Loading...
HomeMy Public PortalAbout12-0450 EllwoodBUILDING PLANNING SECTION R315 FLAME SPREAD AND SMOKE DENSITY R315.1 Wall and ceiling. Wall and ceiling finishes shall have a flame - spread classification of not greater than 200. Exception: Flame- spread requirements for finishes shall not apply to trim defined as picture molds, chair rails, baseboards and handrails; to doors and windows or their frames; or to materials that are less than 1/28 inch (0.91 mm) in thickness cemented to the surface of walls or ceilings if these materials have a flame - spread characteristic no greater than paper of this thickness cemented to a noncombustible backing. R315.2 Smoke - developed index. Wall and ceiling finishes shall have a smoke - developed index of not greater than 450. R315.3 Testing. Tests shall be made in accordance with ASTM E 84. R315.4 Alternate test method. As an alternate to having a flame - spread classification of not greater than 200 and a smoke developed index of not greater than 450 when tested in accor- dance with ASTM E 84, wall and ceiling finishes, other than textiles, shall be permitted to be tested in accordance with NFPA 286. Materials tested in accordance with NFPA 286 shall meet the following criteria: During the 40 kW exposure, the interior finish shall comply with Item 1. During the 160 kW exposure, the interior finish shall comply with Item 2. During the entire test, the interior fin- ish shall comply with Item 3. 1. During the 40 kW exposure, flames shall not spread to the ceiling. 2. During the 160 kW exposure, the interior finish shall comply with the following: 2.1. Flame shall not spread to the outer extremity of the sample on any wall or ceiling. 2.2. Flashover, as defined in NFPA 286, shall not occur. 3. The total smoke released throughout the NFPA 286 test shall not exceed 1,000 m2. SECTION R316 INSULATION R316.1 Insulation. Insulation materials, including facings, such as vapor retarders or vapor permeable membranes installed within floor - ceiling assemblies, roof - ceiling assem- blies, wall assemblies, crawl spaces and attics shall have a flame- spread index not to exceed 25 with an accompanying smoke - developed index not to exceed 450 when tested in accordance with ASTM E 84. Exceptions: 1. When such materials are installed in concealed spaces, the flame- spread and smoke - developed limi- tations do not apply to the facings, provided that the facing is installed in substantial contact with the unex- posed surface of the ceiling, floor or wall finish. 2. Cellulose loose -fill insulation, which is not spray applied, complying with the requirements of Section .Qmat_.lad -� 58 -1443 tk 5. EJ I w o D c R316.3, shall only be required to meet the smoke - developed index of not more than 450. R316.2 Loose -fill insulation. Loose -fill insulation materials that cannot be mounted in the ASTM E 84 apparatus without a screen or artificial supports shall comply with the flame spread and smoke - developed limits of Sections R316.1 and R316.4 when tested in accordance with CAN/ULC S 102.2. Exception: Cellulose loose -fill insulation shall not be required to comply with the flame spread index requirement of CAN/ULC S102.2, provided such insulation complies with the requirements of Section R316.3. R316.3 Cellulose loose -fill insulation. Cellulose loose -fill insulation shall comply with CPSC 16 CFR, Parts 1209 and 1404. Each package of such insulating material shall be clearly labeled in accordance with CPSC 16 CFR, Parts 1209 and 1404. R316.4 Exposed attic insulation. All exposed insulation materials installed on attic floors shall have a critical radiant flux not less than 0.12 watt per square centimeter. R316.5 Testing. Tests for critical radiant flux shall be made