HomeMy Public PortalAbout2021 Road Presentation FinalPublic Works Subcommittee Presentation
September 24, 2020
2019/2020 Road Program Updates
Pavement Management Goals
2021 Road Reconstruction List
Long Streets & Collector Program
Questions
vown
Construction Updates
10 2019 and 2020 road programs bid last December
10 Onyx Corporation was awarded contracts for each
project
' Work began April 2020 with two crews in Town
I
Construction Updates
10 Completed streets
Avon Road
' Chandler Street
' Burnham Street
' Bridgha m Ave.
Piermont Street
Tappan Ave.
Bartlett Street
M
Construction Updates
10 Bellevue Road (Channing Road to
Common Street)
Binder pavement complete
Curb and sidewalk ongoing
10 Kimball Road
is Binder pavement complete
is Curb and sidewalk ongoing
Construction Updates
Frank Street & Louise Street
is Binder pavement complete
is Curb &sidewalk work begins upon completion of
Bellevue Road
10 Nichols Avenue (Dexter Avenue to Boylston Street)
41 Binder pavement complete
' Downey Street
41 Binder pavement complete
Upon completion of Frank & Louise Street, schedule will be updated
SR6-1R
[" T _
I —�T L I (R& D)
—D3-101 I (R&D"
R
R
_MA
R5 1 J (R&D)
sus
R1-1
WHEELER
LANE
t.N�rw.
c�arrw.
24
55
R
,9ei cm urooz
A .
18�covc�2R7-1A
,R�1
`��t
ENO OF
957
13
_ 12
11
r..
—
R7-IA
7—
oo.
MA—D3-101
MA-D3-102
22"•
R6-1 L
x
�2011
(R&D)FMA-D3-101 � 10+00
' 20" • t� s
22"
ROAD
LIMIT OF WORK
CHARGES RIVER
STA 10+09.65
_
N2957303.9689
E741957,7772
0
WATERTOWN
Oeponmem ojN�6lic,vorks
■ -to
- .:;,
f ;r.
B
WATERTOWN
NN'r—r of ftblic works
Complete Streets/Green Streets
}.
a it. rI Tree protection
Complete Streets/Green Streets
Curb extensions ADA compliance Fill in gaps in the sidewalk
Reduce impervious area network
Maintenance, Repair & Reconstruction
Use a variety of preservation treatments to prolong the
useful life of our roadways
10 Coordinate road repairs and reconstruction activities
with capital planning and utility work
10 Take a "Complete Streets" approach to roadway
reconstruction to improve pedestrian and bicycle
facilities and streetscape
Seek alternative funding sources for large-scale
projects
Pavement Management Metrics
' PCI —Pavement Condition Index
' Scaled from 0 to 100 based on level of distress of the road
surface
100 — perfect, no repairs necessary
0—roadway failure
IV Based on field surveys of all streets in Town
IV 2016 Town -Wide Pavement Condition Index: 65 (2012 — 59)
IV 2016 Total Work Backlog: $88 million (2012- $92 million)
2020 Pavement Management Study underway
l � �
RCi
-0-20
.20-40
40-60
60-80
-80-100
Pavement Management Techniques
` Pavement Preservation Techniques
• Limited mill and overlay repairs
• Full depth patch
Is Crack sealing
10 Road Reconstruction Techniques
Is Road reclamation (reconstruction)
Pavement Preservation Techniques
10 Prolong the useful life of
road surfaces
10 Cost-effective overtime
versus complete
reconstruction
10 Do not address other
needs or desires, such as
sidewalks and curbing
f
Lt
o
Pavement Preservation Techniques
Crack sealing
is Sealant applied to cracks to prohibit water from
causing further deterioration
' Permanent patch
is Addresses small areas of settlement, sunken
trenches, etc.
