HomeMy Public PortalAboutChange Oreder No. 2 to Contract No. 148-2018 (R-37463) - INDOT Coordination Agreement (R-37463) 1382810 - Bike Pedestrian facilitiesContract No:R -37463
Change Order No.: 002
1NDIANA
Department of Transportation
. Page: 1
Construction Change Order and Time Extension
Summary
Contract Information
Contract -No.: R -37463
Letting Date:10/12/2017
District:GREENFIELD DISTRICT
AE:Prather, Michael
PE/S:Stanley, William Status:Draft
Change Order Information
Change Order No.: 002
EWA: N or Force Acct: N
Date Generated: 11/20/2018
Date Approved: 00/00/0000
Reason Code: CHANGED COND, Constructability Related
Description: Signal Deletion
Original Contract Amount
$ 5,883,000.00
Current Change Order Amount
$-84,987.70
Percent: -1.445 %
Total Previous Approved Changes
$ 0.00
Percent: 0.000 %
Total Change To -Date
$-84,987.70
Percent: -1.445 %
Modified Contract Amount
$ 5,798,012.30
Time Extension Information
Date Initiated 00/00/0000
Original Contract Time
Time Element Description:
Current Time Extension
Previous Time Approved
Revised Contract Time
Date Completed 00/00/0000
SS Completion Date 00/00/0000 or SS Calendar/Work Days 0
SP Date 00/00/0000 or SP Days
(SS = Standard Specification, SP = Special Provision)
SS Days 0 SP Days 0 SP Days Value $ 0.00
SS Days by AE: DCE: SCE: DDCM:
SS Days,
SP Days Value $
SS Completion Date 00/00/0000 or SS Calendar/Work Days 0
SS Date 00/00/0000 or SP Days 0
Contract No:R -37463 Change Order No.: 002
INDIANA Department of Transportation Page: 2
Construction Change Order and Time Extension Summary
Review and Approval Information
Required Approval Authority AE. x DCE: SCE: * DDCM:
($ per Change Order) (-LE$250K-)(-LE$750K-)(--LE$2M—)(--GT$2M--)
(Days per Contract) ( 50 SS days ) ( 100 SS days) ( 200 SS Days) ( GT 200 SS days)
Verbal Approval Required? (25/ N If Y, by Mike Prather Date Issued 11-19-18
Total Change To-Date>5%? Y 181f Y, Copy to Program Budget Manager
Scope/Design Recommendation Y /&If Y, Referred to Project Manager(PM)
Required?
Date to PM Date Returned
Approval Authority Concurs with PM? Y / N If Y, Concurrence by Date
LPA Signatures Required?
If N,Resolution: Approved Disapproved
Resolved by Date
(D/ N If Y, Date to LPA 11- 2 0 -18
Date Returned
FHWA Signatures Required? Y /(R If Y, Date to FHWA Date Returned
�—�* Field Engineer Recommendation (Required for SCE or DDCM Approval)
Field Engineer Bill Stanley
Comments: United recommends approval of Change Order 2
Date 11-20-18
Contract NOR -37463 INDIANA
Change Order No:002 Department of Transportation
Contract: R -37463
Project: 1382810 - State: 138281000LC3
Change Order Nbr: 002
Change Order Description: Signal Deletion
Reason Code: CHANGED COND, Constructability
Related
CLN PCN PLN Item Code Unit Unit Price
CO Qty
0020. 1382810 0620 202-93995 EACH 500.000
-2.000
Item Description: SIGNAL POLE FOUNDATION, REMOVE
Supplemental Descriptionl:
Supplemental Description2:
0021 1382810 0021 202-93999 EACH 315.000
-2.000
Item Description: SIGNAL POLE, REMOVE
Supplemental Descriptionl:
Supplemental Description2:
0125 1382810 0125 802-09838 SFT 18.000
-13.500
Item Description: SIGN, SHEET, WITH LEGEND, 0.080 IN.
Supplemental Descrip8onl:
Supplemental Description2:
0126 1382810 0126 802-09840 SFT 18.000
-15.000
Item Description: SIGN, SHEET, WITH LEGEND, 0.100 IN.
