HomeMy Public PortalAboutChange Order No. 10 to Contract No. 148-2014 - INDOT Coordination Agreement (R-37463) 1382810 - Bike Pedestrian facilitiesContract No:R -37463 Change Order No.: 010 INDIANA Department of Transportation Construction Change Order and Time Extension Summary Contract Information Contract No.: R -37463 Letting Date:10/12/2017 District:GREENFIELD DISTRICT AE:Prather, Michael PE/S:Stanley, William Change Order Information Change Order No.: 010 EWA: N or Force Acct: N Date Generated: 11/19/2018 Date Approved: 00/00/0000 Reason Code: CHANGED COND, Constructability Related Description: Removal of Existing Concrete Boxes 7th Street Original Contract Amount Current Change Order Amount Total Previous Approved Changes Total Change To -Date Modified Contract Amount Time Extension Information Date Initiated 11/19/2018 Original Contract Time $ 5,883,000.00 $ 0.00 $-40,320.70 $-40,320.70 $ 5,842,679.30 Date Completed 12/12/2018 Percent: 0.000 % Percent: -0.685 % Percent: -0.685 % Page: 1 Status:Draft SS Completion Date 11/30/2018 or SS Calendar/Work Days 0 SP Date 00/00/0000 or SP Days (SS = Standard Specification, SP = Special Provision) Time Element Description: Milestone while performing common excavation on North 7th Street & Fort Wayne Ave Milestone uncovered a 3 x 3 exisitng concrete box that was use as a storm sewer. The concrete box storm sewer ran on the West side of North 7th Street from the middle of North A Street to Fort Wayne Ave. This box impacted Milestone from continuing work on the R-37463 contract until the storm work was completed. On 8-7-18 Greg Stiens gave direction to remove the top of the box and place new dualwall HP pipe through a separate contract with the city. See Attached Notice of Changed Condition Dated 8-7-18. Time Extension for the removal of theexisitng concrete box 20 days. See Explanation Tab and Attachment in Header Tab for further details. This Time Extension is being created by the request of Milestone. Current Time Extension SS Days 0 SP Days 0 SP Days Value $ 0.00 Previous Time Approved SS Days by AE: DCE: SS Days SCE: DDCM: SP Days Value $ Revised Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 20 SS Date 00/00/0000 or SP Days 0 Contract No:R -37463 Change Order No.: 010 INDIANA Department of Transportation Page:.2 Construction Change Order and Time Extension Summary Review and Approval Information Required Approval Authority AE:, xDCE: x SCE: DDCM: ' ($perChangeOrder)(-LE$250K-)(-LE$750K-)(--LE$2M--)(--GT$2M--) (Days per Contract) ( 50 SS days) (100 SS days) ( 200 SS Days) ( GT 200 SS days) Verbal Approval Required? Total Change To-Date>5%? �Y / N If Y, by Greg Stiens Date Issued 9-19-18 Y / N If Y, Copy to Program Budget Manager. Scbpe/Design Recommendation Y / N If Y, Referred to Project Manager(PM) Required? Date to PM Date Returned Approval Authority Concurs with PM? Y / N If Y, Concurrence by Date LPA Signatures Required? FHWA Signatures Required? If N,Resolution: Approved Disapproved Resolved by (Y / N If Y, Date to LPA 12-12-18 Date Date Returned Y /ON If Y, Date to FHWA Date Returned * Field Engineer Recommendation (Required for SCE or DDCM Approval) Field Engineer Bill Stanley - United Date 11-19-18 Comments: United recommends Change Order 10 for approval Contract F,I :R =37463 INDIANA Date;12r14/2G18 Change- Order No:010 Department of Transportation FaCJe: Cortract: R -37463 Project 87ate:? 