House By-pass Connections
Bromfield Street
Dear residents and abutters:
Laboratory testing for water quality of the temporary water system piping has been completed. The
Department is now approving activation of the temporary water line.
Please be advised that Paolini Corp. will be on site beginning Tuesday, August 10 to connect each
building water service to the temporary bypass system. This will utilize a hose connection to the hose bib
on the outside of each structure.
In order to make these connections, the contractor will need access to your basement. All of the
contractor's personnel will be in full compliance with the State of Massachusetts Department of Public
Health's COVID-19 guidelines with respect to social distancing and personal protective equipment.
This work will take place during the contractor's working hours of 7:00 AM — 5:00 PM. If you will not be
home during this time on any of the days listed, please call the contractor's number below to schedule a
time outside of these hours.
Contact Information
Paolini Corporation
Robert Keefe 617-999-9799
More information, including Frequently Asked Questions and schedule updates, can be found on the
DPW website at: https://www.watertowndpw.org/218/Bromfield-Street-Water-Main-Replacement
Upon completion of this task, general excavation of the water main will commence. We would like to
thank you in advance for your cooperation.