1
Supplemental Descriptionl:
Supplemental Description2:
0127 1382810 0127 802-09842 SFT 19.000
-9.000
Item Description: SIGN, SHEET, WITH LEGEND, 0.125 IN,
Supplemental Descriptionl:
Supplemental Description2:
0129 1382810 0129 805-01300 EACH 2,000.000
-1.000
Item Description: TRAFFIC SIGNAL EQUIPMENT, REMOVE
Supplemental Descriptionl:
Supplemental Description2:
0130 1382810 0130 805-01842 EACH 900.000
-2.000
Item Description: HANDHOLE SIGNAL TYPE 1
Supplemental Descriptionl:
Supplemental Description2:
0131 1382810 0131 805-01843 EACH 265.000
-2.000
Item Description: SIGNAL HANDHOLE ADJUST TO GRADE
Supplemental Descriptionl:
Supplemental Description2:
0132 1382810 0132 805-01844 LFT 23.500
-239.000
Item Description: CONDUIT, STEEL, GALVANIZED, 2 IN.
Supplemental Descriptionl:
Supplemental Description2:
0133 1382810 0166 805-02087 LS 2,500.000
-1.000
Item Description: TRANSPORTATION OF -SALVAGEABLE SIGNAL EQUIPMENT
Supplemental Descriptionl:
Date: 11 /20/2018
Page: 3
Comment Amount Change
C Amount:$-1,000.00
C Amount:$-630.00
C Amount:$-243.00
C Amount:$-270.00
C Amount:$-171.00
C Amount:$-2,000.00
C Amount:$-1,800.00
C Amount:$-530.00
C Amount:$-5,616:50
C Amount:$-2,500.00
Contrabt NOR -37463 INDIANA
Change Order No:002 Department of Transportation
Supplemental Description2:
0136 1382810 0135 806-04602 EACH 1,850.000 -1.000
Item Description: CONTROLLER, REWIRE
Supplemental Descriptionl:
Supplemental Description2:
0137 1382810 0136 805-11373 EACH 7,800.000 -1.000
Item Description: SIGNAL CANTILEVER STRUCTURE, SINGLE ARM 15 FT.
Supplemental Descriptionl:
Supplemental Description2:
0139 1382810 0138 805-11378 EACH 12,500.000 -1.000
Item Description: SIGNAL CANTILEVER STRUCTURE, SINGLE ARM 40 FT.
Supplemental Descriptionl:
Supplemental Description2:
0140 1382810 0139 805-11387 EACH 7,000.000 -1.000
Item Description: SIGNAL CANTILEVER STRUCTURE, SPREAD FOOTING FOUNDATION, C
Supplemental Descriptionl:
Supplemental Description2:
0141 1382810 0140 805-11388 EACH 8,500.000 -1.000
Item Description: SIGNAL CANTILEVER STRUCTURE, SPREAD FOOTING FOUNDATION, D
Supplemental Descriptionl:
Supplemental Description2:
f
0143 1382810 0142 805-78109 EACH 17,900.000 -1.000
Item Description: CONTROLLER AND CABINET, SECONDARY MENU DRIVEN, 8 PHASE
Supplemental Descriptionl: ,.M
Supplemental Description2:
0145 1382810 0144 805-78205 EACH 700.000 -2.000
Item Description: TRAFFIC SIGNAL HEAD, 3 SECTION, 12 IN.
Supplemental Descriptionl:, RED BIKE, AMBER BIKE, GREEN BIKE
Supplemental Description2:
0146 1382810 0145 805-78205 EACH 750.000 -4.000
Item Description: TRAFFIC SIGNAL HEAD, 3 SECTION, 12 IN.