in accordance with ASTM E 970. SECTION R317 DWELLING UNIT SEPARATION R317.1 Two- family dwellings. Dwelling units in two - family dwellings shall be separated from each other by wall and/or floor assemblies having not less than a 1 -hour fire - resistance rating when tested in accordance with ASTM E 119. Fire- resis- tance -rated floor - ceiling and wall assemblies shall extend to and be tight against the exterior wall, and wall assemblies shall extend to the underside of the roof sheathing. Exceptions: 1. A fire - resistance rating of 1/2 hour shall be permitted in buildings equipped throughout with an automatic sprinkler system installed in accordance with NFPA 13. 2. Wall assemblies need not extend through attic spaces when the ceiling is protected by not less than 5/8-inch (15.9 mm) Type X gypsum board and an attic draft stop constructed as specified in Section R502.12.1 is provided above and along the wall assembly separat- ing the dwellings. The structural framing supporting the ceiling shall also be protected by not less than 1/2 -inch (12.7 mm) gypsum board or equivalent. R317.1.1 Supporting construction. When floor assem- blies are required to be fire- resistance -rated by Section R317.1, the supporting construction of such assemblies shall have an equal or greater fire- resistive rating. R317.2 Townhouses. Each townhouse shall be considered a separate building and shall be separated by fire- resis- tance -rated wall assemblies meeting the requirements of Sec- tion R302 for exterior walls. Exception: A common 2 -hour fire- resistance -rated wall is permitted for townhouses if such walls do not contain plumbing or mechanical equipment, ducts or vents ire the 2006 INTERNATIONAL RESIDENTIAL CODE® R»►\ : - -- INTERNATIONAL CODE COUNCIL MEMBER City of Tybee Island • Planning & Zoning Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472.5032 • Fax 912.786.9539 Permit No. /2-Del - 7 Date Requested V/ /Z. Owner's Name 67:-JOJ Date Needed Gen. Contractor . -/- ,0 t4.1,,Oi,.�iL. Subcontractor Contact Information t A4>:"2 -r ev- Project Address z Z 7/K— AfF:..... Scope of Work k — Ie f7 < <<::. Inspector '% /1 Inspection C-t 1 -% Date of Inspection r Inspection Inspection Inspection Pass Pass Fee Fee Pass Fail,,, Fee 9415-4,-717poi r-cieRZ 5,c7,4,t,.3P,x4-/Ar-zgeti) 1)/ta70,,Lg retF/0&14 1/1)444 14f► -s /n� SoPIZ. Pel7f141 - ,/41 biz 'tJ6 40/4/' City of Tybee Island • Planning & Zoning Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472.5032 • Fax 912.786.9539 Permit No. / 2 - UCf SZD Date Requested ✓ Z 1 Z Owner's Name away Walk INTERNATIONAL CODE COUNCIL MEMBER Date Needed Gen. Contractor Z' ' /4/00% ,, Subcontractor Contact Information 7-.7 ZZ4- 43& Project Address Z? a / X 4-4i !t.. Scope of Work Inspector 1/4-/ Date of Inspection -PCB Inspection l-1c744") — Pass ❑ Fail Fe Ir 4-1 I , J I IJ ) --�;,. 13) I -0I: �c�� �.� f -f �, T� J • +�'� j U df3tfk) ss t'A) i.:A(4-17-7. Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee City of Tybee Island • Planning & Zoning Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472.5032 • Fax 912.786.9539 Permit No. %2 -J(1()o Date Requested INTERNATIONAL CODE COUNCIL MEMBER Owner's Name ;,iJa) %) Date Needed Gen. Contractor Subcontractor Contact Information l it 2Z cL e Project Address >'1L1 Scope of Work Inspector Date of Inspection Inspection Pass ❑ Fair. Inspection Pass El Fail ❑' tio)/L / jl g7 a ,J 44 j -) Fee Inspection Y/- Pass 1 i� 3j) l i OK) Inspection Pass Fail — lAwizt6 lizr-A &)o i Z c R D, 1,1r) ?2 -pos si a%f Fee City of Tybee Island, Georgia 912 - 472 -5033 or 912 - 472 -5031 - Fax 912 - 786 -9539 APPLICATION FOR BUILDING PERMIT Property Address: 2 2 C'/,44c T�� e i /x-,e r 41 3/ 32-8 ❑ Single Family [✓Duplex ❑ Multi - Family units ❑ Commercial units (Check all that apply) ❑ Discovery/Tearout ❑ Footprint Changes — new square feet heated /cooled v'Vli w v' Demolition of Structure ❑ Other 7 Details of Project: '.7 Sene {.,crCi ,n ep... i /ia -tr'c < /arc t/ roc ace'er),,/,',<� deeefa •6 ii-a_,, c�� •�� ijhal 1' �<� -' /t.N,o,a '4 r -�c,% rov /•fy$�r� ., ;1 —'.tic ,,, ex /f/ "tie 7/ �C.