (732) 541 -3800 `
FA?_ (732) 541 -8925
61 COOKE AVENUE
CARE FRET, NE1y JERSEY 07005
Date: January 31, 2014
70: Patrick J, DeBlasio, Treasurer
Borough of Carteret
PEQ UEST FOR. CERTIFICATION OF A VAILABLE FUNDS:
For: S. Brodhers Iro., Re: (line order ;r'2, 2013 E)d
IIIpoVHtnIt Pboggran Proje-t.
Name of Account:
AMOUNT TO BE ENCUMBERED:
Ui.L ELw or .:u /60. result" in a mused caitra;t price of
316,8 •
-L
KATELEEN M B AM
Municipal Clerk
CERTIFICATION OF AVAII ABILITY OF FUNDS
I, Treasurer of the Borough of Carer< do' hereby cer - u-y that t herz ar e s uffic i ent Hin a_va�
____ an budget.to_ehable he Municipal Counce! fo author e the'eni�nno into a contract between the $o pt�on_tnz_c
d: �h of C
_ The finds - available for this contract are in the Budget in the account of
in the amount
By this cer_5cation, I have hereby encumbered the above named acco r)t for the
✓ a- mount of the contract.
�- tl� /
PATRICK I(� eBLASIO, Treasurer
Date: . s— /� .
ECG/
T f M ASSOCIATES
CONSULTING &MUNICIPAL ENGINEERS PROJECTNO. C. \It 1 -112111
5343 RROAD STREET, SUITE 006
CLIFTON, NE \1' JERSEY 07013
CHANGE ORDER NO.:
DATE: Jmmnn 31.11,14
PROJECT: 12013 Rnad Ira pracemem Pro$nm
O\V,1'ER: Dnrough of Ca"...l
CONTRACTOR:
'TION OF CHANGE:
Additioml uork required to < omplete the p,ojom
Additional pork for replacement of a IP' storm serer pipe located a( the intersection of Cypress SIM and Carteret Avenue.
.Addidonal+vork for relocation of a 4" sanimq sewer lateral located at I6 M.Uhen Avenue
1 thru 5 -13 are being added to the contract to provide for additional services required to complete the project.
i thru SC-6 are being added to the ronDac[ to pride for storm sever system replacement at the intersection of
Cypress Street and Carteret Avenue
-1 Rvu SO -10 are being added to the contract to provde for sastlW, lateral relaeation M 16 MMthem Avenue
This change order adds 10 calendar days to the contract for the additional Work
DONALD L SORDI I. P.E.. C..\LE.
ACCEPTED:
ADDITIONAL
REDUCTION
_
—� CONTRACTOR:
. /uromer., wr.
X.X\'CR=XXN
$0.00
D. TOTAL EXTRAS
OWNER'S APPROVALS:
, THIS C.O.
50.00
X.XXX.CNX.CXXX
C. TOTAL
NOTE: All Work to be done
.according to Contract
Specifications.
SEE ATTACHED DETAIL
ADDITIONAL
REDUCTION
A. TOTAL REDUCTIONS
THIS C.O.
X.X\'CR=XXN
$0.00
D. TOTAL EXTRAS
, THIS C.O.
50.00
X.XXX.CNX.CXXX
C. TOTAL
SUPPLEMENTARY
THIS C.O.
530280.00
X.X.X.XX.XXX.XXX
TOTALS T HIS C.O.
$30,780.00
50.00
NET CHANGE THIS
CHARGE ORDER
530,780.00
PREVIOUS CHANGE
ORDERS
SEL320.00
50.00
TOTAL CHANGE
.ORDERS TO DATE
S74,600.00
50.00
NET CHANGE IN
CONTRACT
5]9.600.00
ORIGINAL CONTRACT DID PRICE 5113].:61 7
CHANGE ORDERS TO DATE 519,600.00
REVISED CONTRACT PRICE F S1,3I6,86375
CHANGE ORDER NO. 2
SHEET NO. 2 OF 2
PROJECTNO. CARI -n2271
PROJECT: 2113 R,10 Imo ro.c ,nl P.....
OWNER: Bnrwi "h of Grtcra
CONTRACTOR: ti. ISrothers. ❑m.
TOTAL REDUCTIONS
F --- sma Il
ITEM
NO.