38281000LC3 Change Order Nor: 010 Change Order Description: Remov:; of Existing Concrete {foxes 7tr -treet Reasor, Code. CHANPED COND. Constructabili:y Re!ated CLN PCN PLN Item Code Unit Unit Pricc CO O..ty Comment Amount Change Total "al,- 'or Chance Order 0, 0 = S 0 ^vi; Contract Completion Date Time Adjustment l f Original Ccmp!eltcr, •7t: 1 ;,3-0r20i$ %vj corr; l Lit ,- �ac - r. ��=% nG, fVO. C' Days 20 rxp,ena: or: 41,ilestore vrnae performing cornmon excavation On NCrih 711n Slreet $ Fro,-, Vfacre Ave ', aiesmr)c unccvared a 3 x 3 ex,sitna concrete box tnai teas, -se as a stonTT s.:rer, .�. t0 ACC t/t - The COncr@i8 COY. _tCr,^,7 cat•:8f rCr Cr the t/gyres: sloe cf Ncr,F 7lh $Cr:Ct from !�;e middle of iVorlh /:t Street ayne A: has box impacted `,IileSten� fr m 'f Greg Sti co.. ir,uinp ;•cork cr::he -37463 Contract Lntit the storm ;vorr; %ias Com;c!eted. On 8-7-18 ens cave direction to rentOve the t0 0f thy place p 06x onC ^ 8 E n .d CLa, t:a,i HP pipe thro.ch a separate contracl',.4th th C Attached Notice of Change-: Co ,dittos Dated 8.7.18 Time even ' re e c y Sea and Attac:nmer.; in f cer r �, son or the mot 2t ;ne axisibTg cc.,crete oat A See gxp nab r, a.. eo Tnt; 'oi 'L. tr �Er 2t�1!3, This -irrie ems-• 2G C. Y5. i•0, C j .. Gxt_i.i;on is tieing Create•^. �� the recLest o' fttllesi0ne Whereas. the Standard Specifications for this contract provides for such .-cork to be periarmed, the following change is recommended. Genera! Cr Standurr Chang: (irC3r cxptana;ivn PM HT Phan has been nob' ec of the Change Order. See Attachment in Heacer fc" futher details. Nev. contract Cornple:ton cave Cf J,:^e 30th 2019 CO ~1 Jun: 7th 2019 + 3 ca s Co 1�5 -J.ne 101,h 2019 + 20 days Co *10 = A� Lst=d Completec Date June 30 201:. Change Order explanation for Specific Line Item It is the ir.Cent of the parties that thi order a a:e p` s change ard.. is full nc corTph,,t. comper•sa-:or to file •crock cascrjhe =hove JJ-, tv0:ii cFcn and consent to :his Chance orcer i8 hQreby ac'snovrlEdged Contra:t•Or' Eppp�, `` ��{{.. �. {rg ./1� �.'✓ LJ', lYf �i, —��fS:.7���1��ie6��ti.L�i�� �er. Signed°y,._ — NOTE' Other rcc,uired State and ,H',tIA s; nVures writ be Cbtt in SC electronfr, ally thm yt. the Sltehlar,@ger system. Contract NOR -374.63 INDIANA Change Order No:010 __Department of Transportation arHraf HH•HraaHHataHrHeaaHfHrHH+ttrafaaHrfrrrHH�fHrHfaH•HHHHfH•HaHHaHafH•HHHarr:HHHararrara APPROVED FOR LOCAL PUBLIC AGENCY (SIGNATURE) (TITLE) !IGNATUR (TITLE) aHHaaaffHltfaf HfatfifHfff HffHHtfttffarit Hrlff •f HHHiftrreraf lfftfflff Hr/rlftttrHafft}r•fffaf of frfrarlffffrrf Hi SUBMITTED FOR CONSIDERATION PE/S Bill Stanley - United Date:12/14/2018 Page: 4 / 2 - zo.- I P (DATE) l2 -Za -�� (DATE) affitriHHrfHfrrfrrrtr•HfHH1t HfHHf HafHrtHiHfa HiH flwf•f rt•taraaarfrrtaftaf.. fart fa.H. H•ar..Hafrw.HaiHraraf APPROVED FOR INDIANA DEPARTMENT OF TRANSPORTATION Approval Level Name of Approver Date Status CHANCE ORDER REQUEST FORM CONTRACT NO. R-3746.3-B DATE OF SUBMISSION October 31, . 2018 PROJECT DESCRIPTION ENHANCEMENT; BIKE, AND, PEDESTRIAN FACILITIES, WAYNE COUNTY, ON E MAIN ST, 7TH STAND LOTH ST IN THE CITY OF (route/inrersectfon/bridgeno(s).) RICHMOND, IN CHANGE ORDER REQUEST SUMMARY I ADD TO CONTRACT: 20 DAYS DESCRIPTION PROPOSED SOLUTION SUMMARY DURING EXCAVATION .CO•NSTRUCTION LIMITS ON 7TH ST, UNCOVERED. EXISTING CONCRETE BOX - REQUIRED REMOVAL .. NOTE: Upon reguestfrom Engineer, enter detailed description on page 2. ONSET DATE OF CHANGE August 7, 2018 TCHANGE ORDER TYPE 104.03 Extra Work PROPOSED COST AND TIME ADJUSTMENT COST COST INCREASE / (DECREASE): $E=E The cost adjustment shall include lump sum and estimated totaled unit -priced item costs. Attach a separate sheet of unit price items Including item description, unit of measurement, estimated quantity and unit price. CHECK APPROPRIATE BOXES PER APPROPRIATE BASIS OF COST CHANGE: .