HomeMy Public PortalAbout12-0638 Kaminsky_1of3_ABANDONEDCITY OF TYBEE ISLAND
BUILDING PERMIT
** PROJECT ABANDONED **
DATE ISSUED: 12 -27 -2012 PERMIT #: 120638
WORK DESCRIPTION NEW RESIDENTIAL -SF * *ABANDONED **
WORK LOCATION 7 TENTH PL
OWNER NAME MYRON & FRANCES KAMINSKY
ADDRESS 7 TENTH PL
CITY, ST, ZIP TYBEE ISLAND GA 31328
PHONE NUMBER
CONTRACTOR NAME SHORELINE PROPERTIES LLC
ADDRESS 16 MORNINGSIDE DR
CITY STATE ZIP SAVANNAH GA 31410
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
2800
P
$ 250.00
PROJECT VALUATION $325,000.00
TOTAL BALANCE DUE:
�2
$ 250.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tv bee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
NN NN oftybee.org
DATE ISSUED: 12 -3 -2012
WORK DESCRIPTION
WORK LOCATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
NEW RESIDENTIAL BLDG - SF
7 TENTH PL
OWNER NAME MYRON & FRANCES KAMINSKY
ADDRESS 7 TENTH PL
CITY, ST, ZIP TYBEE ISLAND GA 31328
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING
OCCUPANC
TOTAL FEE SQUARE FO GE 0
ohabP
SHORELIN ROPERTIE
16 MORNING IDE DR
SAVANNAH A 3O
PROPERTY
PROJECT V I UAT . $325,000.00
l
PERMIT #: 120638
TOTAL BALANCE DUE: $5,347.50
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, tire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
Location:
�► (k b a.•d o r a.ci
CITY OF TYBEE ISLAND
APPLICATION FOR NEW CONSTRUCTION BUILDING PERMIT
pis
Place
NAME
ADDRESS
✓ 2 sets of building plans
1 copy of survey showing
/ ground elevations &.flood zone
V 1 copy REScheck or COMcheck
$250 plan deposit
PIN# 4- 0006- /B•0 /3
TELEPHONE
Owner
'411461.14$14-1
AAya 014 (2tif
9 (ovei P0;4 f- La N e
S•vkn m ,, 4 314a
/12. mo. 77DI
Architect
or Engineer
NO 'ows04, 41A
DAWSON hR- Chi -trcTs
tozo &rye..K woods Loop, sh I
5c01444Atq, U,j- 3i' c
alt tvSS. � rt 1
Building
Contractor
$av I S. fc, f-1
Devtlopnters1, /44.-
I (, MorA;K9 s ;cue brivt
SgvkNh,Li i 6,4 314a5
RI L• 'UA WI
Sl /ufu1JE f'k'eP6,!1 Fs
(Check all that apply) MI,. New Construction
❑ Other
Details of Project:
New ,, s •••� Rts,caAce
Residential
Single Family
❑ Duplex
❑ Multi- Family
❑ Commercial
Estimated Cost of Construction: $
3 z', ado
Construction Type (2) (Enter appropriate number)
(1) Wood Frame (4) Masonry
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use: S :Ails kuun:Lf e5(el ev, +its
Remarks:
(6) Other (please specify)
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units t # Bedrooms 5 # Bathrooms 2 `/L
Lot Area II g� tp Living space (total sq. ft.) 7. OO
# Off - street parking spaces 2 Trees located & listed on site plan ✓
Access:
Driveway 7,4 (ft.) With culvert? With swale?
Setbacks: Front to' Rear lot Sides (L) o' (R) t b'
,�
# Stories 3 Height 3't t -y Vertical distance measured from the average adjacent grade of
the building to the extreme high point of the building, exclusive of chimneys, heating units,
ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through Co,%trfG�'or
On -site waste and debris containers will be provided by C6 vttr„ c for
Construction debris will be disposed by (brt-trat, by by means of
I understand that I must comply with zoning, flood damage control, building, fire, shore protections
and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand
that the lot must be staked out and that the stakes will be inspected to ensure that the setback
requirements are met. I understand also that a certified plot plan showing elevation must be attached
to this application and that an as -built elevation certification is due as soon as the habitable floor level
is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that
surrounding property is in no way adversely affected. I accept responsibility for any corrective action
that may be necessary to restore drainage impaired by this permitted construction.
Date: I - 12- 1 Z
Signature of Applicant:
Note: A permit normally takes 7 to 10 business days to process.
Ake 7t ,04u -r,4/
The following is to be completed by City personnel:
Zoning certification NFIP Flood Zone A 6 12
Approved rezoning /variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Existing
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals:
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm/Drainage
Inspections
City Manager
Date
11.2 (0-1Z
e,L2_ck 2 2 54- 2.. S-0
acbt)'0 sq,.ft 4 go; 4t)OOQ
Permit
Inspections
Water Tap ek; s 11 s
Sewer Stub e •
Aid to Const. i 2Rr,
CC Recove
REQUIRED FOR: Building Permits
Relocation Permits
Sign Permits
Demolition Permits
Land Clearing, Disturbance or Excavation Permits
Tree Removal Permits
Relocation Permits
Special Review Permits
Site Plan Approval
Subdivision of Land
Sketch Plan Approval
Preliminary Plan Approval
Final Plat Approval
Minor Subdivision Plat Approval
Major Subdivision Plat Approval
In addition to specific requirements for the above permits and approvals, applicants must
demonstrate that they are in compliance with the City of Tybee Island Storm Water Management
requirements as outlined in Chapter 5 -4, Code of Ordinances.
