Loading...
HomeMy Public PortalAbout12-0357 AllettoDATE ISSUED: 06 -22 -2012 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP CITY OF TYBEE ISLAND BUILDING PERMIT REPLACE ROOF 35 PULASKI PHILIP/LINDA ALLETTO PO BOX 1458 TYBEE ISLAND GA 31328 MICHAEL'S ROOFING CO LLC PO BOX 267 MELDRIM GA 31318 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 75.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $3,000.00 PERMIT #: 120357 TOTAL BALANCE DUE: $ 75.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org / ,2-4 357 Location: CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT ? I 6 &k. NAME ADDRESS PIN # TELEPHONE Owner 1e,` 355 "PLt_ 1c1t a . B.(_0 -aaai Architect or Engineer Building Contractor i`f\MiNxe V'S (� ilp�,„ `1 b `->c AU) 9 me `dr \-.0(\ Gt A 33« {� U `uo - (Agg (Check all that apply) fq Repair QTResidential Er Renovation Er Single Family ❑ Minor Addition ❑ Duplex ❑ Substantial Addition ❑ Multi- Family ❑ Other ❑ Commercial ❑ Footprint Changes ❑ Discovery ❑ Demolition Details of Project: R2. VY 10 v Q, eklqt a9r tD( 1CL r�� tat-c0 Owens Corm Ong LLrc.An �h 1 nt9 leS Es timated Cost of Construction: $ re2)) © . Construction Type (1) Wood Frame (2) Wood & Masonry (3) Brick Veneer Proposed use: Remarks: (Enter appropriate number) (4) Masonry (6 Othe (please specify) (5) Steel & Masonry F b ATTACH A COPY OF THE CER'1'DIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units # Bedrooms # Bathrooms Lot Area Living space (total sq. ft.) # Off - street parking spaces Trees located & listed on site plan Access: Driveway (ft.) With culvert? With swale? Setbacks: Front Rear Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by gilt CAA noci - Construction debris will be disposed by 'ON 01C�.QiS by means of OL.I� t ruc . I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. p Date: ' I aa` \ l Signature of Applicant" f t_1 Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification Approved rezoning/variance? Street address and number: New Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) NFIP Flood Zone Existing Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date Zoning Administrator Code Enforcement Officer Water /Sewer Stoim/Drainage Inspections City Manager FEES Permit Inspections Water Tap Sewer Stub Aid to Const. TOTAL LEAD -BASED PAINT Adapted from http:// www. epa .govAead/pubs/renovation.htm. Please use that site to access the following information. Information for Property Owners of Rental Housing, Child- Occupied Facilities Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample pre- renovation disclosure form may be used for this purpose. After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation, Repair and Remodeling rule. To become certified, property owners must submit an application for firm certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Property owners who perform renovation, repairs, and painting jobs in rental property should also: • Take training to learn how to perform lead -safe work practices. • Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010. • Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead - safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010. • Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right. • Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting. Information for Homeowners Working at Home If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project. However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home and planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1 -800- 424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint. Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is performed in your home, or in the child care facility or school that your child attends. • Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants sign a pre- renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information pamphlet. • Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools lead hazard information pamphlet. Information for Contractors As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre- renovation disclosure form may be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Contractors who perform renovation, repairs, and painting jobs should also: • Take training to learn how to perform lead -safe work practices. • Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair, and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to become a certified renovator. Click here for a list of eligible courses. • Provide a copy of your EPA or state lead training certificate to your client. • Tell your client what lead -safe methods you will use to perform the job. • Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010. • Ask your client to share the results of any previously conducted lead tests. • Provide your client with references from at least three recent jobs involving homes built before 1978. • Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead - safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has developed to help contractors comply with the renovation recordkeeping requirements. • Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right. • Read aboit how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting. IF