Loading...
HomeMy Public PortalAboutAddendum No. 2 to Contract No. 13-2014 - Metro - Rundell Ernstberger - Bike Path ImprovementsCONTRACT SUPPLEMENT NO.2 THIS SUPPLEMENTAL AGREEMENT, made and entered into this day of 2018, by and between RUNDELL ERNSTBERGER ASSOCIATES, INC, Indianapolis, Indiana, hereinafter referred to as the "CONSULTANT", and the City of Richmond, IN, hereinafter referred to as the "LOCAL PUBLIC AGENCY" or "LPA" WHEREAS, on February 2, 2014, the LPA entered into a Contract with the CONSULTANT for services required for development of Contract Plans for the construction of the Richmond Stellar Streets Project, Richmond, Indiana, INDOT Project Des. No. 1382810, herein after referred to as the Contract, and WHEREAS, on March 9, 2017, the LPA and the CONSULTANT agreed to amend the Contract with Contract Supplement No. 1, and WHEREAS, the LPA and the CONSULTANT have determined that an additional modification of the Contract is required to include additional compensation related to post -bid design changes, and NOW, THEREFORE, the parties agree that the Contract shall be modified by this Contract Supplement No. 2 in accordance with the following: Appendix D of the Contract shall be modified as follows: Appendix D, Section A, paragraph 1, shall be MODIFIED to read: "1. The CONSULTANT shall receive as payment for the work performed under this Contract the total fee not to exceed $782,180.00 in accordance with the . following Fee Schedule, unless a modification of the Contract is approved in writing by the LPA." Appendix D, Section A, paragraph 2, shall be MODIFIED to read- "2. The CONSULTANT will be paid for the work performed under this Contract as indicated in the following Schedule of Fees: a. Environmental Documentation, as indicated in Appendix A, Paragraph A $86,330.00 b. Field Surveying, as indicated in Appendix A, Paragraph B $81,300.00 c. Preliminary Engineering Report, as indicated in Appendix A, Paragraph C $15,000.00 d. Design and Construction Documents, as indicated in Appendix A, Para. D $565,300.00 e. IDEM Rule 5 Permit, as indicated in Appendix A, Paragraph E* $11,550.00 f. Geotechnical Investigation, as indicated in Appendix A, Paragraph F $16,830.00 g. ReimbursableExpenses** $5,870.00 (Remainder of this page left intentionally blank) Page 1 of 2 Addendum #,L to Contract No. 1 3-201 4 IN TESTIMONY WHEREOF, the parties hereto, have executed this Contract Supplement. CONSULTANT LOCAL PUBLIC AGENCY ignature re - Kevin.Osburn, President David M. Snow. Mayor (Print or type name and title) (Print or type name and title) Signature Attest: 1C4A1b �OoRE (Print or type name and title) Signature Carl Kincaid, Vice -President (Print or type name and title) Signature ��l acm (Print or type @m1e and title) Signature (Print or type name and title) W W r U K a a C3 z a J 0 z z z ¢ a RUNDELL ERNSTBEROER ASSOCIATES October 8, 2018 Mr. Greg Stiens Director of Public Works and Engineering City of Richmond Department of Metropolitan Development 50 North 5th Street Richmond, IN 47374 origin I I N D I AN APO L_I S email I realndy0reasite.eom internet I www.reasite.eom Re: Richmond Stellar Streets I LPA Consultant Agreement - Supplement No.2 Des No.: 1382810 Dear Mr. Stiens: As requested, Rundell Ernstberger Associates, Inc. is pleased to provide the following proposed modification to the LPA- Consultant Agreement for the Richmond Stellar Streets Project. Contract Supplement No.2 is for the additional work that is required to complete changes to the construction documents related to the City of Richmond's request for post -bid revisions to redesign the intersection of Main and 2W Streets as well as the northwest corner of the intersection of Main and 3rd Streets. The proposed revisions related to the Main and 2"d Streets intersection include eliminating curb extensions along 2"d