❑ 109.03 Altered Quantities 13 109.05�a) Agreed Price ®'109.05(6 Force.;Accotint ❑ 109:'0 .02 Delay Costs PROPOSED COSTCHANGE INCLUDES: P. Labor.: O Material ..:❑ .Equipment ❑.Lease Agieernent . ❑ Subcontractor TIME ADJUSTMENT INCREASE / (DECREASE): (work days) CHECK APPROPRIATE BOXES PER APPROPRIATE BASIS OF TIME CHANGE: ❑ 108.08(a) Excusable, Non-Compensable ® 108.08(b) Excusable, Compensable !VOTE: !f Compensable, attach details based on 109.05.2(a) Allowable Delay Costs, SUPPLEMENTAL INFORMATION AtiHifinnni Wnrmofinn mov ho onfororl by 41a nnn4r.3 i— CHANGE ORDER ORIGINATION: ❑ INDOT/ LPA Z Contractor DOCUMENTS AFFECTED: ❑ Contract Specifications (ref. doc name/no.) N/A ❑ Contract Plans (ref. doc name/no.) N/A: . CHANGE ORDER AFFECTS DBE PARTICIPATION: P yes ® no (if yes, attach details) Ver. "10.23.17 CHANGE ORDER REQUEST FORM CONTRACT NO. 9-37463-E UPON WRITTEN REQUEST FROM THE ENGINEER, PROVIDE ADDITIONAL DETAIL DATE RECEIVED REQUEST FOR [Select Date] SUBMITTAL DATE OF [Select Date] ADDITIONAL DETAIL ADDITIONAL DETAIL DETAILED DESCRIPTION / JUSTIFICATION: (Include location(s), actions of contractor, owner, and other stakeholders, key events and related couse(s), discoveries,. discussions, meetings, and effect on the contract if no action is taken. Also include references to key documents attached or available to support this change order request.) CITY REQUESTED REMOVAL OF EXISTING CONCRETE BOX IN CONSTRUCTION LIMITS ON 7T" STREET PROPOSED SOLUTION — ADDITIONAL DETAILS: (Include proposed scope of work, means & methods, materials, equipment, utility relocation required, subcontracted scope and the effect on the contract schedule. Also include references to attached documents including, but not limited to, sketches, calculations, photos, material information, and submittals and meeting minutes.) WHILE PERFORMING. COMMON EXCAVATION AT THE CONSTRUCTION LIMITS ON 7TH STREET @ FT WAYNE AVE; MILESTONE UNCOVERED A 3'X3'. EXISTING CONCRETE BOX. THIS BOX IMPACTED MILETSONEFROM CONTINUING WORK ON OUR R-37463 CONTRACT UNTIL THE STORM WORK WAS COMPLETED. THE CITY OF RICHMOND GAVE DIRECTION TO REMOVE THE LID OF THE BOX AND LAY NEW DUALWALL HP PIPE THROUGH A SEPARATE CONTRACT WITH THE. CITY. (SEE ATTACHED NOTICE OF CHANGED CONDITION DATED 08/07/i8) SIGNATURES Contractor: Name: (print) S ST (signature) Date: io/3i/18 pg: 2 CHANGE ORDER REQUEST FORM Project Engineer/Supervisor: (slgnature is to acknowledge receipt of the document and does not sfgnify agreement of the change order) Name: (print) (signature) NOTE: The Contractor and PENS should retain a signed copy of this document for record. CONTRACT NO. L37463-B ATTACHMENT: UNIT PRICE ITEMS DETAIL Attach or paste a unit price item detail. Date: MILESTONE REQUEST 20 DAYS BE ADDED TO THIS CONTRACT FOR IMPACT DUE TO THE CONCRETE BOX DISCOVERED DURING COMMON EXCAVATION ON 7TH ST @ FT WAYNE AVE. pg. 3 Milestone Contractors, LP Rig. Notice of a Changed Condition To: ��0 ��Ie Contract #E:_R- 374 3 From:�5�/Jeic,e, Description: �teti,•��.