HomeMy Public PortalAboutCommon Street Three Week Look AheadONYX - Three Week Look Ahead 6/8/20 through 6/26/20
CREWS:
A. Onyx 4 Man Crew
B. F & C 5-7 Man Crew
C. F & C Concrete sidewalk Crew
Week Of
TASK
CREW
6/8/20 through
6/12/20
A. Crew: Start to install Drainage structure, leaching basin, and trench drains. Remove
and replace concrete in driveway @ 4 Middlesex Rd.
A. Onyx 4 Man Crew
B. F & C 5-7 Man Crew
6/15/20
through
6/19/20
A. Crew: Finish installing light bases and conduit./ Start Drainage at Spring St.
A. Onyx 4 Man Crew
Mill Columbia Street and transitions
6/22/20
through
6/26/20
A. Crew: Finish installing drainage at Spring St. Start curb and sidewalk on Spring St.
A. Onyx 4 Man Crew
Pave Katherine Road, Orchard Street Ext. and Columbia Road