Loading...
HomeMy Public PortalAbout20210708123748431TOWN OF WATERTOWN DEPARTMENT OF PUBLIC WORKS (P) 617-972-6420 124 ORCHARD STREET (F) 617-972-6402 WATERTOWN MA 02472 Gregory St. Louis, P.E. Superintendent NORTH BEACON STREET at ARSENAL STREET SEWER WORK and ROAD CLOSURE Please be advised that North Beacon Street in the eastbound direction will be closed to thru traffic between Arsenal Street and Irving Street starting Monday, July 12, 2021 and continuing through Friday, July 16, 2021. The road closure is required to permit replacement of a 15-inch sewer main on North Beacon Street at Alfred Road. Due to the nature of the work, the road will be closed to thru traffic at all times (work hours will be 7 AM to 4 PM). Drivers should follow the posted detour route along Arsenal Street eastbound to Irving Street southbound and back to N. Beacon Street. N. Beacon Street will remain open to westbound traffic. Access to driveways in the vicinity of the work area will be maintained at all times, however street parking restrictions will apply as posted. No interruption to water or sewer service is anticipated. Sincerely, Gregory St Louis, PE Superintendent of Public Works OVER 4