Loading...
HomeMy Public PortalAboutThree Week Look Ahead Common St. Watertown 3-9-20ONYX - Three Week Look Ahead 3/9/20 through 3/27/20 CREWS: A. Onyx 4 Man Crew B. F & C 5-7 Man Crew C. F & C Concrete sidewalk Crew D. Dagle Electric E. Garity Reclamation Week Of TASK CREW 3/9/20 through 3/13/20 A. Crew: Mobilize site and install tree protection on Orchard St. A. Onyx 4 Man Crew 3/16/20 through 3/20/20 A. Crew: Start lowering Casting on Orchard St./ Install conduit and speed indicator foundation on Common St. A. Onyx 4 Man Crew Dagle Electric to install speed indicator at 206/207 Common St. D. Dagle Electric 3/23/20 through 3/27/20 A.Crew: Work with Garity on Orchard St. A. Onyx 4 Man Crew E. Garity Reclamation crew to reclaim and grade Orchard St. E. Garity Reclamation