Section 5 -4 -9 Prohibition provides, in part, as follows:
(4.) It is unlawful for any person to cause or permit any storm water to flow from their
property onto the property of another person, unless such storm water naturally flowed
thereon prior to any development activity.
(5.) It is unlawful for any person to interrupt the flow of any storm water runoff from
adjacent property onto their property by any development activity.
As part of the City's approval process applicants must illustrate how these storm water
management prohibitions will be met, including a showing of how storm water naturally flowed on
the affected property (prior to any development activity), and what changes in storm water flow have
occurred or are expected to occur, as attachments to this form. The City's approval or permit does not
guarantee that the applicant's plans will result in meeting requirements. The final product must
actually meet the City Ordinance requirements.
Applicant name: /4,...../..0/A
Project I.D.: /(Clvv „l 5A-7
Attachments approved by: Date:
June 30, 2010
The following deficiencies have reached an unacceptable level on the projects in the City of Tybee Island.
While the deficiencies are not necessarily the fault of the Owner or his agent, they are their responsibilities.
The two areas of deficiencies are in the two most basic and common BMPs on local projects. They are:
Co — Construction Exit
Sdl — Sediment Barrier
Correct installation information can be found not only in the "Green Book" but in the Field Manual for
Erosion and Sediment Control in Georgia, Fourth Edition 2002, 4310 Lexington Road, P.O. Box 8024,
Athens, GA 30603, telephone 706.542.3065, www.gaswcc.org, Georgia Soil and Water Conservation
Commission; http: / /www.gaswcc.org/docs/
field_manual 4ed.pdf.
Problems with the Co is not limited to the installation, but to the material. Specifically, the job site personnel
are telling me the stone delivered is the 1.5 " -3.5" stone they requested. I have experienced on my own projects
suppliers not adhering to the specs they are given with the orders. While I regret this situation, I will no longer
be accepting any deviation from the State requirements. The stone will be a representation of 1.5 " -3.5" stone
or larger. Gradations that are obviously smaller will no longer be tolerated. The smaller stone allows for a
smoother surface with smaller voids, thereby reducing the function of the construction exit.
Similarly, I am finding Type A sediment barriers installed where Type C is required and shown on the permit
drawings. I have attempted to work with the Owners through increased inspections, additional backup BMPs,
etc. This has evidently become common knowledge based on the installations I am fording. Where two rows
are called for they will be installed with a separation that allows for the first one to fail (fall over) without
impacting the second one. The complete assembly and installation must be compliant; steel or wood posts,
post spacing, Type C or A.
There has been no discharge into state waters due to previous occasional deficiencies. However, the increased
frequency has created unnecessary exposure to:
1) Sediment discharge into nearby waters of the State,
2) Increased maintenance efforts by the DPW on downstream lines.
3) Due to #2, higher cost to island taxpayers.
I will be adhering strictly to the manual on all BMPs and not just these two.
Downer Davis
City of Tybee Island Consulting Engineer
Sign
e of 0 / ontractor
CITY OF TYBEE ISLAND
BUILDING & ZONING DEPARTMENT
P.O. BOX 2749
TYBEE ISLAND, GA 31328
PHONE (912) 786 -4573
FAX (912) 786 -9539
FEMA Certification of Elevation is required for structures in a Flood Zone.
Location of Work: Lcf- 6S, f0 -11, 19'4 cf P(A/ it 4-0000-18-0(3
Owner's Name: ka m ► n S 141
Address:
Contractor's Name: ./tv 15- SLefH
This notice is to confirm our understanding that all equipment such as air conditioning compressors,
water heaters, furnaces, electrical outlets, meters, etc., are not permitted below the required finished
floor elevation.
By accepting the building permit, I (owner /contractor) agree to construct/place the equipment above
or up to the required finished floor elevation, which is stated below.
i ;'o' f M.$(r
BFE
Acknowledged and agreed to this
er / Co r actor Signature
Li.cc.-m
Owner / Contractor Printed Name
day of 1 5�= , 20 /1 .
Location of Work:
Owner's Name:
Address:
Contractor's Name:
STATE ENERGY CODE AFFIDAVIT
L04- try J f 10-t- O c"-.c
Kcov.t..sky
Lo-F) (05— to +17 p„,
Sco
This letter is to confirm the understanding of the owner / contractor to the compliance requirement of
the Georgia State Energy Code for Buildings, 2009 Edition, with Georgia Amendments.
I hereby declare that the design and construction of the above referenced project is in compliance
with the Georgia State Energy Code for Buildings, 2009 Edition, with Georgia Amendments.
A Georgia Energy Code Compliance Certificate will be required at project completion.
It is understood and agreed by the undersigned owner of agent and contractor (if applicable) that the
approval of the permit does not constitute a privilege to violate the Code and that any omission of or
misrepresentation of fact with or without intention of the permit issued which was based on the
approval of this application. The owner as listed above will be held responsible for insuring that all
permits have been obtained and that all required inspections have been made. The owner will be held
legally liable for any violations which may occur with or without his knowledge. The owner shall be
allowed to request a Certificate of Occupancy when all inspections have been approved.
Peti_54) ii/Z4 n .'f 61",'" t 1 s I Owner's Si ae Date
wner' Printed Name
' ec .i I Sc�o `-
Contractor's Printed Name
I( //5 / 12,
Date
��R O r i r i t N O '