YOU'RE NOT EAD-SAFECERTIFIED, ISTURBING JUST SIX SQUARE FEET COULD COST YOU BIG TI Signature MC ncte L (kry UL—� Ca j710 r) Printed Name 62 I g °N Date GEORGIA Permit Acknowledgement of Asbestos/Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. u tch_o 1 . Lo. Caq0-1 ;., Date Undersigned m∎ cv \cte\ L. Cno ie- Printed Name Office Use Only: Project Address: Permit Number: 06/22/2012 08:15 9127486937 CITY OF TYB �E ISLAND, GEORGIA APPLICATION ?OR BUILDING PERMIT Ji Location: P) t I a-M6 NAME ADDRESS PIN # PAGE 01/04 TELEPHONE Owner L ie: 0: T.lak.l S . g �P a�,a Architect or Engineer Building Contractor ri--\∎ ,.k e. ( >S RC �i�ck, 1' `l�C d(9 r j YY1 At "M\ Gt u�1BlR ilLtg • i'9 gs (Check all that apply) Repair Renovation ❑ Minor Addition. ❑ Substantial Addition ❑ Other El—Re si lential E Sing e Family ❑ Dup. ex ❑ Mull i- Family ❑ Commercial ❑ Footprint Changes ❑ Discovery ❑ Demolition. Details of Project: Re. .rnl ke , roc Lecce O11.0'1S C-rrri3a r i Estimated Cost of Construction: $ ?j� Oa) , e.° Construction Type (1) Wood Frame (2) Wood & Masonry (3) Brick Veneer Proposed use: Remarks: Lo (Enter appropriate number) (4) Masonry (5) Steel & Masonry thet,(please specify) ATTACH A COPY OF THE CERTIFIED 1 LEVATION SURVEY OF LOT and complete the following information based on the constrix tion drawings and site plan: # Units Lot Area # Off-street parking spaces Trees located & listed on site plan # Bedroi ims # Bathrooms Living s ,ace (total sq.yft.) Access: Driveway (It) Setbacks: Front With culvert? With swale? Rear T Sides (L) (R) # Stories Height Verti,:al distance measured from the average adjacent grade of the building to the extrem, high po nt of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. 06/22/2012 08:15 9127486937 During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be , rovided b Construction debris will be dispos xi by 'CO k_C \\CxQ.i by means of PAGE 02104 : I understand that I must comply with zonin;;, flood damage control, building, fire, shore protections and wetlands ordinances FEMJ. regulations, and all applicable codes and regulations. T understand that the lot must be staked out tnd that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an at-built elevation certification is due as soon as the habitable floor level is established. Drainag;':: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that nay be necessary to restore drainage impaired by this permitted construction. Date: L.Q. � � � 1 a Signal are of Applicant: Note: A permit normally takes 7 tc 10 days :o process. q(L The following is to be completed by City pet sonnel: Zoning certification Approved rezoning/variance? Street address and number: New _ Is it in compliance with City map? If not, has street name and /or number been reported to MPC? NFTP Flood Zone Existing FEMA Certification attached State Energy Code Affidavit attached _ Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Zoning Administrator Code Enforcement Officer Water /Sewer Storm/Drainage Inspections City Manager Date �•,�� -/a FEES Permit Inspections Water Tap Sewer Stub Aid to Const. TOTAL 06/22/2012 08:39 9127486937 PAGE 03/04 LEAD -BASED PAINT Adapted from http: / /www, t3Da, covflead/ot. bs/renovafr m. htm. Please use that site to access the following information. In formation for Property Owners of Rental Hou! hag, Child. Occupied Faeiilitles Pntperty owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space rented by child -care facilities must, before beginnings work, provide tenants with a copy of EPA's lead hazard ittf >rmation pamphlet Renovate Right, Important Led Hazard fofprllation for Families Child Care Providers,,, go lL$LL24.%. Owners of these rental properties must document r ompliance with this requirement. EPA's sample pro-renovation disclosure_form may be used for this r urpose. Pft er April 22, 203.0, property owners who perform i hese proje :ts In pre -1978 rental housing or space rented by Child -care facilities must be certified and follow the lead-safe work practices required by EPA's Renovation, Re lair and Remodeling rule. To become certified, property owners must submit an ,egelcation for firm es<i tification and fee payment to EPA. The Agency t as up to S3 days after receiving a complete request for cei tiflcation to approve or disapprove the application. Pre iperty owners who perform renovation, repairs, and painting ;i. rbs in rental property should also; • Take trainin4 to learn how to perform lead-sale work pre :Nees. • Learn the lead laws that apply regarding certii iCation and lead -safe work practices beginning in April 2010. ▪ Keep records to demonstrate that you and yc ur workers have been trained in lead -safe work practices and safe work practices on the job. To make re cordkeepin ; easier, you may use the apt &ejordkeepine developed to help contractors comply with the renovatior recordkeeping requirements that took effect April 2 • Read about how to comply with EPA's rule in the EPA $ni fN Entity Goma/lance , e to Renovate Rim. • Read about how to use lead -safe work practloas In EPA's ete„s_telead Safe Renay,a,tion Reoalr and Painting I n 'ormatlon for Homeowners Working at Home If •'ou are a homeowner performing renovation, repelir, or