Street, eliminating curb islands intheSE corner of the intersection between the cycle track and the roadway, eliminating all work on the NE corner of the intersection'and eliminating parking on the south side of Main Street between 2"d Street and 3rd Street. The proposed geometric revisions will also eliminate drainage structures 304 and 305. The proposed revisions on the northwest corner of the Main and 3rd Streets include reconstructing the sidewalk and curb ramp to meet ADA/PROWAG standards. The reconstruction of this area was not included in the original scope of the project because portions of the ramp and sidewalk are outside of the right-of-way. In an effort to eliminate work outside of the right-of-way, the City originally elected not to reconstruct this area. The City has since confirmed that they in fact own the adjacent property and want to reconstruct the sidewalk and curb ramp on this corner. The requested revisions will impact the plan & profile, construction details, layout plans, sidewalk ramp details, planting plans, pavement marking & signing details, structure data table, pipe material table and signing table plan sheets. Updates to the quantity calculations 618 EAST MARKET STREET INDIANAPOLIS, INDIANA 46202 TE [3171 263.0127 FX [3171 263.2080 L0UISVILLE OFFICE: TE [5021 531.8676 FX [5021 561.9076 Richmond Stellar Streets I LPA Consultant Agreement -Supplement No.2 I Page 2 of 2 and cost estimate will also be required. Level one design criteria, turning movement, intersection sight distance and accessibility (ADA) design computations will be reviewed. No additional pavement design, maintenance of traffic design, utility coordination, categorical exclusion or Rule 5 permit work is anticipated. After approval of the proposed revisions by the City and INDOT, all revised plan sheets and files will be uploaded to the INDOT ERMS website as part of an official Construction Change. Based on the above scope of work we have worked with our subconsultants to determine the time and effort it will take to make these changes. We propose that Appendix D of our contract be amended to reflect an additional fee of $31,800.00 for these services. The attached worksheets provide a detailed estimate of the tasks and staff hours to complete these services. We propose to invoice theseservices on an hourly basis. Attached is Contract Supplement No.2 that will modify our LPA-Consultant Agreement to include the work described above. If the terms of this supplement are agreeable to you, please sign and return one (1) copy to our office. If you have any questions or concerns regarding this proposed contract supplement, please call me. Thank you for the opportunity to work with you on this project. We look forward to hearing from you soon. Sincerely, k Kevin Osburn, ASLA Principal Attachments: Task and Staff Hour Justification Worksheets Contract Supplement No.2 , STELLAR RICHMOND STREETSI Richmond, IN Des No. 1382810 DESIGN SERVICES - Supplement #2 (Main Street and 2nd Street Intersection Redesign) RUNDELL ERNSTBERGER ASSOCIATES, Inc. DESCR/PT/ON HOURS BY CLASSIFICAT/ON Principal. Project Manager I Project LA-1 LA Tech. . CONSTRUCTION CHANGE: Revise Index Sheet & Sheet Numbers 1 1 2 Revise Roadway/Trail Layout Design, Geometrics 1 6 2 8 Review Turning Movements/Revise Geometry as Required 1 2 4 Revise Curb Ramp. Details 1 _ 2 _ 21 8 Revise Landscape Plans and Details 1 4 6 Review Grading and Pavement Marking &_Road Sign Design _ 1 _ QA/QC Review 2 4 Coordinate w/ Design Team & Combine Documents 4 2 Revise Quantities / Estimate 1 2 4 Prepare & Submit Construction Change to INDOT in ERMS 1 4 TOTAL HOURS 5 25 15 32 HOURLY RATE $ 185.00 $ 113.20 $80.241 $62.60 SUBTOTAL $925.00 $2,930.00 $1.203.601 $2,003.20 PROJECT ADMINISTRATION / MEETINGS: _ Submit Curb Ramp Details for INDOTTechnical Review 3 Owner Review _ 4 8 4 Design Team Coordination 2 6 3 TOTAL HOURS 6 17 7 0 _ HOURLY RATE $ 185.00 $ 113.20 $80.241 $62.60 SUBTOTAL $1,110.00 $1,924.40 $561.68 $.00 TOTAL FEE $10,557.88 $10,600.00 STELLAR RICHMOND STREETSI Richmond, IN Des No. 1382810 DESIGN SERVICES - Supplement.