�.,�, P:4 c� , elf L✓4 // YxV 0s! �/' o- C •.' ,0 r Zx /2 OovS /e .S/ecdef .1 f� / / �f /� / s ✓� // ��i ��,o`/ s� -cis ,, ,!-w• ek��►/,� Wdr% 4, it1'w c..-' « ,t• 1, ke d /C✓ t ✓c -4 04,4„Et. 6 ,79/€, ,6,,,74,-, iY.t o vb16ia2 c1! ��J1 �L �Cf.•�^j ✓C1lGVe� of .-td e /eiiie,:C€ (/ Estimated Cost of Construction: $ s, 5'o0 (materials + labo + profit/over ead) 2.13 -12 +1 c Barry ?,,4 - #Qrs rctuirc.c1 -4"�dr; �c�y�o- -�r,e(r61Y - Cr.3eIN eas4 If applicable, attach a copy of the certified elevation certificate and /or surey of the property. Depending upon the scope of the work, two sets of construction drawings and /or a site plan may be required. Year Built: ! 1 > Listed on National Historic Register or located within a National Historic District? Y /C9) * Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. * Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through Construction debris will be disposed by Z'i GC by means of /rte e 1 - . I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this per itted construction. Date: / / .3/i y Signature of Applicant: Printed Name garey /►''da% Note: A permit normally takes 7 to 10 days to process Approvals: Signature Planning & Zoning Manager Building Official Water /Sewer Storm /Drainage City Manager Date FEES Permit /3.00 Inspections /7.00 Cap Cost Rec Water Tap Sewer Stub Eng. Fees Aid to Const. No ,iv) TOTAL /1/6. o0 j *'oo UC Name Mailing Address Telephone Owner /ar,�u &1.,✓ -00 e ZZ t '41,t r.14.1_754-16/. 3/ 3 Zwr Home: CeIL 7'10- -CV-3 - es 03 Architect or Engineer Contractor get,-,-7 4400 -C ZeA. r?�lock e rs,/, 6.,1 c I/ 011 C ^'!U-z/• Veds $5a V. 1,4 - 3/ `496' Hopg e� 927 -513g3 CeiI.. `i 2.25 - Y 3 i 3 ❑ Single Family [✓Duplex ❑ Multi - Family units ❑ Commercial units (Check all that apply) ❑ Discovery/Tearout ❑ Footprint Changes — new square feet heated /cooled v'Vli w v' Demolition of Structure ❑ Other 7 Details of Project: '.7 Sene {.,crCi ,n ep... i /ia -tr'c < /arc t/ roc ace'er),,/,',<� deeefa •6 ii-a_,, c�� •�� ijhal 1' �<� -' /t.N,o,a '4 r -�c,% rov /•fy$�r� ., ;1 —'.tic ,,, ex /f/ "tie 7/ �C.�.,�, P:4 c� , elf L✓4 // YxV 0s! �/' o- C •.' ,0 r Zx /2 OovS /e .S/ecdef .1 f� / / �f /� / s ✓� // ��i ��,o`/ s� -cis ,, ,!-w• ek��►/,� Wdr% 4, it1'w c..-' « ,t• 1, ke d /C✓ t ✓c -4 04,4„Et. 6 ,79/€, ,6,,,74,-, iY.t o vb16ia2 c1! ��J1 �L �Cf.•�^j ✓C1lGVe� of .-td e /eiiie,:C€ (/ Estimated Cost of Construction: $ s, 5'o0 (materials + labo + profit/over ead) 2.13 -12 +1 c Barry ?,,4 - #Qrs rctuirc.c1 -4"�dr; �c�y�o- -�r,e(r61Y - Cr.3eIN eas4 If applicable, attach a copy of the certified elevation certificate and /or surey of the property. Depending upon the scope of the work, two sets of construction drawings and /or a site plan may be required. Year Built: ! 1 > Listed on National Historic Register or located within a National Historic District? Y /C9) * Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island. * Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction: On -site restroom facilities will be provided through Construction debris will be disposed by Z'i GC by means of /rte e 1 - . I understand that I must comply with zoning, flood damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this per itted construction. Date: / / .3/i y Signature of Applicant: Printed Name garey /►''da% Note: A permit normally takes 7 to 10 days to process Approvals: Signature