Loading...
HomeMy Public PortalAboutAlden Rd Sheldon Rd Hazel StGregory M. St. Louis, PE Superintendent June 17, 2021 TOWN OF WATERTOWN DEPARTMENT OF PUBLIC WORKS (P) 617-972-6420 124 ORCHARD STREET (F) 617-972-6402 WATERTOWN MA 02472 BINDER COURSE PAVING CURBING AND SIDEWALK INSTALLATION Dear Resident/Abutters: Weather permitting, the Watertown Department of Public Works and our contractor Lorusso Corporation will begin the process of installing the binder course of pavement. Please do not park your vehicles within the work zone. Monday, June 21, 2021: starting on Alden Road, proceeding to Sheldon Road and Hazel Street Please note that this schedule is subject to change based on weather, availability of asphalt trucks, production, etc. It is possible for the work to be ahead of or behind schedule. Please plan accordingly. `No Parking' signs will be posted along the area selected for road work. Please do not park your car in the posted area. Parking restrictions will be strictly enforced during this phase of the work. The Watertown Police will be informed of the construction and its effects. Typical hours of construction work are from 7:00 AM to 4:00 PM. Residents of Alden Road and Sheldon Road: Please note that Belmont Street is under control of the Town of Belmont and overnight parking is not permitted. Our contractor will begin then installation of granite curbing, concrete sidewalks and concrete driveway aprons starting Tuesday, June 22, 2021 (all streets). • Granite curbing at driveways will be laid out and installed in accordance with Zoning requirements. Properties requiring driveway opening modifications have previously received letters from the Zoning Enforcement Office noting the deficiencies and proposed remedies. DPW will not make modifications to driveway openings unless approved by the Zoning Enforcement Agent. • Please do not park your car next to any areas marked in front of your residence during construction. • You will be notified by the Contractor prior to any work that affects access to your driveway. Driveways may remain closed up to three days to permit the concrete to cure. • Please note that there may be lapses in time between curbing installation, sidewalk excavation, installing wood sidewalk forms, and final concrete work. Over> • Adjustments necessary to make sidewalks and driveways ADA compliant may require minor regrading of areas beyond the back of sidewalk, such as landscaping, driveways, or walkways. The Department will match existing materials and finishes to the maximum extent possible. • Please note: Repair of damage is typically completed at the end of the project. Additional information is available at: https://www.watertowndpw.orq/191/Annual-Road-Program under "2021 Annual Road Program." Should you have any questions, please e-mail dpwdept(cwatertown-ma.gov or you may call Ed Baptista, Highway Supervisor, at 617-972.6420. Sincerely, Gregory St. Louis, P.E. Superintendent of Public Works Over>