paining work in your own home, EPA's RRP rule does not cover your project. Ho Never, you have the ultimate responsibility for the safety of four family or children in your care. If you are living in a pre-1978 home anti planning to do painting or repairs, please read a copy of EP Vs j y to Right• .important Lead Hazard InformaMnAr Families, Child Ga,;c Providers. and.,.SGhools lead hazard information pamphlet. fou may also want to call the National Lead Information Center at 1 -800- 421 -LEAD (5323) and ask for more Information on ho to work t >fely in a home with lead-based paint. Information for Tenants and Families of Childrer under AR 6 in Child Care Facilities and Schools As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is psi formed in your home, or in the child care facility of school the: your child attends. • Before starting a renovation in residential buildings built: before 1978, the contractor or property owner is required to have tenants sign a pre- renovatn_ disclosure fo,, which Indicate! that the tenant received the Renovate Right lead hazard information pamphlet. ▪ Beginning in December 2008, the contractor must also make renovation Information available to the parents or guardians of children under age six that attend child care Facilities and schools, and to provide to owners and administrators of pre -1978 child care facilities and schools to be renovated a ropy of EP! 's R n n -. • •. •.Ld information for Farai.Les. Child ,je.rov1ders. and SSF,jgois lead hazard information par >hlet. Int oomatlon for Contractors A;6 contractor, you play an important rote in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create dolt that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation, repairs, and painting jobs in pre-1978 housing and child - occupied facilities must, before beginning work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information iamphiet m,• - -d H ijop for FamAles. Ci.4IL�re Providers, and Schools. Contractors must document Cr mpliance with this requirement. EPA's pie-renovation diS�.gaure form may, be used for this purpose. Understand that after April 22, 2011, federal law will require you to be certified and to use lead -safe work pia :ekes. To become certified, renovation contracto •s must sv unit an application and fee payment to EPA. See: Application for firm Sgciij cation. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Cm tractors who perform renovation, repairs, and painting jobs sl ould also: Take training to learn how to perform lead-safi i work practices. • Find a trainina_orovider that has been accredited by EPA to provide training for renovators under EPA'S Renovation, Repair, and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may take the 4 -hour refresher course instead of thr 8 -hour initial course from an accredited training provider to become a certified renovator. Click here fora iis;-gf ejigj�L courses, Provide a copy of your EPA or state lead trainlr g certificat. to your client. Tell your client what lead -safe methods you wi I use to pe form the job. Learn the lead laws that apply to you regardint certifcatlr .n and lead -safe work practices beginning in April 2010. Ask your client to share the results of any previously conducted lead tests. Provide your client with references from at least three ret: nt jobs involving homes built before 1978. Keep records to demonstrate that you and your workers rave been trained In lead -safe work practices and that you followed lead - safe work practices on the job. To make recordkeepinq easier, you may use the aairj le recordkeepJ,g checklist that EPA has developed to help contractors comply with the renovation recordkeeping requirements. Read about how to comply with EPA's rule in tie EPA Sma'f_Entity Comojtaance Guide to Renovate Ruhr:. Read about •w o use lead -safe work practice; in EPA's 1 e s to Lea,{ Safe Renovarr'pn. Reoalran,d.Paintirio, IF YOU RENOT D{STIJRBIN6 f JUST Six SQUARE FEET :0111 I) MST YOU .. BIGTiME. that you followed lead - checklist that EPA has 010. • : t- . • 1 • n•v.e g •• - .I • • - /l• II • c-A Sitar ature ur(\\( Prin :ed Name Date 06/22/2012 08:39 9127486937 Ica isTrAst C'4 GEORGIA Iermit Acknowledgement of Asbestos/Envirnnmental Notification to Georgia EPD for Pro'ects Involving Demolition, Wrecking, or Renovation PAGE 04/04 The undersigned hereby acknowleilges that he issuance of this permit does not in any way grant permission to the owner, owner's represen ative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prier to the filing of any required ten (10) day "Project Notification for Asbestos Renovation EncrTsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the proje ;t is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestox ; and the removal of the asbestos before renovation, wrecking, or demolition begins almostt witF out exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures 1,,Atitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues si. ch as asbestos removal techniques, lead abatement, ground contamination, or unusual kite condi sons may have EPD regulations that could affect the project. Undersigned ICh Printed Name Office Use Only: Project Address: Permit Number: ca 2.a l a Date