Planning & Zoning Manager Building Official Water /Sewer Storm /Drainage City Manager Date FEES Permit /3.00 Inspections /7.00 Cap Cost Rec Water Tap Sewer Stub Eng. Fees Aid to Const. No ,iv) TOTAL /1/6. o0 j *'oo UC LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363 -7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. * * * * * * * * * * * * * * * * * * * ** Asbestos /Environmental Notification to Georgia EPD for Prolects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * * * * * * * * * * * * * * * * * * BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http://www.gaswcc.org/docs/field_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5 " -3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. at . ignature for receipt of Lead Paint, Asbestos, and BMP notices. Ot Date Printed ame ;hatham County Board of Assessors: 2012 Property Record Card 4 -00... http: // boa. chathamcounty. org /DesktopModules /Chat hamCounty/Boardo... 2012 Chatham County Board of Assessors Property Record Card APPRAISER gdwtiiddo UNITS 1 & 2 SUB OF LOTS 226 226A 227 228 WARD 1 TYBEE ISLAND LAST INSP 05/23/2007 APPR ZONE 000008 SALES BOOK / INS VI QU RSN PRICE PAGE 07 Nov 2003 261S 0486 WD I Q 210,000 GRANTOR:MAZO PAUL U GRANTEE:ELLWOOD GLORIA 19 May 1998 1930 0057 NA I Q 80,000 GRANTOR:NETTLES JAMES H GRANTEE :MAZO PAUL U COMMENTS: 20 Aug 2003 FOR SALE 08/15/03 $219,000 �i osr- AFB I 4- 0003 -08 -011 B 22 6TH AVE TYBEE ISLAND ELLWOOD GLORIA CAMA ASMT 3059 TRAFALGAR WAY 108,300 108,300 LAND 1 ATLANTA GA 30341 76,300 76,300 BLDG 1 900 900 OBXF 1 185,500 185,500 Cost - MS [Click for larger picture] CODES PROPERTY 0006 RESIDENTIAL USE UTA 0004 Tybee Island NBHD 020270.00 T270 TYBEE SCREVEN EXEMPTIONS HISTORY LAND IMPR TOTAL 2011 142,300 53,500 195,800 Cama 2010 201,800 53,500 255,300 Cama 2009 202,000 133,000 335,000 Oyer 2008 202,000 133,000 335,000 Cama 2007 202,000 99,500 301,500 Cama 2006 198,500 67,500 266,000 Cama 2005 118,000 99,500 217,500 Cama 2004 106,000 87,500 193,500 Cama 2003 76,000 87,500 163,500 Cama 2002 51,500 87,500 139,000 Cama 2001 32,000 59,500 91,500 Cama 2000 25,000 59,500 84,500 Cama 1999 21,500 59,500 81,000 Cama 1998 21,500 59,500 81,000 Cama 1997 81,000 A/C 1996 12,560 62,100 74,660 Over 1995 12,560 62,100 74,660 Over 1994 12,560 62,100 74,660 Over 1993 12,560 62,100 74,660 Ober 1992 12,560 62,100 74,660 Ober EXTRA FEATURES ID# BLDG # SYSTEM DESC DIM 1 DIM 2 UNITS QL UNIT PRICE RCN AYB EYB DT ECON FUNC SP SP% RCNLD MKT VALUE 84505 WOOD DECK AV WOOD DECK 0 0 588.00 A 7.98 4,692 1988 1988 2R 938 900 LAND ID# USE DESC FRONT DEPTH UNITS / TYPE 108673 2 -4 FAMILY 0 0 5,057.00 -SF PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE 42.00 C2 108300 of 2 8/13/2012 9:32 AN hatham County Board of Assessors: 2012 Property Record Card 4 -00... http: // boa. chathamcounty. org /DesktopModules /ChathamCounty/Boardo... 2012 Chatham County Board of Assessors Property Record Card 4- 0003 -08 -011 B 22 6TH AVE TYBEE ISLAND BUILDING SECTION CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PI-IYS ECON FUNC OBSV / % TOTAL DEP % RCNLD U. FACTOR MKT VAL 84505 -1 -2012 Residential 83,009 1985 1988 MS 28.00 0.00 0.00 0.00 28.00 59,766 1.10 76,300 6' II .. Wood Dick 6' 7' •WOD Wow! DM u• [Click for larger picture] UFA ESTIMATED. SECTION TYPE 1 - Main AREA 1365 TYPE 5 - Duplex FRAME 1 - Stud Frame STYLE 5 - 1 1/2 Story Finished QUALITY 3.00 CONDITION 3.00 # UNITS 0 # OF BEDS / BATHS 2 / 2.00 COMPONENTS R1 108 Frame, Siding, Wood R2 208 Composition Shingle R3 352 Heat Pump R4 402 Automatic Floor Coeer Allowance R6 601 Plumbing Fixtures ( #) R6 602 Plumbing Rough -ins ( #) R6 622 Raised Subfloor (% or SF) Units % QUAL 100.00 100.00 100.00 10.00 2.00 100.00 of 2 8/13/20129:32A N CONTRACTOR RECONSTRUCTION / IMPROVEMENT AFFIDAVIT Name of Company Ze ^° Moo'"<- 6., j ;r Contractor Address 'f0 l L 44044-44 v. M Pyote Name of Property Owner G/° '-."