HomeMy Public PortalAboutChange Order No. 2 to Contract No. 108-2018 - Whiteoak Construction - Downtown FaçadeChange Order
PROJECT: (Name and address)
Stellar Facade
631-920 E, Main Street
Richmond, Indiana 47374
OWNER: (Name and address)
City of Richmond
Document G701 TM -2017
CONTRACT INFORMATION:
Contract For: General Construction
Date:
ARCHITECT: (Name and address)
LWC, INC
Kevin McCurdy
712 East Main Street
Richmond, IN 47374
CHANGE ORDER INFORMATION:
Change Order Number: 002 - #820 E
Main St.
Date: 2/ 18/2019
CONTRACTOR: (Name and address)
White Oak Construction
10967 E. US Hwy 136
Indianapolis. IN 46234
THE CONTRACT IS CHANGED AS FOLLOWS:
(Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments
attributable to executed Construction Change Directives.)
Engineeered Steel Support Beam for Brick Facade. 4" Columns set on structually designed concrete foortings. Does not
include any architectural finish system to cover the added steel structure. This Change order includes four (4) weeks of added
supervision and regional expenses. The Original RFI Date of said issue was 10-5-18.
The original Contract Sum was $ 248,727.00
The net change by previously authorized Change Orders $ 0.00
The Contract Sum prior to this Change Order was $ 248,727.00
The Contract Sum will be increased by this Change Order in the amount of $ __44784f $�—
The new Contract Sum including this Change Order will be $ 269,573.81
The Contract Time will be increased by Zero (0) days.
The new date of Substantial Completion will be
NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract
Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the
Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
LWC, Inc.
ARCHITECT (Firm name)
SIGNATURE
White Oak Construction
CONTRACTOR (Firm name)
SIGNATURE
Kevin McCurdy, AIA Shawn Falls, Senior Project Manager
PRINTED NAME AND TITLE PRINTED NAME AND TITLE
DATE
2-18-19
DATE
Citv of Richmond
O7,61&
(Firm name)
'
SI , N TU E
PRINTED NAME AND TITLE
DATE
AIA Document G701 TM — 2017. Copyright O 1979, 1987, 2000. 2001 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This
A!A" Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIAe Document, or
any portion of it; may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This
document was produced by AIA software at 08:50:19 ET on 02A 8/2019 under Order No. 2769827365 which expires on 04/11/2019, and is not for resale.
User Notes: (389ADA66)