HomeMy Public PortalAboutChange Order No. 2 to Contract No. 108-2018 - Whiteoak Construction - Downtown FaçadeChange Order PROJECT: (Name and address) Stellar Facade 631-920 E, Main Street Richmond, Indiana 47374 OWNER: (Name and address) City of Richmond Document G701 TM -2017 CONTRACT INFORMATION: Contract For: General Construction Date: ARCHITECT: (Name and address) LWC, INC Kevin McCurdy 712 East Main Street Richmond, IN 47374 CHANGE ORDER INFORMATION: Change Order Number: 002 - #820 E Main St. Date: 2/ 18/2019 CONTRACTOR: (Name and address) White Oak Construction 10967 E. US Hwy 136 Indianapolis. IN 46234 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments attributable to executed Construction Change Directives.) Engineeered Steel Support Beam for Brick Facade. 4" Columns set on structually designed concrete foortings. Does not include any architectural finish system to cover the added steel structure. This Change order includes four (4) weeks of added supervision and regional expenses. The Original RFI Date of said issue was 10-5-18. The original Contract Sum was $ 248,727.00 The net change by previously authorized Change Orders $ 0.00 The Contract Sum prior to this Change Order was $ 248,727.00 The Contract Sum will be increased by this Change Order in the amount of $ __44784f $�— The new Contract Sum including this Change Order will be $ 269,573.81 The Contract Time will be increased by Zero (0) days. The new date of Substantial Completion will be NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. LWC, Inc. ARCHITECT (Firm name) SIGNATURE White Oak Construction CONTRACTOR (Firm name) SIGNATURE Kevin McCurdy, AIA Shawn Falls, Senior Project Manager PRINTED NAME AND TITLE PRINTED NAME AND TITLE DATE 2-18-19 DATE Citv of Richmond O7,61& (Firm name) ' SI , N TU E PRINTED NAME AND TITLE DATE AIA Document G701 TM — 2017. Copyright O 1979, 1987, 2000. 2001 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This A!A" Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIAe Document, or any portion of it; may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 08:50:19 ET on 02A 8/2019 under Order No. 2769827365 which expires on 04/11/2019, and is not for resale. User Notes: (389ADA66)