- 7 /`v°`I Location of Property 2 Z Telephone (q,Zcg27 -Y313 I hereby attest to the fact that I, or a member of my staff, inspected the above mentioned property and produced the attached itemized list of the Estimated Cost of Reconstruction and /or Improvements. Further, all of the repairs and /or reconstruction and /or improvements proposed on the subject building for the attached Building Permit Application are included in this estimate. I understand that I am subject to enforcement action and /or penalties and /or fines if inspection of the property reveals repairs and /or reconstruction and /or improvements not included on the attached list of the Estimated Cost of Reconstruction and /or Improvements as well as the Building Permit Application. I understand that any Building Permit issued by the City of Tybee Island pursuant to this Affidavit does not authorize the repair and /or reconstruction and /or improvement and /or maintenance of any illegal additions, fences, sheds, or non - conforming uses or structures on the subject property. Total Labor & Materials Overhead & Profit Total Cost STATE OF GEORGIA COUNTY OF CHATHAM Before me this day personally appeared fr i (: r]T who, by his /her signature below, states that the information pro ed on this Affidavit is correct and that he /she has read, nderstands, and agrees to comply with all the aforementioned conditions. ra ms's S nature Sworn to and subscribed before me this 3 3 Signature of Notary Public My Commission expires day of ZIOZ isakV :saa!dxg uowspuito ,iy� V9 `d$ul OD ulegte4� 399wd AetoN 13Ss!}3NI "I Lima Donna L. McKissick Notary Public Chatham County, GA My Commission Expires: August 27th, 'P."' DATE ISSUED: 08 -14 -2012 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP CITY OF TYBEE ISLAND BUILDING PERMIT R &R SCREEN PORCH 22A SIXTH AVE 1 GLORIA ELLWOOD 3059 TRAFALGAR WAY ATLANTA GA 30341 -3927 ZENO MOORE CONSTRUCTION CO 409 E MONTGOMERY CROSSROADS SAVANNAH GA 31406 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 430.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $5,500.00 PERMIT #: 120450 TOTAL BALANCE DUE: $ 430.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.city ofty bee.org " , 4; " ? . " 1" -'" . -1 I. : . " . 1 " ' I. '," " 1-4- ��Y ce; 4. %'" _1. rt" " " ..i._L- .)...J. __ L.j.. .1 .L,L_" _ I.L '.1_L_' -!__ ' .1. _7. 1" _I_: a_" .. __L./...'.. __.L__ ; _.t " 1" " �� " 1_i.L.{" 1 -1 o '1 -I -A I t " . .1. J_ L . _ .. _ bQ 1......1" " " " " 1 .. 1 y -t 1 + 1 r i : , 1 / 1- , 1,,1" : 1 i 1 1 1" 1 ! �., .- ' . . 1 -�� : 1 I 1 I _" " _' � L .'" _ r " . 1 .- i - ..p" . ...!....,...,4 .. i.. -i,.d- . _ 7...7 -�i_.1 L.a- t_.1 :?. 13-- h- i- " ." ..4-L " 4.+ r .r :1.. -?. " . 1_ u" .: .i. {��" 1- 4 t " l i., " . . I ��}V "��.{1r��.����r .(J..14 .�� I I ; ' ;If . 1 j 1 - t , " _ r t ! 1 : " .. _. .. ' " .. t 1 -3 - 1 1 ' .... 1 " j " 1 4 1 1 A��O �T" . '" -_r_T Y'Ti6 ��' .. (_.....1 .. -1...4...r.............1 ��..I_ -i_" : " T. 1 -; " 1- _: .(. _I.. .1 .i._ ._- n" .i..yr" 1 1. " _, q 1- " Mf, " .n " 1 ( 1 . -1 I 1 1 " _I. .1 ! _,r " .. ��. ��. I 1 1 r .... .- " i8��r1;QA'.��t.)�%c' ; " " _ ��i ., .. T . 7.-4 " " t^ (' i " 1 " 1 1 " 1 ; 1 . 1 _ "��"" !- , _ i - '....1.. ; � _,.. .. t} " O M j.. i, _:. t 1 ., " I J ......1..,1" .1.1_" 1..4- 1._;..J_ _L.1......1-1.-L.:-.4 " .. " .._...s .L. .- _t.. L_F-......1..1.. ...._ i ` L" . . J. _i_ �I_r.1 -i t " " , 1 1 1 1 1 1 r " 1 4 1 1 4 " Zeno Moore Construction Company, Inc 409 Montgomery Crossroads, 8- A Savannah, Georgia 31406 (912) 927 - 4383 -'- - 10 ,12 14 ' 16 18. Cusiomer Address ��7 1�� C." 4. Z.7l1.4./ 4) 0" */ 2. ea L 4ve �� bee. -71 ,i Gil. J /3?