��?! <<e �3- ��d, Date: MCLP Job No.: t W O V 3 This is a Notice of a Changed Condition. The details of the changed condition are as follows: Date of Discovery: % a if- `Q Discovered by Whom: Discovery Method: �� �$!i✓ ��via $�Q�✓ Nature and Circumstances: d�P/t: le2�l ice✓ &V02 s pi 6reA0 R) �B �NSTiCG iihl `y i/ TS ram % 67- r!✓ eve l��coa�t•add 3'� 3' A0 . % Cr� 0a4 01 Ate-4mowi 4*s v.-vex i tsca0 u 5 afr/�e �¢tOh/ t) b wa ve. A4c- Lion oo 7-34 SOX f Z,04wes,! Ds'++W AV-41 W P o loedUu� �,��-tie Controlling Operation Impact: i4aV'A 6^4iwrie. 0v1 A V&4&r, R' 37q` L'a (441. tic 4nxin 4.eJ Se, 4Z/&A-d. VO-t4c o,! iy Wj1jV64S 40e-O s A41 *ice ,w ®wv- w4 4� oAle-teAr' Prolect Cost impact: RThe estimate of the cost is: The estimate of the cost is unknown at this time. Daily records will be kept in accordance with the contract. Protect Time Impact: e estimate of the"time is: The estimate of the time is unknown at this time. Dally records will be kept in accordance with the contract. - - - , 4, efir" 9/fey /OVcknowledgerneflt of Receipt FM-04400 Rev. 419/2014 Milestone Representative Stanley, Bill From: Greg Stiens <gstiens@richmondindiana.gov> - Sent: Friday, December 14, 2018 3:51 PM To: Stanley, Bill; mprather@indot.in.gov Subject: RE: R-37463 Richmond SS [CO 10 Revised Time Extension Concrete Sewer (12-14-18)] Bill, Looks good. Please proceed with processing Change Order # 10. Greg Stiens From: Stanley, Bill[mailto:Bill.Stanley@ucindy.com] Sent: Friday, December 14, 2018 3:34 PM To: Greg Stiens <gstiens@rich mondindiana.gov>; mprather@indot.in.gov Subject: RE: R-37463 Richmond SS [CO 10 Revised Time Extension Concrete Sewer (12-14-18)] CitriX Attachments Expires January 13, 2019 R-37463 Richmond SS CO 10 Time Extensio...18).pdf 5.7 [VG Bill Stanley uses Citrix Files to share documents securely. Greg, I have revised Change. Order 10 please review. Sincerely, Bill Stanley Construction Manager United Consulting 8440 Allison Pointe Blvd., Suite 200 Indianapolis, IN 46250 Phone: 317-796-3649 Email: Bill.Stanley@ucindy.com Web: www.ucindy.com From: Greg Stiens <gstiens@richmondindiana.gov> Sent: Friday, December 14, 2018 8:18 AM To: Stanley, Bill <Bill.Stanley@ucindy.com>; mprather@indot.in.gov Subject: RE: R-37463 Richmond SS [CO 10 Time Extension Concrete (12-12-18)] Bill, The description says, "Milestone while performing common excavation on North 7`h and Fort Wayne Avenue Stanley; Bill From: Prather, Michael <mprather@indot.IN.gov> Sent: Wednesday, December 12, 2018 1:01 PM To: Stanley, Bill Cc: Greg Stiens Subject: RE: R-37463 Richmond SS [CO 10 Time Extension Concrete (12-12-18)] I concur; please process for approval within SiteManager pending comment from Greg. From: Stanley, Bill[mailto:Bill.Stanley@ucindy.com] Sent: Wednesday, December 12, 201812:56 PM To: Prather, Michael <mprather@indot.IN.gov>; Greg Stiens <gstiens@rich mondindiana.gov> Subject: R-37463 Richmond SS [CO 10 Time Extension Concrete (12-12-18)] **** This is an EXTERNAL email. Exercise caution. DO NOT open attachments or click links from unknown senders or unexpected email. **** Citrix Attachments Expires January 11, 2019 R-37463 Richmond SS CO 10 Time Extensio...18).pdf Bill Stanley uses Citrix Files to share documents securely. Mike\Greg, Please review Change Order 10 — Time Extension for Removal of Concrete Box Lids. United recommends the Change Order for approval. Sincerely, Bill Stanley Construction Manager United Consulting 8440 Allison Pointe Blvd., Suite 200 Indianapolis, IN 46250 Phone:317-796-3649 Email: Bili.Stanley(aucindy.com Web: www.ucindv.com 1