UNIT
DESCRIPTION QUANTITY PRICE AYIOUNT
2UNIT
53,500.00
50.00
5 -12
$0.00
1 UNIT
51
$0.00
5 -13
$0.00
i UNIT
$1,680.00
50.00
E
SC-,I
50.00
R
56.00
50.00
x
SC -2
$0.00
E
$180.00
50.00
T
SC -3
$0.00
D
5500.00
(500.00
U
SCA
$0.00
U
5500.00
$0.00
R
SC -5
50.00
c
564.00
50.00
A
SC-6
$0.00
T
$270.00
5540.00
L
$0.00
50.00
E
SM -1
so.00
0
$2
50.00
M
SM -2
$0.00
N
55.50
50.00
E
SMJ
so.00
I UNIT
$500.00
50.00
N
SM -4
S9.00
60 LF
560.00
50.00
T
S)-5
So.00
30 IT
51[5.00
$0.00
A..$)46
$0.00
I UNIT
$250.00
50.00
R
S)I-9
$0.00
32 SF
$35.00
$1,120.00
Y
SM-8
$0.00
10 SY
5150.00
51,500.00
SM -9
50.00
ILS
$1,000.00
$1,000.00
SM-10
$0.00
TOTAL REDUCTIONS
F --- sma Il
TOTAL EXTRA
o.00
S -11
10" SANITARY SEWER SPOT REPAIR,.LLL DEPTHS
2UNIT
53,500.00
50.00
5 -12
BOLLARDATO.E.M.
1 UNIT
51
$0.00
5 -13
BURIED MANHOLE
i UNIT
$1,680.00
50.00
E
SC-,I
SAW CUT ASPHALT
40 LP
56.00
50.00
x
SC -2
REMOVE AND REPLACE 12" RCP
20 LF
$180.00
50.00
T
SC -3
RECONSTRUCT INLET TYPE B
I UNIT
5500.00
(500.00
U
SCA
R ECONST RUCF STOR.\ I SEWER NIANHOL E
1 UNIT
5500.00
$0.00
R
SC -5
CY OF D GA BACKFILL
5 C
564.00
50.00
A
SC-6
BITUMINOUS BASE COURSE ASPHALT - TRENCH PATCH
2TON
$270.00
5540.00
L
50.00
E
SM -1
TEST PIT
$UNIT
$2
50.00
M
SM -2
SANV CUT ASTRAL
60 LP
55.50
50.00
E
SMJ
TIE LATERAL INTO EXISTING)LWHOLE
I UNIT
$500.00
50.00
N
SM -4
INSTALL 4" PVC
60 LF
560.00
50.00
T
S)-5
INSTALL 4" DIP
30 IT
51[5.00
$0.00
A..$)46
INSTAL[. 4 ". CLEANOUT
I UNIT
$250.00
50.00
TOTAL EXTRA
o.00
C. TOTAL SUPPLEMENTARY W780.00
S -11
10" SANITARY SEWER SPOT REPAIR,.LLL DEPTHS
2UNIT
53,500.00
$7,000.00
5 -12
BOLLARDATO.E.M.
1 UNIT
51
$1,400.00
5 -13
BURIED MANHOLE
i UNIT
$1,680.00
51,680.00
SC-,I
SAW CUT ASPHALT
40 LP
56.00
5200.00
SC -2
REMOVE AND REPLACE 12" RCP
20 LF
$180.00
53,600.00
S
SC -3
RECONSTRUCT INLET TYPE B
I UNIT
5500.00
(500.00
U
SCA
R ECONST RUCF STOR.\ I SEWER NIANHOL E
1 UNIT
5500.00
$500.00
P
SC -5
CY OF D GA BACKFILL
5 C
564.00
1320.00
P
SC-6
BITUMINOUS BASE COURSE ASPHALT - TRENCH PATCH
2TON
$270.00
5540.00
L
E
SM -1
TEST PIT
$UNIT
$2
51,250.00
M
SM -2
SANV CUT ASTRAL
60 LP
55.50
$330.00
E
SMJ
TIE LATERAL INTO EXISTING)LWHOLE
I UNIT
$500.00
$500.00
N
SM -4
INSTALL 4" PVC
60 LF
560.00
53,600.00
T
S)-5
INSTALL 4" DIP
30 IT
51[5.00
53,450.00
A..$)46
INSTAL[. 4 ". CLEANOUT
I UNIT
$250.00
$250.00
R
S)I-9
REMOVE /REPLACE 4" THICK CONCRETESMEWALK
32 SF
$35.00
$1,120.00
Y
SM-8
BITUMINOUS BASE COURSEASPHALT- TRENCH PATCH
10 SY
5150.00
51,500.00
SM -9
TEMPORARY PAVEMENT RESTORATION .2" TOP
ILS
$1,000.00
$1,000.00
SM-10
PERJIANENT LAN'SDCAPING RESTORATION
I LS
2000.00
$1,000.00
C. TOTAL SUPPLEMENTARY W780.00