Supplemental Descriptionl:, RED, AMBER, GREEN
Supplemental Description2:
0147 1382810 0146 805-78467 LFT 2.000-300.000
Item Description: SIGNAL CABLE, SERVICE, COPPER, 3C/8 GA
Supplemental Descriptionl:
Supplemental Description2:
0148 1382810 0147 805-78470 LFT 0.600-334.000
Item Description: SIGNAL CABLE, ROADWAY LOOP, COPPER, 1C/14 GA
Supplemental Descriptionl:
�— Supplemental Description2:
0149 1382810 0148 805-78485 LFT 1.300-524.000
Item.Description: SIGNAL CABLE, CONTROL, COPPER, 5C/14 GA
Supplemental Descriptionl:
Supplemental Description2:
Date: 11 /20/2018
Page: 4
C Amount:$-1,850.00
C Amount:$-7,800.00
C Amount:$-12,500.00
C Amount:$-7,000.00
C Amount:$-8,500.00
C Amount:$-17,900.00
C Amount:$-1,400.00
C Amount:$-3,000.00
C Amount:$-600.00
C Amount:$-200.40
C Amount:$-681.20
Contract NOR -37463 INDIANA
Change Order No:002 Department of Transportation
0150 1382810 0149 805-78490 LFT 1.400-994.000
Item Description: SIGNAL CABLE, CONTROL, COPPER. 7C/14 GA
Supplemental Descriptionl:
Supplemental Descriptionl:
0151 1382810 0150 805-78510 LFT 1.000-217.000
Item Description: SIGNAL CABLE. DETECTOR LEAD-IN. COPPER, 20116 GA
Supplemental Descriptionl:
Supplemental Descripticn2:
0152 1382810 0151 805-78785 EACH 1.200.000 -2.000
Item Description: SIGNAL DETECTOR HOUSING
Supplemental Descriptionl'
Supplemental Descripticn2:
0153 1382810 0152 805-78795 LFT 11.000-367.000
Item Description: SAVV CUT FOR ROADWAY LOOP DETECTOR AND SEALANT
Supplemental Descriptionl:
Supplemental Descripticn2:
0154 1382810 0153 805-92504 EACH 375.000 -2.000
Item Description: LOOP DETECTOR DELAY AMPLIFIER. 2 CHANNEL
Supplemental Descriptionl:
Supplemental Descriptionl:
C Amount:S
C Amount:S
C AmOunt:S
C Amount:S
Date: 1Ill 5/2018
Page: 5
-1,391.60
-217.00
-2,400.00
-4.037.00
C Amount:S-750.00
Total value for Change Order 002 = S-84,987.70
Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended.
General or Standard Change Order Explanation
According to the contract information book for R-37463 (page 81). portions of the work shown in STA 11+20 to STA 12+75 on Line TEN-S along
South 10th St. Part of the work for Des. No. 1382810 may be removed from the contract and constructed as part of the US 40 project (Des. No,
0013790. Contract No. R-30397) at the direction of the INDOT Area Engineer. Specifically, part or all of the work associated with the traffic
signals may be completed as part of Contract No. R-30397. United PEPS. Bill Stanley was directed by INDO'r Area Engineer Michael Prather to
eliminate the signal at South 10th Street and South A Street. Even though the signal is being installed by the US 40 Project Contract P.-30397 the
signal design (Specifically the phasing and bike signals is to be based on the RSS project design.
General or Standard Change Order Explanation
Change Order Explanation for Specific Line Item
It is the intent of the parties that this change order is full and complete compensation for the work desclel above.
Notification and consent to this change order is hereby acknowledged, 1
Contractor. Milestofte Contractors, U.P.Signed By:
Date: /' / 69
NOTE: Other required State and FHVVA signatures will be obtained electronically through the Sitef,Aanager system.
e
Contract No:R -37463 INDIANA Date:11/20/2018
Change Order No:002 Department of Transportation Page: 6
1 _- ' tHraretf:etH+HfltffaHrt*HetHH+lHatffH:tHHH1ta++afeHtaaateH*H*fHtfee++fr+:ff*iteereHHrlr**tHt1/flrHttiaH
v APPROVED FOR LOCAL PUBLIC AGENCY
TIG
TU )(TITLE) (DATE)
TURE) (TITLE) (DATE)
Hf kHrifHHi*ifMkrfifrrHHff*tfHHH*HeHrrHHtttfHHiflt*eHiftHHHHtfifefiHf*aaa*aetirf ttifttfft*Nttitt►ttftt
SUBMITTED FOR CONSIDERATION
mftereiffrlHHlt*rHtfrltf if*k1f eHtf tlfftlrf **i*ttrft*fff e*.H.*aHH1f *itfH**RteHaaf ttHHfrtfrH*HHtrlttfH*1fHH
APPROVED FOR INDIANA DEPARTMENT OF TRANSPORTATION
Approval Level Name of Approver Date Status