10 Mill and Overlay
' Removes and replaces top 1.5-inch of road surface
41 Typically applied in 300- to 500-foot sections
http://www.watertowndPw.org/154/Highway
Pavement Preservation Techniques
` Road Reconstruction
6 Addresses the structural integrity of the roadway
is Fully replaces the pavement surface (flinch thickness)
is Scope of work also includes:
Installation of granite curbing, concrete sidewalks, driveway
aprons and handicap ramps
Rehabilitation or addition of a planting strip
41 Review of driveway openings for compliance with Zoning
41 Drainage and stormwater management improvements
41 Tree plantings
Streets proposed for road reconstruction are
submitted to Town Council for review
7 miles of roadway
reconstructed since 2016
Roadway RehabIitation, 2016.20
Funding Source
Funding5ource
Roadways
Chapter M Lo I Funds
MmDOT Complete Stray is
Mitigation
Safe Routes to School
* Ma DOT Complete Sheets
?ff,
WATERTOWN
Oeporrmenr of ftblic works
Developing a "Universe of Projects"
2012 & 2016 Pavement Management Inventory
Windshield surveys
Maintenance records
10 Capital projects (proposed and completed)
10 Resident input
Developing the List
0 Prioritize streets in greatest state ofdisrepair
Consider project readiness
' Develop a program that fits within funding
constraints
10 Continue ongoing preventative maintenance
' Consider alternative funding sources
' Consider geographic equity
Utility Coordination & Capital Planning
It Water main replacement program (2,400-feet)
• Essex Street, Nash Street and Pine Street
• Oak Street
' National Grid streets
• Irving Street
• Lexington Street
• Grant Ave. (Lexington St. to Duff Street)
• Pierce Road
' Riverside Street (N. Beacon Street to #50 Riverside Street)
' Forest Street (Bartlett St. to Summer St.)
• Grandview Ave.
• Alden Road �
Sheldon Road
Proposed Streets
10 Alden Road
' Sheldon Road
' Hazel Street (Quimby Street to Dexter Ave.)
10 Gertrude Street
10 Goldie Street
10 Elmwood Ave.
' Grandview Ave. (Chapman St. to Copeland St.)
Alden Road
Alden Road
320 feet long — 30 feet wide
Sheldon Road
Sheldon Road
270 feet long — 24 feet wide
Hazel Street (Quimby Street to Dexter Ave.)
-00
0 WI-
i
w
Gertrude Street
d �
r.+a.:
V 1
Goldie Street
Goldie Street
280 feet long — 24 feet wide
V
Ma
• Gas main replaced in 2017
• Alligator cracking, trenches
WATERTOWN
Oepnrlmem Of PUMC IWAS
Grandview Ave. (Chapman St. to Copeland St.)
Next Steps
10 Review driveways with DCDP
Review street trees with Tree Warden
' Review water services and fire hydrants
' Green infrastructure review
' Finalize concepts, where applicable
10 Supplemental survey, where necessary
' Notify residents of future work
' Maintain schedule for December bid
Waverley Ave.
Waverley Ave. included in Town's Complete
Streets Prioritization Plan (#17)
41 Install granite curbing, remove and replace sidewalks
41 Provide ADA compliant accessible ramps at
intersections
is Provide curb extensions at intersections for traffic
calming
is Add street trees
http://www.watertowndpw.org/DocumentCenter/View/303/Watertown-Complete-
Streetes-Plan-Final
Waverley Ave.
Land survey completed
Driveways reviewed with Zoning Enforcement
10 Existing road is 35-feet wide with no defined
travel lanes or parking aisles
10 Substandard water services will be replaced this
fall
Waverley Ave.
10 Next steps
41 Develop concept plan for review by Complete
Streets working group
is Advance design for public bid
is Abutter notifications
■
Bid in winter for construction next
ear
Proposed Streets
10 Alden Road
' Sheldon Road
' Hazel Street (Quimby Street to Dexter Ave.)
10 Gertrude Street
10 Goldie Street
10 Elmwood Ave.
' Grandview Ave. (Chapman St. to Copeland St.)
Gertrude Street
Sheldon Road �,.�=•t=-d'
Grandview Ave. Alden Road ~�
rect
'..' �•"•` EJ mw o od Ave.
Goldie Street
Hazel Street
Ar end? areez
ff
WATERTOWN
OeNamem of Public works
PROP.
SIDEWALK
4` LOAM do SEED 4
(Typ•)
EAST. GROUND , 1.5v (TYP.) MAX. j 2.0% (TYP.)
i CEW CONC-
WALK SURFACE
8- GRAVEL BORROW, TYPE B
WHERE REQUIRED/DIRECTED BY ;
DPW SUPERINTENDENT (Tl'P,)
EAST, ROADWAY
PROP.
PROP. ROADWAY SIDEWALK
VARIES MATCH E76ST. 2'— 5'-a' (MIN.)
L FVLL DEPTH PAVEMENT RECLAVAT ON
GRAN. CURB — TYPE VA-4
4' LOAM do SEED
1:10 °
MAX 1.51 * Tr
4` LOAM & SEED
(TIP,)
EXIST GROUND
-.{.
4" CEAI. CONC.
WALK SURFACE
4' LOAM & SEED
TYPICAL SECTION GRAN. CURB — TYPE VA-4
FULL DEPTH PAVEMENT RECLAMAMCK
NOT To SCALE
v
WATERTOWN
DoNamem of ftblic works