$ " O ;EvePYeiiort'hut:. been. _ni de �to:ldO" [c:oae..v.10.1et1ots;.no. nlrere1Jt;" b*. the- ; :reviewet- ahaq- be" aonitrii4d-as;adthgt' ty- ;" .r .2:1" tb- vIelate,' t .at�%cet" ,- aIter" or" set-a8" ids -; -" 4 a PP1101thte code F ard.r a1tc_'e ;'hs 4., : r'ev��_ei ..aria..pgtr )t $h910. ti603.e:0ansttued a ?is " a Warranty !pt .guaraeteer' - ' " " -; -- 1 fire *N ��v_ Y B�F_;_. ,..-1,.7-- . T -: tr _��Ii _i " 1" " 1 _ -r,..! 1-r-. , ! 1 t .J_ -. i:_!_ ._._.L_L. 1_t- L.__.7_ , 1 I" 1 11 ! 1 , 1 6 " " ' 4LL' C1 NSrtt'UCtI0N 'MUST ICOMPtY WI .S t ..:.4sT�_ L.:41 4- ,. At fl s A -moo 1A; 1 t" 1 1 -; t " " I I T" 1 n . . . , J (" 1 , 1 1 1 7 i 1 " " { 1 r -r- L a.. ___' 1_4..L. -a:p.. i." L. - C. 1_. :_I. .1..I_ t. .. _ _L -L La':r1.. 1 J.. _.!. " I- '_J. " _3 '_J. J r .... ... �� .. ��, " . _- ,/.��L.��" . i. .1 ...rL.. ,- " . ..1..r n.l.r .j- .1rK_1 - C..r..1_.., i- v-(-- r." ..1..;. -; .��ir'M,; ..L'a: R'; 4) _ i" _r .. . ''���� .j_.,.r... I1 i" _�� " r+ :.t I 111. _:._.. t..2 - ',A,11-71u #iOff that lletians o E ; compty with The Internatloija Z ;. 09de. '��7v..Edl tlbr and State " ' �. ^t .Geode " A'rnarid!rteOtr. - -" - - 10 _. ._... cn J. ; .. " �% t' - " All llleetrlpel- k+atilliall':ka -is must E "Comply ialth" Th6 Nattonet. Eleictrle " . ' :Code' V41'1' 8ditktif State " " " " " 4,)5.. 1,201z V/e cl . 1 r icy ak V/e cl 1A4- ;(\ I G g 5 POS 2M c ev . Ce r-i- . o %n - C : 1 e) 1 so:k 5 , 4-eJ (o r,Q HIoc1 ( 11'70) 511-3 - R503 - Z ono MooC"e C,Dn54-", 22L+-1+3S 3 EfJwooc( (-12°) LrLf3 eYo_ -- r e_uJo,(` Qaew�9Q b " - /2y � ,/icy -0?-7/ Gam. (r 11 () 543- 8503 D/S out 5114 77,1 / , / SJb •H. Dianne Otto From: Dianne Otto Sent: Tuesday, June 12, 2012 3:28 PM To: Warren Millikan Subject: RE: 22 6th Ave North Hodad, Mel Gordon (272 -3028) is acting as go- between with Ms. Ellwood. He has submitted a building permit application that she filled out for $1,750 for "covered deck, remodeled bath." I'm holding it until tomorrow so Ray can get a grip on it. I'll share your notes with Ray about the HVAC and duct work, etc. Thank you, Dianne K. Otto, CFM City of Tybee Island phone 912.472.5031 fax 912.786.9539 From: Warren Millikan Sent: Tuesday, June 12, 2012 3:17 PM To: Dianne Otto Subject: 22 6th Ave North I Dianne, I left you a voice mail reference Ms Ellwood (22 6th Ave North). She has done quite a bit of work at the site (new upper deck, added a bathroom, replaced HVAC & duct work, plumbing, electrical, windows, doors, etc). I placed a Stop Work and explained the process to Ms Ellwood. She should be on her way to see`` you. I took photos, but I would suggest Ray take a look before any permits are issued. Give me a call. A c ciA.,;o,n . as ! ssu L d • Thanks, cov r` . • ' Hodad \A(1.16. 2911. �4i S zectz, (7) -',v( 1)�y..F �i �) SR��� rJ 0-$./5 St(ok r taDM, Z-Oh^�� 6'Z W Upr -^fit t - 411/ of," CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT Location: c e. No m NAME / ADDRESS PIN # TELEPHONE Owner 64(0tetOL_ AO, fl -Ue_ gc,1 /770-5-4-_'- if Architect or Engineer Building Contractor l (Check all that apply) [❑ epair Renovation ❑ Minor Addition ❑ Substantial Addition ❑ Other Details of Project: ❑ Residential ❑ Single Family ❑ Duplex ❑ Multi - Family ❑ Commercial e (-t 2'72- ❑ Footprint Changes ❑ Discovery ❑ Demolition Cb bot. Estimated Cost of Construction: $ 00 C struction Type (Enter appropriate number) (1) ood Frame (4) Masonry (6) Other (please specify) (2) ood & Mas inry (5) Steel & Masonry (3) Br k Venee Proposes use: Remarks: ATTACH A OPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following i , o • ation based on the construction drawings and site plan: # Units Lot Area # Off -str et parking .aces Trees to ated & liste• on site plan Access: Drivew.y (ft.) Setbac s: Front # Bedrooms # Bathrooms Living space (total sq. ft.) With culvert? With swale? Rear Sides (L) (R) # Storrs Height Vertical distance measured from the average adjacent grade of the building to the ex eme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by 0 u n-e 4 by means of —I-Wei; ; e I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that 1 must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Signature of Applican Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification Approved rezoning /variance? Street address and number: New Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) NFIP Flood Zone Existing Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Zoning Administrator Code Enforcement Officer Water /Sewer Storm /Drainage Inspections City Manager —V2 —t2 1.4 0Jck Signature Date 51-0 P (jog t L.00r )( Z+ 12S-CD FEES Permit Inspections Water Tap Sewer Stub Aid to Const. TOTAL LEAD -BASED PAINT Adapted from http: / /www.epa.gov/lead /pubs /renovation.htm. Please use that site to access the following information. Information for Property Owners of Rental Housing, Child- Occupied Facilities Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space rented by child-care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample pre- renovation disclosure form may be used for this purpose. After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation, Repair and Remodeling rule. To become certified, property owners must submit an application for firm certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Property owners who perform renovation, repairs, and painting jobs in rental property should also: • Take training to learn how to perform lead -safe work practices. • Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010. • Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead - safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010. • Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right. • Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting. Information for Homeowners Working at Home If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project. However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home and planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1 -800- 424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint. Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is performed in your home, or in the child care facility or school that your child attends. • Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants sign a pre-renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information pamphlet. • Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools lead hazard information pamphlet. Information for Contractors As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre- renovation disclosure form may be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Contractors who perform renovation, repairs, and painting jobs should also: • Take training to learn how to perform lead -safe work practices. • Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair, and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to become a certified renovator. Click here for a list of eligible courses. • Provide a copy of your EPA or state lead training certificate to your client. • Tell your client what lead -safe methods you will use to perform the job. • Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010. • Ask your client to share the results of any previously conducted lead tests. • Provide your client with references from at least three recent jobs involving homes built before 1978. • Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead - safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeepinq checklist that EPA has developed to help contractors comply with the renovation recordkeeping requirements. Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right. •^ Read about how to use lead-safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting. Dat I YOU'RE OU'RE NOT MAD SASE CHIMED. - DISTURBING JUST SIX SQUARE FEET `COULD COST YOU -BIG TIME. 11 • Prin es ame Permit Acknowledgement of Asbestos /Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. Otaheff-- Undersigned Date e(oi.Q I J LD Printed Name Office Use Only: Project Address: Permit Number: Page 1 of 1 http: // boa. chathamcounty. org /PortalsBoardofAssessors/ PropertyRecordCards /Photos/RE... 07/17/2012 Chatham County Board of Assessors: 2012 Property Record Card 4- 0003 -08 -011 B 2012 Chatham County Board of Assessors Property Record Card Page 1 of 2 4- 0003 -08 -011 B 22 6TH AVE TYBEE ISLAND APPRAISER gdwhiddo UNITS 1 & 2 SUB OF LOTS 226 226A 227 228 WARD 1 TYBEE ISLAND LAST INSP 05/23/2007 APPR ZONE 000008 (SALES BOOK/ INS VI QU RSN PRICE PAGE 261S 0486 WD I Q 07 Nov '2003 GRANTOR:MAZO PAUL U GRANTEE:ELLWOOD GLORIA 19 May 1930 0057 NA I Q 80,000 1998 GRANTOR:NETTLES JAMES H GRANTEE:MAZO PAUL U 210,000 COMMENTS: 1120 Aug 2003 FOR SALE 08/15/03 $219,000 ELLWOOD GLORIA 3059 TRAFALGAR WAY ATLANTA GA 30341 CAMA ASMT 108,300 108,300 76,300 76,300 900 900 185,500 185,500 LAND 1 BLDG 1 OBXF 1 Cost- MS [Click for larger picture] 198s PO4-Ft Ri& 14 Chatham County Tax Commissioner IEXTRA FEATURES ID# BLDG # SYSTEM DESC 136746 84505 WOOD DECK AV WOOD DECK LAND ID# 108673 USE DESC 2 -4 FAMILY CODES PROPERTY 0006 RESIDENTIAL USE UTA 0004 Tybee Island NBHD 020270.00 T270 TYBEE SCREVEN EXEMPTIONS HISTORY LAND IMPR TOTAL 2011 142,300 53,500 195,800 Cama 2010 201,800 53,500 255,300 Cama 2009 202,000 133,000 335,000 Over 2008 202,000 133,000 335,000 Cama 2007 202,000 99,500 301,500 Cama 2006 198,500 67,500 266,000 Cama 2005 118,000 99,500 217,500 Cama 2004 106,000 87,500 193,500 Cama 2003 76,000 87,500 163,500 Cama 2002 51,500 87,500 139,000 Cama 2001 32,000 59,500 91,500 Cama 2000 25,000 59,500 84,500 Cama 1999 21,500 59,500 81,000 Cama 1998 21,500 59,500 81,000 Cama 1997 81,000 A/C 1996 12,560 62,100 74,660 Over 1995 12,560 62,100 74,660 Over 1994 12,560 62,100 74,660 Over 1993 12,560 62,100 74,660 Over 1992 12,560 62,100 74,660 Over DIM 1 DIM 2 UNITS QL UNIT PRICE RCN AYB EYB DT ECON FUNC SP SP% RCNLD MKT VALUE 0 0 588.00 A 7.98 4,692 1988 1988 2R 938 900 FRONT DEPTH UNITS / TYPE 0 0 5,057.00 -SF PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE 42.00 C2 108300 http: //boa. chathamcounty. org /DesktopModules/ ChathamCounty / BoardofAssessors /PropertyRecordCard.asp... 6/12/201: Chatham County Board of Assessors: 2012 Property Record Card 4- 0003 -08 -011 B Page 2 of 2 2012 Chatham County Board of Assessors Property Record Card 4- 0003 -08 -011 B 22 6TH AVE TYBEE ISLAND BUILDING SECTION 84505 -1 -2012 CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PHYS ECON FUNC OBSV / % TOTAL DEP % RCNLD U.FACTOR MKT VAL Residential 83,009 1985 1988 MS 28.00 0.00 0.00 0.00 28.00 59,766 1.10 76,300 26' [Click for larger picture] UFA ESTIMATED. SECTION TYPE 1 - Main AREA 1365 TYPE 5 - Duplex FRAME 1 - Stud Frame STYLE 5 - 1 1/2 Story Finished QUALITY 3.00 CONDITION 3.00 # UNITS 0 # OF BEDS / BATHS 2 / 2.00 COMPONENTS R1 108 Frame, Siding, Wood R2 208 Composition Shingle R3 352 Heat Pump R4 402 Automatic Floor Cover Allowance R6 601 Plumbing Fixtures ( #) R6 602 Plumbing Rough -ins ( #) R6 622 Raised Subfloor (% or SF) Units % QUAL 100.00 100.00 100.00 10.00 2.00 100.00 http: // boa. chathamcounty .org /DesktopModules/ ChathamCounty / BoardofAssessors /PropertyRecordCard. asp... 6/12/201: