Loading...
HomeMy Public PortalAbout2020 Catch Basin Cleaning Press ReleaseTOWN OF WATERTOWN DEPARTMENT OF PUBLIC WORKS (P) 617-972-6420 124 ORCHARD STREET (F) 617-972-6402 WATERTOWN MA 02472 Gerald S. Mee Jr. Superintendent FOR IMMEDIATE RELEASE Contact: Public Works Department September 18, 2020 617-972-6420 Beginning the week of September 21, 2020, the Town will be cleaning stormwater catch basins throughout Town, utilizing a contractor, BMC Corp. There are about 3,200 catch basins in Town and it will take about a month to clean them all. Catch basins carry stormwater off the streets and into the Town's drainage system, which ultimately flows to the Charles River. The purpose of this work is to remove sediment and oils that accumulate in the catch basins to reduce the risk of flooding and so that these pollutants don't go into the river. Remember to keep catch basins free and clear of debris that could clog them when it rains. And help keep the Town and river clean by never placing dog waste, leaves, litter or pollutants down the storm drain. For additional information, please refer to the DPW web -site, at http://www.watertowndpw.org/l 61 /Stormwater-Management.