Loading...
HomeMy Public PortalAboutBromfield St 10AugGregory M. St. Louis, PE Superintendent August 9, 2021 TOWN OF WATERTOWN DEPARTMENT OF PUBLIC WORKS (P) 617-972-6420 124 ORCHARD STREET (F) 617-972-6402 WATERTOWN MA 02472 House By-pass Connections Bromfield Street Dear residents and abutters: Laboratory testing for water quality of the temporary water system piping has been completed. The Department is now approving activation of the temporary water line. Please be advised that Paolini Corp. will be on site beginning Tuesday, August 10 to connect each building water service to the temporary bypass system. This will utilize a hose connection to the hose bib on the outside of each structure. In order to make these connections, the contractor will need access to your basement. All of the contractor's personnel will be in full compliance with the State of Massachusetts Department of Public Health's COVID-19 guidelines with respect to social distancing and personal protective equipment. This work will take place during the contractor's working hours of 7:00 AM — 5:00 PM. If you will not be home during this time on any of the days listed, please call the contractor's number below to schedule a time outside of these hours. Contact Information Paolini Corporation Robert Keefe 617-999-9799 More information, including Frequently Asked Questions and schedule updates, can be found on the DPW website at: https://www.watertowndpw.org/218/Bromfield-Street-Water-Main-Replacement Upon completion of this task, general excavation of the water main will commence. We would like to thank you in advance for your cooperation. Aegory y questio tact the Public Works Department at (617) 972-6420. ouis, PE Superintendent