HomeMy Public PortalAboutAlden Rd Sheldon Rd Hazel StGregory M. St. Louis, PE
Superintendent
June 17, 2021
TOWN OF WATERTOWN
DEPARTMENT OF PUBLIC WORKS (P) 617-972-6420
124 ORCHARD STREET (F) 617-972-6402
WATERTOWN MA 02472
BINDER COURSE PAVING
CURBING AND SIDEWALK INSTALLATION
Dear Resident/Abutters:
Weather permitting, the Watertown Department of Public Works and our contractor Lorusso
Corporation will begin the process of installing the binder course of pavement. Please do not park your
vehicles within the work zone.
Monday, June 21, 2021: starting on Alden Road, proceeding to Sheldon Road and Hazel Street
Please note that this schedule is subject to change based on weather, availability of asphalt trucks,
production, etc. It is possible for the work to be ahead of or behind schedule. Please plan accordingly.
`No Parking' signs will be posted along the area selected for road work. Please do not park your car in
the posted area. Parking restrictions will be strictly enforced during this phase of the work. The
Watertown Police will be informed of the construction and its effects. Typical hours of construction work
are from 7:00 AM to 4:00 PM.
Residents of Alden Road and Sheldon Road: Please note that Belmont Street is under control of the
Town of Belmont and overnight parking is not permitted.
Our contractor will begin then installation of granite curbing, concrete sidewalks and concrete driveway
aprons starting Tuesday, June 22, 2021 (all streets).
• Granite curbing at driveways will be laid out and installed in accordance with Zoning requirements.
Properties requiring driveway opening modifications have previously received letters from the Zoning
Enforcement Office noting the deficiencies and proposed remedies. DPW will not make
modifications to driveway openings unless approved by the Zoning Enforcement Agent.
• Please do not park your car next to any areas marked in front of your residence during construction.
• You will be notified by the Contractor prior to any work that affects access to your driveway.
Driveways may remain closed up to three days to permit the concrete to cure.
• Please note that there may be lapses in time between curbing installation, sidewalk excavation,
installing wood sidewalk forms, and final concrete work.
Over>
• Adjustments necessary to make sidewalks and driveways ADA compliant may require minor
regrading of areas beyond the back of sidewalk, such as landscaping, driveways, or walkways. The
Department will match existing materials and finishes to the maximum extent possible.
• Please note: Repair of damage is typically completed at the end of the project.
Additional information is available at: https://www.watertowndpw.orq/191/Annual-Road-Program under
"2021 Annual Road Program."
Should you have any questions, please e-mail dpwdept(cwatertown-ma.gov or you may call Ed Baptista,
Highway Supervisor, at 617-972.6420.
Sincerely,
Gregory St. Louis, P.E.
Superintendent of Public Works