#2 (Main Street and 3rd Street NW Corner Redesign) RUNDELL ERNSTBERGER ASSOCIATES, Inc. DEWR/PUON HOURS BY CLASS/F/CAT/ON Principal lProjectManager Project LA LA Tech - CONSTRUCTION CHANGE: _ Revise Index Sheet & Sheet Numbers 0.5 0.5 Revise Roadway/Trail Layout Design, Geometrics 0.5 3 1.5 8 Review Turning Movements/Revise Geometry as Required 1 4 Revise Curb Ramp Details 0.5 2 _2 3 8 Review Grading and Pavement Marking & Road Sign Design _ 1 _ QA/QC Review 1 3 0.5 _ Coordinate w/ Design Team & Combine_ Documents 2 1 _ Revise Quantities / Estimate 1 2 2 Prepare & Submit Construction Change to INDOT in ERMS 1 0.51 41 1 TOTAL HOURS 2.51 17 11.5 22.5 HOURLY RATE $ 185.00 $ 11 3.20_ $80.241 $62.60 _ SUBTOTAL $462.50 $1,924.40 $922.761 $1.408.50 PROJECT ADMINISTRATION / MEETINGS:__ _ Submit Curb Ramp Details for INDOT Technical Review ___ 3 Owner Review 0.5 2 1 Design Team Coordination 0.5 2 1 TOTAL HOURS 1 7 2 0 HOURLY RATE $ 185.00 $ 113.20 $80.241 $62.60 SUBTOTAL $185.00 $792.40 $160.48 $.00 TOTAL FEE $5,856.04 $5,900.00 REA I Richmond Stellar Streets page 1 of 1 I72V�TEDMain Street & 2nd Street, Redesign MAN-HOUR JUSTIFICATION Stellar Richmond Streets Des. No. 1382810 Supplement No. 2 - Item No. 1 DESCRIPTION Department Manager Team Leader Senior Project Manager Project Engineer Design Engineer CARD Designer Geometric Design Review level one design criteria 0.5 1 Review tuning movements 1 3 Review intersection sight distance 1 3 Revise construction details 1 3 6 QC review I Drainage Design Review drainage design 0.5 3 Revise plan & profile 1 3 3 Revise structure data table 0.5 I 1 Revise pipe material table 0.5 1 1 QC review 1 Grading/Spot Elevation Design Review grading/spot elevation design 3 6 Revise sidewalk ramp details 1 3 9 Request INDOT ADA Committee Approval 1 3 Revisions per INDOT ADA Committee Approval 1 3 QC review I Pavement Marking & Road Sign Design Review pavement marking & road sign design 1 3 Revise pavement marking & signing details OS I 6 Revise signing table 0.5 1 1 QC review 1 Quantities & Cost Estimate Update quantity calculations and cost estimate 1 3 QC review 1 Meetings/Coordination Design Review Mtg with Client 1 6 hrs each 6 Revisions per Client Mtg 1 3 3 TOTAL HOURS 5 22 0 0 44 30 BILLING RATE $ 191.56 $ 154.54 $ 156.56 $ 112.09 $ 93.95 $ 99.89 DIRECT SALARY COST $ 957.80 1 $ 3,399.88 S - S - $ 4,133.80 S 2,996.70 S 11,488.18 TOTAL FEE $ 11,500 UNITED CONSULTING 10/5/2018 UN�� ED Main Street & 3rd Street Redesign = ConxulLLng— MAN-HOUR JUSTIFICATION Stellar Richmond Streets Des. No. 1382810 Su plement No. 2 - Item No. 2 DESCRIPTION Department Manager. Team Leader Senior -Project Manager Project Engineer Design Engineer CADD Designer Geometric Design Review level one design criteria 0.5 0.5 Review turning movements 0.5 1 Review intersection sight distance 0.5 0.5 Revise construction details 1 2 2 QC review 1 GradingtSpot Elevation Design Review grading/spot elevation design 1 2 Revise sidewalk ramp details I 2 4 Revisions per INDOT ADA Committee 0.5 1 1 QC review 1 Pavement Marking & Road Sin Design Review pavement marldng & road sign design 0.5 1 Revise pavement marking & signing details 0.5 1 1 QC review 0.5 uantities & Cost Estimate Update quantity calculations and cost estimate 0.5 1 QC review 0.5 Meetings/Coordination Design Review Mtg with Client Incl. w/ Item #1 Revisions per Client Mt 0.5 I 1 TOTAL HOURS 3 7 0 0 13 9 BILLING RATE $ 191.56 $ 154.54 $ 156.56 $ 112.09 $ 93.95 $ 99.89 DIRECT SALARY COST $ 574.68 $ 1,081.78 $ - S - $ 1,221.35 $ 899.01 $ 3,776.82 TOTAL FEE $ 3,800 UNITED CONSULTING