Loading...
HomeMy Public PortalAboutChange Order No. 7 to Contract No. 85-2016Contract No:R -34206 Change Order No.: 007 INDIANA Department of Transportation Page: 1 Construction Change Order and Time Extension Summary Contract Information Contract No.: R -34206 Letting Date:09/14/2016 District:GREENFIELD DISTRICT AE:Prather, Michael PE/S:Stevens, Mark Status:Pending Change Order Information Change Order No.: 007 EWA: Y or Force Acct. N Date Generated: 05/03/2018 Date Approved: 00/00/0000 Reason Code: CHANGED COND, Weather Related Description: Installed a Concrete Waterway Original Contract Amount $ 1,095,465.00 Current Change Order Amount $ 3,968.81 Percent: 0.362 % Total Previous Approved Changes $ 35,183.65 Percent: 3.212 % Total Change To -Date $ 39,152.46 Percent: 3.574 % Modified Contract Amount $ 1,134,617.46 Time Extension Information Date Initiated 00/0o/0000 Original Contract Time Time Element Description: Current Time Extension Previous Time Approved Revised Contract Time Date Completed 00/00/0000 SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 SP Date 00/00/0000 or SP Days (SS = Standard Specification, SP = Special Provision) SS Days 0 SP Days 0 SP Days Value $ 0.00 SS Days by AE:_ DCE: SCE: DDCM: SS Days SP Days Value $ SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 SS Date 00/00/0000 or SP Days 0 Contract No:R -34206 Change Order No.: 007 INDIANA Department of Transportation Page: 2 Construction Change Qrder and Time Extension Summary Review and Approval Information Required Approval Authority AE: DCE: SCE: * DDCM: ($ per Change Order) (-LE$250K-){-LE$750K-)(—LE$2M--)(—GT$2M--) (Days per Contract) ( 50 SS days ) ( 100 SS days ) ( 200 SS Days } ( GT 200 SS days) Verbal Approval Required? Y / N If Y. by Date Issued Total Change To-Date>5%? Y / N If Y, Copy to Program Budget Manager Scope/Design Recommendation Y / N If Y, Referred to Project Manager(PM) Required? Date to PM Date Returned Approval Authority Concurs with PM? Y / N If Y, Concurrence by Date If N,Resolution: Approved Disapproved Resolved by Date LPA Signatures Required? Y / N If Y, Date to LPA Date Returned FHWA Signatures Required? Y / N If Y, Date to FHWA _ Date Returned * Field Engineer Recommendation (Required for SCE or DDCM Approval) Field Engineer Date Comments: Contract NOR -34206 INDIANA Change Order No:007 Department, of Transportation Contract: R -34206 Project: 1173174 - State:1173174 Change Order Nbr: 007 Change Order Description: Installed a Concrete Waterway Reason Code: CHANGED COND. Weather Related CLN PCN PLN Rant Code Unit Unit Price CO Oty Comment 0113 1173174 0113 109-04299 DOL 3.968.810 1.000 C Item Description: FORCE ACCOUNT WORK Supplemental Descriplionl : Supplemental Oescrip0on2- Date:05/30/2018 Page: 3 Amount Change Arnow:$ 3,968.81 Total Value (Of Change Order 007 = S 3.968.81 whereas, the Standard SWIficationa for this contract provides for such work to be performed, lt►e folio wing change IS recommended. General or Standard Change Order Explanation During the Pee -Final Inspection. it was determined by everyone in attendance (Greg Stiens-City of Richmond, Scoff Oufl-Miiesik torte. Me Prather-AE for INppT, H Phan -PM for tNOdT and Mark Stevens-BLN), there was an area, at approximate Station 23+00 RT where you could tell there would be a substantial amount of erosion from water running off a nearby parking lot onto the RM for this project Everyone agreed that a modified concrete ditch should be built from the RAN fine leading to an existing calch basin This work is to be done as a Force Account because Substantial Completion had already been completed and the contract did not have items to cover this type of work. The Project Manager for INGOT. H. Pham, is aware of ous change order and a draft wpy will be sent to horn. The .vor% is necessary to complete the original COMract scope but is considered non -participating. Change Order Explanation for Specific fine Item II is the intent of the parties that this change order is full and Conptete compensation for the work describe above Notification and consent to this change order is hereby acknowledged. r , Contractor:.--- Mkt Contractors, LA Uale: NOTE: Other required State and FHWA signatures will be obtained efectronicaffy throtigh the SiteMOnager system Contract No:R -34206 INDIANA Change Order No:007 Date:05/30/2018 g Department of Transportation Page: 4 1Hw.wM#kH#M11M#M#Y#MMw1MM.MfawN#w#IY#Y.MHMR#M#RMYwM► - .. -a..• •-�a�a t.-a..x.. APPROVED FOR LOCAL PUBLIC AGENCY _1� 7URE) (TITLE) 1 (DATE) /p - 44'� rA 6 g- (SI U E (TITLE) '�w1f�RH##Y'H11f'Mw##/RYwwrn}}###w SUBMITTED FOR CONSIDERATION PUS #HHMMH}.'Rqf1H/MMH#RMR#1HfIRM1MRM1}1f##111N►+.+Fft#Rf Vw1MMYRf/f######fIH}w1f#MRR###1RN#f1'+IHRHM###kt#Hk##H APPROVED FOR INDIANA DEPARTMENT OF TRANSPORATION Approval Level Name of Approver Date` Statu.�.s Project Engineer/Supervisor Stevens, Mark 00/00/0000 Action Pending